This document is Amendment #2 to an RFP, providing clarifications and updates to various aspects of the solicitation. The Notice of Intent to Award date has been corrected to February 25, 2025, and proposals must be hand-delivered by the date and time prescribed in the RFP. The amendment clarifies that the project scope section referenced in Part G paragraph 4 is listed as "Not Applicable" and confirms that the 2011 renovation drawings excluded work in the basement and 5th floor.
The amendment adds the qualification "as necessary" to several project staff requirements, including Security, Security Hardware, Doors and Hardware Specialist, Elevator Consultant, Civil, Geotechnical, Environmental, Landscape Architect, and Interior Designer positions. Additionally, the term "term contract" has been changed to "contract" on page 18 of 21 in Part G. The RFP has been updated to incorporate all these changes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment #2
1. Page 2 indicates proposal is due Feb 18, and Part G indicates anticipated notice to award Feb 2, 2025. Please clarify. Part G lists Notice of Intent to Award as Feb 25, 2025.
2. Part G paragraph 4 implies project scope will be found “below”, but no project scope is found, please clarify. Listed as Not Applicable
3. Can the 2011 renovation drawings be provided? Please clarify – the basement and 5th floor were excluded from that work.
4. Part C, criteria 4, proposed project staff to include Security, Security Hardware, Doors and Hardware Specialist, and Elevator Consultant do not appear to be necessary based on scope described on page 1, please clarify. the words, “as necessary” have been added
5. Part C, criteria 5, project staff to include Civil, Geotechnical, Environmental, Landscape Architect and Interior Designer do not appear to be necessary based on scope described on page 1, please clarify the words, “as necessary” have been added.
6. Part G, similar to questions above, naming Security and Security Hardware, Doors and Hardware Specialist, Civil, Geotechnical, Environmental, Landscape Architect, and Interior Design does not appear to be necessary based on the scope described in page 1.
Please clarify if necessary. the words “as necessary” have been added.
7. Can RFP responses be submitted electronically? Must be hand delivered by date and time prescribed in the RFP
8. The words “term contract” have been changed to “contract”. Page 18 of 21 part G.
Note: The RFP has been updated to include the above changes.