This is a solicitation for initial outfitting services at Hadnot Point. The solicitation seeks quotes for outfitting a medical treatment facility, with a response deadline of June 8, 2020 at 12:00pm Central Time. The requirement is set aside for competitive 8(a) small businesses with a NAICS code of 337127 and size standard of 500 employees. The U.S. Army Corps of Engineers Engineering District Little Rock is the contracting agency. The solicitation and attachments provide additional details on the requirement.

View the file

Other files for this federal contract opportunity

Other files attached to Hadnot Point Initial Outfitting Project, newest first.
File Type Posted
W9127S20Q6002 AMENDMENT 0002.pdf PDF
Appendix 7.12 LVS DWGS and Supplemental Cutshees.pdf PDF
W9127S20Q6002 ProjNet Report.pdf PDF
Appendix 7.6 - REVISED Bid Schedule W9127S20Q6002.xlsx XLSX spreadsheet
W9127S20Q6002 REVISED Solicitation.docx DOCX document
W9127S20Q6002 AMENDMENT 0001.pdf PDF
W9127S20Q6002 Combined Synopsis Solicitation.pdf PDF
Appendix 7.8 CID.pdf PDF
Appendix 7.6 - Price Schedule.xlsx XLSX spreadsheet
Appendix 7.7 Construction Schedule.pdf PDF
Appendix 7.4 Submittal Examples.pdf PDF
Appendix 7.11 DMLSS.pdf PDF
Appendix 7.10 Equip Plans-List-Cutsheets Compressed.pdf PDF
Appendix 7.5 - Change Tracker.xlsx XLSX spreadsheet
Appendix 7.1 Glossary.pdf PDF
Appendix 7.9 SID.pdf PDF
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WEEKLY REPORT OVERVIEW (TAB1)

PROJECT INFORMATIONCOST SUMMARYSCHEDULE SUMMARY
FY2017SCOPECOSTPROPOSEDSCHEDULEDACTUAL
PRIMARY PROJ #PF BASE BID$25,000,000PERIOD OF PERFORMANCE1200 days1300 days
PROJECT TITLE3MDG MODERNIZATIONPF OPTIONS$21,350,000PROJECT AWARD0-Jan-00
PRIMARY BLDG #D-B SUB-TOTAL:$46,350,000POP END DATE
INSTALLATIONLACKLANDIO-S SUBCLIN$1,380,000NTP
PRIMARY FAC TYPEHOSPITALIO OPTION$9,200,000IO AWARD
NEAREST CITYSAN ANTONIO TXIO SUB-TOTAL:$10,580,000ACCEPTED DESIGN0-Jan-000-Jan-000-Jan-00
DELIVERY METHODIDBIOOP-S SUBCLIN$10,000CONSTRUCT COMPLETE1-Jun-051-Jun-051-Jun-05
CONTRACT #W9126G-08-R-0188OP OPTION$250,000IO COMPLETE15-Jun-0530-Jun-0530-Jun-05
TASK ORDER #W9126G-08-D-0015OP SUBTOTAL:$260,000TRANSITION COMPLETE (OFB)30-Jun-05
AWARD DATE30-Sep-17PROPOSAL TOTAL:$57,190,000PROJECT % COMPLETE%placed
PROJECT MANAGEMENTMODSCOSTRATEACTUAL PERCENT COMPLETE%placed
PRIME CONTRACTORJones and Co.PF MODS$50,0000.11%SCOPE SUMMARY
A-E OF RECORDSmith and Co.IO-S MODS$6,0000.43%PROPOSED GSF100,000
IO CONTRACTORDavidson and CoIO MODS$32,0000.35%REVISED GSF-TOTAL50,000
A-E 3Jane and Co.OP-S SUBCLIN$1,50015.00%
CONTRACT AGENTUSACE-SWLOP MODS$22,0008.80%
FIELD AGENTUSACE-SWFMOD TOTAL:$111,5000.19%
CUSTOMERAFMSA/HFOCONTRACT TOTAL + MODS:$57,301,500
PROJECT BREAKDOWN
*BUILDING #100101102103104CHANGE REQUESTS (CR)EST COST
PROJECT TYPEADDADALADALNEWRPLPF CR$25,000
BUILDING CLASSHOSPCLINICPHARMWAREVETIO-S CR$1,800
FUNDING SOURCEMILCONSRMOPUMCSRMIO CR$15,000
*BOLD=Primary Facility #OP-S CR$0
OP CR$0
CR TOTALS:$41,800
POTENTIAL CHANGES (PC)EST COST
PF PC$5,000
IO PC$0
OP PC$0
PC TOTALS:$5,000

&"-,Bold"WEEKLY REPORT (TAB 1-OVERVIEW) PROJECT REPORT DATE: &KFF0000XXXX

&"System Font,Regular"&10&KFF0000FY19 IDBIO MATOC (REVISED: 1 JAN 19) &P

TEMPLATE

WEEKLY REPORT-COSTS (TAB2)

