About this file
This is a bidding document package for the Windsor Readiness Center Backup Battery project, a state and local contract opportunity involving the Colorado Army National Guard and the Department of Military and Veteran's Affairs. The project encompasses the installation of a battery energy storage system (BESS) and solar photovoltaic (PV) generation system at the Windsor Readiness Center located at 3172 5 Great Western Drive, Windsor, Colorado 80550. The facility is a military training and readiness center with multiple functional areas including classrooms, administrative offices, maintenance facilities, and specialized training spaces. The proposed location for the battery backup system is in Mechanical/Electrical Room B101, as indicated on the floor plan. The bidding documents include detailed product specifications, electrical load calculations, and interconnection plans for integrating renewable energy and backup power capabilities into the existing facility infrastructure.
The technical specifications detail two primary system components: a Sol-Ark 60K-3P-480V commercial hybrid inverter system capable of 60 kilowatts continuous output with three-phase 480-volt capability, and an L3 Series Limitless Lithium battery energy storage system offering multiple configuration options ranging from 40.96 to 61.44 kilowatt-hours of usable capacity. The Sol-Ark inverter features transformerless design, 15-millisecond backup transfer time, integrated four-channel MPPT charge controllers, and modular scalability up to 600 kilowatts with support for DC and AC coupling. The L3 battery system utilizes lithium iron phosphate chemistry with integrated controls, 200-amp transfer relays, and round-trip efficiency of 94 percent. Both systems include ten-year warranties and certifications including UL 1741, UL 1973, and UL 9540 standards. The existing PV generator system was completed as-built in July 2018, with power panels installed in Room C108 due to space constraints, and the documentation references interconnection with the facility's existing electrical infrastructure through multiple distribution panels and automatic transfer switches.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sol-Ark LLC | Sales: (972) 575-8875 ext. 1, sales@sol-ark.com | Support: (972) 575-8875 ext. 2, support@sol-ark. com | SK150-0015 Rev. 10
Commercial: 60K-3P-480V
Perfect for Large Industrial AC/DC Coupling Capability Modular & Scalable Energy Seamless Backup Power
Simplifies adding energy storage to small commercial buildings.
Enables seamless integration with existing grid-tied PV systems.
Modular and flexible design allows for easy installation and expansion.
Helps meet your corporate renewable energy goals and decarbonization efforts.
Native 277/480V 3P output with Wye or Delta options simplifies installation, removing the need for external transformers.
Allows for efficient DC coupling using the integrated 4x channel MPPT charge controller.
Accommodates a range of system sizes with outputs starting from 60kW going to 600kW.
Blazing fast 15ms transfer time with 200A grid relay allows for business continuity during grid outages.
Commercial: 60K-3P-480V
Sol-Ark Commercial Energy Solutions
Mounting cleat for easy installation
2x Integrated locking PV disconnect
WiFi or Ethernet monitoring via MySolArk
Outdoor-rated to NEMA 3R
Sol-Ark LLC | Sales: (972) 575-8875 ext. 1, sales@sol-ark.com | Support: (972) 575-8875 ext. 2, support@sol-ark. com | SK150-0015 Rev. 10
DATASHEET 60K-480V SKU: 60K-3P-480V
60K-3P-480V C&I Hybrid Inverter
Input Data (PV)
Max. Allowed PV Power (STC) 78,000W
MPPT Voltage Range 150-850V
Startup Voltage 180V
Max. Input Voltage 1 1,000V
Max. operating input current per MPPT 36A
Max. short circuit current per MPPT 55A
No. of MPP Trackers 4
No. of PV Strings per MPPT 2
Max. AC Coupled Input 60,000W
Output Data (AC)
Nominal AC Voltage (3Φ) 2 277/480V (4-wire Wye) or 480V (3-wire Delta)
Grid Frequency 50 / 60Hz
Real Power, max continuous (3Φ) 60,000W
Max. Output Current 72.3A
Peak Apparent Power (10s, off-grid, 3Φ) 90,000VA
Max. Grid Passthrough Current (10min) 200A
Continuous Grid Passthrough Current 180A
Power Factor Output Range +/- 0.8 adjustable
Backup Transfer Time 15ms (adjustable)
CEC Efficiency 96.5%
Max Efficiency 97.5%
Design (DC to AC) Transformerless DC
Stackable Up to 10 in parallel
Battery Input Data (DC)
Supported Battery Chemistry Lithium-ion
No. of Battery Inputs 2
Battery Input Terminal Rating 50A
Nominal DC Voltage ≥ 600V
Operating Voltage Range 160 - 700V
Battery Capacity Range 50 — 9900Ah
Max. Battery Charge / Discharge Current 100A (50A per input)
Charge Controller Type CC/CV - BMS Controlled
Grid to Battery Charging Efficiency 96.0%
Automatic Generator Start (AGS) 2 Wire Start - Integrated
BMS Communication 3 CAN (Controller Area Network)
General Data
Dimensions (H x W x D) 894 x 528 x 295 mm (35.2 x 20.8 x 11.6 in)
Weight 80 Kg / 176 lb.
Enclosure IP65 / NEMA 3R
Operating Temperature -40 – 60°C, >45°C Derating
Operating Altitude 4 2000 m (6561 ft)
Noise Level @ 1m < 30 dB @ 25°C (77°F)
Idle Consumption - No Load 60W
Communication and Monitoring Wi-Fi & LAN Hardware Included
Warranty 10 Years
Category
Certifications and Listings (Grid Support Interactive Inverter)
UL 1741-2021 (UL1741SB), CSA C22.2 No 107.1-16, IEEE 1547-2018 & 1547a-2020 & 1547.1-2020 (SRD V2.0), UL 1741 CRD-PCS, UL1699B, CEC, SGIP, CSIP
PV DC Disconnect Switch — NEC 240.15 Integrated
Ground Fault Detection — NEC 690.5 Integrated
PV Rapid Shutdown Control — NEC 690.12 Integrated
PV Arc Fault Detection — NEC 690.11 Integrated
PV Input Lightning Protection Integrated
PV String Input Reverse Polarity Protection Integrated
Surge Protection DC Type II / AC Type III
1 See the Installation Manual for details on sizing array strings. Highest input voltage is based on the open-circuit voltage of the array at minimum design temperature.
2 Does not support corner grounded delta, high leg delta, or 240V delta systems. Consult the installation manual or solark.com for details.
3 Active BMS communication is required for all lithium batteries. See solark.com for list of compatible battery partners.
4 Derating occurs above 2000 m (6561 ft).
Sol-Ark reserves the right to modify specifications at any time, and without prior notice. See sol-ark.com for the latest information.
https://www.sol-ark.com/solar-installers/knowledge-hub/ https://www.sol-ark.com/solar-installers/battery-partners/ https://www.sol-ark.com/solar-installers/knowledge-hub/
Sol-Ark LLC | Sales: (972) 575-8875 ext. 1, sales@sol-ark.com | Support: (972) 575-8875 ext. 2, support@sol-ark.com PS-00020 Rev. 12
L3 BESS: 208V Outdoor and Indoor
Modular Solutions Efficient and Flexible Scalable and Cost Effective Innovative
L3 HV-40: Stack up to 10 inverters / 160 battery cabinets for 300kWac / 6.4MWh
Increase business uptime and reliability with industry leading backup power.
Maximize ROI with industry-leading cost per kWh.
Integrated controls, 200A transfer relays, AC and DC coupling.
L3 HVR-60: Stack up to 6 inverters / 36 battery cabinets for 180kWac / 2.2MWh
Reduce utility demand charges with integrated peak shaving control.
Reduce wiring costs and integrate electric vehicle charging stations using the GEN port.
Reduce installation costs with built-in module and cabinet fire suppression.
Sell excess energy back to the grid or participate in DER programs.
Combine renewable energy sources.
Integrated 4-channel MPPTs allow maximum charging efficiency.
