Annual Residential Street Rehabilitation Project Phase 2D.pdf

PDF 2 MB Posted

Attached to
Annual Residential Street Rehabilitation Project Phase 2D
Solicitation number
18-01
Issued by
Los Angeles County, California

About this file

Annual Residential Street Rehabilitation Project Phase 2D

This is a sealed bid solicitation document issued by the City of Compton Department of Public Works for the Annual Residential Street Rehabilitation Project Phase 2D (CIP #18-01), located on Tucker Street, Bradfield Avenue, and Greenleaf Boulevard. The project encompasses construction of cold mill asphalt, asphalt rubber hot mix (ARHM) pavement, AC base course, aggregate base, full-depth AC slot pavement, curb and gutters, sidewalks, cross gutters, alley intersections, driveway approaches, curb ramps, signing, striping, markings, pavement legends, speed humps, traffic signal loops, and adjustments to grade for existing sewer manholes, water valves, water meters, and storm drain manholes. Estimated quantities include 245,000 square feet of cold mill existing pavement, 5,700 tons of ARHM, 2,700 tons of AC base course, 5,200 cubic yards of aggregate base, 2,000 square feet of concrete sidewalk, 42 driveway approaches, 3,800 square feet of cross gutter, 31 curb ramps, and numerous utility adjustments and signage installations. Sealed bids must be received by August 26, 2026, at 10:00 AM at the City Clerk's office. Contract documents are available beginning August 3, 2026. The contractor must possess a Class A contractor's license or equivalent specialty licenses, and all subcontractors must hold appropriate licenses. The contract time for completion is 180 working days from the Notice to Proceed, with liquidated damages of $1,000 per calendar day for delays.

The bid guarantee must be 10 percent of the total bid amount via certified check or corporate surety bond. Performance and payment bonds must each equal 100 percent of the contract price. The City will retain 5 percent of each progress payment as security for completion, with payments based on the engineer's estimate of work completion. The successful bidder must comply with California prevailing wage rates as determined by the State Director of Industrial Relations, with the higher rate applied if federal minimum wage rates exceed state prevailing wage rates. All contractors must register apprentices per Labor Code Section 1777.5 (unless the contract is completable within 20 working days or is valued under $30,000) and maintain certified weekly payrolls. The City reserves the right to reject any or all bids, award to the lowest responsible bidder, and accept bids under advisement for 90 calendar days. The contractor must obtain a City of Compton business license and all required construction permits prior to commencing work. Comprehensive insurance requirements include general liability of $1,000,000 combined single limit, automobile liability of $1,000,000 combined single limit, workers' compensation per California law, and course of construction insurance for the completed project value. The contractor shall implement National Pollution Discharge Elimination System (NPDES) best management practices and maintain storm water pollution prevention compliance throughout the project, with potential penalties of $1,000 per day for noncompliance and deduction of City fines from final payment.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TITLE

CITY OF COMPTON

DEPARTMENT OF PUBLIC WORKS

ANNUAL RESIDENTIAL STREET REHABILITATION PROJECT

PHASE 2D

(Tucker Street, Bradfield Ave, and Greenleaf Blvd)

CIP #18-01

Emma Sharif Mayor

Deidre Duhart Andre Spicer District 1 Council Member District 2 Council Member

Jonathan Bowers Lillie Darden District 3 Council Member District 4 Council Member

John D. Strickland, Jr., Public Works Engineering Department Date 8-3-26

205 South Willowbrook Ave., Compton, CA 90220 ii

TABLE OF CONTENTS

TITLE ................................................................................................................................................................. I

TABLE OF CONTENTS ................................................................................................................................... II

SECTION A. NOTICE INVITING SEALED BIDS

SECTION B. INSTRUCTIONS TO BIDDERS

B -1. Proposal Forms B -2. Proposal Guaranteed (Bid Bond) B -3. Delivery of Proposal B -4. Examination of Site of Work and Contract Documents B -5. Addenda and Interpretations B -6. Irregular Proposals B -7. Taxes B -8. Relief of Bidders B -9. Disqualification of Bidders B -10. Legal Responsibilities B -11. Bid Protest B -12. Award of Contract B -13. Contract Bonds B -14. Execution of Contract B -15. Time of Completion and Liquidated Damages B -16. Public Liability, Automobile Liability, and Workman's Compensation Insurance B -17. Employment of Apprentices B -18. Workers Compensation Certificate B -19. Labor Code B -20. Certified Payrolls B -21. Penalties B -22. Prohibition Against Employment Discrimination B -23. Clayton Act and Cartwright Act B -24. Subletting and Subcontracting B -25. Substitution of Securities

SECTION C. BIDDER’S PROPOSAL ......................................................................................................... C-1 BID ITEM LIST ..................................................................................................................................... C-3 LIST OF SUBCONTRACTORS ........................................................................................................... C-5 PUBLIC CONTRACT CODE ............................................................................................................... C-6 NONCOLLUSION AFFIDAVIT .......................................................................................................... C-8 REFERENCES ....................................................................................................................................... C-9 BID PROPOSAL SIGNATURE AND NOTARY SEAL .................................................................... C-10 BID BOND .......................................................................................................................................... C-11 iii

SECTION D. CONTRACT AGREEMENT ................................................................................................. D-1 FAITHFUL PERFORMANCE BOND .................................................................................................. D-4 PAYMENT BOND ................................................................................................................................ D-6 COMPENSATION INSURANCE CERTIFICATE .............................................................................. D-8

SECTION E. GENERAL PROVISIONS ...................................................................................................... E-1 E -1. DESCRIPTION OF WORK AND GENERAL PROCEDURES ............................................... E-1

E -1.1. General ............................................................................................................................ E-1 E -1.2. Emergency Information ................................................................................................... E-1 E -1.3. Scope of the Work covered by Contract Documents ...................................................... E-1 E -1.4. Contractor’s Duties.......................................................................................................... E-1 E -1.5. City of Compton License and Permit .............................................................................. E-1 E -1.6. Allotted Working Space .................................................................................................. E-1 E -1.7. Maintenance of Existing Improvements .......................................................................... E-1 E -1.8. Survey and Layout .......................................................................................................... E-2 E -1.9. Discrepancies in the Bid and Contract Documents ......................................................... E-2 E -1.10. Errors and Omissions .................................................................................................... E-2 E -1.11. Order of Precedence of Bid and Contract Documents .................................................. E-2 E -1.12. Notice to Proceed .......................................................................................................... E-3 E -1.13. Contract Time/Project Schedule .................................................................................... E-3 E -1.14. Delay in Obtaining Materials ........................................................................................ E-4 E -1.15. Record Drawings ........................................................................................................... E-4 E -1.16. Inspection and Testing................................................................................................... E-4 E -1.17. Sanitary Conditions ....................................................................................................... E-5 E -1.18. Sound Control ............................................................................................................... E-5 E -1.19. Air Pollution and Dust Control ..................................................................................... E-5 E -1.20. Water Pollution Control ................................................................................................ E-5 E -1.21. Public Convenience and Traffic Control ....................................................................... E-9 E -1.22. Minimum Requirements for Maintaining Traffic Flow .............................................. E-10 E -1.23. No reduction in the number of lanes during Holiday Period ....................................... E-10 E -1.24. Temporary No Parking ................................................................................................ E-10 E -1.25. Street Closures, Detours and Barricades ..................................................................... E-11 E -1.26. Street Excavations ....................................................................................................... E-12 E -1.27. Excavation - Changed Conditions ............................................................................... E-13 E -1.28. Utility Companies Coordination ................................................................................. E-13 E -1.29. Graffiti Removal ......................................................................................................... E-14 E -1.30. Materials ...................................................................................................................... E-14 E -1.31. Solid Waste Management and Recycling Plan ............................................................ E-15 E -1.32. Warranty ...................................................................................................................... E-16 iv

E-2. CHANGES TO THE CONTRACT.......................................................................................... E-16 E-2.1. Changes in Contract Scope of Work .............................................................................. E-16 E-2.2. Changes in Contract Price .............................................................................................. E-17 E-2.3. Negotiated Contract Change Orders ............................................................................... E-18 E-2.4. Force Account Payment Procedures. .............................................................................. E-19 E-2.5. Unit Price Adjustments Due to Increased or Decreased Quantities. .............................. E-22 E-2.6. Differing Site Conditions................................................................................................ E-22

E-3. CLAIMS AND RESOLUTION OF CLAIMS ......................................................................... E-22 E-3.1. Claims ............................................................................................................................. E-22 E-3.2. Records of Disputed Work. ............................................................................................ E-23 E-3.3. Submission of Claim Costs............................................................................................. E-23 E-3.4. Claims Meetings ............................................................................................................. E-24 E-3.5. Resolution of Claims ...................................................................................................... E-24

SECTION F. TECHNICAL SPECIFICATIONS ........................................................................................... F-1 F -1. Mobilization and Demobilization, Bonding and Agency Coordination ...................................... F-1 F -2. Traffic Control ............................................................................................................................. F-2 F -3. Best Management Practices ......................................................................................................... F-6 F -4. Clearing, Grubbing and Unclassified Excavation ....................................................................... F-6 F-5. Cold Mill 4" Existing AC Pavement ........................................................................................... F-9 F-6. Construct 2" Asphalt Rubber Hot Mix, ARHM ........................................................................ F-10 F-7. Construct 2" AC Base Course ................................................................................................. F-12 F-8. Construct 8” CAB ..................................................................................................................... F-13 F-9. Sawcut Existing and Construct 4" Concrete Sidewalk .............................................................. F-14 F-10. Sawcut Existing and Construct PCC Driveway Approach ........................................................ F-15 F-11. Sawcut Existing and Construct PCC Cross Gutter .................................................................... F-16 F-12. Sawcut Existing and Construct PCC Curb Ramp ...................................................................... F-17 F-13. Sawcut Existing and Construct Alley Intersection .................................................................... F-20 F-14 Adjust to Grade Water Valve ................................................................................................ F-21 F-15. Adjust to Grade Sewer Manhole ............................................................................................... F-22 F-16. Adjust to Grade Storm Drain Manhole ..................................................................................... F-22 F-17. Adjust to Grade Pull Box .......................................................................................................... F-22 F-18. Construct Speed Hump .............................................................................................................. F-23 F-19-20-21.Furnish and Install Street Name sign, Overhead reflective Street Sign and Regulatory sign ………………………………………………………………………………………………...F-23 F-22. Install Traffic Detector Loops ................................................................................................... F-26 F-23. Miscellaneous Concrete, Items etc. ........................................................................................... F-27 F-24. Signing, Striping, Markings and Legends ................................................................................. F-27 APPENDIX A- Standrad Plans ........................................................................................................ APP-1 APPENDIX B- Street Name Signs, Overhead Reflective Street Name Signs & Traffic Signs

…………………..……………..………………………………………………………………….APP-17

APPENDIX C- Construction advisory sign…………………….……………………………….APP-24

SECTION A. NOTICE INVITING SEALED BIDS

PUBLIC WORKS/MUNICPAL UTILITIES DEPARTMENT

“NOTICE INVITING BIDS”

SEALED BIDS will be received at the office of the City Clerk, City of Compton, 205 South Willowbrook Avenue, Compton, CA 90220 on or before August 26, 2026 at 10:00 AM, opened and read in the City Clerk’s Office, 205 South Willowbrook Avenue, Compton, CA 90220.

All Bids shall be enclosed in a sealed envelope addressed to:

City Clerk, City of Compton 205 South Willowbrook Avenue

Compton CA 90220

And marked outside with: Annual Residential Street Rehabilitation Project (Phase 2D)

The proposed work shall be performed in accordance with the plans, specifications and other contract documents as specified herein and shall consist of the following general work descriptions: construction of Cold mill, ARHM pavement, AC Base course, Aggregate Base, full depth AC slot pavement, curb and gutters, sidewalks, Cross Gutter, Alley Intersection, Driveway Approach, Curb Ramps, signing, striping, markings, and pavement legends, Speed Hump, traffic signal loop, adjust to grade existing sewer manhole, water valve, water meter, and storm drain manhole, and such other items or details, not mentioned above, that are required by the Plans and Standard Specifications. The project location will be Tucker Street, Bradfield Ave, and Greenleaf Blvd.

Plans, Special Provisions and Proposal Forms will be available by August 3, 2026, at 10:00 am at www.comptoncity.org. If you need additional information, please call John D. Strickland, Project Manager at

(310) 605-5505.

The Agency reserves the right, after opening bids, to reject any or all bids, or to make award to the lowest responsible bidder and reject all other bids; to waive any informality in the bidding; and to accept any bid or portion thereof; and to take all bids under advisement for a period of Ninety (90) calendar days. Bids will be compared on the basis of the engineer's estimate of the quantities of the several items of work as shown on the Bid Sheets. Only such plans, specifications, and items of work as are appropriate shall apply to the work as bid.

At the time of contract award, the contractor shall possess a Class A Contractor's License or a combination of Specialty Contractor's License(s) adequate to perform the work herein described. All subcontractors shall have equivalent licenses for their specific trades. The contractor and all subcontractors shall have a valid City of Compton business license prior to commencing work.

Each bid must conform and be responsive to this notice and shall be made on the official forms furnished in the Instructions to Bidders. Each bid must be accompanied by a certified or cashier's check, or by a corporate surety bond on the form furnished by the CITY, as a guarantee that the bidder will, if an award is made to him in accordance with the terms of their bid, promptly secure workmen's compensation insurance and liability insurance, execute a contract in the required form, and furnish satisfactory bonds for the faithful performance of the contract and for the payment of claims of material and laborers thereunder. Said check or bidder's bond shall be in an amount not less than 10 percent of the amount of the bid. The Performance Bond shall be not less than 100 percent of the total amount of the bid price named in the contract. The Payment Bond shall be http://www.comptoncity.org/ not less than 100 percent of the total amount of the bid price named in the contract. The CITY reserves the right to reject any bond if, in the opinion of the CITY Attorney, the Surety's acknowledgment is not in the form included in the contract documents or in another form substantially as prescribed by law.

Minimum wage rates for this project have been predetermined by the Secretary of Labor. If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the prevailing wage rates as determined by the State for similar classifications of labor, the Contractor and their subcontractors shall pay not less than the higher wage rate.

In accordance with provisions of Section 1773.2 (amended 1977) of the California Labor Code copies of the prevailing rate of per diem wages as determined by the State Director of Industrial Relations and are available at the California Department of Industrial Relations’ Internet web site at http://www.dir.ca.gov/DLSR/PWD.

Future effective general prevailing wage rates, which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed. Copies of the prevailing wage rates are on file with the City and available upon request.

The City of Compton hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, Disadvantaged Business and Women's Business Enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, creed, color, or national origin in consideration for an award.

The Contract Documents call for monthly progress payments based upon the Engineer's estimate of the percentage of work completed. The CITY will retain 5 percent of each progress payment as security for completion of the balance of the work. At the request and expense of the successful bidder, the City will pay the amounts so retained upon compliance with the requirements of Government Code Section 4590 and the provisions of the Contract Documents pertaining to the Substitution of Securities.

SATRA D. ZURITA

CITY CLERK

PUBLISH: AUGUST 05, 2026

AUGUST 12, 2026

AUGUST 19, 2026

http://www.dir.ca.gov/DLSR/PWD

SECTION B. INSTRUCTIONS TO BIDDERS

B -1. Proposal Forms All proposals must be made upon the forms provided by the City. In case of disagreement between the unit prices and the total amounts, the unit prices and corrected totals will be considered as representing the bidder's intentions. All proposals must be completely filled out.

Bids shall be submitted only on the forms attached hereto and shall be enclosed in a sealed envelope bearing on the outside the name of the bidder, his/her address, and the name of the project for which the bid is submitted.

B -2. Proposal Guaranteed (Bid Bond) Proposals must be accompanied by a proposal guarantee consisting of a certified check or bid bond payable to the City in the minimum amount of ten percent (10%) of the total amount bid. Any proposal not accompanied by such a guarantee will not be considered. If a bidder to whom a contract is awarded fails or refuses to execute the contract documents or furnish the required insurance policies and bonds as set forth in those documents, the proposal guarantee shall be forfeited to the City. The proposal guarantees of all bidders will be held until the successful bidder has properly executed all contract documents.

B -3. Delivery of Proposal Proposals may be mailed or delivered by messenger. However, it is the bidder's responsibility alone to ensure delivery of the proposal to the City’s designated official prior to the bid opening hour stipulated in the "Notice Inviting Sealed Bids." Late proposals will not be considered.

Proposals shall be enclosed in a sealed envelope plainly marked as noted in "Notice Inviting Sealed Bids" Section.

B -4. Examination of Site of Work and Contract Documents The bidder shall examine carefully the site of the work contemplated and the plans, specifications and contract documents. The submission of a bid shall be conclusive evidence that the bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality and scope of work to be performed, the quantities of materials to be furnished, and as to the requirements of the plans, specifications and contract documents.

B -5. Addenda and Interpretations Any explanation desired by the bidders regarding the meaning or interpretation of any of the Contract Documents must be requested in writing, with sufficient allowance of time for receipt of reply before the time set for opening of Bids. Any such explanations or interpretations will be made in the form of addenda to the documents and will be furnished to all bidders who shall submit all addenda with their Bids. Neither the Inspector nor any representative of the City is authorized to give oral explanations or interpretations of Contract Documents, and a submission of a Bid constitutes agreement by the bidder that it has placed no reliance on any such oral explanation or interpretation.

However, the Engineer may, upon inquiry by bidder, orally direct the bidder’s attention to specific provisions of the Contract Documents which cover the subject of the inquiry.

Any and all such interpretations and any supplemental instructions will be in the form of written addenda to the plans, specifications and/or contract documents which, if issued, will be mailed by certified mail with return receipt requested to all prospective bidders (at the respective addresses furnished for such purposes), no later than three days prior to the date fixed for the opening of bids.

Failure of any bidder to receive any such addendum shall not relieve such bidder from any obligation under his/her bid as submitted. All addenda so issued shall become part of the contract documents.

Technical questions shall be in writing and should be directed to:

Attn: John D. Strickland, Project Manager City of Compton Public Works Engineering

205 South Willowbrook Avenue, Compton, CA 90220 Phone: (310) 605-5505 Email: jstrickland@comptoncity.org

B -6. Irregular Proposals Unauthorized conditions, limitations, or provisions attached to a proposal will render it irregular and may cause its rejection. The completed proposal forms shall be without interlineation, alterations, or erasures. Alternative proposals will not be considered unless specifically requested. No oral, telegraphic, or telephonic proposal, modification, or withdrawal will be considered.

B -7. Taxes No mention shall be made in the proposal of Sales Tax, Use Tax, or any other tax, as all amounts bid will be deemed and held to include any such taxes, which may be applicable.

B -8. Relief of Bidders Attention is directed to the provisions of Government Code Sections 14350 to 14353, inclusive (State Contract Act), concerning relief of bidders and in particular to the requirement therein, that if the bidder claims a mistake was made in his/her bid, the bidder shall give the City written notice within five days after the opening of the bids of the alleged mistake, specifying in the notice in detail how the mistake occurred.