AWARD AMOUNTCLIN #AWARD DATEPERF PERIODNSFGSFPF ($)IO-S ($)IO ($)OP-S($)OP ($)DESCRIPTION (DB/IO/OP)FFE JSN SUMMARY (REFER TO INSTRUCTIONS IN 01 10 11 ADMINISTRATIVE, CHANGE MANAGEMENT PROCESS)PRCL REPORT DATE:REFER TO INSTRUCTIONS IN 01 10 11 ADMINISTRATIVE, CHANGE MANAGEMENT PROCESS
BASE BID000130 SEP 121200500,00070,000$25,000,000$750,000$5,000,000$0DB: Inpat Pych AddJSNJSN NOMENCLATUREA. CONTRACTOR'S PROPOSAL PRICEB. SUBMITTAL 1 UPDATESC. SUBMITTAL 2 UPDATESD. ACCEPTED DESIGN UPDATES
SUBCLIN0002$5,000,000$150,000$1,000,000$800,000IO-TRAW COSTEXTEND COSTTAXESGCCOST ($) PER EACH JSNQTY REQ'D BY SOLICITATIONTOTAL ($) COSTS1 QTYRAW COSTEXTEND COSTTAXESGCTOTAL ($) per Each JSNTOTAL ($) COSTCommentsS2 QTYRAW COSTEXTEND COSTTAXESGCTOTAL ($) per Each JSNTOTAL ($) COSTCommentsCF QTYRAW COSTEXTEND COSTTAXESGCTOTAL ($) per Each JSNTOTAL ($) COSTComments
ADD/OPT 10003$500,000$15,000$100,000$1,200,000IO-C$0.00$0.00$0.00$0.00$0.00
ADD/OPT 20004$15,000,000$450,000$3,000,000$0OP: MRI
ADD/OPT 30005$500,000$15,000$100,000$0New Vet Clinic
ADD/OPT 40006$350,000$0$0$0IO-Vet Clinic
TOTALS:$46,350,000$1,380,000$9,200,000$2,000,000
IO RATE (%)2.98%19.85%21.74%
MODS#AWARD DATEEST ADJ POPADJ NSFADJ GSFD-B ($)IO-T ($)IO-C ($)OP ($)DESCRIPTION (DB/IO/OP)
MOD 100011 DEC 130001800$350,000$10,500$70,000$0DB: Add DTR
MOD 200021 FEB 14$55,000$1,650$11,000$0DB:add manhole at site
MOD 300031 MAR 14$0$10,000$0$100,000IO: upgrade pharm robot
MOD TOTAL:$405,000$12,150$81,000$0
MOD RATE (%)0.87%0.88%0.88%0.00%
PENDING CHANGE REQUESTS#RFP RECV’D DATEEST ADJ POPEST ADJ NSFEST ADJ GSFD-B ($)IO-T ($)IO-C ($)OP ($)DESCRIPTION (DB/IO/OP)
CR 1000115 NOV 1315$25,000$0$0$0DB: Upgrade lab finishes
CR 200025 JAN 13$0$5,000$100,000$0OP: add JSN to Radiology
CR TOTAL:$25,000$5,000$100,000$0
EXPOSURE RATE (%)0.05%0.01%0.22%0.00%
POTENTIAL CHANGESRISK #ID DATEEST ADJ POPEST ADJ NSFEST ADJ GSFD-B ($)IO-T ($)IO-C ($)OP ($)DESCRIPTION (DB/IO/OP)
PC 1000115 NOV 1315$25,000$0$0$0OP: Add monitors
PC 200025 JAN 13$0$5,000$100,000$0DB: delete casework$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
PC TOTAL:$25,000$5,000$100,000$0Difference between DS1 Review & Original Pricing$0.00Difference between DS2 Review & Original Pricing$0.00Difference between CF Review & Original Pricing$0.00
EXPOSURE RATE (%)45.45%9.09%181.82%0.00%
CURRENT AWARDED TOTAL ($) (include base and awarded options and modifications
PENDING AWARDED TOTAL ($) (unawarded CLIN's and Modifications)
CURRENT & PENDING TOTAL$0$0$0$0

&"-,Bold"WEEKLY REPORT (TAB 2-COST) PROJECT REPORT DATE: &KFF0000XXXX

&"Calibri (Body)_x0000_,Regular"&KFF0000FY19 IDBIO MATOC (REVISED: 1 JAN 19)&"-,Regular"&K01+000 &P

TEMPLATE

WEEKLY REPORT-SCHEDULE (TAB3)

Activity#Proposed Schedule (preaward)Master Schedule (post award submission)Actual (Revised)
Contract Award1
Notice-to-Proceed2
Project Kick-Off Meeting3
Pre-Charrette (Scope Validation) Meeting4
Site Investigation Meetings/Surveys5
Existing Inventory (RPIE/PP) Meeting/Surveys6
Charrette7
Submittal 18
Submittal 1: Resolution Conference9
Progress Update: Presentation10
Progress Update: Report11
Submittal 212
Submittal 2: Resolution Conference13
Award IO Contract Options14
Award OP Contract Actions15
Construction Kick-Off (Demo & TPF Const.)16
Construction Kick-off (Main Project)17
Commissioning Kick-Off (Construction Phase)18
Cx: BAS/DDC Control Coordination Meeting19
Phase 1: (Identify work areas: i.e. TOPA, Dental Clinic, Parking Lot, etc.)
Phase 1 - Precon20
Phase 1 - Demo Start21
Phase 1 - Construction End22
Phase 1 - Commissioning Start23
Phase 1 - Punchout Inspection24
Phase 1 - Prefinal Inspection (Facility)25
Phase 1 - Final Inspection (Facility)26
Phase 1 - Construction Complete27
Phase 1 - Transition Planning Meetings Begin28
Phase 1 - Final Transition Plan Documents Due29
Phase 1 - Prefinal Inspection (RPIE/PP)30
Phase 1 - Department Move Dates (Start/End)31
Phase 1 - Final Cleaning32
Phase 1 - Final Acceptance (RPIE/PP)33
Phase 1 - Open for Business34
Phase 1 - Record Docs & Closeout35
Phase 2: (Identify work areas: i.e. TOPA, Dental Clinic, Parking Lot, etc.)
Phase 2 - [same as above]36
Phase X - (to be continued as above)37
Total Project - Final Commissioning38
Total Project - Final Inspection/Warranty39
Total Project - Final Acceptance40

IDBIO MATOC &"-,Bold"WEEKLY REPORT (TAB 3-SCHEDULE) PROJECT REPORT DATE: &KFF0000XXXXX

&"Calibri (Body)_x0000_,Regular"&KFF0000FY19 IDBIO MATOC (REVISED: 1 JAN 19) &P

TEMPLATE

WEEKLY REPORT-SCOPE(TAB4)

SCOPE (update following the submission of EACH Submittal)
BLDG #DEPT/ SYSTEMCLASSIFICATIONTYPELEVEL OF RENOGSFDESIGN $CONSTRUCTION $IO $OP $COST/SF
PROPOSED

Allison Keck: DROP DOWN MENU: hospital, clinic, warehouse, vet, lab, morgue, garage, pharmacy

REVISED
Allison Keck: DROP DOWN MENU: hospital, clinic, warehouse, vet, lab, morgue, garage, pharmacyPROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

PROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

D REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

PROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

PROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

PROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

PROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

PROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

PROPOSED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

REVISED

Allison Keck: DROP DOWN MENU: ADD (addition) , ALT (alteration), NEW (new), RPL (replacement) or ADAL (addition & alteration)

