South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 1 | P a g e
Shasta-Trinity NF
South Fork Road 40N26
Road Subbase and Surface Repair
SPECIAL PROJECT SPECIFICATIONS
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 2 | P a g e
Preface 101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid, Award, and Execution of Contract 102 Bid, Award, and Execution of Contract
103 - Scope of Work Deletions
104 - Control of Work
Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources
105.02(a) Government-provided sources
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims
107.06 Contractor’s Responsibility for Work
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
107.02 Protection and Restoration of Property and Landscape
108 - Prosecution and Progress
108 Delete 109 - Measurement and Payment
109 Deletions
109.02 Measurement Terms and Definitions
151 - Mobilization
155 - Schedules for Construction Contracts 155 Delete
156 - Public Traffic
156.04 Maintaining Roadways During Work
156.08 Traffic and Safety Supervisor
207 - Earthwork Geosynthetics……………………………………………………………………………..57
301 - Untreated Aggregate Courses
301 Title Change
301.05 Compacting
303 - Road Reconditioning
303.05 Compacting
ASPHALT Material
714 - Geosynthetic aterial……………………………...……………………………………………………63
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 3 | P a g e
Preface Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest
System Roads.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 4 | P a g e
101 - Terms, Format, and Definitions 101.00_nat_us_07_25_2005
101.01_nat_us_01_22_2009
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association
Mine Safety and Health Administration
National Institute of Standards and Technology
National Electrical Safety Code
West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line
(including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or
“construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
http://www.nist.gov/
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 5 | P a g e
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest
Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S. Department of
Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road
Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 6 | P a g e
Figure 101-1—Illustration of road structure terms.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 7 | P a g e
102 - Bid, Award, and Execution of Contract 102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 8 | P a g e
103 - Scope of Work 103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 9 | P a g e
104 - Control of Work 104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road
Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 10 | P a g e
105 - Control of Material 105.02_nat_us_01_18_2007
105.02 Material Sources.
105.02(a) Government-provided sources.
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_us_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 11 | P a g e
106 - Acceptance of Work 106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 12 | P a g e
107 - Legal Relations and Responsibility to the Public 107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill.
Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
107.10_05_us_05_04_2007
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 13 | P a g e
107.02 Protection and Restoration of Property and Landscape
Meet the requirements chapters 10, 11, and 12.2 in their entirety of “Water Quality Management for
National Forest System Lands in California Best Management Practices” dated September 2000
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 14 | P a g e
108 - Prosecution and Progress 108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 15 | P a g e
109 - Measurement and Payment 109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 16 | P a g e
151 - Mobilization 151.00_01_us_10_11_2006
Delete Section 151 in its entirety and replace with the following.
Description
151.01 This work consists of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site; obtaining of permits, insurance, and bonds. This work also includes washing and treating construction equipment and vehicles necessary for equipment transport to remove seeds, plants, and plant fragments before the equipment is used on Forest
Service lands, according to the requirements within.
Construction Requirements
Wash the sides, tops, and undercarriages of all construction equipment. Remove all seeds, plants, plant fragments, dirt, and debris from the construction equipment. Only equipment inspected by the Forest
Service will be allowed to operate within the project area. All subsequent move-ins of equipment to the project area will be treated in the same manner as the initial move-in. This requirement does not apply to cars, pickup trucks, and other vehicles that regularly travel between the construction site and areas off the
National Forest.
Equipment will be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment, components or the need for specialized inspection tools is not required.
Notify the CO in writing at least 72 hours before moving any construction equipment onto the national forest. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Inspection will be required after every cleaning.
Use methods of cleaning and locations for cleaning approved by the CO.
For work at a commercial washing facility, use an approved facility.
New infestations of noxious weeds of concern to Forest Service and identified by either Contractor or
Forest Service, in the Project Area or on the haul route, will be promptly reported to the other party.
Contractor and Forest Service will agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.
Measurement
151.02 Clean equipment prior to moving onto this project. The initial cleaning will not be included in the measurement for payment. Payment for cleaning will only be made if subsequent cleanings are ordered by the CO. Measurement shall be on an “each” basis, meaning one complete cleaning of all equipment required for this contract. Subsequent cleanings necessitated by the Contractor’s actions but not directed by the CO will not be included in the measurement for payment.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 17 | P a g e
Measure mobilization according to Subsection 109.02.