B -9. Disqualification of Bidders In the event that any bidder acting as a prime contractor has an interest in more than one proposal, all such proposals will be rejected, and the bidder will be disqualified. This restriction does not apply to subcontractors or suppliers who may submit quotations to more than one bidder.

No contract will be executed unless the bidder is licensed in accordance with the provisions of the State Business and Professions Code.

B -10. Legal Responsibilities All proposals must be submitted, filed, made, and executed in accordance with State and Federal laws relating to bids for contracts of this nature whether the same are expressly referred to herein or not.

Any Bidder submitting a proposal shall by such action thereby agree to each and all of the terms, conditions, provisions, and requirements set forth, contemplated, and referred to in the Plans, Specifications, and Contract Documents, and to full compliance therewith.

B -11. Bid Protest Any protest of the proposed Project award must be submitted in writing to the City no later than 5:00 PM on the third business day following the date of the bid opening. Bid protests are to be delivered to the following address: City Clerk, 205 South Willowbrook Ave., Compton, CA 90220

The protest must contain a complete statement of the basis for the protest.

a. The protest must state the facts and refer to the specific portion of the document or the specific statute that forms the basis for the protest. The protest must include the name, address, and telephone number of the person representing the protesting party.

b. The party filing the protest must concurrently transmit a copy of the protest to the proposed awardee and provide evidence to the City of that transmittal.

c. The party filing the protest must have actually submitted a bid for the Project. A subcontractor of a party filing a bid for the Project may not submit a bid protest. A party may not rely on the bid protest submitted by another bidder, but must timely pursue its own protest.

d. The procedure and time limits set forth in these Instructions to Bidders are mandatory and are the bidders’ sole and exclusive remedy in the event of a bid protest. Any bidder’s failure to fully comply with these procedures shall constitute a waiver of any right to further pursue a bid protest, including filing of a challenge of the award pursuant to the California Public Contract Code, filing of a claim pursuant to the California Government Code, or filing of any other legal proceedings.

e. The City shall review all timely protests prior to award of the Project. The City shall not be required to hold an administrative hearing to consider any protests, but may do so at its option. At the time of the City Council’s consideration of the Project award, the City Council shall also consider the merits of any timely protests. The City Council may either reject the protest and award to the lowest responsible bidder or accept the protest and award the bid to the next lowest responsible bidder. Nothing in this section shall be construed as a waiver of the City Council’s right to reject all bids.

B -12. Award of Contract Following a review of the bids, the City shall determine whether to award the contract or to reject all bids. The award of contract, if made, will be to the lowest responsible Bidder as determined solely by the City. The award of the contract, if it be awarded, will be to the lowest responsible bidder whose proposal complies with all the requirements prescribed. Such award, if made, will be made within 30 days after the opening of proposals. If the lowest responsible bidder refuses or fails to execute the contract, the City may award the contract to the second lowest responsible bidder. Such award, if made, will be made within 45 days after the opening of bids. If the second lowest responsible bidder refuses or fails to execute the contract, the City may award the contract to the third lowest responsible bidder

At the time of contract award, the successful Bidder shall hold a Class A Contractor's License or a combination of Specialty Contractor's License(s), as required to perform the work, issued by the State of California. Additionally, the City reserves the right to reject any or all proposals, accept any bid or portion thereof, to waive any irregularity, and to take the bids under advisement for the period of time stated in the "Notice Inviting Sealed Bids", all as may be made until all necessary investigations are made as to the responsibility and of the Bidder to whom the award is contemplated.

No bidder may withdraw his/her proposal for a period of Ninety (90) Days after the time set for opening thereof. However, the City will return all proposal guarantees within ten (10) days after the award of the contract or rejection of the bids, as the case maybe, to the respective bidders whose proposals they accompany.

B -13. Contract Bonds The successful bidder shall comply with the provisions of Subsection 3-1.05 of the State Standard Specifications, and section 3247 and 3249 of the California Civil Code. The successful bidder shall furnish a Payment bond and a Performance bond. Each bond is to be executed in a sum equal to one hundred percent (100%) of the contract price. All bonds must be executed by a corporate surety licensed to conduct business in the state of California. Personal securities will not be accepted.

The bidder's bond shall conform to the bond form provided by the City. in the Bid Proposal section.

B -14. Execution of Contract The successful bidder will be notified in writing by the City of the award of the Contract.

Accompanying the City’s Notice of Award will be the Contract, in duplicate, which the successful bidder will be required to execute and return, together with the Performance and Payment Bonds, and the required certificates and policies of insurance together with the required endorsements thereto (or equivalent) for the Contractor, the workers’ compensation certificate, and all other requested documents to the City within ten (10) calendar days following receipt of such Notice of Award.

Failure to do so shall be just cause for annulment of the award and for forfeiture of the Bid Bond which shall be retained as liquidated damages, and it is agreed that the bond sum is a fair estimate of the amount of damages that the City will sustain by reason of such failure.

The City will promptly determine whether such Contract, Bonds and insurance are as required by the Contract Documents, and upon such determination will forward a fully executed copy of the Contract and a Notice to Proceed with the work to the successful bidder. Signature by both parties constitutes execution of the Contract. In the event of failure of the lowest responsible bidder to sign and return the Contract with acceptable Bonds and insurance as prescribed herein, the City may award the Contract to the next lowest responsible bidder, and, in the event that bidder fails to sign and return the Contract with acceptable Bonds and insurance, the City may award the Contract to the then next lowest responsible bidder, etc.

B -15. Time of Completion and Liquidated Damages Attention is directed to the provisions in Section 8 "Prosecution and Progress" of the State Standard Specifications and these provisions.

The Contractor shall begin work after the contract has been approved by the City attorney and only after written notice to proceed with work has been issued by the City. The Contractor shall then have ten (10) calendar days after receipt of written notice to proceed to begin work. The counting of contract days will begin ten (10) calendar days from the time the Contractor receives the Notice to proceed or when Contractor starts work, whichever comes first.

This work shall be diligently prosecuted to completion before the expiration of 180 WORKING

DAYS.

Contractor shall pay to the City as liquidated damages the amount of $1000.00 per day, for each and every calendar day's delay in finishing the work in excess of the number of working days specified.

The parties expressly agree that determining the exact amount of actual daily damage would be difficult to fix in advance and that after reasonable negotiation, this amount is reasonable under the circumstances existing at the time the Contract is made.

B -16. Public Liability, Automobile Liability, and Workman's Compensation Insurance.

Insurance Requirements

Contractor shall procure and maintain for the duration of the contract insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the work hereunder by the Contractor, his/her agents, representatives, employees or subcontractors. The cost of such insurance shall be included in Contractor's bid.

Contractor shall indemnify and hold harmless City and its officers, official, employees, and volunteers from and against all claims, damages, losses and expenses including attorney fees arising out of the performance of the work described herein, caused in whole or in part by any negligent act or omission of the contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, except where caused by the active negligence, sole negligence, or willful misconduct of the City.

Minimum Scope of Insurance Coverage shall be at least as broad as:

1. Insurance Services Office Commercial General Liability coverage (occurrence form CG 00 01 11 88).

2. Insurance Services Office form number CA 00 01 06 92 covering Automobile Liability, code 1 (any auto).

3. Workers' Compensation insurance as required by the Labor Code of the State of California and Employer’s Liability Insurance.

4. Course of Construction insurance covering for all risks of loss.

Minimum Limits of Insurance Contractor shall maintain limits no less than:

1. General Liability: $1,000,000 combined single limit per occurrence for bodily injury, personal injury and property damage. If Commercial General Liability Insurance or other form with a general aggregate limit is used, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the required occurrence limit.

2. Automobile Liability: $1,000,000 combined single limit per accident for bodily injury and property damage.

3. Employer’s Liability: $1,000,000 per accident for bodily injury and property damage.

4. Course of Construction: Completed value of the project.

Deductibles and Self-Insured Retentions Any deductibles or self-insured retentions must be declared to and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials, employees and volunteers; or the Contractor shall provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigation, claim administration and defense expenses.

Other Insurance Provisions The general liability and automobile liability policies are to contain, or be endorsed to contain, the following provisions:

1. The City, its officers, officials, employees, and volunteers are to be covered as insureds with respect to liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the contractor; and with respect to liability arising out of work or operations performed by or on behalf of the Contractor including materials, parts or equipment furnished in connection with such work or operations. General liability coverage can be provided in the form of an endorsement to the Contractor’s insurance, or as a separate owner’s policy.

2. For any claims related to this project, the Contractor’s insurance coverage shall be primary insurance as respects the City, its officers, officials, employees, and volunteers.

Any insurance or self-insurance maintained by the City, its officers, officials, employees, or volunteers shall be excess of the Contractor’s insurance and shall not contribute with it.

3. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled by either party, except after thirty (30) days’ prior written notice by certified mail, return receipt requested, has been given to the City.

Course of construction policies shall contain the following provisions:

1. The City shall be named as loss payee.

2. The insurer shall waive all rights of subrogation against the City.

Acceptability of Insurers Insurance is to be placed with insurers with a current A.M. Bests' rating of no less than A:VII.

Verification of Coverage Contractor shall furnish the City with original certificates and amendatory endorsements affecting coverage required by this clause. The endorsements should be on forms provided by the City or on other than the City’s forms, provided those endorsements or policies conform to the requirements.

All certificates are to be received and approved by the City before work commences. The City reserves the right to require complete, certified copies of all required insurance policies, including endorsements affecting the coverage required by these specifications at any time.

Subcontractors Contractor shall include all subcontractors as insureds under its policies or shall furnish separate certificates and endorsements for each subcontractor. All coverages for subcontractors shall be subject to all of the requirements stated herein.

B -17. Employment of Apprentices Pursuant to Labor Code Section 1777.5, all contractors shall file with the appropriate Joint Apprenticeship Training Committee, a DAS-140 form registering to train apprentices. This requirement to register to train apprentices is mandated by Section 1777.5 whether or not you are signatory to or a party of any approved training program. Only those programs approved by the California Apprenticeship Council are applicable to accept DAS-140 registration forms.

If the contractor is approved to train apprentices, then apprentices must be called in a ratio not less than one apprentice hour for each five journeyman hours.

However, if the entire contract may be completed within 20 working days or the entire contract (nor subcontracts) is less than thirty thousand ($30,000), then the contractor is exempt from requesting apprentices under Labor Code Section 177.5.

In addition, all contractors are required to make appropriate training contributions as set forth in the prevailing wage determination to each appropriate JATC, or in the alternative, to the California Apprenticeship Council. Payments shall be made not less than monthly, calculated and paid by the fifteenth of each month, for work performed that prior month.

The address for the applicable Joint Apprenticeship Training Committee and for the California Apprenticeship Council can be obtained by calling the Division of Apprenticeship Standards.

B -18. Workers Compensation Certificate Section 3700 of the State Labor Code requires that every employer shall secure the payment compensation by either being insured against liability to pay compensation with one or more insurers or by securing a certificate of consent to self-insure from the State Director of Industrial Relations.

In accordance with this section and with Section 1861 of the State Labor Code, the contractor shall sign a Compensation Insurance Certificate which is included with the Contract Agreement, and submit same to City along with the other required contract documents, prior to performing any work.

Reimbursement for this requirement shall be considered as included in the various items of work.

B -19. Labor Code

Pursuant to the provisions of Section 1773 of the Labor Code of the State of California, the City has obtained the general provisions rate of per diem wages and the general prevailing rate for holiday and overtime work in this locality for each craft, classification or type of workman needed to execute the contract from the State Director of the Department of Industrial Relations. These rates are on file with the Clerk of the City of Compton, and copies will be made available to any interested party on request.

It shall be the responsibility of the prime Contractor to comply with all applicable sections of the Labor Code.

Travel and subsistence payments to each workman needed to execute the work shall be made as such travel and subsistence payments are defined in the applicable collective bargaining agreements filed in accordance with Section 1773.8 of the Labor Code.

The Contractor shall comply with the provisions of Section 1774 of the Labor Code. Failure to comply with the subject section will subject the Contractor to penalty and forfeiture provisions of Section 1775 of the Labor Code.

Pursuant to the provisions of Section 1770 of the Labor Code, the general prevailing rate of wages has been ascertained (which rate includes employer payments for health and welfare, vacation, pension and similar purposes) applicable to the work to be done, for straight time, overtime, Saturday, Sunday and holiday work. The holiday wage rate listed shall be applicable to all holidays recognized in the collective bargaining agreement of the particular craft, classification or type of workmen concerned.

The City will not recognize any claim for additional compensation because of the payment by the Contractor of any wage rate in excess of the prevailing wage rate or the Federal Minimum Wage Rate (whichever is greater) as set forth in the contract. The possibility of wage increases is one of the elements to be considered by the Contractor in determining his/her bid, and will not under any circumstances be considered as the basis of a claim against the City on the contract.

The Contractor and subcontractors shall comply with Section 1777.6 which stipulates that it shall be unlawful to refuse to accept otherwise qualified employees as registered apprentices solely on the grounds of race, religious creed, color, national origin, ancestry, sex, or age, except as provided in Section 3077, of such employee.

B -20. Certified Payrolls All contractors shall keep weekly payroll records, which shall be certified under penalty of perjury to record the proper payment of prevailing wages for each public works project. The City will accept computer printouts (which are then certified) in lieu of the standard form so long as the computer printout provides all of the same information as required on the certified payroll form.

Failure to provide the certified payrolls within 10 days of a written deficiency notice from the City will result in a penalty of $25.00 per day per worker for each day of violation. Labor Code Section 1776.

The City maintains the right to withhold any and all funds due a contractor and/or his/her subcontractors in the event that certified payrolls are not maintained and provided to the City upon request.

B -21. Penalties Failure to pay the appropriate prevailing wage can result in penalties being assessed as follows:

a. Up to $50.00 per day per worker for each and every violation; and,

b. debarment from future public works for a period not to exceed three years.

c. $25.00 per day per worker for each failure to comply with the payment of overtime for all hours worked in excess of 8 in one day or 40 in one week.

Failure to register to train apprentices or failure to pay the appropriate training contribution can result in penalties being assessed as follows:

a. $50.00 per day for each day of violation; and,

b. debarment from future public works for a period not to exceed three years.

B -22. Prohibition Against Employment Discrimination All contractors shall employ workers without regard to race, gender, marital status, ethnicity, religion, age or medical condition as set forth in the California Labor Code Section 1777.6; the Government Code, Title VII of the Civil Rights Act and the Civil Rights Act of 1991.

B -23. Clayton Act and Cartwright Act In accordance with Section 7103 of the Public Contract Code, in entering into a public works contract or a subcontract to supply goods, services or materials pursuant to a public works contract, the contractor or subcontractor offers and agrees to assign to the awarding body all rights, and interest in and all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2(commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. This assignment shall be made and become effective at the time the awarding body tenders final payment to the contractor, without further acknowledgment by the parties.

B -24. Subletting and Subcontracting Pursuant to the Subletting and Subcontracting Fair Practices Act (commencing with Section 4100 of the Public Contract Code), bidders are required to list in their proposal the name and location of place of business of each subcontractor who will perform work or labor or render services in or about the construction of the work or improvement or a subcontractor who specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the Plans and Specifications in excess of 1/2 of 1% of this prime Contractor's total bid or $10,000, whichever is greater. Failure to list a subcontractor for a portion of the work means that the prime Contractor will do that portion of the work. It is the City’s intent for the Subletting and Subcontracting Fair Practices Act to apply to all phases of the work.

B -25. Substitution of Securities In conformance with the State of California Government Code, Chapter 13, Section 4590, the Contractor may substitute securities for any monies withheld by the Agency to performance under the contract.

At the request and expense of the Contractor, securities equivalent to the amount withheld shall be deposited with the City, or with a State or federally chartered bank as the escrow agent, who shall pay such monies to the Contractor upon notification by the City of Contractor's satisfactory completion of the contract.

The type of securities deposited and the method of release shall be approved by the City Attorney's office.

C-1

SECTION C. BIDDER’S PROPOSAL

ANNUAL RESIDENTIAL STREET REHABILITATION PROJECT (Phase 2D) (Tucker Street, Bradfield Avenue, and Greenleaf Boulevard)

BIDDER SHALL SUBMIT ALL FORMS UNDER SECTION C. BIDDER’S PROPOSAL AS PART OF THE

BID. FAILURE TO DO SO WILL RESULT IN A NON-RESPONSIVE BID.

NAME OF BIDDER __________________________________________________________________

BUSINESS P.O. BOX _________________________________________________________________

CITY, STATE, ZIP ___________________________________________________________________

BUSINESS STREET ADDRESS ________________________________________________________

(Please include even if P.O. Box used)

CITY, STATE, ZIP ___________________________________________________________________

TELEPHONE NO: AREA CODE ( ) _________________________________________

FAX NO: AREA CODE ( ) _________________________________________

CONTRACTOR LICENSE NO. ________________________________________________________

The work for which this proposal is submitted is for construction in conformance with the Contract Bid Documents (including the payment of not less than the State general prevailing wage rates or Federal minimum wage rates), the project plans described below, including any addenda thereto, the contract annexed hereto, and also in conformance with the Plans, Specifications and Contract Documents as specified within.

The contract bid documents and project plans for the work to be done are entitled:

(Tucker Street, Bradfield Avenue, and Greenleaf Blvd)

CIP #18-01

Bids are to be submitted for the entire work. The amount of the bid for comparison purposes will be the total of all items.

The bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for that purpose. In the case of unit basis items, the amount set forth under the "Item Total" column shall be the product of the unit price bid and the estimated quantity for the item.

C-2

In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail, except as provided in (a) or (b), as follows:

(a) If the amount set forth as a unit price is unreadable or otherwise unclear, or is omitted, or is the same as the amount as the entry in the item total column, then the amount set forth in the item total column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price;

(b) (Decimal Errors) If the product of the entered unit price and the estimated quantity is exactly off by a factor of ten, one hundred, etc., or one-tenth, or one-hundredth, etc. from the entered total, the discrepancy will be resolved by using the entered unit price or item total, whichever most closely approximates percentage-wise the unit price or item total in the CITY OF COMPTON’S Final Estimate of cost.

If both the unit price and the item total are unreadable or otherwise unclear, or are omitted, the bid may be deemed irregular. Likewise if the item total for a lump sum item is unreadable or otherwise unclear, or is omitted, the bid may be deemed irregular unless the project being bid has only a single item and a clear, readable total bid is provided.

Symbols such as commas and dollar signs will be ignored and have no mathematical significance in establishing any unit price or item total or lump sums. Written unit prices, item totals and lump sums will be interpreted according to the number of digits and, if applicable, decimal placement. Cents symbols also have no significance in establishing any unit price or item total since all figures are assumed to be expressed in dollars and/or decimal fractions of a dollar. Bids on lump sum items shall be item totals only; if any unit price for a lump sum item is included in a bid and it differs from the item total, the items total shall prevail.

The foregoing provisions for the resolution of specific irregularities cannot be so comprehensive as to cover every omission, inconsistency, error or other irregularity which may occur in a bid.

This is the start of the file's text. The full file is on GovTribe.