CLINIC
LAB
WAREHOUSE

&"-,Bold"WEEKLY REPORT (TAB 4-SCOPE) PROJECT REPORT DATE:&KFF0000 XXXXX

&"Calibri (Body)_x0000_,Regular"&KFF0000FY19 IDBIO MATOC (REVISED: 1 JAN 19) &P

TEMPLATE

WEEKLY REPORT-RISK (TAB5)

RISKS (Note:Chronicle each risk on a weekly basi. Formal time/cost notification must be accomplished via FAR Clause)
#Date EnteredRiskPlan to Minimize RiskCurrent StatusPlanned Resolution DateActual Date ResolvedEst Impact to Critical Path (Days)Est Impact to CostRisk Type (Owner/Contractor)"Level of Risk” (R/G/Y)
1R
2G
3Y
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Total$-

IDBIO MATOC &"-,Bold"WEEKLY REPORT (TAB 5-RISK) WEEKLY REPORT DATE: &KFF0000XXXX&K01+000_x000D_

&"Calibri (Body)_x0000_,Regular"&KFF0000FY19 IDBIO MATOC (REVISED: 1 JAN 19)

TEMPLATE

WEEKLY REPORT-PDT DISTRO (TAB6)

NOTE: REQUIREMENTS/CELLS HIGHLIGHTED IN RED ARE NOT REQUIRED ON PROJECTS WITH A CCL LESS THAN $12M
CORE PROJECT DELIVERY TEAM & DISTRIBUTION LISTNOTE: all hard copy drawings are half-sized
PROJECT: TemplateCONTRACT #:SUBMITTALS (Design, FFE-LVS, Precon, Construction, Closeout)
#AGENCYNAMEOFFICEROLE/ POSITIONADDRESSE-MAILPHONEInvites / Minutes / CorresSubmittal #1Progress Update: PresentationProgress Update: ReportSubmittal #2Final Construction DocumentsSID/CID Boards/BindersMTF Project and Departmental BindersASI'sConstruction Submittals / Shop Dwgs
#ElectElectHard CopyElectHard CopyElectHard CopyElectHard CopyElectHard CopyElectHard Copy (Binders)ElectHard Copy (Binders)ElectHard CopyElectHard Copy
1USACEUSACE-SWLProject ManagerOffice:
Cell:1111111111
2USACEUSACE-SWLACOOffice:
Cell:211111111
3USACEUSACE-SWLProject Engineer / Civil EngineerOffice:
Cell:311111111
4USACE (Local)USACE-SPKCOR/Project EngineerOffice:
Cell:41111111111111112
5USACE (Local)USACE-SPKQuality Assurance (QA) Evaluatorsee aboveOffice:
Cell:51
6AFMSAHFD/SG8FProject Health Facilities Officer
(Primary)ATTN: Yadi Ramirez Peterson AFMSA/SG8F,

Health Facilities Division, 601 Davy Crockett Rd, Suite 100,

San Antonio, TX 7822661
7AFMSAHFD/SG8FProject Health Facilities Officer
(Secondary)71
8AFMSAMaj Marcus BooneHFD/SG8FChief, Design and ConstructionRE: Yadi Ramirez-Peterson abovemarcus.b.boone.mil@mail.mil81
9AFMSAMaj Charlie StevensHFD/SG8FChief, Initial Outfitting & TransitionRE: Yadi Ramirez-Peterson abovecharlie.d.stevens.mil@mail.mil91
10AF MDGFacility ManagerOffice:
Cell:1011311 HC
2 Dwg11 HC
2 Dwg11 HC
2 Dwg11 HC
2 Dwg1111 HC
2 Dwg1
11AE-3Sr Project Manager11122222222222111
12BASE CEProject Manager12111
13BASE CEFire Chief1311111111
14BASE CEAsst. Chief of Fire Prevention14
EXTENDED PROJECT DELIVERY TEAM SUPPORT
15USACEUSACE-SWLMedical Program Manager15
16USACEUSACE-SWLAlternate ACO16
17USACEUSACE-SWLContracting Officer17
18USACEUSACE-SWLContract Specialistsee above181
19USACE (LOCAL)USACE-SPKResident Engineer19
20AFMSAMs. Yadi Ramirez-PetersonHFD/SG8FOffice ManagerATTN: Yadi Ramirez Peterson AFMSA/SG8F,

Health Facilities Division, 601 Davy Crockett Rd, Suite 100,

San Antonio, TX 78226yadira.p.ramirez-peterson.ctr@mail.mil210-925-14862012 (CDs)2 Drwg1(via email or AMRDEC)01(via email or AMRDEC)02(CDs)2 Drwg12 Drwg1 Cd)1001(Cd)2 Drwg10
21AFMSALT Col Eric GreenHFD/SG8FChief, Planning Design and ConstructionRE: Yadi Ramirez-Peterson aboveeric.a.green.mil@mail.mil22
24AFMSAAFMSA HFD Comm Team (Christine Toscano)HFD/SG8FCommunication and Electronic
Cybersecurity Engineer TeamRE: Yadi Ramirez-Peterson aboveusaf.jbsa.afmsa.list.afmsa-comm-team@mail.mil210-925-1610
210-925-2014 210-925-1391241
25AFMSACynthia MillerDHA Facilities DivisionInterior DesignRE: Yadi Ramirez-Peterson abovecynthia.j.miller45.ctr@mail.mil210-925-1485251
26AFMSAKaren SamsonDHA Facilities DivisionInterior DesignRE: Yadi Ramirez-Peterson abovekaren.samson.stl@gmail.com314-239-1004261
27AFMSASharon RobertsHFD/SG8FCertified Healthcare Facility

Design Professional (HFDP)

Sr. MEP EngineerRE: Yadi Ramirez-Peterson abovesharon.y.roberts.ctr@mail.mil210-925-2298
210-846-1331 cell271
28AFMSADon NapieralaHFD/SG8FProgram Director, Biomedical SystemsRE: Yadi Ramirez-Peterson abovedonald.j.napierala.ctr@mail.mil210-925-1601
210-452-0186 cell281
29AFMSASean OsborneHFD/SG8FInitial Outfitting Equipment PlannerRE: Yadi Ramirez-Peterson abovesean.m.osborne3.ctr@mail.mil291
30AFMSAJeff HouseHFD/SG8FInitial Outfitting Equipment PlannerRE: Yadi Ramirez-Peterson abovejeffrey.l.house6.ctr@mail.mil301
31AFMSAGeri GaramiHFD/SG8FInitial Outfitting and Transition Manager19776 Nugget Ave,
Bend, OR 97702geri.garami@gmail.com925-594-0481311111111
32AFMSAValentin FernandezHFD/SG8FSenior Design Support (Architecture)RE: Yadi Ramirez-Peterson abovevalentin.m.fernandez.ctr@mail.mil210-925-1481321
33AFMSAOrlando PalaciosHFD/SG8FMechanical EngineerRE: Yadi Ramirez-Peterson aboveorlando.x.palacios.ctr@mail.mil210-559-5005331
34DHADHA HITEngineering & Design TeamAttention To: Scott James

Engineering, Design, and Deployment Branch Infrastructure and Operations Division 2720 Howitzer Rd, Bldg. 2372 JBSA Fort Sam Houston, TX 78234-5087 dha.jbsa.health-it.list.io-edd-pie-ie-milcon@mail.mil Email Correspondence

Only341111111
35DHADHA HITDeployment TeamAttention To: Kevin O'Hara/Stephanie Dean

Engineering, Design, and Deployment Branch Infrastructure and Operations Division 3515 S General McMullen, Suite 1023 JBSA Lackland, TX 78236-1025 dha.jbsa.j-6.list.hit-lan-wlan-depmgt@mail.mil Email Correspondence

Only351111111
36AF DECSBill Basden D.D.S.USAF Dental Evaluation & Consultation Service (DECS)Civilian National Consultant to the Surgeon General for Facility Standards and Design3698 Chambers Pass STE B
JBSA Fort Sam Houston TX 78234-7767james.w.basden.civ@mail.milOffice: (210) 539-7011

DSN: 389-7011

Cell: (325) 374-1913361111111
37AF MDGLogistics CCEmail Correspondence Only37111111111
38AF MDGMDSS/CCEmail Correspondence Only381
39AF MDGDental Flight ChiefEmail Correspondence Only39111111111
40AF MDGDental FlightEmail Correspondence Only40
41AF MDGMedical IT ChiefEmail Correspondence Only41
42AF MDGBioenvironmentalEmail Correspondence Only42111111111
43SFS/ATOAnti-TerrorismEmail Correspondence Only431111111
44BASE COMMBase Comm Representative44
45BASE COMMBase Comm Representative45
46BASE CEEnvironmental Chief461111111
47BASE CEChief Engineer47
48BASE CEDeputy BCE48111111111111
49BASE CEEngineering PM49
50BASE CEO&M COR50
51BASE CECommunications51
GENERAL CONTRACTOR
52Project ManagerO:
C:52
53DBIO Program ManagerO:
C:53
54Construction Division ManagerO:
C:54
55Project SchedulerO:
C:55
56Project Coordinator
Assistant Project SchedulerO:
C:56
57Contract OfficerO:
C:57
58Site SuperintendentO:
C:58
59QA / QCO:
C:59
60SafetyO:
C:60
61Contractor's Commissioning SpecialistO:
C:61
62Mechanical Operations Directorsee aboveO:
C:62
DESIGN TEAM
ARCHITECT & TEAM
63Architect of RecordO:
C:63
64Architect's Project ManagerO:
C:64
65Health Facility PlannerO:65
66Design QA /QCO:66
67Team LeadO:67
68DesignerO:68
69SID Interior DesignO:69
STRUCTURAL ENGINEERING
70Structural EngineerO:70
CIVIL - SITE - LANDSCAPE ENGINEERING
71Civil EngineerO:71
INITITAL OUTFITTING - I/O
72Team Lead
RPIE/PP Project ManagerO:
C:72
73Medical Equipment Plannersee aboveO:73
74CID Interior Designersee aboveO:74
75Transition Plannersee aboveO:75
76Art PMsee aboveO:76
77Wayfinding Consultantsee aboveO:77
MECHANICAL ENGINEERING
75Principle in Charge/ MechanicalO:
C:75
76Assoc. Project Manager / Team Leadsee aboveO:
C:76
ELECTRICAL ENGINEERING
77Project Engineer - ElectricalO:
C:77
FIRE PROTECTION ENGINEERING
78Fire Protection EngineerO:
C:78
RCDD
79Information Transport Systems
Data. Voice, Security, Audio, Visual79
COMMISSIONING AGENT
80Team LeadO:80
81Commissioning Agentsee aboveO:81

IDBIO MATOC 4.0 &"-,Bold"WEEKLY REPORT (TAB 6-PDT DISTRIBUTION LIST) PROJECT REPORT DATE:&KFF0000 XXXX

Version: 9 May 2017 PDT Members may be updated if required by any PDT member throughout the project. &P mailto:sharon.y.roberts.ctr@mail.milmailto:marcus.b.boone.mil@mail.milmailto:geri.garami@gmail.commailto:cynthia.j.miller45.ctr@mail.milmailto:orlando.x.palacios.ctr@mail.milmailto:eric.a.green.mil@mail.milmailto:usaf.jbsa.afmsa.list.afmsa-comm-team@mail.milmailto:donald.j.napierala.ctr@mail.milmailto:karen.samson.stl@gmail.commailto:yadira.p.ramirez-peterson.ctr@mail.milmailto:charlie.d.stevens.mil@mail.milmailto:jeffrey.l.house6.ctr@mail.milmailto:sean.m.osborne3.ctr@mail.milmailto:valentin.m.fernandez.ctr@mail.milmailto:james.w.basden.civ@mail.mil

RFI LOG (TAB7)

Project Name
RFI #Date SentResponse NeededLevel of Importance Low/Med/HighDate AnsweredDate ClosedSubjectInformation RequestedGovt. Response

TEMPLATE

SUBMITTAL REGISTER (TAB 8)