Outdoor BESS IP55 rated
Indoor BESS IP20 rated
Sol-Ark LLC | Sales: (972) 575-8875 ext. 1, sales@sol-ark.com | Support: (972) 575-8875 ext. 2, support@sol-ark.com PS-00020 Rev 12
| L3 Series Limitless Lithium Battery Energy Storage System
208V Options Battery Energy Storage System Outdoor Indoor Battery Model Name:
ESS Model Name:
Sol-Ark Product SKU:
L3 HVR-60
L3 HVR-60KWH-30K
L3-HVR-60KWH
L3 HV-40
L3 HV-40KWH-30K
L3-HV-40KWH
System Data
Compatible Inverter Model Sol-Ark 30K-3P-208V
Cell Chemistry Lithium Iron Phosphate
Nameplate Energy Capacity (DC) 61.44 kWh 40.96 kWh
Usable Energy Capacity (DC) 1 55.30 kWh 36.86 kWh
Built-In DC Disconnect Rating 200A
Internal Fuse Rating 160A
Max. # Battery Units Per Inverter 6 16
Max. # Inverters in Parallel 6 10
Recommend Depth of Discharge 90%
Roundtrip Efficiency Charge/Discharge (DC) 94% (25C, 0.5C)
System Nominal Voltage (DC) 307V 410V
System Operating Voltage (DC) 294V — 336V 392V — 448V
Battery Pack Internal Configuration 6s2p 8s1p
Charge/Discharge Current (DC) 2
• Recommend 100A 50A
• Max. Continuous 100A
• Peak Discharge (60 sec @ 25ºC) 125A
Battery Max. Continuous Charge/Discharge Power (DC) 61.44kW 40.96kW
ESS Max. Continuous Charge/Discharge Power (AC) 30kW
Fault Current Contribution per Battery 4,200A / 1.47ms
Mechanical Specifications
Product Dimensions (WxDxH) 76x107x226 cm (30x42x89 in) 58x58x163 cm (23x23x64 in)
Net Weight 950 kg (2,095 lbs) 628 kg (1,384 lbs)
Mounting Type Outdoor Enclosure Freestanding Rack Mount
Material and Finish Steel — Corrosion Resistant Powder Coat Steel — Powder Coated
Operating Temperature3 and Humidity -20°C — 50°C (-4°F — 122°F) — 5%—85% RH 4°C — 43°C (40°F — 110°F) — 5%—85% RH
Operating Altitude 4 3000m (9,843 ft)
Storage Conditions 5 -4ºF — 95ºF — Up to 85% RH (non-condensing) and State of Charge (SOC) 30%
Ingress Rating IP55 (NEMA 3R) IP20 (NEMA 1)
Noise Level @ 1m 75 dBA at 30°C (86°F) < 40 dBA at 30°C (86°F)
Seismic Mounting Up to Category F
Communication Ports CAN2.0/RS485
Battery Module Specifications
Battery Module Nominal Energy Capacity 5.12kWh
Battery Module Nominal Voltage and Capacity 51.2V / 100Ah
Terminal Type Amphenol SurLok – Push Lock Connector
Warranty and Certification
Performance Warranty 6 10 years or 196MWh Throughput 10 years or 130MWh Throughput
Product Warranty 10 Years
Certifications UL1973, UL9540, UL9540a, UN38.3, FCC, Prop 65
1. DC usable energy, test conditions: 90% DOD, 0.3C charge and discharge at 25ºC. System usable energy may vary due to system configuration parameters.
2. Output current is affected by battery temperature and SOC.
3. Temperature is based on the average cell temperature measured by the BMS. Charging is disabled below 0°C (32ºF). Derating occurs above 45°C (113ºF). Contact Sol-Ark for outdoor sites.
4. Battery will operate at a maximum 1C charge/discharge up to 2000m, above 2000m maximum output is derated to 0.8C, contact Sol-Ark for details.
5. Storage temperature of the battery with no charge or discharge
6. EOL (End of Life) 70% retained capacity. See L3 Series warranty document for details.
Sol-Ark has a policy of continuous improvement and reserves the right to modify its specifications at any time and without prior notice. Please visit sol-ark.com for the latest information.
