AG-9AC7-S-15-0109.pdf
PDF 868 KB Posted
- Attached to
- Pave Parks Creek Road 42N17
- Solicitation number
- AG-9AC7-S-15-0109
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_1_Pave_Parks_Creek.pdf | ||
| WD_CA9_17Apr15.pdf | ||
| Fire_Plan.pdf | ||
| Parks_Creek_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AG-9AC7-S-15-0109
1. REQUEST NO.
5a. ISSUED BY
NAME
a. NAME
c. STREET ADDRESS
d. CITY
10. PLEASE FURNISH QUOTATIONS TO
THE ISSUING OFFICE IN BLOCK 5a ON
OR BEFORE CLOSE OF BUSINESS (Date)
2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG.1
RATING
6. DELIVERY BY (Date)
7. DELIVERY
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
PAGE OF PAGES
5b. FOR INFORMATION CALL: (No collect calls)
TELEPHONE NUMBER
AREA CODE NUMBER
8. TO:
b. COMPANY
e. STATE f. ZIP CODE
c. CITY
d. STATE e. ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
THIS RFQ
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
IS IS NOT A SMALL BUSINESS SET ASIDEX
04/22/2015 739234
1 44
R5 NO-CAL ACQ SERVICE AREA NCASA
3644 AVTECH PARKWAY SUITE 180
REDDING CA 96002
USDA FOREST SERVICE
30 Days After Notice to Proceed
USDA FOREST SERVICE
SHASTA TRINITY NATIONAL FOREST
3644 AVTECH PARKWAY
REDDING
CA 96002
530 226-2408SANDRA VINCENT
05/15/2015 1630 PT
FOB DESTINATION
OTHER
(See Schedule)X
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
Pave Parks Creek Road 42N17
Please use the Schedule of Items (Section B) to respond to price criteria and to provide contact information. Technical response is also required (See Section M).
Quotes are preferred by email but are also accepted by fax or post.
The quote due date is 5/15/15 at 4:30PM Pacific.
Period of Performance: 09/01/2015 to 10/01/2015
001 See Schedule of Items
FOB: Destination
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations
13. NAME AND ADDRESS OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
a. NAME OF QUOTER
AREA CODE
NUMBER
15. DATE OF QUOTATION
b. TELEPHONE are are not attached
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA - FAR (48 CFR) 53.215-1(a)
CONSTRUCTION RFQ SOLICITATION NO. AG-9AC7-S-15-0109
Pave Parks Creek Road 42N17
Shasta-Trinity National Forest
PAVE PARKS CREEK ROAD 42N17
SHASTA-TRINITY NATIONAL FOREST
Contents
PART I: THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS/SCHEDULE OF ITEMS
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
101 - Terms, Format, and Definitions 102 - Bid, Award, and Execution of Contract
103 - Scope of Work 104 - Control of Work 105 - Control of Material
106 - Acceptance of Work 107 - Legal Relations and Responsibility to the Public
108 - Prosecution and Progress 109 - Measurement and Payment 151 - Mobilization
155 - Schedules for Construction Contracts 156 - Public Traffic
301 - Untreated Aggregate Courses 303 - Road Reconditioning
ASPHALT Material
SECTION D--PACKAGING AND MARKING
SECTION E--INSPECTION AND ACCEPTANCE
SECTION F--DELIVERIES OR PERFORMANCE
SECTION G--CONTRACT ADMINISTRATION DATA
SECTION H--SPECIAL CONTRACT REQUIREMENTS
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
PART III--LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J--LIST OF ATTACHMENTS
PART IV--REPRESENTATIONS AND INSTRUCTIONS
SECTION K--REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF
OFFERORS OR RESPONDENTS
SECTION L--INSTRUCTIONS, CONDITIONS, AND NOTICES TO QUOTERS
SECTION M--EVALUATION FACTORS FOR AWARD
Shasta-Trinity National Forest
PART I: THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS/SCHEDULE OF ITEMS
PAY ITEM DESCRIPTION
PAYMENT
METHOD
PAY
UNIT
QTY
UNIT
PRICE
TOTAL
PRICE
151(01)
Mobilization
JOB LSQ 1 $_________ $ ___________
156(01)
Public Traffic
JOB LSQ 1 $_________ $ ___________
301(01)
Untreated Aggregate Course
Shoulder Backing
Compaction B
Compact by Rollers
Government Supplied-Onsite
JOB LSQ 1 $_________ $ ___________
303(01)
Road Reconditioning Final Shaping and Compaction of Base
Compaction F
Compact to 95% AASHTO T-180
JOB LSQ 1 $_________ $ ___________
403(01)
Hot Asphalt Concrete Pavement
Type PG 64-16, ½-inch mix
TN AQ 275 $_________ $ ___________
* ESTIMATED QUANTITY – ACTUAL QUANTITY WILL BE DETERMINED DURING CONTRACT PERFORMANCE
TOTAL QUOTE
Quoter Name:
Address:
Phone / Email:
DUNS Number:
Shasta-Trinity National Forest
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 DESCRIPTION OF WORK
Furnish all labor, equipment and materials to pave 5 sections of road. The approximate lengths are 90 feet, 120 feet, 185 feet, 195 feet, and 195 feet.
C.2 WORK ITEMS
Work will include completing the final grading and compaction (95% T-180) the base. Saw-cutting and tack coat the edges of the existing asphalt, paving (2-1/2-inch) and shoulder backing. Saw-cutting and tack coat will not have separate pay items and will be incidental to the contract. The material for the shoulder backing will be onsite.
C.3 PROJECT LOCATION
The project is located in the Shasta-McCloud Ranger District, Siskiyou County. See location map.
C.4 PRE-QUOTE CONFERENCE
A Pre-Quote meeting will not be scheduled but interested parties may contact Gene Rand at (530) 226-
2330 to schedule a pre-quote site visit.
C.5 CONTRACT TIME AND ESTIMATED STARTING DATE
Estimated starting date is September 1, 2015. The contract time will be 30 days.
C.6 PROJECT ACCESS
The road on this project may be closed to traffic during construction for a maximum of 60 minutes during weekdays only. The road must be open through the weekend starting by 5:00 PM on Fridays.
Any closure request must be submitted at least 10 days before work starts.
C.7 TECHNICAL INFORMATION
The Contractor shall furnish a Traffic control plan, Safety Plan and a Spill Plan, along with a detailed plan of operation for approval by the Government prior to starting work. Technical questions about this project should be directed to the Contracting Officer: Sandra Vincent; svincent02@fs.fed.us.
C.8 PRICE RANGE
The price range for this project is between $25,000 and $100,000. This range includes all items.
mailto:svincent02@fs.fed.us
Shasta-Trinity National Forest
C.9 TECHNICAL SPECIFICATIONS
ALL of the specifications from the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-03 are part of this solicitation and any resultant contract. The website for the specifications is http://flh.fhwa.dot.gov/resources/pse/specs/fp-03.htm. The following specifications are specifically associated with this contract. The omission of a Forest Service
Specification shall not be cause for a contract modification.
Preface 101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid, Award, and Execution of Contract 102 Bid, Award, and Execution of Contract
103 - Scope of Work Deletions
104 - Control of Work Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources
105.02(a) Government-provided sources
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims
107.06 Contractor’s Responsibility for Work
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
107.02 Protection and Restoration of Property and Landscape
108 - Prosecution and Progress 108 Delete
109 - Measurement and Payment 109 Deletions
109.02 Measurement Terms and Definitions
151 - Mobilization 155 - Schedules for Construction Contracts
155 Delete 156 - Public Traffic
156.04 Maintaining Roadways During Work
156.08 Traffic and Safety Supervisor
301 - Untreated Aggregate Courses 301 Title Change
301.05 Compacting
303 - Road Reconditioning
303.05 Compacting
ASPHALT Material http://flh.fhwa.dot.gov/resources/pse/specs/fp-03.htm
Shasta-Trinity National Forest
Preface Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National
Forest System Roads.
Shasta-Trinity National Forest
101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association
Mine Safety and Health Administration
National Institute of Standards and Technology
National Electrical Safety Code
West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line
(including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2)
Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition
Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest
Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of
Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
http://www.nist.gov/
Shasta-Trinity National Forest
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road
Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Shasta-Trinity National Forest
Figure 101-1—Illustration of road structure terms.
Shasta-Trinity National Forest
102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
Shasta-Trinity National Forest
103 - Scope of Work 103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
Shasta-Trinity National Forest
104 - Control of Work 104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road
Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
Shasta-Trinity National Forest
105 - Control of Material 105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
Shasta-Trinity National Forest
106 - Acceptance of Work 106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
Shasta-Trinity National Forest
107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph:
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with
Federal, state, and local laws and regulations.
107.10_05_us_05_04_2007
107.20 Protection and Restoration of Property and Landscape
Meet the requirements chapters 10, 11, and 12.2 in their entirety of “Water Quality Management for
National Forest System Lands in California Best Management Practices” dated September 2000
Shasta-Trinity National Forest
108 - Prosecution and Progress 108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
Shasta-Trinity National Forest
109 - Measurement and Payment 109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
Shasta-Trinity National Forest
151 - Mobilization 151.00_01_us_10_11_2006
Delete Section 151 in its entirety and replace with the following.
Description
151.01 This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site; obtaining of permits, insurance, and bonds. This work also includes washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on
Forest Service lands, according to the requirements within.
Construction Requirements
Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the Forest
Service will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the National Forest.
Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.
Notify the CO in writing at least 72 hours before moving any construction equipment onto the national forest. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.
Use methods of cleaning and locations for cleaning approved by the CO.
For work at a commercial washing facility, use an approved facility.
New infestations of noxious weeds of concern to Forest Service and identified by either Contractor or
Forest Service, in the Project Area or on the haul route, will be promptly reported to the other party.
Contractor and Forest Service will agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.
Measurement
151.02 Clean equipment prior to moving onto this project. The initial cleaning will not be included in the measurement for payment. Payment for cleaning will only be made if subsequent cleanings are ordered by the CO. Measurement shall be on an “each” basis, meaning one complete cleaning of all equipment required for this contract. Subsequent cleanings necessitated by the Contractor’s actions but not directed by the CO will not be included in the measurement for payment.
Measure mobilization according to Subsection 109.02.
Shasta-Trinity National Forest
Payment
151.03 The accepted quantity, measured as provided in Subsection 109.02, will be paid at the contract price per unit of measurement for the Section 151 pay item shown in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Progress payments for mobilization lump sum will be paid as follows:
(a) If applicable, bond premiums will be reimbursed according to FAR Clause 52.232-5 Payments
Under Fixed-Price Construction Contracts, after receipt of the evidence of payment.
(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.
(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.
(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.
Include all costs associated with the initial cleaning of equipment in the unit bid price for Mobilization.
Cleaning for subsequent move-ins will not be paid for unless after a suspension ordered by the CO.
Shasta-Trinity National Forest
155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
Shasta-Trinity National Forest
156 - Public Traffic 156.00_nat_us_04_17_2007
Delete Section 156 in its entirety and replace with the following:
Description
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Construction sign panels 633
Retro-reflective sheeting 718.01
Temporary concrete barrier 618
Temporary plastic fence 710.11
Temporary traffic control devices 718.22
156.03 General. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed 60 minutes at any one time followed by an open period of no less than
10 minutes.
Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post construction signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags.
Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
Shasta-Trinity National Forest
156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.
Table 156-1
Temporary Road Closures
Road
Number
From
Terminus
To
Terminus
Maximum
Consecutive
Days of
Closure
Minimum
Consecutive
Days Open
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Payment will be made as specified in the Schedule of Items.
156.04_nat_us_02_24_2005
156.04 Maintaining Roadways During Work.
(a) Add the following:
Do not construct detours outside of the clearing limits or use alternate route detours without the approval of the CO.
156.08_nat_us_02_24_2005
156.08 Traffic and Safety Supervisor.
Delete this subsection in its entirety.
Shasta-Trinity National Forest
301 - Untreated Aggregate Courses 301.00_nat_us_03_03_2005
301 Title Change.
Change the title to: Section 301 Aggregate Courses
301.05_nat_us_05_17_2005
301.05 Compacting
Delete and replace with the following:
Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road.
Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
Compaction A. Operating spreading and hauling equipment over the full width of the travelway.
Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).
Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in
Subsection 204.11(a)(1).
Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.
Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
301.10_nat_us_03_03_2005
301.10 Payment
Delete the following:
adjusted according to Subsection 106.05
303 - Road Reconditioning
303.05 Compacting
Delete the line
Compact according to Subsection 204.11.
Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road.
Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
Compaction A. Operating spreading and hauling equipment over the full width of the travelway.
Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).
Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in
Subsection 204.11(a)(1).
Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.
Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
Shasta-Trinity National Forest
ASPHALT Material
702.01 Delete the first sentence add the following:
Performance graded (PG) asphalt binder shall conform to the following Standard Specifications, State of California:
Performance Graded Asphalt Binder
Specification
Grade
Property AASHTO
Test
Method
PG
58-22a
64-10
64-16
64-28
70-10
Original Binder
Flash Point, Min. °C T48 230 230 230 230 230
Solubility, Min. % b T44 99 99 99 99 99
Viscosity at 135°C, c
Max., Pa·s
T316
3.0
Dynamic Shear, Test Temp. at 10 rad/s, °C
Min. G*/sin(delta), kPa
T315
1.00
RTFO Test e, Mass Loss, Max., %
T240
RTFO Test Aged Binder
Dynamic Shear, Test Temp. at 10 rad/s, °C
Min. G*/sin(delta), kPa
T315
2.20
Ductility at 25°C
Min., cm
T51
PAV f Aging, Temperature, °C
R28
RTFO Test and PAV Aged Binder
Dynamic Shear, Test Temp. at 10 rad/s, °C
Min. G*sin(delta), kPa
T315
22 d
31 d
28 d
22 d
34 d
Creep Stiffness, Test Temperature, °C
Max. S-value, MPa
Min. M-value
T313
-12
0.300
-6
-18
0.300
Notes:
a. For use as asphalt rubber base stock for high mountain and high desert area.
b. The Engineer will waive this specification if the supplier is a Quality Supplier as defined by the Department's "Certification Program for Suppliers of Asphalt."
c. The Engineer will waive this specification if the supplier certifies the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards.
d. Test the sample at 3°C higher if it fails at the specified test temperature. G*sin(delta) shall remain 5000 kPa maximum.
e. "RTFO Test" means the asphaltic residue obtained using the Rolling Thin Film Oven
Test, AASHTO Test Method T240 or ASTM Designation: D 2872.
f. "PAV" means Pressurized Aging Vessel.
Shasta-Trinity National Forest
AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J and elsewhere in the contract.
AGAR 452.211-73 ATTACHMENTS TO STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
SECTION D--PACKAGING AND MARKING
{For this Solicitation, there are NO clauses in this Section}
SECTION E--INSPECTION AND ACCEPTANCE
FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR: https://www.acquisition.gov/far
AGAR: http://www.dm.usda.gov/procurement/policy/agar.html
FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
INCORPORATED BY REFERENCE
FAR 52.246-1 Contractor Inspection Requirements (APR 1984)
FAR 52.246-12 Inspection of Construction (AUG 1996)
SECTION F--DELIVERIES OR PERFORMANCE
FAR 52.242-14 Suspension of Work (APR 1984) http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#21172 http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#21173 https://acquisition.gov/far/current/html/52_248_253.html#wp1120047 https://www.acquisition.gov/far http://www.dm.usda.gov/procurement/policy/agar.html http://acquisition.gov/far/current/html/52_246.html#wp1118709 https://acquisition.gov/far/current/html/52_246.html#wp1118901 https://acquisition.gov/far/current/html/52_241_244.html#wp1128875
FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984)
The Contractor shall be required to (a) commence work under this contract within upon the effective date of the Notice to Proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 calendar days after receipt of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
The anticipated/ estimated start work date is September 1, 2015. Note: Submittals and ordering may begin before construction starts.
AGAR 452.236-75 MAXIMUM WORKWEEK – CONSTRUCTION SCHEDULE (NOV 1996)
Within seven (7) calendar days after receipt of a written request from the Contracting Officer, the
Contractor must submit the following information in writing for approval:
(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the
Contractor proposed to carry out the work.
SECTION G--CONTRACT ADMINISTRATION DATA
POST-AWARD CONFERENCE
A post award conference with the successful offeror may be scheduled within 5 calendar days after the date of contract award and held at a location mutually agreed upon between the Contracting Officer and the awarded contractor prior to start of work.
INVOICE PROCESSING PLATFORM (IPP)
The "Submit Invoice-to" address for USDA orders is the Department of Treasury's Invoice Processing
Platform (IPP). All invoices for service under this contract shall be submitted via the electronic
Invoice Processing Platform. This platform is managed by the U.S. Department of Treasury and additional information is available at this website: https://www.ipp.gov/index.htm.
Vendors new to IPP register at https://www.ipp.gov/vendors/enrollment-vendors.htm.
SUBMITTAL OF INVOICE DOCUMENTS
Submittal of payment certification via attachment in IPP is recommended, but they may also be delivered to the COR in a manner agreeable to both parties. The Contractor shall submit payrolls to the
COR via email or as otherwise agreed between both parties.
https://acquisition.gov/far/current/html/52_207_211.html#wp1141217 http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#23675 https://www.ipp.gov/index.htm https://www.ipp.gov/vendors/enrollment-vendors.htm
Shasta-Trinity National Forest
SECTION H--SPECIAL CONTRACT REQUIREMENTS
WORKER’S COMPENSATION INSURANCE
The Contractor shall provide evidence of Worker's Compensation Insurance or a written explanation as to why the Contractor is exempt from the requirement. NOTE: The Contractor working alone as an owner/operator is not required to carry the insurance.
AGAR 452.236-77 EMERGENCY RESPONSE (NOV 1996)
(a) Contractor's Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause
52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,
AND IMPROVEMENTS, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.
(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
( c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting
Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire fighting). An equitable adjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR
52.243-4.
PART II--CONTRACT CLAUSES
SECTION I--CONTRACT CLAUSES
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
FAR: www.acquisition.gov/far
AGAR: www.usda.gov/procurement/policy/agar.html
52.204-7 System for Award Management (JUL 2013)
52.219-6 Notice of Total Small Business Set-Aside (NOV 2011)
52.222-3 Convict Labor (JUN 2003) http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#23677 https://acquisition.gov/far/current/html/52_248_253.html#wp1120047 http://www.acquisition.gov/far http://www.usda.gov/procurement/policy/agar.html https://acquisition.gov/far/current/html/52_200_206.html#wp1137850 https://acquisition.gov/far/current/html/52_217_221.html#wp1136004 https://acquisition.gov/far/current/html/52_222.html#wp1147479
Shasta-Trinity National Forest
52.222-5 Construction Wage Rate Requirements—Secondary Site of the Work (MAY 2014)
52.222-6 Construction Wage Requirements (MAY 2014)
52.222-7 Withholding of Funds (MAY 2014)
52.222-8 Payrolls and Basic Records (MAY 2014)
52.222-9 Apprentices and Trainees (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements (FEB 1988)
52.222-11 Subcontracts (Labor Standards) (MAY 2014)
52.222-12 Contract Termination - Debarment (MAY 2014)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations (MAY 2014)
52.222-14 Disputes Concerning Labor Standards (FEB 1988)
52.222-15 Certification of Eligibility (MAY 2014)
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000 (MAY 2014)
52.222-21 Prohibition of Segregated Facilities (FEB 1999)
52.222-26 Equal Opportunity (MAR 2007)
52.222-27 Affirmative Action Compliance Requirements for Construction (FEB 1999)
52.222-36 Equal Opportunity for Workers with Disabilities (JUL 2014)
52.222-50 Combating Trafficking in Persons (FEB 2009)
52.222-55 Minimum Wages Under Executive Order 13658 (DEC 2014)
52.223-6 Drug-Free Workplace (MAY 2001) (Applicable if contract is awarded to an individual)
52.225-13 Restrictions on Certain Foreign Purchases (JUN 2008)
52.227-4 Patent Indemnity -- Construction Contracts (DEC 2007)
52.232-5 Payments Under Fixed-Price Construction Contracts (MAY 2014)
52.232-23 Assignment of Claims (MAY 2014)
52.232-27 Prompt Payment for Construction Contracts (MAY 2014)
52.232-33 Payment by Electronic Funds Transfer – System for Award Management (JUL 2013) 52.233-1 Disputes (MAY 2014)
52.233-3 Protest After Award (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim (OCT 2004)
52.236-2 Differing Site Conditions (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984)
52.236-5 Material and Workmanship (APR 1984)
52.236-7 Permits and Responsibilities (NOV 1991)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, &Improvements (APR 1984)
52.236-10 Operations and Storage Areas (APR 1984)
52.236-11 Use and Possession Prior to Completion (APR 1984)
52.236-12 Cleaning Up (APR 1984)
52.236-13 Accident Prevention (NOV 1991)
52.236-15 Schedules for Construction Contracts (APR 1984)
52.236-17 Layout of Work (APR 1984)
52.236-21 Specifications and Drawings for Construction (FEB 1997)
52.236-26 Preconstruction Conference (FEB 1995)
52.243-5 Changes and Changed Conditions (APR 1984)
52.244-6 Subcontracts for Commercial Items (OCT 2014)
52.246-21 Warranty of Construction (MAR 1994)
52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short From) (APR 1984) 52.249-10 Default (Fixed-Price Construction) (APR 1984)
52.253-1 Computer Generated Forms (JAN 1991) https://acquisition.gov/far/current/html/52_222.html#wp1150718 https://acquisition.gov/far/current/html/52_222.html#wp1147505 https://acquisition.gov/far/current/html/52_222.html#wp1147521 https://acquisition.gov/far/current/html/52_222.html#wp1147526 https://acquisition.gov/far/current/html/52_222.html#wp1147541 https://acquisition.gov/far/current/html/52_222.html#wp1147548 file:///C:/Users/svincent02/Documents/Not%20fire/Contract%20Documents%202013/03Evaluating/MNF%20Soda%20Creek%20WH%20Roof%20-%20728645/Pre-Award/Working%20Docs/52.222-11 https://acquisition.gov/far/current/html/52_222.html#wp1147560 https://acquisition.gov/far/current/html/52_222.html#wp1147565 https://acquisition.gov/far/current/html/52_222.html#wp1147570 https://acquisition.gov/far/current/html/52_222.html#wp1147575 https://acquisition.gov/far/current/html/52_222.html#wp1147649 https://acquisition.gov/far/current/html/52_222.html#wp1147656 https://acquisition.gov/far/current/html/52_222.html#wp1147711 https://acquisition.gov/far/current/html/52_222.html#wp1147739 https://acquisition.gov/far/current/html/52_222.html#wp1162802 https://acquisition.gov/far/current/html/52_222.html#wp1151848 http://acquisition.gov/far/current/html/52_222.html#wp1163045 https://acquisition.gov/far/current/html/52_223_226.html#wp1168850 https://acquisition.gov/far/current/html/52_223_226.html#wp1169608 https://acquisition.gov/far/current/html/52_227.html#wp1139101 https://acquisition.gov/far/current/html/52_232.html#wp1152507 https://acquisition.gov/far/current/html/52_232.html#wp1152984 https://acquisition.gov/far/current/html/52_232.html#wp1153110 https://acquisition.gov/far/current/html/52_232.html#wp1153351 https://acquisition.gov/far/current/html/52_233_240.html#wp1113304 https://acquisition.gov/far/current/html/52_233_240.html#wp1113329 https://acquisition.gov/far/current/html/52_233_240.html#wp1113344 https://acquisition.gov/far/current/html/52_233_240.html#wp1113365 https://acquisition.gov/far/current/html/52_233_240.html#wp1113375 https://acquisition.gov/far/current/html/52_233_240.html#wp1113390 https://acquisition.gov/far/current/html/52_233_240.html#wp1113402 https://acquisition.gov/far/current/html/52_233_240.html#wp1113412 https://acquisition.gov/far/current/html/52_233_240.html#wp1113418 https://acquisition.gov/far/current/html/52_233_240.html#wp1113425 https://acquisition.gov/far/current/html/52_233_240.html#wp1113431 https://acquisition.gov/far/current/html/52_233_240.html#wp1113436 https://acquisition.gov/far/current/html/52_233_240.html#wp1113461 https://acquisition.gov/far/current/html/52_233_240.html#wp1113477 https://acquisition.gov/far/current/html/52_233_240.html#wp1113494 https://acquisition.gov/far/current/html/52_233_240.html#wp1113534 https://acquisition.gov/far/current/html/52_241_244.html#wp1129035 https://acquisition.gov/far/current/html/52_241_244.html#wp1129139 https://acquisition.gov/far/current/html/52_246.html#wp1119079 https://acquisition.gov/far/current/html/52_248_253.html#wp1119604 https://acquisition.gov/far/current/html/52_248_253.html#wp1119885 https://acquisition.gov/far/current/html/52_248_253.html#wp1120078
Shasta-Trinity National Forest
AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES
452.209-71 Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a
Felony Conviction (Deviation 2012-01) (FEB 2012) (Alternate 1 Feb 2012)
452.236-72 Use of Premises (NOV 1996)
452.236-73 Archeological or Historic Sites (FEB 1988)
452.236-76 Samples and Certificates (FEB 1988)
FAR 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action
Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered are, are as follows:
Goals for minority participation for each trade: 6.8%
Goals for female participation for each trade: 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41
CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative actions obligations required by the clause entitled "Affirmative Action Compliance
Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to
Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4.
Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal
Contract Compliance, U. S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the--
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is
Siskiyou County, California.
http://www.dm.usda.gov/procurement/policy/docs/USDAFARDeviation03-22-2012Solicitation.pdf http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#23672 http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#23673 http://www.dm.usda.gov/procurement/policy/agar_x/agar04/subchaph.html#23676 https://acquisition.gov/far/current/html/52_222.html#wp1147671
Shasta-Trinity National Forest
FAR 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER
SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013)
(a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of Agriculture (USDA)-designated items unless—
(1) The product cannot be acquired—
(i) Competitively within a time frame providing for compliance with the contract performance schedule;
(ii) Meeting contract performance requirements; or
(iii) At a reasonable price.
(2) The product is to be used in an application covered by a USDA categorical exemption (see 7
CFR 3201.3(e)). For example, all USDA-designated items are exempt from the preferred procurement requirement for the following:
(i) Spacecraft system and launch support equipment.
(ii) Military equipment, i.e., a product or system designed or procured for combat or combat-related missions.
(b) Information about this requirement and these products is available at http://www.biopreferred.gov.
(c) In the performance of this contract, the Contractor shall—
(1) Report to http://www.sam.gov, with a copy to the Contracting Officer, on the product types and dollar value of any USDA-designated biobased products purchased by the Contractor during the previous Government fiscal year, between October 1 and September 30; and
(2) Submit this report no later than—
(i) October 31 of each year during contract performance; and
(ii) At the end of contract performance.
FAR 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN
SERVICE AND CONSTRUCTION CONTRACTS (MAY 2008)
(a) In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired—
(1) Competitively within a timeframe providing for compliance with the contract performance schedule; (2) Meeting contract performance requirements; or
(3) At a reasonable price.
(b) Information about this requirement is available at EPA’s Comprehensive Procurement
Guidelines web site, http://www.epa.gov/cpg/. The list of EPA-designated items is available at http://www.epa.gov/cpg/products.htm.
FAR 52.225-9 BUY AMERICAN - CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. As used in this clause—
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and https://acquisition.gov/far/current/html/52_223_226.html#wp1168786 http://www.biopreferred.gov/ http://www.sam.gov/ http://acquisition.gov/far/current/html/52_223_226.html#wp1181056 http://www.epa.gov/cpg/ http://www.epa.gov/cpg/products.htm https://acquisition.gov/far/current/html/52_223_226.html#wp1169273 https://acquisition.gov/far/current/html/Subpart%202_1.html#wp1145508
Shasta-Trinity National Forest
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .