Appendix 2 - CSD-1 Checklist.pdf

PDF 537 KB Posted

Attached to
Boiler Testing and Tune-Up Service
Contract number
505CAP-M27-AD271154-01
Issued by
Wisconsin

About this file

This document is a CSD-1 Checklist, specifically Appendix 2 for RFB #AD271154 regarding Annual Boiler Testing and Tune-Up Services. The checklist is associated with Detroit Stoker Co. and is designed for use in Wisconsin, as indicated by the Wisconsin Boiler Registration Tag field at the top of the form. The document serves as an inspection and verification sheet for boiler burner installation and operation.

The checklist comprehensively documents all inspection activities required for annual boiler testing and tune-up services, including verification of burner installation and operation, field piping and electrical work, draft fan operation, and combustion analysis. The form captures detailed inspection points across multiple categories: operating limit trips (low water cutout, high boiler pressure), safety limits and interlocks for both gas and oil burners (pressure switches, fan interlocks, air flow verification), flame failure detection systems, gas and oil valve leak tests, and oil gun positioning. Each inspection item includes fields for setpoint values, BMS (Building Management System) indications, responsible technician identification, and completion dates. The checklist requires sign-off by the service provider and customer representative, with final certification by Detroit Stoker Co., ensuring comprehensive documentation and accountability for all annual boiler maintenance activities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix 2 - CSD-1 Checklist

RFB #AD271154

Annual Boiler Testing and Tune-Up Services

Jerome Jansen DFD Text Box Wisconsin Boiler Registration Tag_________________

File details come from the government source that posted it. Updated .