Amend_003_Hotshot_Garage_SF30.doc
DOC document 72 KB Posted
- Attached to
- Groveland Hotshot Garage Construction Federal contract opportunity
- Solicitation number
- AG-9JGP-S-16-0029
About this file
Amendment 003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 100_PCT_Design_REV_1.pdf | ||
| 02_26_26_lead_remediation.pdf | ||
| Groveland_HS_Civil--_Final_-_C_7.1.pdf | ||
| 13_28_10_Asbestos_Remediation.pdf | ||
| Site_Visit_2-10-16_Engine_Garage.pdf | ||
| Amend_002_Hotshot_Garage_SF30.doc | DOC document | |
| Groveland_Building_2205_Environmental.pdf | ||
| Hotshots_Geotechnical_Report.pdf | ||
| 100_PCT_Design.pdf | ||
| Wage_Determination.docx | DOCX document | |
| Door_Schedule.docx | DOCX document | |
| Solicitation.doc | DOC document | |
| Drawing.pdf | ||
| Catalog_Cuts.pdf | ||
| 9._PAL_Fire_Plan_Aug_2012.doc | DOC document | |
| Project_Specifications.pdf | ||
| 07160_Manhole_Sealing.doc | DOC document | |
| Wage_Determination.docx | DOCX document | |
| Solicitation 1442 | — | |
| 9. PAL Fire Plan Aug 2012.doc | DOC document | |
| Solicitation.zip | ZIP file | |
| 226169.pdf |
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 2 AMENDMENT 003
GROVELAND HOTSHOT GARAGE Construction
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 4 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 003 |
| 2/18/2016 |
| 781111 |
| 6. ISSUED BY |
| CODE |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
Central California Acquisition Service Area Tahoe National Forest
631 Coyote Street
Nevada City, CA 95959
Same as 6
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
FORMCHECKBOX
AG-9JGP-S-16-0029
9B. DATED (SEE ITEM 11)
01/20/2016
FORMCHECKBOX
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14. (TO BE FILLED OUT BY THE CONTRACTING OFFICER)
| (X) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN |
THE CONTRACT ORDER NO. IN ITEM 10A.
FORMCHECKBOX
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
FORMCHECKBOX
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FORMCHECKBOX
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, FORMCHECKBOX is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
Amendment 003 claifies questions submitted in the last week. Replaces Sheet C.7.1 with the attached Civil—Final-C7.1. Also incorporates into the solicitation Lead remediation specifications and asbestos remediation specification also attached.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
| MATTHEW GAGNON |
| 02/18/2016 |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
Additional Clarifications based on further Government review of the plans:
1. The retaining wall drainage shall be placed per Detail D4, Sheet A321 with this addition, filter fabric shall be placed between the compacted gravel and the earth. Detail 8, Sheet S5, fails to show the drainage board or drain rock along the length of the retaining wall and is incorrect for that portion of the detail.
2. Detail D2, Sheet A321 incorrectly shows cement-fiber panel siding below watertable. This should be the same as the cement fiber lap siding as shown above the watertable in Detail D2. Refer to building exterior elevations on Sheets A200 and A201 for the correct finished look.
3. There are two Details labeled A4 on Sheet A321. The right hand Detail A4 which shows flashing over the drainage board should be labelled A2 as referenced on Detail D4, Sheet A321. Also the note on Detail A2 (formerly D4 right), “sealant by others” should be changed to “sealant”.
RFI 11
E-Mail, 02/11/2016 2:57 pm
28. We strongly recommend that the bid date be moved to Tuesday, February 23, 2016.
Response:
Bid response date has been changed to Tuesday, February 23, 2106
RFI 12
02/12/2016 8:29 am
29. Are these proposals to be hand delivered at the Nevada city address?
Response:
Hand deliver is acceptable or Fedex, UPS or other courier service. Fax is acceptable however original bid bond with wet signature and raised seal are required. Remember only 1 fax line is designated to receive proposals and may be busy during the hours prior, if it is not received by closing time of the solicitation it is not responsive. I highly recommend hand delivered or overnight carrier to ensure it is at the location at the proper place and time. The correct address is Tahoe National Forest SO, 631 Coyote St., Nevada City CA 95959.
RFI 13
E-Mail, 02/12/2016 9:24 am
30. Mention was made at the Site Visit of a fire alarm system being requested for this facility. The drawings do not seem to indicate a fire alarm system and there was no Specification Section for fire alarm provided. If a fire alarm system is required for this building, will the Forest Service provide Div. 28 Specifications for the actual system requirements? Please confirm that the fire alarm system does not have to be provided by a proprietary manufacture and that it is a standalone system that does not tie back into an existing system?
Response:
Per Sheet E001, General Electrical Note “U”, Fire Alarm shall be a Design-Build, deferred submittal. System must meet referenced NFPA and other codes. It can be any commercially available system and does not tie back into any other existing system.
31. Information from the Site Visit indicates the PG&E electrical design documents have yet to be furnished. Will the Forest Service clarify which entity will be paying for the PG&E design and fees? If this is to be the Contractor, will the Forest Service provide the cost information for this utility work?
Response:
PG&E primary electrical power design and wiring shall be paid for by the Forest Service. Contractor will be responsible for installation of service pedestal, trenching, placement of conduit, and back fill per PG&E requirements.
32. Will the government please clarify that in the case were a manufacture is listed by name on the plans or in the specification, that it is the governments intent to allow for the contractors to utilize and equal product that provides the government with all of the salient characteristics of the product called out by name? IF there are any systems that must conform to an existing standard that cannot be met with an equal can the government provide a list of those products.
Response:
For all listed equipment, the “brad name or equal” clause (52.211-6) applies. See solicitation amendment 002.
RFI 14
E-Mail, 02/12/2016 9:30 am
33. The washer, dryer, and refrigerator equipment specified are all discontinued models. Can you please provide alternates?
Response:
All three appliances are subject to Brand Name or Equal” (see question 32.)
Refrigerator: Kenmore Model #51 21 cu ft Counter-Depth Side-by-Side
Washer: Whirlpool Model #WFW72HEDW 4.2 cu ft Front Load
Dryer: Whirlpool Model #WED72HEDW 7.3 cu ft Electric Dryer
34. Will any structural drawings for the garage portion of the project be provided?
Response:
Please refer to Sheets A130, A160, A300, A310, A320, A321, A601, S3, S4, S5 and S6 for specifics on Engine Bay construction. Truss design shall be a deferred submittal by the contractor per Truss note, Sheet S1.
RFI 15
E-Mail, 02/12/2016 9:57 am
35. Pursuant to the findings in the Hazardous Building Material Survey by Ford Environmental Services, provided in Amendment 0002, will the Forest Service be issuing any Specifications or other specific instructions as to the handling of the Asbestos Containing Materials and / or the Lead Based Paint noted in the survey?
Response:
Yes, Specifications 02 26 26 – Lead Remediation and 13 28 10 – Asbestos Remediation are included with this solicitation.
RFI 16
E-Mail, 02/12/2016 12:09 pm
36. Specification Section 08 36 13 – Sectional Overhead Doors, Parts 1.8 & 2.1-A require the doors be manufactured by Raynor. Will the Forest Service consider the attached information from Northwest Door to be considered an equal product?
Response:
Review of “or equal” product submittals will be after contract award.
RFI 17
E-Mail, 02/15/2016 4:55 pm
37. In order to accurately quantify demolition material, please provide as-builts for original building construction.
Response:
As-built drawings are not available for the existing building. Contractor was expected to make this determination during the site visit. Nominal dimensions of Building 2205 are 31.2’x81.5’ for the original building and 12.4’x20’ for the addition. Nominal dimensions of Building 2114 are 63’ x 21’.
38. After extensive examination of the existing building to be demolished (2205), please confirm that testing has been completed for lead paint contamination in the existing sub structure and siding material.
Response:
Testing was only accomplished as documented. Please note that exterior siding at the rear of the building (T-111) was placed over asbestos siding in approximately 1992. No other determinations for sub-structures have been made. Contractor will inform the Government of suspected additional contamination at time of demolition. Investigation by the Government and resulting actions will be accomplished at that time.
39. Please confirm that the property owner will remove all material and debris from Building 2114 before contractor begins demolition.
Response:
All non-structural material will be removed from this building prior to demolition by the Government.
RFI 18
E-Mail, 02/15/2016 6:54 pm
40. The Earthwork Specification states that excess dirt is to be stockpiled in a designated location by the CO. I do not see anywhere in the documents a location onsite to place this. Will the excess material be kept onsite?
Response:
Stockpiling of excess dirt can be staged within the limits of work as shown on Sheet A001. Additional stockpiling can be made at the area east of Building 2112 per the direction of the CO. Excess material not required has to be removed off US Government lands prior to completion of this project.
RFI 19
E-Mail, 02/16/2016 2:15 pm
41. On page C 2.0 it shows the quantity of AC to be removed is 9800 + / -. We have digitized it twice and came out with the square footage to be 12,532.
Response:
A review of the CAD file puts it at 13,400 sf +/-. This includes all driveable AC and Concrete to be removed along with the concrete area in the slope where storage shed identified in reference note “6” is located. This higher number should be reflected in your proposal. The concrete in the covered porch is in addition to this and the area is correct as shown.
File details come from the government source that posted it. Updated .