SECTION B - SCHEDULE OF ITEMS
South Fork Road Repair
AMENDMENT 6
Amendment 6 4/22/2015 1/1
Item No. Desc. Method Unit Qty Unit Price Total
GENERAL WORK
151(01) Mobilization LSQ Job 1 $____________ $______________
156(01) Public Traffic LSQ Job 1 $____________ $______________
157(01) Soil Erosion Control LSQ Job 1 $____________ $______________
204(01) Excavation and Embankment AQ CY 2000 $____________ $______________
Eacavation and removal of material
207(01) Earthwork Geotextiles AQ SY 2850 $____________ $______________
Table 714-1 Class 1 Woven, Type D
207(02) Earthwork Geotextiles AQ SY 5700 $____________ $______________
Table 714-6 Type VI
301(01) Untreated Aggregate Course AQ CY 1000 $____________ $______________
Includes Shoulder Backing
Compaction F, 95% T-180
Government Supplied
301(02) Untreated Aggregate Course AQ CY 500 $____________ $______________
Drain Rock-Commercial source
403(01) Hot Asphalt Concrete Pavement AQ TN 950 $____________ $______________
Type PG 64-16, 1/2-inch mix
412(01) Asphalt Tack Coat AQ LS 1 $____________ $______________
Spread rate-0.10 gallons per square yard
602(01) Culverts and Drains AQ LF 50 $____________ $______________
24-inch 12 gauge galvanized CMP
Total $____________ $______________
Amendment 6
AG-9AC7-S-15-0052
South Fork Road 40N26 Road repair
SECTION C - DESCRIPTION/SPECIFICATION/WORK STATEMENT
C.1. DESCRIPTION OF WORK
Furnish all labor, equipment and materials to repair road damage on the South Fork Road. 40N26. There are generally two types of work
C.1.a DIGOUT WORK
Work will include removing the existing chipseal, excavation and removal of approximately 20 inches of base and subbase, disposing this material at the designated disposal site, placing geotextile under a 6-inch layer of drain rock, placing 12 inches of base separated by geotextiles fabric at 6-inch intervals, paving (2-inch) and shoulder backing.
C.1.b PATCHING WORK
Work will include pothole patching and skin patching of the existing chipseal. Skin patch areas shall be completed by cleaning any deleterious material, placing a tack coat and placing approximately 1-inch of asphalt.
The contractor will be required to complete all sampling and testing in accordance with the specifications.
C.1.c DETAILED DESCRIPTION OF MAJOR PAY ITEMS
Pay Item 157(01) Soil Erosion Control: This pay item consist of providing proper drainage and wattle protection around the disposal material at the designated disposal site.
Pay Item 204(01) Excavation and Embankment: This work consists of excavation of existing base and subbase to a depth of approximately 20-inches. The material will be hauled to the designated disposal site (rock quarry).
Pay Item 207(01) Earthwork Geotextiles: This work consists of providing and placing the designated geotextile as shown on the drawings. Payment will include all work required to place this material.
Pay Item 207(02) Earthwork Geotextiles: This work consists of providing and placing the designated geotextile as shown on the drawings. Payment will include all work required to place this material.
Pay Item 301(01) Untreated Aggregate Course: This material is provided by the Government at the designated rock quarry. This work will consist of loading, hauling and placing and compacting to 95% T180, 12-inches of road base. This also included placing and compacting (no designated compaction requirement) the shoulder backing as required on the digout areas.
Pay Item 301(02) Untreated Aggregate Course: This work consists of purchasing, delivering and placing and compacting 6-inches of drain rock as shown in the drawings. This rock shall be a washed free draining rock with a maximum size of 2-inches. The contractor will submit a gradation for approval before work commences.
Pay Item 602(01) Culverts and Drains: This work consist of installing a 24-inch galvanized cmp. It includes all work and materials for a complete installation.
AMENDMENT 006
| SF30 |
| A1 Schedule of Items |
| Schedule |
| A2 Section C |
| A3 Drawing 3 TYPICAL Revised |
| A4 Sheet 4 Road Logs |