143014301430
DD
HHH
VENT HOODS
W/ DAMPER CONTROL
OPTIONAL
D
C C C
C H
D D
D D
D C
C
D
D
C
G G
G
D
C
D
DHIN
HOUT
D
CWICWO
H
C
FD
FD
A201
A201 D1
A1
ASSEMBLY HALL
B105
LOBBY / MAIN HALL
C117
KITCHEN
C104
CLASSROOM
C114
MECH
C107
MDF
C108 RECRUITING
C113
LEARNING CENTER
C109
UNIT STORAGE
B107
CORRIDOR
B106
VAULT
B103
VAULT
B102
DIST.
B104
TABLE & CHAIR
STOR.
C105
CONTROLLED
WASTE
A103
LOCKER ROOM
B100
MECH/ELEC
B101
MAINT. & STOR.
B111
SUPPLY OFFICE
B110
UNIT LEVEL
MAINTENANCE
TRAINING
A100
SUPPLY
A104
FLAM MTLS.
A102
OFFICE / LIBRARY
A110
TOOLS
A108
CORRIDOR
A107
AUDIO/VISUAL
STORAGE
C112
TRAINING AID
STORAGE
C115
READINESS NCO
C134
VESTIBULE
C116
ELEC
B108
VESTIBULE
C118
MEN'S
C119
CONFERENCE
C129
FAMILY READINESS
C130 ADMIN NCO
C132
1ST SGT
C136
COMMANDER
C137
ADMINISTRATION
C133RECY. / PRINT
C131
BREAK
C128
CLASSROOM
C111
JAN.
C122
SCULLERY
C100
OFFICE
C101
JAN
C102
DRY STORAGE
C103
A201 C1
B1 A301
A1 A302
A1 A302
B3 A302
B3 A302
D4 A302
D4 A302
D2 A302
D1 A302
B1 A302
B2 A302
A5 A321
WASH BAY
D1 A301
C4 A301
C4 A301
EXECUTIVE
OFFICER
C135
A1 A301
A1
A301JAN
A109
A201 B1
A2 A322
A3 A323
A2 A324
A2 A325
A3 A325
A203 A1
ELEC
C106
A203 C3
CORRIDOR
C127
2 3 4 6
A
B
C
F
E
G
H
J
K
5 12
15 16
8 9 11101
STORAGE
C104A
FITNESS
C126
WOMEN'S
C124
2'
- 4
4"
4"
4"
4'
- 0
2'
- 4
9" 20' - 9" 40' - 8" 34' - 8" 53' - 8" 29' - 4" 56' - 8" 33' - 8" 36' - 2" 20' - 4" 9' - 0" 28' - 0" 1' - 6"
21' - 6" 75' - 4" 139' - 8" 128' - 8"
365' - 2"
2'
- 8
8"
4"
4"
4"
4"
4"
21' - 6" 40' - 8" 34' - 8" 126' - 1 1/4"
236' - 6"
D
4"
122' - 8"
4"
8"
8"
8"
21' - 0" 34' - 4"
10' - 4" 34' - 4"
19' - 8"
CONTRACTOR TO DETERMINE
SIDEWALK/LANDSCAPE LOCATIONS
FROM CAD FILE, TYP.
B1 A301
B1 A301
B3 A302
B3 A302
EQUIPMENT
PLATFORM
B200
A
B
P
LO
T
D A
TE
A
P R
O
JE
C T
IN
FO
R M
A
TI
O N
S H
EE
T
IN
FO
R M
A
TI
O N
P R
O
JE
C T
P H
A S
E A
R C
H
IT
EC
T
S
EA
L
REVISIONS
ISSUE DATE:
CHECKED BY:
DRAWN BY:
RB+B PN:
Architects, Inc.
C O
N S
U
LT
A N
T
T - 970.484.0117 F - 970.484.0264
315 East Mountain Ave Suite 100 Fort Collins, CO 80524-2913
© 2009 www.rbbarchitects.com
B
C
D
A
B
C
D
1 2 3 4 5
2 3 4
7/
/2
3:
0 0 :1
PM
G
R
EA
T W
ES
TE
R N
D R
IV
E W
IN
D
S O
R
C O
A101
LEVEL ONE FLOOR PLAN
W
IN
D S
O R
R
EA
D
IN
ES
S
C
EN
TE
R
C O
LO
R A D
O A
R M
Y N
A
TI
O N
A L
G U
A R D
DY/KF
ESM
CONSTRUCTION
DOCUMENTS
July 20, 2011
1/16" = 1'-0" A1
FLOOR PLAN
N
EQUIPMENT PLATFORM
NO DESCRIPTION DATE
VOL. 1 - 97 of 151
Proposed Location of Battery Backup System
1633706057.NFG
Text Box Mech/Elec Room B101
1633706057.NFG
Line
Department of Military and Veteran's Affairs
Colorado Army National Guard Windsor
Readiness Center PV-Generator System
PN080580
Curtis Hansen
AS BUILT 7/2018
UP
Curtis Hansen
*PANELS SPH AND SPL INSTALLED IN
RM C108 DUE TO SPACE LIMITATIONS
UP
Panel SPH
Curtis Hansen Panel SPL
Curtis Hansen
XFMR
TLSB &
TSPL
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
SPL
Curtis Hansen
Curtis Hansen
Curtis Hansen
SPH
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
SPARE JUNCTION BOX AND
CONDUIT FROM MSB TO SPH
FEEDER CONDUIT FROM HE TO SPH
Generator status and output ATS 1 kW, kWh, Amps ATS 2 kW, kWh, Amps smart panel status (2) smart panel load (2) GPM controller failure status GPM inverter limiting status
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen
Curtis Hansen x
Curtis Hansen x
Curtis Hansen x
Curtis Hansen x
Curtis Hansen x
Curtis Hansen x
Curtis Hansen *CT’s ARE LOCATED ON GENERATOR OUTPUT CONDUCTORS
**METER MOUNTED TO ATS ‘HE’
SPD
10,000
DESCRIPTION
C112/C113 Rcpt (New)
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Space
Space
Space
Space
Space
Space
TOTAL
TOTAL
LOAD
DESIGN
AMP
AIC
/ 208
L
VOLT
A MAIN CB
R
M
A
E
T|S|O
M|A|E|H
KVA
AMPS
PHASE
PANEL
GROUND BUS
100% NEUTRAL BUS
PHASE
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
LOADS IN
VOLT-AMPERES
50.0
SPL
KVA
AMPS
AMPS
L
WIRE SERVICE
R
CONNECTED
DESIGN
DEMAND
SPARE
M
A
E
SURFACE MOUNTED
T|S|O
M|A|E|H DESCRIPTION
Spare
Spare
Spare
Spare
Spare
Space
Space
Space
Space
Space
TOTAL
KVA
KVA
KVA
KVA
SPD
14,000
DESCRIPTION
Area A Exterior Ltg
Area B Exterior Ltg
Area C Exterior Ltg
Area A Em Ltg
Area C Em Ltg
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Space
Space
Space
Space
Space
Space
TOTAL
TOTAL
LOAD
DESIGN
SPARE
AMP
AIC
/ 480
L
VOLT
MAIN LUGS ONLY
R
16.0
19.3
M
A
E
T|S|O
M|A|E|H
KVA
AMPS
PHASE
D.F.
PANEL
GROUND BUS
100% NEUTRAL BUS
PHASE
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
LOADS IN
VOLT-AMPERES
18.7
22.5
60.0
37.5
HE
KVA
AMPS
AMPS
AMPS
L
WIRE SERVICE
R
CONNECTED
DESIGN
DEMAND
SPARE
S
S
S
M
A
E
SURFACE MOUNTED
T|S|O
M|A|E|H
2960.0
3653.0
1000.0
DESCRIPTION
TRANSFORMER
TE
Area B Em Ltg
PV CONNECTION BRKR
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Space
Space
Space
TOTAL
18.7
49.9
18.7
31.2
KVA
KVA
KVA
KVA
10,000
DESCRIPTION
FACP
C116 Door Locks
LCPA
Spare
Spare
Spare
Spare
Spare
TOTAL
TOTAL
LOAD
DESIGN
SPARE
AMP
AIC
/ 208
L
VOLT
A MAIN CB
R
5.0
8.4
E
E
E
M
A
E
T|S|O
M|A|E|H
KVA
AMPS
PHASE
PANEL
GROUND BUS
100% NEUTRAL BUS
PHASE
A
B
C
A
B
C
A
B
C
A
B
C
LOADS IN
VOLT-AMPERES
5.0
13.9
50.0
36.1
LE
KVA
AMPS
AMPS
AMPS
L
WIRE SERVICE
R
CONNECTED
DESIGN
DEMAND
SPARE
E
E
M
A
E
SURFACE MOUNTED
T|S|O
M|A|E|H
DESCRIPTION
MNS Power Supply
B104 - Door Locks
LCPB
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
TOTAL
5.0
18.0
5.0
13.0
KVA
KVA
KVA
KVA
C112/C113 Rcpt (New)
C112/C113 Rcpt (New)
C112/C113 Rcpt (New)
Spare
Spare
Spare
Space
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
SPD
14,000
DESCRIPTION
C111/C114 Lighting
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Spare
Space
Space
Space
Space
Space
Space
TOTAL
TOTAL
LOAD
DESIGN
AMP
AIC
/ 480
L
VOLT
A MAIN CB
R
10.2
M
A
E
T|S|O
M|A|E|H
KVA
AMPS
PHASE
PANEL
GROUND BUS
100% NEUTRAL BUS
PHASE
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
A
B
C
LOADS IN
VOLT-AMPERES
60.0
SPH
KVA
AMPS
AMPS
L
WIRE SERVICE
R
CONNECTED
DESIGN
DEMAND
SPARE
M
A
E
SURFACE MOUNTED
T|S|O
M|A|E|H DESCRIPTION
Spare
Spare
Spare
Spare
Spare
Space
Space
TOTAL
KVA
KVA
KVA
KVA
Corridor Lighting
Restroom Lighting
Spare
Spare
Spare
Space
XFMR
Spare
Spare
Spare
Spare
Spare
0 2000
C111/C114 Lighting(Note 1)
NOTES:
1. CONNECT TO SPARE BREAKER IN PANEL.
NOTES:
1. CONNECT TO SPARE BREAKER IN PANEL.
C112/C113 Rcpt (New)
C112/C113 Rcpt (New)
C112/C113 Rcpt (New)
C112/C113 Rcpt (New)
(Note 2)
2. NEW BREAKER IN SPACE NOTED. THIS BREAKER SHALL FEED PANEL SPH FOR SMART PANEL ALTERNATE.
Spare
Spare
Spare
PV CONNECTION BRKR
Spare
Spare
Spare
Curtis Hansen
Curtis Hansen
SPARE BREAKERS FOR CIRCUITS 9 & 11 PROGRAMMED TO ‘TIER 2’
Curtis Hansen
Curtis Hansen
Curtis Hansen
FEED TO PANEL SPH
SPARE
| 60K-3P-480V_Datasheet_Rev_10_31July2026 |
| L3_208V_Rev12_Combined_Datasheet_8Aug2025 |
| Windsor Floor Plan- marked with BESS location |
| Windsor PV Generator Systems As Built Dwgs |
| 150450-E2.01-Power Plan-E0.1 |
| 150450-E2.01-Power Plan-E0.2 |
| 150450-E2.01-Power Plan-E1.1 |
| 150450-E2.01-Power Plan-E2.1 |
| 150450-E2.01-Power Plan-E2.2 |
| 150450-E2.01-Power Plan-E3.1 |
| 150450-E2.01-Power Plan-E3.2 |
| Windsor Stamped PV Drawings DG 8-22-2012 |
| DESTINATION1_0000002834 |
| DESTINATION1_0000002828 |
| DESTINATION1_0000002829 |
| DESTINATION1_0000002830 |
| DESTINATION1_0000002831 |
| DESTINATION1_0000002832 |
| DESTINATION1_0000002833 |
File details come from the government source that posted it. Updated .