NOTES:
1This document is considered Preliminary and is included as part of the RFP. The Contractor is required to update this list with all submittals required in the Contract unless directed otherwise.
2Refer to DIV 01 GENERAL REQUIREMENTS, 01 10 12 ADMINISTRATIVE for submittal classification definitions
3Provide samples of material if sample was not provided during design development and included in design submittals
4Submittals referenced below under the Division/Section found in the contract, shall be located under the appropriate specification section (not the contract section) in the final submittal register.
5Comply with the Submittal Requirements outlined in the UFGS (Reference WBDG).
Legend:
DORDesigner of RecordAction Legend:
A-E33rd Party A-E; Government Technical Consultant/RepresentativeAApproved as submitted
USACEU.S. Army Corps of Engineers - Little Rock DistrictBApproved, except as noted on attached comment sheet. Resubmission NOT required.
QAEQuality Assurance EngineerCApproved, except as noted on attached comment sheet. Resubmission required.
POService Project OfficerEDisapproved (see attached comment sheet). Resubmission required.
MTFMedical Treatment FacilityFReceipt acknowledged (FIO submittals only)
DADesigner of Record ApprovedFxDisagree with contractor's certified compliance
CRConformance Review
GAGovernment Approved Submittal
DAICRDesigner of Record Approval and Conformance Review
DA/GADesigner of Record and Government Approval
FIOFor Information Only
N/RNot Required
DESIGN-BUILD SUBMITTAL REGISTERTITLE AND LOCATION: FY-- Facility Repair/Air Base name, USADATE: day/month/yearNOTES
Reference: ER 415-1-10 Contractor Submittal ProceduresCONTRACTOR: Restricted/Unrestricted Industry PartnerCONTRACT NO:XXXX
ACTIVITY #TRANSMITTAL #ITEM #DIVISION/ SECTIONDESCRIPTION OF SUBMITTALTYPE OF SUBMITTALCLASSIFICATION (per JCH)REVIEWERCONTRACTOR SCHEDULE DATESCONTRACTOR ACTIONGOVERNMENT ACTIONDISTRIBUTION
OFFICE /NAMESUBMITAL NEEDED BYREVIEW NEEDED BYMATERIAL NEEDED BYCODEAGENT RECEIVED DATECODEAGENT RETURN DATEDORAGENT PMA-E3USACE-COR/QAEPROJECT OFFICERMTFBASE
See Legend
01 10 10STATEMENT OF WORK
Temporary Phasing Facilities SubmittalsDESIGNCR
01 10 11CRITERIA
List of Updated CriteriaCRITERIACR
01 10 12ADMINISTRATIVE
Agendas, Meeting Minutes & Written RecordsADMINISTRATIVECR
Weekly ReportSADMINISTRATIVECR
Request for Information (RFI)ADMINISTRATIVECR
Architectural Supplemental Information (ASI)ADMINISTRATIVEGA
Document AmendmentsADMINISTRATIVEGA
Submittal Register (all Project Phases)ADMINISTRATIVEGA
01 10 13DESIGN AFTER AWARD
PROJECT KICK-OFFDESIGNCR
SITE INVESTIGATION SURVEYDESIGNCR
EXISTING INVENTORY (RPIE/PP)DESIGNCR
PRECHARRETTE (VALIDATE SCOPE)DESIGNCR
Contractor Key-Personnel ResumesDESIGNCR
CHARRETTE (DESIGN DEVELOPMENT)DESIGNCR
Site Investigation ReportsDESIGNCR
Existing Inventory List (RPIE/PP)DESIGNCR
SpecificationsDESIGNCR
Drawings:DESIGNCR
Site PlanDESIGNCR
Floor PlansDESIGNCR
Roof PlanDESIGNCR
Exterior ElevationsDESIGNCR
Building SectionsDESIGNCR
Reflective Ceiling PlansDESIGNCR
Enlarged Floor PlansDESIGNCR
Room Typical PlansDESIGNCR
Door SchedulesDESIGNCR
Wall Partition Types & Rated AssembliesDESIGNCR
Structural DrawingsDESIGNCR
Mechanical DrawingsDESIGNCR
Plumbing DrawingsDESIGNCR
Electrical DrawingsDESIGNCR
Program For Design (Current/Updated)DESIGNCR
Project Room Contents (PRC Current/Updated)DESIGNCR
Transition Plan (Preliminary Info)DESIGNCR
Early Design & Construction Phase PackagesDESIGNCR
SUBMITTAL 1: DESIGNDESIGNCR
Program for DesignDESIGNCR
RPIE/PP and CES Inventory ListDESIGNCR
Existing Conditions and Baseline ReportsDESIGNCR
Civil-SiteDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
LandscapingDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
ArchitecturalDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Structural-SeismicDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Sustainability (Refer to UFC 4-510-01 and UFC 1-200-02)DESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Fire Protection and Life SafetyDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Furniture, Fixtures, EquipmentDESIGNCR
NarrativesDESIGNCR
Price Schedule-IO and OP SummaryDESIGNCR
Price Schedule-FFE JSN SummaryDESIGNCR
Project Room Contents (PRC Current/Updated)DESIGNCR
Communications and Electronic Systems ListDESIGNCR
Existing Inventory List (RPIE/PP)DESIGNCR
Manufacturer Product Specs/Cut SheetsDESIGNCR
MTF Supplied FFE-LVS ListDESIGNCR
DrawingsDESIGNCR
Binders (MTF and Departmental)DESIGNCR
Interstitial Building Systmes (IBS) - Refer to UFC 4-510-01DESIGNCR
MechancicalDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
CutsheetsDESIGNCR
PlumbingDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
CutsheetsDESIGNCR
ElectricalDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
CalculationsDESIGNCR
CutsheetsDESIGNCR
Communications and Electronic SystemsDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
CalculationsDESIGNCR
SpecificationsDESIGNCR
CutsheetsDESIGNCR
AccessibilityDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Electronic Security SystemsDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
CutsheetsDESIGNCR
CybersecurityDESIGNCR
NarrativesDESIGNCR
Facility Related Control Systems List (FRCS)DESIGNCR
Anti-Terrorism & Force Protection (ATFP) - Refer to UFC RequirementsDESIGNCR
NarrativesDESIGNCR
DESIGNCR
Transportation and LogisticsDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Structural Interior Design (SID), Wayfinding, SignageDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
ColorboardsDESIGNCR