Payment
151.03 The accepted quantity, measured as provided in Subsection 109.02, will be paid at the contract price per unit of measurement for the Section 151 pay item shown in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
Progress payments for mobilization lump sum will be paid as follows:
(a) If applicable, bond premiums will be reimbursed according to FAR Clause 52.232-5 Payments
Under Fixed-Price Construction Contracts, after receipt of the evidence of payment.
(b) When 5 percent of the original contract amount is earned from other bid items, 50 percent of the mobilization item, or 5 percent of the original contract amount, whichever is less, will be paid.
(c) When 10 percent of the original contract amount is earned from other bid items, 100 percent of the mobilization item, or 10 percent of the original contract amount, whichever is less, will be paid.
(d) Any portion of the mobilization item in excess of 10 percent of the original contract amount will be paid after final acceptance.
Include all costs associated with the initial cleaning of equipment in the unit bid price for Mobilization.
Cleaning for subsequent move-ins will not be paid for unless after a suspension ordered by the CO.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 18 | P a g e
155 - Schedules for Construction Contracts 155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
156 - Public Traffic 156.00_nat_us_04_17_2007
Delete Section 156 in its entirety and replace with the following:
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Construction sign panels 633
Retro-reflective sheeting 718.01
Temporary concrete barrier 618
Temporary plastic fence 710.11
Temporary traffic control devices 718.22
156.03 General. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic.
Delays may not exceed 30 minutes at any one time followed by an open period of no less than 10 minutes.
Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post construction signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 19 | P a g e
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services Association, the
National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.
Table 156-1
Temporary Road Closures
Road
Number
From
Terminus
To
Terminus
Maximum
Consecutive
Days of
Closure
Minimum
Consecutive
Days Open
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Payment will be made as specified in the Schedule of Items.
156.04_nat_us_02_24_2005
156.04 Maintaining Roadways During Work.
(a) Add the following:
Do not construct detours outside of the clearing limits or use alternate route detours without the approval of the CO.
156.08_nat_us_02_24_2005
156.08 Traffic and Safety Supervisor.
Delete this subsection in its entirety.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 20 | P a g e
Section 207. — EARTHWORK GEOSYNTHETICS
Delete Section 207 in its entirety and replace with the following:
207.01 This work consists of furnishing and installing geotextile in separation, stabilization, and filter applications, geogrid in stabilization applications, and geomembrane in moisture barrier applications.
Geosynthethics are designated according to the tables in Section 714.
Material
207.02 Conform to the following Subsections:
Geomembrane 714.05
Geotextile 714.01
Stabilization geogrid 714.03
Construction Requirements
207.03 General. Identify, store, and handle geosynthetics according to ASTM D4873 and the manufacturer’s recommendations. Elevate and protect geosynthetic rolls with a waterproof cover if stored outdoors. Limit geosynthetics exposure to less than 10 days of ultraviolet radiation.
For seams sewn on-site, conform to the manufacturer’s recommendations. Obtain approval of the seam before installation. Use thread consisting of high strength polypropylene or polyester. Do not use nylon thread. Use thread that is resistant to ultraviolet radiation and a contrasting color to the geotextile.
Submit a seam assembly description and a sample of the sewn material at least 14 days before installation when geosynthetic joints are sewn as follows:
(a) Assembly description. Include the seam type, seam allowance, stitch type, sewing thread tex ticket numbers and types, stitch density, and stitch gauge.
(b)
(b) Sewn seam samples. Sew seam samples using the same equipment and procedures used to sew production seams. Submit samples that have at least 6 feet (1.8 meters) of sewn seam and are at least 5 feet (1.5 meters) wide. If production seams are sewn in both the machine and cross-machine directions, provide sewn seam samples that are oriented in both the machine and cross-machine directions.
Replace or repair geosynthetic that is torn or punctured. Remove the damaged area and place a patch of the same type of geosynthetic overlapping 36 inches (900 millimeters) beyond the damaged area or sew a seam around the damaged area.
207.04 Geotextile and Geogrid Separation and Stabilization Applications.
(a) Surface preparation. Before placing the geotextile, geogrid, or both, prepare the surface as follows:Section
207 125
(1) Existing ground. Cut trees and shrubs flush with the ground surface. Do not remove the topsoil and vegetation mat. Clear the area of vegetation and obstructions according to Sections 201 and 203. Remove sharp objects and large rocks. Fill depressions or holes with suitable material to provide a smooth surface.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 21 | P a g e
(2) Subgrade. Prepare the subgrade according to Subsections 204.13(c) and (d).
(3) Subexcavation. Perform subexcavation according to Subsection 204.07.
(c) Geotextile or geogrid placement. Place geogrid on top of geotextile when both are shown at the same elevation in the plans. Place the geosynthetic smooth, taut, and wrinkle free on the underlying surface.
Conform to curves. Overlap in the direction of construction. Overlap at least 24 inches (600 millimeters) at the ends and sides of adjoining sheets or sew the joints according to the manufacturer’s recommendations. Do not place longitudinal overlaps below anticipated wheel loads. Hold the geosynthetic in place with pins, staples, or piles of cover material.
(c) Backfilling.
(1) First layer placement and compaction. End dump the backfill material onto the geotextile or geogrid from the edge of the geosynthetic or from previously placed cover material. Do not operate equipment directly on the geosynthetic. Spread the end-dumped pile of cover material maintaining a 12 inch (300 millimeters) lift over the geosynthetic. Avoid sudden stops, starts, or turns of the construction equipment. Fill ruts from construction equipment with additional cover material. Do not blade material down to remove ruts. If rutting exceeds 3 inches (75 millimeters) during placement, decrease the construction equipment size, decrease the equipment weight, or increase the first lift thickness as directed by the CO.
Compact according to Subsection 204.11. Do not use sheepsfoot or studded compaction equipment. Compact the cover material with pneumatic-tire or nonvibratory smooth drum rollers.
(2) Subsequent layer placement and compaction. Place subsequent layers according to Subsection 204.10.
Compact according to Subsection 204.11. Vibratory rollers may be used unless pumping or foundation failures occur. Repair damaged areas and then use only nonvibratory rollers.
207.05 Reinforcement Geotextile and Geogrid. See Section 261 for reinforcement geotextile and geogrid placement.
207.06 Geotextile Filter Applications.
(a) Geotextile placement. For slope or wave protection, place the long dimension of the geotextile down the slope. For stream bank protection, place the long dimension of the geotextile parallel to the centerline of the channel.
Overlap or sow seams at the ends and sides of adjoining sheets.
(1) Overlapping. Overlap the uphill or upstream sheet over the downhill or downstream sheet. For above water applications, overlap the geotextile at least 12 inches (300 millimeters). For underwater applications, overlap the geotextile at least 36 inches (900 millimeters).Section 207 126
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 22 | P a g e
(2) Sewing. Sew the geotextile seam according to the manufacturer’s recommendations.
Offset end joints of adjacent sheets at least 5 feet (1.5 meters). Use key trenches or aprons at the crest and toe of slopes to hold the geotextile in place. As an alternative use anchor pins, at least 18 inches (450 millimeters) long and spaced at 36 inch (900 millimeters) centers to hold the geotextile sheets in place.
(b) Backfilling. Place aggregate, slope protection, or riprap on the geotextile starting at the toe of the slope and proceeding upward. Place riprap onto the geotextile from a height of less than 12 inches (300 millimeters). Place slope protection rock or aggregate backfill onto the geotextile from a height less than 36 inch (900 millimeters).
Do not allow stones weighing more than 100 pounds (45 kilograms) to roll down the slope. In underwater applications, place the geotextile and cover material in the same day.
207.07 Geomembrane Applications. Submit a geomembrane installation plan at least 10 days before installing the geomembrane. Include a drawing of the panel layout identifying the location of seams. Include a seam detail and a written description of the seaming procedure.
(a) Surface preparation. Provide a smooth, flat, firm, unyielding foundation for the geomembrane with no sudden, sharp, or abrupt changes or break in grade. Remove rocks, stones, sticks, sharp objects, and debris protruding more than ½ inch (13 millimeters) above the prepared surface.
(b) Geomembrane placement. Orient seams parallel to the line of maximum slope. Use sandbags or piles of cover material to hold the geomembrane in place. Do not drive equipment directly on the geomembrane.
(c) Backfilling. Place backfill material within the same work shift that the geomembrane is installed. End dump backfill material onto the edge of previously placed cover material and roll it into place. Do not push material along the geomembrane which can result in damage or wrinkling.
207.08 Acceptance. Geosynthetics will be evaluated under Subsection 106.03. Submit a production certification with each shipment of geosynthetics.
Geosynthetic installation will be evaluated under Subsections 106.02 and 106.04.
Sewn joints will be evaluated under Subsection 106.02.
Measurement
207.09 Measure the Section 207 pay items listed in the bid schedule according to Subsection 109.02.
When measuring geosynthetics by the square yard (square meter), measure on the plane parallel to the slope face.
Do not measure overlapping material.Section 207 127
Payment
207.10 The accepted quantities will be paid at the contract price per unit of measurement for the Section 207 pay item listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section.
See Subsection 109.05.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 23 | P a g e
301 - Untreated Aggregate Courses 301.00_nat_us_03_03_2005
301 Title Change.
Change the title to: Section 301 Aggregate Courses
301.05_nat_us_05_17_2005
301.05 Compacting
Delete and replace with the following:
Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
Compaction A. Operating spreading and hauling equipment over the full width of the travelway.
Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).
Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in
Subsection 204.11(a)(1).
Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest
Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.
Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest
Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
301.10_nat_us_03_03_2005
301.10 Payment
Delete the following:
adjusted according to Subsection 106.05
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 24 | P a g e
303 - Road Reconditioning
303.05 Compacting
Delete the line
Compact according to Subsection 204.11.
Compact each layer full width. Roll from the sides to the center, parallel to the centerline of the road. Along curbs, headers, walls, and all places not accessible to the roller, compact the material with approved tampers or compactors.
Compact the aggregate using one of the following methods as specified:
Compaction A. Operating spreading and hauling equipment over the full width of the travelway.
Compaction B. Operate rollers and compact as specified in Subsection 204.11(a)(1).
Compaction C. Moisten or dry the aggregate to a uniform moisture content between 5 and 7 percent based on total dry weight of the mixture. Operate rollers and compact as specified in
Subsection 204.11(a)(1).
Compaction D. Compact to a density of at least 95 percent of the maximum density, as determined by AASHTO T 99, method C or D.
Compaction E. Compact to a density of at least 96 percent of the maximum density, as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest
Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
Compaction F. Compact to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.
Compaction G. Compact to a density of at least 100 percent of the maximum density as determined by the Modified Marshall Hammer Compaction Method (available upon request from USDA Forest
Service, Regional Materials Engineering Center, P.O. Box 7669, Missoula, MT 59807).
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 25 | P a g e
ASPHALT Material
702.01 Delete the first sentence add the following:
Performance graded (PG) asphalt binder { XE "Asphalt:Performance Graded (PG)" }shall conform to the following
Standard Specifications, State of California:
Performance Graded Asphalt Binder
Specification
Grade
Property AASHTO
Test
Method
PG
58-22a
64-10
64-16
64-28
70-10
Original Binder
Flash Point, Min. °C T48 230 230 230 230 230
Solubility, Min. % b T44 99 99 99 99 99
Viscosity at 135°C, c
Max., Pa·s
T316
3.0
Dynamic Shear, Test Temp. at 10 rad/s, °C
Min. G*/sin(delta), kPa
T315
1.00
RTFO Test e, Mass Loss, Max., %
T240
RTFO Test Aged Binder
Dynamic Shear, Test Temp. at 10 rad/s, °C
Min. G*/sin(delta), kPa
T315
2.20
Ductility at 25°C
Min., cm
T51
PAV f Aging, Temperature, °C
R28
RTFO Test and PAV Aged Binder
Dynamic Shear, Test Temp. at 10 rad/s, °C
Min. G*sin(delta), kPa
T315
22 d
31 d
28 d
22 d
34 d
Creep Stiffness, Test Temperature, °C
Max. S-value, MPa
Min. M-value
T313
-12
0.300
-6
-18
0.300
Notes:
a. For use as asphalt rubber base stock for high mountain and high desert area.
b. The Engineer will waive this specification if the supplier is a Quality Supplier as defined by the Department's "Certification Program for Suppliers of Asphalt."
c. The Engineer will waive this specification if the supplier certifies the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards.
d. Test the sample at 3°C higher if it fails at the specified test temperature. G*sin(delta) shall remain 5000 kPa maximum.
e. "RTFO Test" means the asphaltic residue obtained using the Rolling Thin Film Oven
Test, AASHTO Test Method T240 or ASTM Designation: D 2872.
f. "PAV" means Pressurized Aging Vessel.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 26 | P a g e
Section 714. — GEOSYNTHETIC MATERIAL
Delete Section 151 in its entirety and replace with the following.
