This document is an amendment to a solicitation for the purchase of one CFM56-3C1 aircraft engine and one engine transportation dolly/cradle from the Justice Prisoner & Alien Transportation System (JPATS). Key details include: JPATS requires documentation showing the engine has a minimum 20 degree EGT margin at full power of 23,500 lbs as demonstrated by a recent max power assurance run sheet from either a test cell or on-wing run, provided the engine has not been operated since. The amendment changes pre-award inspection and deliverables requirements to accept this documentation in lieu of inspecting the physical engine. The solicitation number and award date are not provided, but the response date is not extended by this amendment.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15M30020QA3700168/0001 Page 1 of 3
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
04/22/2020
4. REQUISITION/PURCHASE REQUISITION NUMBER
M-20-A37-R-000345
5. PROJECT NUMBER (If applicable)
MHQ006CODE
U.S. Marshals Service Justice Prisoner & Alien Transportation System 1251 NW Briarcliff Parkway | Suite 300 Kansas City, MO. 64116
6. ISSUED BY 15M300CODE
U.S. Marshals Service Justice Prisoner & Alien Transportation System 1251 NW Briarcliff Parkway | Suite 300 Kansas City, MO. 64116
7. ADMINISTERED BY (If other than Item 6)
9A. AMENDMENT OF SOLICITATION NUMBER
15M30020QA3700168
CODE FACILITY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)
X 9B. DATED (SEE ITEM 11)
04/10/2020
10A. MODIFICATION OF CONTRACT/ORDER
NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not,
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The above referenced solicitation is hereby amended as follows:
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Victor J. Stamps
(Signature of person authorized to sign)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
By (Signature of Contracting Officer)
16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
04/22/2020 Previous edition unusable STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
N/A
(x) is required to sign this document and return _______ copies to the issuing office.
X
CONTINUATION SHEET PAGE 2 OF 3 PAGESREFERENCE NO. OF DOCUMENT BEING CONTINUED:
15M30020QA3700168/0001
Address questions submitted via e-mail. JPATS’ answers to each of the questions are included below:
Questions and Answers
Question 1: What is the tentative contract award data?
Answer 1: The contract will be awarded after all quotes have been thoroughly evaluated and the offer that represents the best value has been determined.
Question 2: When is the tentative date for the pre-award inspection?
Answer 2: The pre-award inspection occurs following the issuance of the “Notice of Apparent Successful Offeror” by JPATS. This date will be based on the offeror’s response (Factor 2 – Delivery Schedule) to the RFQ.
Question 3: If the engine is currently undergoing Performance Restoration in the shop, what would JPATS require for a pre-award inspection?
Answer 3: JPATS requires the offeror to have the engine ready and available for inspection within the continental United States. See Technical Specifications-Requirements, Paragraph IV, Pre-Award Inspection.
Question 4: Will there be any preference given to zero time from Performance Restoration engines with AD 2017-14-08 terminated?
Answer 4: This is a “best value” procurement using the trade-off process. The Government will make an award to the responsible offeror, whose offer is most advantageous to the Government, price and other factors considered. A best value determination using the trade-off analysis will be conducted.
Question 5: Is the (20) degree EGT Margin at 23,500 lbs of thrust requirement as per AMM 71-00-00 Test No. 5?
Answer 5: If the proposed engine is not undergoing a shop visit, AMM Task 71-00-00-725-025-C00 for Test No. 5 - Power Assurance Check will sufficiently demonstrate EGT Margin by completing Table 505/71-00-00-993-836-C00. If the proposed engine is undergoing a shop visit, the Summary Log of Engine Test or Engine Test Cell Results will demonstrate EGT Margin.
Question 6: Please confirm the definition of QEC is all parts listed in the Boing PPBU, or does JPATS have a separate listing?
Answer 6: JPATS confirms that for the purposes of this solicitation the definition of Quick Engine Change (QEC) is per Boeing’s PPBU manual and shall include all QEC items identified in said manual except as identified in the solicitation. JPATS does not have a separate QEC listing.
Question 7: Does JPATS have a MIN requirement list for the back to birth trace on LLP’s?
Answer 7: JPATS does not have a minimum requirement for back to birth traceability on LLP’s. The offeror must sufficiently demonstrate LLP life remaining of all installed LLP’s.
a
PAGE 3 OF 3 PAGESCONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:
15M30020QA3700168/0001
• Solicitation is hereby amended to change the below requirement:
IV. PRE-AWARD INSPECTION:
•Review and evaluate the latest Max Power Assurance Run Sheet, either test Cell or On-Wing, documented EGT margins at 80% N1, 85% N1, and 90%N1 thereby demonstrating the engine will have the required EGT margin at full power (23,500 lbs) of not less than 20 degrees. (The engine must not have been operated after the performance of an on-wing Max Power Assurance Run or
(Reference SF 1449 Page 5) Test Cell Run for either to be considered valid)
VI. DELIVERABLES
•The latest Max Power Assurance Run Sheet, either test Cell or On-Wing, documented EGT margins at 80% N1, 85% N1, and 90%N1 thereby demonstrating the engine will have the required EGT margin at full power (23,500 lbs) of not less than 20 degrees. (The engine must not have been operated after the performance of an on-wing Max Power Assurance Run or Test Cell Run for either to be considered valid) (Reference SF 1449 Page 6)
You must submit the following documentation as part of your technical quote:
For Aircraft Engines that are serviceable at time of quote submittal:
4. The latest Max Power Assurance Run Sheet, either test Cell or On-Wing, documented EGT margins at 80% N1, 85% N1, and 90%N1 thereby demonstrating the engine will have the required EGT margin at full power (23,500 lbs) of not less than 20 degrees.(The engine must not have been operated after the performance of an on-wing Max Power Assurance Run or Test Cell Run for either to be considered valid) (Reference SF 1449 Page 24)
(End of Summary of Changes)
| Amendment 0002.pdf |
| Form |
| FAR 52.212-4 Contract Terms and Conditions – Commercial Items (MAY 2015) |
| FAR 52.247-52 Clearance and Documentation Requirements -- Shipments to DoD Air or Water Terminal Transshipment Points (FEB 2006) |
| Part 12 Clauses |
| CLAUSES ADDED TO PART 12 BY ADDENDUM |
| Attachments |
| List of Attachments |
| Part 12 Provisions |
| PROVISIONS ADDED TO PART 12 BY ADDENDUM |
File details come from the government source that posted it. Updated .