Comprehensive Interior Design (CID)DESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
Cut SheetsDESIGNCR
Color BoardsDESIGNCR
Attic Stock and Spare Parts ListDESIGNCR
Material & Spare Parts ListDESIGNCR
DESIGNCR
Commissioning - Refer to 01 10 15 Spec SectionDESIGNCR
DESIGNCR
Food ServiceDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
TransitionDESIGNCR
Transition Plan -Narratives/PlansDESIGNCR
Department Activity ScheduleDESIGNCR
Master Move ScheduleDESIGNCR
RPIE/PP Training ScheduleDESIGNCR
RPIE/PP Testing & Certification ScheduleDESIGNCR
Public Relations PlanDESIGNCR
Department Move SpreadsheetDESIGNCR
Transition Lessons Learned SurveyDESIGNCR
Temporary Facilities - Refer to UFCs for additional submittal requirementsDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Project ScheduleDESIGNCR
Utility Shutdown Schedule Matrix (Preliminary)DESIGNCR
Presentation SlidesDESIGNCR
World-Class ChecklistDESIGNCR
PROGRESS REPORT: PRESENTATIONDESIGNCR
Main Presentation & Decision BriefDESIGNCR
Department PresentationsDESIGNCR
Mock-Ups: InteriorDESIGNCR
Mock-Ups: ExteriorDESIGNCR
DESIGNCR
PROGRESS UPDATE: REPORTDESIGNCR
AttendanceDESIGNCR
PDT ExpectationsDESIGNCR
Resolution of ProjNet CommentsDESIGNCR
Significant scope refinements for all disciplines (including RPIE/PP)DESIGNCR
Block/Floor PlansDESIGNCR
Project ScheduleDESIGNCR
Phasing & TransitionDESIGNCR
CommissioningDESIGNCR
Document recommendations, key findings, and decision points from the main presentationDESIGNCR
Current/updated PRC (refer to 01 10 10 SOW, PRC section)DESIGNCR
Current RPIE/PP Cut sheets and Product LiteratureDESIGNCR
Current typicalsDESIGNCR
Current CESDESIGNCR
Key constraints and milestones and move sequencing related to the Transition PlanDESIGNCR
SUBMITTAL 2: FINAL CONSTRUCTION DOCUMENTSDESIGNCR
Program for DesignDESIGNCR
RPIE/PP and CES Inventory ListDESIGNCR
Existing Conditions and Baseline ReportsDESIGNCR
Civil-SiteDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
LandscapingDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
ArchitecturalDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
Structural-SeismicDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Sustainability (Refer to UFC 4-510-01 and UFC 1-200-02)DESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
Fire Protection and Life SafetyDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
DESIGNCR
Furniture, Fixtures, EquipmentDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
Binders (MTF and Departmental)DESIGNCR
SpecificationsDESIGNCR
Interstitial Building Systmes (IBS) - Refer to UFC 4-510-01DESIGNCR
MechancicalDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
CutsheetsDESIGNCR
PlumbingDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
CutsheetsDESIGNCR
SpecificationsDESIGNCR
ElectricalDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
CalculationsDESIGNCR
CutsheetsDESIGNCR
Communications and Electronic SystemsDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
CalculationsDESIGNCR
SpecificationsDESIGNCR
CutsheetsDESIGNCR
SpecificationsDESIGNCR
AccessibilityDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
Electronic Security SystemsDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
CutsheetsDESIGNCR
CybersecurityDESIGNCR
NarrativesDESIGNCR
Facility Related Control Systems List (FRCS)DESIGNCR
Anti-Terrorism & Force Protection (ATFP) - Refer to UFC RequirementsDESIGNCR
NarrativesDESIGNCR
DESIGNCR
Transportation and LogisticsDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
Structural Interior Design (SID), Wayfinding, SignageDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
ColorboardsDESIGNCR
SpecificationsDESIGNCR
Comprehensive Interior Design (CID)DESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
Cut SheetsDESIGNCR
Color BoardsDESIGNCR
Attic Stock and Spare Parts ListDESIGNCR
Material & Spare Parts ListDESIGNCR
DESIGNCR
Commissioning - Refer to 01 10 15 Spec SectionDESIGNCR
SpecificationsDESIGNCR
DESIGNCR
Food ServiceDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
TransitionDESIGNCR
Transition Plan -Narratives/PlansDESIGNCR
Department Activity ScheduleDESIGNCR
Master Move ScheduleDESIGNCR
RPIE/PP Training ScheduleDESIGNCR
RPIE/PP Testing & Certification ScheduleDESIGNCR
Public Relations PlanDESIGNCR
Department Move SpreadsheetDESIGNCR
Transition Lessons Learned SurveyDESIGNCR
Temporary Facilities - Refer to UFCs for additional submittal requirements & USACE Master Guide TemplateDESIGNCR
NarrativesDESIGNCR
DrawingsDESIGNCR
SpecificationsDESIGNCR
Project ScheduleDESIGNCR
Utility Shutdown Schedule Matrix (Preliminary)DESIGNCR
Presentation SlidesDESIGNCR
World-Class ChecklistDESIGNCR
01 10 14CONSTRUCTION
PRECONSTRUCTION SUBMITTALS:PRECONSTRUCTION
Environmental Protection PlanPRECONSTRUCTIONGA
Interim Life Safety PlansPRECONSTRUCTIONGA
Utility Shutdown Schedule MatrixPRECONSTRUCTIONGA
Quality Control PlanPRECONSTRUCTIONGA
Micro Work PlansPRECONSTRUCTIONGA
Accident Prevention PlanPRECONSTRUCTIONGA
Contractor Key PersonnelPRECONSTRUCTIONGA
PermitsPRECONSTRUCTIONGA
Construction Submittal RegisterPRECONSTRUCTIONGA
Plans Required by the InstallationPRECONSTRUCTIONGA
Site Logistics PlanPRECONSTRUCTIONGA
Commissioning PlanPRECONSTRUCTIONGA
Demolition Work PlanPRECONSTRUCTIONGA
Infection Control Risk Assessment (ICRA)PRECONSTRUCTIONGA
Interim Smoke Management PlansPRECONSTRUCTIONGA
Health & Safety PlanPRECONSTRUCTIONGA
Indoor Air Quality PlanPRECONSTRUCTIONGA
CONSTRUCTION SUBMITTALS:CONSTRUCTIONGA
Transition PlanCONSTRUCTIONGA
Cybersecurity PlanCONSTRUCTIONGA
CommissioningCONSTRUCTIONGA
Statement of ConditionsCONSTRUCTIONGA
Utility Shutdown MatrixCONSTRUCTIONGA
Shop Drawings & Other Submittals (Refer to 01 10 12 Admin, Submittal Register and Technical Specs (Div 02-33)CONSTRUCTIONGA
DMLSS Data Entry InformationCONSTRUCTION
01 10 15COMMISSIONING
Design Phase Submittals:COMMISSIONING
OPRCOMMISSIONINGCR
Commissioning SpecsCOMMISSIONINGCR
Commissioning Design Review & ReportCOMMISSIONINGCR
Commissioning PlanCOMMISSIONINGGA
Prefunctional Checklist TemplatesCOMMISSIONINGCR
Functional Performance Testing TemplatesCOMMISSIONINGCR
BAS/DDC Contol Integration & CoordinationCOMMISSIONINGCR
Issue Tracking LogCOMMISSIONINGCR
Construction Phase SubmittalsCOMMISSIONING
Commissioning PlanCOMMISSIONINGGA
Commissioning Schedule & PhasingCOMMISSIONINGCR
Construction Submittal Review ReportCOMMISSIONINGCR
Construction On-Site/Field Observation ReportCOMMISSIONINGCR
BAS and DDC Coordination MeetingsCOMMISSIONINGCR
Startup ReportsCOMMISSIONINGCR
Building System Certifications & Testing RecordsCOMMISSIONINGCR
PreFunctional ChecklistsCOMMISSIONINGCR
Functional Performance Testing TemplatesCOMMISSIONINGCR
Readiness Verfication ReportCOMMISSIONINGCR
TAB Verification ReportCOMMISSIONINGCR
FPT Testing ReportsCOMMISSIONINGCR
Supplemental Design Document & AsBuilt UpdatesCOMMISSIONINGGA
Trending LogsCOMMISSIONINGCR
O&M ManualsCOMMISSIONINGGA
O&M TrainingCOMMISSIONINGGA
Closeout & Warranty PhaseCOMMISSIONINGGA
OPRCOMMISSIONINGGA
Final Commissioning Report & System ManualCOMMISSIONINGGA
Cybersecurity RMFCOMMISSIONINGGA
Post Construction SubmittalsCOMMISSIONING
Commissioning ReportCOMMISSIONINGGA
Lessons Learned Workshop & ReportCOMMISSIONINGCR
01 10 16CLOSEOUT & WARRANTY
Inspection, Acceptance and Closeout PlanCLOSEOUTGA
Inspection DocumentationCLOSEOUTGA
O&M DataCLOSEOUTGA
Closeout ScheduleCLOSEOUTGA
Sustainability ReportsCLOSEOUTGA
Commissioning ReportsCLOSEOUTGA
RPIE/PP & CES & TransitionCLOSEOUTGA
Real Property Listing (RPIE)CLOSEOUTGA
Record Documents & As-BuiltsCLOSEOUTGA
Control sequences and diagramsCLOSEOUTGA
Transfer and Acceptance of Military Real Property (DD Form & AF Forms)CLOSEOUTGA
Closeout Documentation - Record DocumentsCLOSEOUTGA
RPIE/PP & CES & Transition DocumentationCLOSEOUTGA
Room IdentifierCLOSEOUTFIO
InventoriesCLOSEOUTGA
Contractor Furnished Contractor Installed Equipment (CF/CI)CLOSEOUTGA
Government Furnished Contractor Installed Equipment (GF/CI)CLOSEOUTGA
Attic StockCLOSEOUTGA
PhotographsCLOSEOUTFIO
01 10 17SCHEDULE
Contractor Proposed ScheduleSCHEDULEGA
Design-Project ScheduleSCHEDULEGA
Pre-Charrette Schedule (Preliminary)SCHEDULEGA
Submittal 1 Schedule (Initial)SCHEDULEGA
Submittal 2 Schedule (Final)SCHEDULEGA
Construction Project SchedulesSCHEDULEGA
Transition SchedulesSCHEDULEGA
3-Week Look Ahead SchedulesSCHEDULEGA
Closeout & Warranty ScheduleSCHEDULEGA
Monthly Update SchedulesSCHEDULEGA
01 10 18QUALITY CONTROL
Quality Control PlanQUALITYGA
Design Quality Control PlanQUALITYGA
01 10 19SAFETY
Refer to EM 385-1-1 Safety & Health RequirementsSAFETYGA
01 10 20ENVIRONMENTAL PROTECTION
Environmental Protection PlanENVIRONMENTALGA
01 10 21TEMPORARY CONSTRUCTION FACILITIES
Construction Site PlanTEMP FACILITIESGA
Backflow Preventers CertificateTEMP FACILITIESCR
Backflow Tester CertificateTEMP FACILITIESCR
Backflow Prevention Training CertificateTEMP FACILITIESCR
Traffic control planTEMP FACILITIESGA
Electrical/communications connection plan/details;TEMP FACILITIESGA
Water/waste connection plan/detailsTEMP FACILITIESGA
Product data, as requiredTEMP FACILITIESFIO
Construction and Safety Signs: Elevations, graphics, installation detailsTEMP FACILITIESGA
Test Reports: Backflow Preventer Tests;TEMP FACILITIESCR
Backflow Tester Certification;TEMP FACILITIESCR
Backflow Preventers Certificate of Full Approval;TEMP FACILITIESCR
DIV 02EXISTING CONDITIONS
024116Structure DemolitionDESIGN / PRECONCR
024119Selective DemolitionDESIGN / PRECONCR
DIV 03CONCRETE
33300Architectural ConcreteSamplesCR
34500Precast Architectural ConcreteSamplesCR
Exterior wallsMock upGA
Mix DesignGA
DIV 04MASONRY
Visible prefinished Unit masonrySamplesCR
Exterior wallsMock upGA
DIV 05METALS
Visible finished metal finishesSamplesCR
DIV 06WOOD, PLASTICS, AND COMPOSITES
64113Wood Veneer faced Architectural CabinetsSamples of finishNote 3
64116Plastic Laminate Faced Architectural CabinetsSamples of finishCR
64216Flush wood panelingSamplesCR
64219Plastic laminate faced wood panelingSamplesCR
64400Ornamental WoodworkSample of finishCR
Panelling Interior wallMock upCR
06 41 16Plastic Laminate CabinetsShop DrawingsCR
DIV 07THERMAL AND MOISTURE PROTECTION
74113.16Standing Seam Metal RoofSample of roof/finishCR
074213.19Insulated Metal Wall PanelsSample of panel/finishCR
074213.53Metal Soffit PanelsSample of panel/finishCR
074616Aluminum SidingSample of panel/finishCR
074619Steel SidingSample of panel/finishCR
Exterior WallsMock upGA
Hydraulic Cement - Qualification DataCONSTRUCTIONDA
07 27 00Building Air Barrier System (Sheet & Fluid Applied)CONSTRUCTION
Test ReportsCONSTRUCTIONDA
Final Acceptance TestsCONSTRUCTIONDA
Qualifications of InstallersCONSTRUCTIONGA
Shop DrawingsCONSTRUCTIONDA
WarrantiesCONSTRUCTIONGA
Record DrawingsCONSTRUCTIONGA
07 81 00Spray Applied FireproofingCONSTRUCTION
Product DataCONSTRUCTIONFIO
Inspector ReportsCONSTRUCTIONDA
Qualifications of Qualified Lead InstallerCONSTRUCTIONGA
Certifications: Surface Preparation Report & Manufacturer’s Inspection ReportCONSTRUCTIONFIO
WarrantiesCONSTRUCTIONGA
07 84 00Fire StoppingCONSTRUCTION
Product DataCONSTRUCTIONFIO
Inspector ReportsCONSTRUCTIONDA
Qualifications of Qualified Lead InstallerCONSTRUCTIONGA
Qualifications of InspectorCONSTRUCTIONDA
WarrantiesCONSTRUCTIONGA
DIV 08OPENINGS
All prefinished door materialSamplesCR
81000All finished metal systemsSamplesCR
Aluminum Framed Entrances and Storefronts - SamplesCR
88000Glass and GlazingSamplesCR
Exterior/Interior wallsMock upGA
08 10 00DoorsCR
08 71 00DOOR HARDWARECR
DIV 09FINISHES
All finish materialSamplesCR
09 67 23.14Chemical Resistive Resinous Flooring
Product DataCONSTRUCTIONFIO
GA– Product SamplesCONSTRUCTIONCR
Test ReportsCONSTRUCTIONDA
Final Acceptance TestsCONSTRUCTIONCR
Qualifications of InstallersCONSTRUCTIONGA
WarrantiesCONSTRUCTIONGA
DIV 10SPECIALTIESCONSTRUCTION
All specialty materialsCONSTRUCTIONCR
Wall and Door ProtectionCONSTRUCTIONCR
Window TreatmentsCONSTRUCTIONCR
Signage & WayfindingCONSTRUCTIONCR
Cubicle Curtains & TracksCONSTRUCTIONCR
10 41 63ELECTRONIC MESSAGE SIGNAGECONSTRUCTIONCR
Product Literature that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Qualifications of installers and inspectorsCONSTRUCTIONGA
Warranty informationCONSTRUCTIONGA
Joint Interoperability Test Command (JTIC) Approval DocumentationCONSTRUCTIONDA
Contact Information for Repair Technician or Emergency Repair CompanyCONSTRUCTIONCR
10 28 00TOILET, BATH, AND LAUNDRY ACCESSORIESCONSTRUCTION
Product Literature that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
10 44 16FIRE EXTINGUISHERSCONSTRUCTIONCR
10 50 00STORAGE SPECIALTIESCONSTRUCTIONCR
10 51 00LOCKERSCONSTRUCTIONCR
DIV 11EQUIPMENTCONSTRUCTION
11 20 00COMMERCIAL EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 22 13VAULT EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 28 00OFFICE EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
CONSTRUCTION
11 30 00RESIDENTIAL EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 41 00FOODSERVICE STORAGE EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 42 00FOOD PREPARATION EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTION
11 43 00FOOD DELIVERY CARTS AND CONVEYORSCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 44 00FOOD COOKING EQUIPMENT GeneralCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 46 00FOOD DISPENSING EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 48 00FOODSERVICE CLEANING AND DISPOSAL EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 53 00LABORATORY EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
CONSTRUCTION
11 53 23LABORATORY REFRIGERATORS & FREEZERSCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 67 00RECREATIONAL EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 71 00STERILIZING EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Shop drawings showing size, quantity, and location of systems to be installed in projectCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 72 00EXAMINATION AND TREATMENT EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 73 00PATIENT CARE EQUIPMENTCONSTRUCTION
[Product Literature that includes manufacturers’ installation instructions, sizing, options, utility requirements and accessories being provided.]CONSTRUCTIONCR
[Warranty information.]CONSTRUCTIONGA
[Joint Interoperability Test Command (JTIC) Approval Documentation.]CONSTRUCTIONCR
[Contact Information for Repair Technician or Emergency Repair Company]CONSTRUCTIONCR
[Qualifications of installers and inspectors.]CONSTRUCTIONCR
[Specification Compliance Document]CONSTRUCTIONCR
11 73 20POINT OF USE SYSTEMSCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 74 00DENTAL EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 75 00OPTICAL EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 76 00OPERATING ROOM EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 77 00RADIOLOGY EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Shop drawings showing size, quantity, and location of systems to be installed in projectCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 78 00MORTUARY EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 79 00THERAPY EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 80 00FACILITY MAINTENANCE AND OPERATION EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 81 00FACILITY MAINTENANCE EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
Warranty informationCONSTRUCTIONGA
11 82 00SOLID WASTE HANDLING EQUIPMENTCONSTRUCTION
[Product Literature that includes manufacturers’ installation instructions, sizing, options, utility requirements and accessories being provided.]CONSTRUCTIONCR
[Warranty information.]CONSTRUCTIONGA
[Joint Interoperability Test Command (JTIC) Approval Documentation.]CONSTRUCTIONCR
[Contact Information for Repair Technician or Emergency Repair Company]CONSTRUCTIONCR
[Qualifications of installers and inspectors.]CONSTRUCTIONCR
[Specification Compliance Document]CONSTRUCTIONCR
11 94 00VETERINARY EQUIPMENTCONSTRUCTION
Product Data that shall include manufacturers’ installation instructions, sizing, options, utility requirements and accessories being providedCONSTRUCTIONCR
11 73 13PATIENT BED SYSTEMSCONSTRUCTION
[Product Literature that includes manufacturers’ installation instructions, sizing, options, utility requirements and accessories being provided.]CONSTRUCTIONCR
[Warranty information.]CONSTRUCTIONGA
[Joint Interoperability Test Command (JTIC) Approval Documentation.]CONSTRUCTIONCR
[Contact Information for Repair Technician or Emergency Repair Company]CONSTRUCTIONCR
[Qualifications of installers and inspectors.]CONSTRUCTIONCR
[Specification Compliance Document]CONSTRUCTIONCR
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION
DIV 12FURNISHINGSCONSTRUCTION

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .