About this file
This amendment to an Invitation for Bid is issued by the South Carolina Department of Transportation (SCDOT) for the supply and hauling of rip rap, crusher run, and 57 stone materials for Calhoun maintenance operations. The solicitation requests 1,000 tons of CR-14 Crusher Run, 600 tons of Rip Rap, and 600 tons of 57 Stone annually over a five-year period, with total quantities of 5,000 tons of crusher run, 3,000 tons of rip rap, and 3,000 tons of 57 stone across all years. The bid submission deadline is October 20, 2022, at 2:30 p.m., with questions due by October 7, 2022, at 12:00 p.m. No pre-bid conference or site visit is required. Award is scheduled for November 4, 2022. The contract term spans five years with materials to be sourced from qualified suppliers listed on the Qualified Products List for Coarse Aggregate Sources.
Pricing must be submitted on a per-ton basis for each material type and year, with separate line items for Rip Rap hauling fees and combined Crusher Run and 57 Stone hauling fees. Fuel surcharges are not permitted. All materials must meet SC End-Product and U.S. End-Product preference criteria as applicable. Bidders must acknowledge receipt of this amendment and are required to hold their offers open for a minimum of 30 calendar days following the opening date. Offers must be submitted online through the South Carolina procurement portal, and all bidders must complete the cover page with authorized signatures, entity type identification, and vendor registration information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice Regarding Award.pdf | ||
| Notice Revised Award.pdf | ||
| Solicitation.pdf | ||
| Attachment A.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAP
State of South Carolina
Invitation For Bid Amendment 1
Solicitation:
Date Issued:
Procurement Officer:
Phone:
E-Mail Address:
Mailing Address:
5400024115 10/07/2022
JON BAYSDEN
803-737-4832 BaysdenJW@scdot.org SCDOT Procurement Office PO Box 191 Columbia SC 29202-0191
DESCRIPTION: Rip Rap & Crusher Run Calhoun Maint
USING GOVERNMENTAL UNIT: SC Department of Transportation
SUBMIT YOUR OFFER ON-LINE AT THE FOLLOWING URL: http://www.procurement.sc.gov
SUBMIT OFFER BY (Opening Date/Time): 10/20/2022 @ 14:30:00 (See "Deadline For Submission Of Offer" provision)
QUESTIONS MUST BE RECEIVED BY: 10/07/2022 @ 12:00:00 (See "Questions From Offerors" provision)
NUMBER OF COPIES TO BE SUBMITTED: 1
CONFERENCE TYPE: Not Applicable
DATE & TIME:
(As appropriate, see "Conferences - Pre-Bid/Proposal" & "Site Visit" provisions)
LOCATION: Not Applicable
AWARD &
AMENDMENTS
Award will be posted on 11/04/2022. The award, this solicitation, any amendments, and any related notices will be posted at the following web address: http://www.procurement.sc.gov
You must submit a signed copy of this form with Your Offer. By signing, You agree to be bound by the terms of the
Solicitation. You agree to hold Your Offer open for a minimum of thirty (30) calendar days after the Opening Date. (See
"Signing Your Offer" provision.)
NAME OF OFFEROR
(full legal name of business submitting the offer)
Any award issued will be issued to, and the contract will be formed with, the entity identified as the Offeror. The entity named as the offeror must be a single and distinct legal entity. Do not use the name of a branch office or a division of a larger entity if the branch or division is not a separate legal entity, i.e., a separate corporation, partnership, sole proprietorship, etc.
AUTHORIZED SIGNATURE
(Person must be authorized to submit binding offer to contract on behalf of Offeror.)
DATE SIGNED
TITLE
(business title of person signing above)
STATE VENDOR NO.
(Register to Obtain S.C. Vendor No. at www.procurement.sc.gov)
PRINTED NAME
(printed name of person signing above)
STATE OF INCORPORATION
(If you are a corporation, identify the state of incorporation.)
OFFEROR'S TYPE OF ENTITY: (Check one) (See "Signing Your Offer" provision.)
___ Sole Proprietorship ___ Partnership ___ Other_____________________________
___ Corporate entity (not tax-exempt) ___ Corporation (tax-exempt) ___ Government entity (federal, state, or local)
COVER PAGE - ON-LINE ONLY (MAR. 2015)
http://www.procurement.sc.gov/ http://www.procurement.sc.gov/
QUESTIONS FROM OFFERORS - AMENDMENT (JUN 2017)
THE SOLICITATION IS AMENDED AS PROVIDED HEREIN. INFORMATION OR CHANGES RESULTING FROM
QUESTIONS WILL BE SHOWN IN A QUESTION-AND-ANSWER FORMAT. ALL QUESTIONS RECEIVED HAVE
BEEN REPRINTED BELOW. THE “STATE’S RESPONSE” SHOULD BE READ WITHOUT REFERENCE TO THE
QUESTIONS. THE QUESTIONS ARE INCLUDED SOLELY TO PROVIDE A CROSS-REFERENCE TO THE
POTENTIAL OFFEROR THAT SUBMITTED THE QUESTION. QUESTIONS DO NOT FORM A PART OF THE
CONTRACT; THE “STATE’S RESPONSE” DOES. ANY RESTATEMENT OF PART OR ALL OF AN EXISTING
PROVISION OF THE SOLICITATION IN AN ANSWER DOES NOT MODIFY THE ORIGINAL PROVISION EXCEPT
AS FOLLOWS: UNDERLINED TEXT IS ADDED TO THE ORIGINAL PROVISON. STRICKEN TEXT IS DELETED.
[02-2A097-1]
QUESTIONS AND ANSWERS ARE BELOW. THE SCDOT’S ANSWER APPEARS IN RED.
1. I noticed there are pages for the Material Price increases during the 5-year period, but not for the Haul Rates. How do we show the increase for hauling each year? See Bidding Schedule / Price-Business Proposal below.
2. Is there a way for us to apply a Fuel Surcharge to this project? No.
3. The totals come out to 11,000 tons. Line item 0016 – Hauling Services has a total of 12,000 tons? See Bidding
Schedule / Price-Business Proposal below.
4. Haulers charge more to deliver Riprap than they do to deliver Crusher Run and 57 Stone (the Riprap is so large it damages their trucks when being loaded). Can you break out the haul charges for Crusher Run, 57 Stone and
Riprap? See Bidding Schedule / Price-Business Proposal below.
5. Is this for supplying the material and hauling? Yes
AMENDMENTS TO SOLICITATION
(a) The Solicitation may be amended at any time prior to opening. All actual and prospective Offerors should monitor the following web site for the issuance of Amendments: www.procurement.sc.gov (b) Offerors shall acknowledge receipt of any amendment to this solicitation (1) by signing and returning the amendment, (2) by identifying the amendment number and date in the space provided for this purpose on Page Two, (3) by letter, or (4) by submitting a bid that indicates in some way that the bidder received the amendment. (c) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.
The Bidding Schedule originally published is replaced in its entirety with the one below.
VIII. BIDDING SCHEDULE / PRICE-BUSINESS PROPOSAL
BIDDING SCHEDULE (NOV 2007)
Line Number Quantity Unit of Measure Unit Price Extended Price
0001 1000.000 US Ton
Product Catg.: 75035 - Crushed Stone (Includes Riprap)
Item Description: CR-14 Crusher Run - Year 1
Tendering Text: Enter your per ton price for CR 14 Crusher Run from a qualified source listed on the Qualified
Products List 2 Coarse Aggregate Sources, which can be accessed here -http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx. The quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, if not claiming a preference.
Mandatory No
______Yes
______No
Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see www.procurement.sc/preferences
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a preference.
http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx http://www.procurement.sc/preferences
0002 600.000 US Ton
Item Description: Rip Rap - Year 1
Tendering Text: Enter your per ton price for Rip Rap from a qualified source listed on the Qualified Products List 2
Coarse Aggregate Sources, which can be accessed here - http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx. The quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
0003 600.000 US Ton
Item Description: 57 Stone - Year 1
Tendering Text: Enter your per ton price for 57 Stone from a qualified source listed on the Qualified Products List 2
Coarse Aggregate Sources, which can be accessed here - http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx. The quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
0004 1000.000 US Ton
Item Description: CR-14 Crusher Run - Year 2
Tendering Text: Enter your per ton price for CR 14 Crusher Run from a qualified source listed on the Qualified
Products List 2 Coarse Aggregate Sources, which can be accessed here -http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx. The quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
0005 600.000 US Ton
Item Description: Rip Rap - Year 2
Tendering Text: Enter your per ton price for Rip Rap from a qualified source listed on the Qualified Products List 2
Coarse Aggregate Sources, which can be accessed here - http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx. The quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
0006 600.000 US Ton
Item Description: 57 Stone - Year 2
Tendering Text: Enter your per ton price for 57 Stone from a qualified source listed on the Qualified Products List 2
Coarse Aggregate Sources, which can be accessed here - http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx. The quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
0007 1000.000 US Ton
Item Description: CR-14 Crusher Run - Year 3
Tendering Text: Enter your per ton price for CR 14 Crusher Run from a qualified source listed on the Qualified
Products List 2 Coarse Aggregate Sources, which can be accessed here -http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx. The quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
0008 600.000 US Ton
Item Description: Rip Rap - Year 3
Tendering Text: Enter your per ton price for Rip Rap from a qualified source listed on the Qualified Products List 2
Coarse Aggregate Sources, which can be accessed here - http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx. The quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
0009 600.000 US Ton
Item Description: 57 Stone - Year 3
Tendering Text: Enter your per ton price for 57 Stone from a qualified source listed on the Qualified Products List 2
Coarse Aggregate Sources, which can be accessed here - http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx. The quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
0010 1000.000 US Ton
Item Description: CR-14 Crusher Run - Year 4
Tendering Text: Enter your per ton price for CR 14 Crusher Run from a qualified source listed on the Qualified
Products List 2 Coarse Aggregate Sources, which can be accessed here -http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx. The quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
0011 600.000 US Ton
Item Description: Rip Rap - Year 4
Tendering Text: Enter your per ton price for Rip Rap from a qualified source listed on the Qualified Products List 2
Coarse Aggregate Sources, which can be accessed here - http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx. The quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
0012 600.000 US Ton
Item Description: 57 Stone - Year 4
Tendering Text: Enter your per ton price for 57 Stone from a qualified source listed on the Qualified Products List 2
Coarse Aggregate Sources, which can be accessed here - http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx. The quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
0013 1000.000 US Ton
Item Description: CR-14 Crusher Run - Year 5
Tendering Text: Enter your per ton price for CR 14 Crusher Run from a qualified source listed on the Qualified
Products List 2 Coarse Aggregate Sources, which can be accessed here -http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx. The quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
0014 600.000 US Ton
Item Description: Rip Rap - Year 5
Tendering Text: Enter your per ton price for Rip Rap from a qualified source listed on the Qualified Products List 2
Coarse Aggregate Sources, which can be accessed here - http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx. The quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
0015 600.000 US Ton
Item Description: 57 Stone - Year 5
Tendering Text: Enter your per ton price for 57 Stone from a qualified source listed on the Qualified Products List 2
Coarse Aggregate Sources, which can be accessed here - http://info2.scdot.org/Materials/Pages/QualifiedProd.aspx. The quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
0016 600.000 US Ton
Product Catg.: 96239 - Hauling Services
Item Description: Hauling Fee – Rip Rap – Year 1
Tendering Text: Enter your Per Ton hauling fee. These quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, 0017 1600.000 US Ton
Item Description: Hauling Fee – CR-14 CR & 57 Stone Year 1
Tendering Text: Enter your Per Ton hauling fee. These quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, 0018 600.000 US Ton
Item Description: Hauling Fee – Rip Rap – Year 2
Tendering Text: Enter your Per Ton hauling fee. These quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, 0019 1600.000 US Ton
Item Description: Hauling Fee – CR-14 CR & 57 Stone Year 2
Tendering Text: Enter your Per Ton hauling fee. These quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, 0020 600.000 US Ton
Item Description: Hauling Fee – Rip Rap – Year 3
Tendering Text: Enter your Per Ton hauling fee. These quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, 0021 1600.000 US Ton
Item Description: Hauling Fee – CR-14 CR & 57 Stone Year 3
Tendering Text: Enter your Per Ton hauling fee. These quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, 0022 600.000 US Ton
Item Description: Hauling Fee – Rip Rap – Year 4
Tendering Text: Enter your Per Ton hauling fee. These quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, 0023 1600.000 US Ton
Item Description: Hauling Fee – CR-14 CR & 57 Stone Year 4
Tendering Text: Enter your Per Ton hauling fee. These quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, 0024 600.000 US Ton
Item Description: Hauling Fee – Rip Rap – Year 5
Tendering Text: Enter your Per Ton hauling fee. These quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No, 0025 1600.000 US Ton
Item Description: Hauling Fee – CR-14 CR & 57 Stone Year 5
Tendering Text: Enter your Per Ton hauling fee. These quantities are estimated.
Question Mandatory /
Optional
Multiple
Responses
Accepted?
Response
US End-Product Pref. Section 11-35-
1524, (B)(1). Select US End Product if product is made, manufactured or grown in the US. Select No, if not claiming a
Are you requesting the SC Resident
Vendor Preference? See the SC
Procurement Code, Section 11-35-
1524(C)(1)(I)&(II) and Section IIB of this solicitation for more information. For a FAQ on these preferences, please see
SC End-Product Pref. Section 11-35-
1524 (B)(2). Select SC End Product
Preference if product is made, manufactured or grown in SC. Select No,
File details come from the government source that posted it. Updated .