714.01 Geotextile. Use long-chain synthetic polymers composed of at least 95 percent by mass of polyolefins or polyesters to manufacture geotextile and the threads used in joining geotextile by sewing.
Form the geotextile, including selvedges, into a stable network such that the filaments or yarns retain their dimensional stability relative to each other.
Property values, with the exception of apparent opening size (AOS), in these specifications represent minimum average roll value (MARV) in the weakest principal direction (that is average test results of any roll in a lot sampled for conformance or quality assurance testing must meet or exceed the specified values).
Values for AOS represent maximum average roll values.
Conform to the following physical requirements:
(a) Separation and stabilization geotextile and geotextile filter. Conform to Table 714-1. { XE "Earthwork geotextile" }{ XE "Geotextile:earthwork" }
Table 714-1
Separation and Stabilization Geotextile and Geotextile Filter Requirements (1)
Strength and Durability Properties
Property Test
Method
ASTM
Units Class 1 Class 2
Type of Geotextile Woven Nonwoven Woven Nonwoven
Elongation at break D4632 % < 50 ≥ 50 < 50 ≥ 50
Minimum grab strength
D4632 lb (N) 320
(1420)
(890)
(1110)
(710)
Minimum sewn seam strength
D4632 lb (N) 290
(1290)
(800)
(980)
(620)
Minimum tear strength
D4533 lb (N) 110
(490)
(360)
(400)
(240)
Minimum puncture strength
D6241 lb (N) 620
(2760)
(1910)
(2220)
(1380)
Minimum ultraviolet stability
D4355 % 50% retained strength after 500 hours of exposure
Hydraulic Properties
Property Test
Method
ASTM
Units Type A Type B Type C Type D Type E
Minimum permittivity
D4491 s -1
0.7 0.5 0.2 0.1 0.1
Maximum apparent opening size
(AOS)
D4751 Sieve size
U.S.
(mm)
No. 40
(0.425)
No. 40
(0.425)
No. 60
(0.250)
No. 40
(0.425)
No. 70
(0.212)
(1) Do not use woven slit film geotextile.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 27 | P a g e
(b) Paving geotextile. Furnish nonwoven geotextile conforming to Table 714-2. { XE "Paving geotextile" }{ XE
"Geotextile:paving" }
Table 714-2
Paving Geotextile Requirements
Property Test Method
ASTM
Units Specifications
Grab strength D4632 lb (N) 110 (490)
Elongation at break D4632 % ≥ 50
Asphalt retention D6140 gal/yd (L/m
) See Note (1)
Mass per unit area D5261 oz/yd (g/m
) 4 - 6 (135 - 200)
Melting point D276 ºF (ºC) 300 (150)
(1) Asphalt required to saturate fabric only. Value supplied by manufacturer in material certification. Value does not indicate the asphalt application rate required for construction.
Product asphalt retention property must meet the MARV provided by the manufacturer’s certification.
714.02 Geocomposite Drain. Furnish a prefabricated geocomposite drain composed of a drainage core and a nonwoven geotextile that permits in-flow from both sides. Geocomposites that only permit in-flow from one side may only be used directly against a concrete surface. Furnish geotextile and drainage core manufactured from long chain synthetic polymers composed at least 95 percent by mass of polypropylene, polyester, polyamide, polyvinyl chloride, polyolefin, or polystyrene. Build the core up in thickness by columns, cones, nubs, cusps, meshes, stiff filaments, or other configurations. Fabricate the core in sheets, panels, or rolls of adequate strength to resist installation stresses and long-term loading conditions.
Property values, with the exception of fungi resistance, in these specifications represent MARV in the weakest principal direction (that is average test results of any roll in a lot sampled for conformance or quality assurance testing must meet or exceed the specified values).
Furnish a nonwoven encapsulating geotextile meeting requirements of Table 714-1. Firmly attach the encapsulating geotextile to the core at the manufacturing plant, so that folding, wrinkling, or other movement cannot occur during handling or after placement. Use a nonwater-soluble adhesive, heat sealing, or other methods recommended by the geotextile manufacturer. Do not use adhesive on areas of the geotextile where flow is intended to occur.
If heat sealing is used, do not weaken the geotextile below the required strength values. Extend the geotextile beyond the core length on all sides sufficiently to encapsulate the core and collector pipe.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 28 | P a g e
Conform to Table 714-3.
Table 714-3
Geocomposite Drain Requirements
Property Test Method Units Specifications
Sheet
Drain
Strip Drain
Type 1 Type 1 Type 2
Transmissivity
(flow rate)
ASTM
D4716 gal/min/ft
(m /sec/m)
5.0
(0.0010)
15.0
(0.0031)
20.0
(0.0041)
Compressive strength at yield
ASTM
D1621 psi
(kPa)
(690)
(340)
(340)
Applied normal compressive stress
ASTM
(4) psi
(kPa)
14.5
(100)
1.45
(10)
1.45
(10)
Hydraulic gradient ASTM
(2)(3)(4) dimensionless 1.0 0.1 0.1
Fungi resistance ASTM G21 − No visible growth
(1) If core construction separates the flow channel into two or more discrete sections, only the flow rate on one in-flow face is considered in determining the core's acceptability.
(2) 14-inch (350 millimeter) long specimen.
(3) 100-hour seating period.
(4) Rubber membrane between platens and geocomposite.
714.03 Stabilization Geogrid. Furnish biaxial geogrid manufactured using long-chain synthetic polymers composed of at least 95 percent by mass of polyolefins, polyesters, or polyamides. Fabricate the geogrid into a stable network such that the ribs, filaments, or yarns retain their dimensional stability relative to each other, including selvages.
Property values, with the exception of maximum opening size, represent MARV (that is average test results of any roll in a lot sampled for conformance or quality assurance testing must meet or exceed the minimum specified values). The value for maximum opening size represents maximum average roll value.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 29 | P a g e
Conform to Table 714-4.
Table 714-4
Stabilization Geogrid Requirements
Property Test Method Specifications
Minimum opening size N/A (2)
½ in (13 mm)
Maximum opening size N/A (2)
3 in (75 mm)
Tensile strength at 2% strain ASTM D6637 400 lb/ft (5.8 kN/m)
Tensile strength at
5% strain
ASTM D6637 800 lb/ft (11.7 kN/m)
Ultimate tensile strength ASTM D6637 1300 lb/ft (19.0 kN/m)
Junction strength GRI (3)
GG2 25 lb (110 N)
Ultraviolet stability ASTM D4355 50% retained strength after
500 hours of exposure
(1) Strength values are in the weaker principal direction.
(2) Direct measure with caliper.
(3) Geosynthetic Research Institute.
714.04 Reinforcement Geotextile and Geogrid. Furnish reinforcement geotextile manufactured using long-chain, synthetic polymers, composed at least 95 percent by mass of polyolefins or polyesters. Form the geotextile, including selvedges, into a stable network such that the filaments or yarns retain their dimensional stability relative to each other.
Furnish reinforcement geogrid manufactured as a regular network of integrally-connected longitudinal and transverse polymer tensile elements with a geometry that permits significant mechanical interlock with the backfill. Provide geogrid composed of fibers or ribs that are at least 95 percent by mass polypropylene, polyethylene, or polyester. The geogrid structure must remain dimensionally stable under construction stresses and have a high resistance to damage during construction, to ultraviolet degradation, and to chemical and biological degradation encountered in the soil being reinforced.
Conform to Tables 714-5 and Table 714-6. Property values represent MARV (that is average test results of any roll in a lot sampled for conformance or quality assurance testing must meet or exceed the minimum specified values).
The nominal long-term strength (Tal) is based on:
Tal = Tult/RF where RF = RFID × RFCR × RFD.
RFID, RFCR, and RFD values must be substantiated by evaluation of independent test results by Highway
Innovative Technology Evaluation Center (HITEC), AASHTO National Transportation Product Evaluation
Program (NTPEP), or an equivalent third party report. Provide a copy of the report to the CO. Determine
RFID, RFCR, and RFD according to the following:
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 30 | P a g e
(a) RFID: Determine the reduction factor for installation damage from the results of full scale construction damage tests conducted according to ASTM D5818. Conduct the tests with a soil having the same maximum particle size, D50, and angularity as the soil to be used for construction. Tests using coarser soils (same or larger maximum particle size and D50) may be an acceptable substitution. The
CO will make the final determination as to whether the test data based on the substitute soil is acceptable. Interpolation of RFID will not be allowed, the results for the coarser soils will be used. The
Contractor may elect to perform a test using project specific fill, placement, and compaction techniques and equipment to determine the RFID. Use a default value of 3.0 if no installation damage testing has been conducted. The minimum value for RFID is 1.1.
(b) RFCR. Determine the creep reduction factor according to one of the following:
(1) Conventional creep testing according to ASTM D5262; or
(2) A combination of Stepped Isothermal Method (SIM) according to ASTM D6992 and conventional creep testing. Perform testing and determine creep reduction factors for a 75 year design life according to the procedures in Appendix D of FHWA-NHI-10-025, Design and
Construction of Mechanically Stabilized Earth Walls and Reinforced Soil Slopes – Volume II. If testing has not been conducted, default values for RFCR are 2.5 for polyester polymer, and 5.0 for polypropylene or polyethylene polymer.
(c) RFD. For polypropylene or polyethylene geosynthetics conforming to the requirements of Table
714-5, a default reduction factor of 1.1 may be used for RFD. For polyester geosynthetics conforming to the requirements of Table 714-5, a default reduction factor of 1.15 may be used for RFD if the soil has a pH between 5 and 8; and a reduction factor of 1.3 may be used if the soil pH is between 3 and 5 or between 8 and 9.
Table 714-5
Reinforcement Geotextile and Geogrid Polymer Requirements
Polymer Type Property Test Method Specifications
Polypropylene and polyethylene
Thermo-oxidation resistance
ENV ISO 13438,
Method A
(polypropylene) or Method B
(polyethylene)
Minimum 50% retained strength after 28 days (polypropylene) or 56 days (polyethylene)
Polyester Hydrolysis resistance
Inherent Viscosity
Method
ASTM D4603
& GRI
(1)
GG8
Minimum number average molecular weight (Mn) of 25,000
" GRI
(1)
GG7 Maximum carboxyl end group
(CEG) of 30
All polymers Ultraviolet stability ASTM
D4355
Minimum 70% retained strength after 500 hours of exposure
Mass per unit area
ASTM
D5261
Minimum 8 oz/yd
(270 g/m
Percent post consumer recycled material by mass
Certification of material used
Maximum 0%
(1) Geosynthetic Research Institute.
South Fork Road 40N26 Construction, AG-9AC7-S-15-0052 31 | P a g e
Table 714-6
Reinforcement Geotextile and Geogrid Strength Requirements
Property Test
Method
ASTM
Units Specifications (1)(2)
Type I Type II Type III Type IV Type V Type VI
Ultimate strength (3)
(Tult)
D4595 or
D6637 (4) lb/ft
(kN/m)
(29.2)
(43.8)
(58.4)
(73.0)
(87.6)
(116.8)
Nominal long-term strength (Tal)
See
Note (5) lb/ft
(kN/m)
(14.6)
(21.9)
(29.2)
(36.5)
(43.8)
(58.4)
(1) For reinforcement geotextile, also meet the Class 1 strength requirements in Table 714-1 and the ultraviolet stability requirements in Table 714-5.
(2) The specified strength is in the principal direction of reinforcement (that is perpendicular to the wall or slope face).
(3) Based on MARV.
(4) ASTM D4595 is for reinforcement geotextile and ASTM D6637 is for geogrid.
(5) See the nominal long-term strength (Tal) formula above.
714.05 Geomembrane. Furnish geomembrane that consists of textured (roughened) surface polyvinyl chloride, high density polyethylene, or linear low density polyethylene geomembrane with a thickness of
28.5 to 31.5 mils (0.72 to 0.80 millimeters). Glue or weld seams of the geomembrane to prevent leakage.
Conform to Table 714-7.
Table 714-7
Geomembrane Requirements
Geomembrane Type Test Method
Polyvinyl chloride (PVC) ASTM D7176 (1)
High density polyethylene (HDPE) GRI (2)
Test Method GM13
Linear low density polyethylene (LLDPE) GRI (2)
Test Method GM17
(1) The minimum average asperity height is 10 mils (0.25 millimeters).
Of 10 readings, 8 of 10 must be greater than or equal to 7 mils (0.18 millimeters) and the lowest individual reading must be greater than or equal to 5 mils (0.12 millimeters).
(2) Geosynthetic Research Institute.
File details come from the government source that posted it. Updated .