Attach2_SPECIAL_PROJECT_SPECIFICATION_CSI.pdf

PDF 70 KB Posted

Attached to
Martin's Dairy Campground Reconstruction
Solicitation number
AG-9AC7-S-13-0030
Issued by

About this file

Attachment 2 Special Project Specs

View the file

Other files

File Type Posted
AG-9AC7-S-13-0030_A2.pdf PDF
CA9_Rev7.dvb.pdf PDF
Amendment_1.pdf PDF
MARTINS-DAIRY-CG-PLANS.pdf PDF
Attach1_Supplement_to_FP03_Specifications.pdf PDF
CA9_mod_6_040513dvb.pdf PDF
PAL_Fire_Plan_030613.pdf PDF
AG-9AC7-S-13-0030.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-9AC7-S-11-0030 Page 1 Martin’s Dairy Campground Reconstruction Special Project Specifications (CSI) Attachment 2

SPECIAL PROJECT SPECIFICATIONS

Division 1 - SECTION 01100 – Summary of Work

SECTION 01100 - SUMMARY OF WORK

The intent of this section is to outline in a general sense the work required under this contract. It is not intended to provide detailed specifications for materials, labor, and workmanship. These are covered in other sections of these specifications.

Location of Work: Martins Dairy Campground is located 42 miles northeast of Weed, California and approximately 36 miles northeast of Montague, California in the Township 46N, Range 3W, Section 27 on the Goosenest Ranger District, Klamath National Forest.

Description of Work: The work shall include all labor, materials, and incidentals necessary to reconstruct the campsites in Martins Dairy Campground. Work includes surveying and re-grading the campsites, Fee tube/Fee Station area and water faucet areas, sloping the sites a maximum of 2% for drainage. Additional work includes installing picnic table anchoring systems, lantern hangers, fire rings, waste receptacles, and cooking grills. Boulder barriers shall be placed around the site adjacent to the campground road and site spur roads where no existing barrier exists. Several wood post barriers shall be replaced with boulders. Final boulder location shall be determined by the engineer. The campsites shall be topped with 4 inches, compacted depth, of ¾-inch minus aggregate and the tent pads shall be topped with 4 inches, compacted depth, of stringy bark and wood to be approved by the engineer.

The contract includes grading the individual campsite spurs in Martins Dairy Campground. The spur subgrade shall be topped with 6 inches, compacted depth, of ¾-inch minus aggregate.

Precast concrete wheel-stops shall be installed on the back end of the pull-in spurs. The contract includes re-grading both the southwest and northeast campground roads as well as widening both of the turn-arounds along the campground roads. Boulders shall be located around the outside and inside perimeter of the turn-around with final location placement approval required from the engineer. An 18” diameter metal pipe shall be installed in the northeast campground road according to the plans.

Option 1 of the contract includes replacing all existing wood post barriers located in Martins Dairy campground with boulders. This includes both sides of the campground roads and the campsite spurs. Final boulder location will be determined by the engineer.

SECTION 01330 – SUBMITTAL PROCEDURES

The CONTRACTOR is responsible to submit all information necessary to insure compliance with standards and specifications. The CONTRACTOR shall provide submittals at least ten business days prior to beginning the associated work.

Submit (2) two copies to the Contracting Officer (C.O.) for approval on items required herein:

AG-9AC7-S-11-0030 Page 2 Martin’s Dairy Campground Reconstruction

a. Written work plan/schedule

b. Manufacture’s literature, MSDS, and shop drawings of all construction products and materials planned to be used.

c. Provide Hazardous Spill plan per spec Section 107.10.

Work shall not begin until all submittals have been reviewed and approved by GOVERNMENT.

No separate measurement or payment will be made for work specified in this section.

SECTION 01600 - USE OF GOVERNMENT FACILITIES, UTILITIES, ECT

Storage of CONTRACTOR's materials and equipment, if required, may be at the project site, where approved by the C.O. The GOVERNMENT shall not be responsible for CONTRACTOR's materials or equipment stored on GOVERNMENT property.

CONTRACTOR may use existing GOVERNMENT utilities if available and if the C.O. gives written approval. Otherwise, the CONTRACTOR shall be responsible for furnishing all utilities necessary to complete this job.

SECTION 01640 – PRODUCT HANDLING

Work includes protecting products scheduled for use in the work by means including, but not necessarily limited to, those described in this section.

Packaging: Delivery of products to the job site: Maintain packaged materials with seal unbroken and labels intact until time of use. Promptly remove damaged material meeting the specified requirements, at no additional cost to the GOVERNMENT. The GOVERNMENT will reject as non-complying such material and products that do not bear identification satisfactory to the GOVERNMENT as to grade, quality, and other pertinent information.

Protection: Protect finished surfaces over which equipment and materials are handled. Maintain finished surfaces to be suitably protected until accepted by the GOVERNMENT.

Repairs and Replacements:

a. In event of damage, promptly make replacements and repairs to the item as directed and approved by the GOVERNMENT at no additional cost to the GOVERNMENT.

b. Additional time required to secure replacements and to make repairs will not be considered by the GOVERNMENT to justify an extension in the Contract Time of Completion.

END OF SECTION 01640

AG-9AC7-S-11-0030 Page 3 Martin’s Dairy Campground Reconstruction

Division 1 - SECTION 01010

SUMMARY OF WORK– CAMPSITE FURNITURE

PART 1 - GENERAL

1.1 SECTION INCLUDES:

A. Description of work.

B. Contractor use of site.

1.2 DESCRIPTION:

A. Work under this section consists of the following items of work:

1. Install site furniture, including nine foot picnic tables, single pedestal grills, lantern hangers and fire rings.

2. Removal and re-installation or disposal of existing site furniture.

1.3 FIELD VERIFICATION:

A. The Contractor shall field-verify all new and existing dimensions and field conditions prior to starting work or ordering products.

1.4 CONTRACTOR-FURNISHED ITEMS:

A. The Contractor shall furnish all labor, materials and equipment necessary for the completion of the work, as specified.

END OF SECTION

AG-9AC7-S-11-0030 Page 4 Martin’s Dairy Campground Reconstruction

SECTION 01711 – CLEANUP AND DISPOSAL

PART 1 GENERAL

1.01 SCOPE

A. This work consists of the cleanup required in areas affected by the construction and the disposal excess materials resulting from construction operations.

1.03 MEASUREMENT AND PAYMENT

A. No separate measurement or payment will be made for the work specified in this Section.

PART 2 PRODUCTS

Not applicable.

PART 3 EXECUTION

3.01 EXCESS MATERIALS AND REFUSE

A. All refuse and unused materials generated by the Contractor's operations including barrier posts and the like, shall be removed from the project site and disposed off National Forest lands in accordance with State and Local regulations. Stumps and other vegetative materials shall be removed and disposed of at the designated disposal site.

3.02 EXISTING TABLES

A. Existing Klamath Stoves shall be removed and disposed at the designated disposal site.

3.03 SITE RESTORATION

A. Any ground disturbance resulting from removal operations shall be restored to its original condition.

AG-9AC7-S-11-0030 Page 5 Martin’s Dairy Campground Reconstruction

DIVISION 10– SPECIALTIES

SECTION 10300 – PICNIC TABLES & LANTERN HANGERS

1. GENERAL

1.01 DESCRIPTION: The work performed in this section includes, but is not limited to, furnishing all materials, labor and equipment to remove and reset existing lantern hangers;

furnish and install new picnic tables and lantern hangers in accordance with this specification at the locations shown on the drawings or as designated by the Forest Service.

2. PRODUCTS

2.01 MATERIALS:

A. 9’ Picnic Tables: The 9’ Heavy Duty Picnic Tables shall be furnished by the government and installed by the contractor. Picnic Tables are manufactured by Sonoma County Probation Camp, 7400 Steve Olson Lane, Forestville, CA 95436. Phone (707) 565-8900, and installed by the Contractor. Tables are 9’ heavy duty with 3” x 12” redwood top and bench, 6” x 6” A frames, and 4” x 6” cross braces, assembled. Weight 405 lbs.

B. Lantern Hangers: The lantern hangers shall be furnished by the government and installed by the contractor. Lantern Hangers shall be manufactured by Pilot Rock Park Equipment, R.L. Thomas Manufacturing Co., Inc. PO Box 946, Cherokee, Iowa, 51012-0946 Phone 1-800-762-5002. Model LH/CB-180. Weight 38 lbs.

C. Storage: Government materials will be stored at the Mt Hebron Work Center. Contact Joe Hoisington at (530) 398-5772 (office) or (530) 905-3715 (cell) to make arrangements for pick up.

3 EXECUTION

REMOVAL AND RE-SETTING OF EXISTING LANTERN HANGERS: Remove designated lantern hangers and re-set in locations as shown on the plans. Old concrete shall be removed from the hanger and disposed at the designated disposale site. Paint re-set lantern hangers to match new lantern hangers.

Material surrounding the concrete footing shall be compacted to provide a firm installation of the hanger at the proper height.

INSTALLATION OF NEW TABLES & LANTERN HANGERS: New tables and lantern hangers shall installed at the locations designated on the drawings. Final locations are to be approved by the engineer.

The tables shall be held in place by being chained and locked to a concrete anchor. 5/16” x 6’ long chains shall provided by the contractor with the locks furnished by the government.

AG-9AC7-S-11-0030 Page 6 Martin’s Dairy Campground Reconstruction

Table Anchoring: The tables shall have a concrete anchor cast in to the soil in accordance with the drawings at locations designated by the Forest Service. Construction to be paid under Item 10300(02). The tables shall be installed within the picnic pads to leave 4 foot minimum between the edge of the table top and the edge of the unit pad and all other campground accessories.

Lantern Hanger Footing: The lantern hangers shall have a concrete footing cast into the unit pad in accordance with the drawings at locations designated by the Forest Service. Construction to be paid under Item 10300(02) or 10300(04).

4. MEASUREMENT AND PAYMENT

4.01 MEASUREMENT: The method of measurement will be DESIGNATED in the SCHEDULE OF ITEMS. All labor, materials, and equipment necessary to remove and dispose of existing tables and grills; remove and re- set existing lantern hangers; furnish and install new picnic tables and lantern hangers shall be included in this item.

4.02 PAYMENT: The quantities, as measured above, shall be paid for at the unit price per each table and lantern hanger installed and accepted.

PAY ITEM

PAY UNIT

10300(01) 9’ Picnic Table…………………………………..………….EA

10300(02) Lantern Hanger………………………………………..……EA

10300(04) Remove and Re-set Lantern Hanger………………….……EA

AG-9AC7-S-11-0030 Page 7 Martin’s Dairy Campground Reconstruction

SECTION 10510- COOKING GRILLS/FIRE RINGS

GENERAL

1.02 DESCRIPTION: The work performed in this section includes, but is not limited to, furnishing all materials, labor and equipment to install new grills and fire rings in accordance with this specification at the locations shown on the drawings or as designated by the Forest Service.

PRODUCTS

a. Single Pedestal Grill: The grills will be furnished by the government and installed by the Contractor. Grills to include optional utility shelf (Model B2) and weights 108 lbs and are manufactured by Pilot Rock Park Equipment, R.L. Thomas Manufacturing Co., Inc. PO Box 946, Cherokee, Iowa, 51012-0946 Phone 1-800- 762-5002. Model N-24/S B2.

b. Universal Access Fire Ring: The fire rings will be furnished by the government and installed by the Contractor. Rings shall include optional Heat Shield (Model HS-F).

Fire ring is 30” inside diameter with 9” high (once filled w/ 9” of course aggregate) fire barrier and weights 117 lbs. Ring includes three ½” diameter “U” shaped anchor pins for concrete embedment and are manufactured by Pilot Rock Park Equipment, R.L. Thomas Manufacturing Co., Inc. PO Box 946, Cherokee, Iowa, 51012-0946 Phone 1-800-762-5002. Model FS-30/18/PA.

c. Fire Ring: The fire ring will be furnished by the government and installed by the

Contractor. Fire ring is 30” inside diameter with 9” high fire barrier and weights 80 lbs. Ring includes two ½” diameter “U” shaped anchor pins for concrete embedment and is manufactured by Pilot Rock Park Equipment, R.L. Thomas Manufacturing Co., Inc. PO Box 946, Cherokee, Iowa, 51012-0946 Phone 1-800- 762-5002. Model FS-30/9/TB.

d. Storage: Government furnished materials will be stored at the Mt Hebron Work

Center. Contact Joe Hoisington at (530) 398-5772 (office) or (530) 905-3715 (cell) to make arrangements to pick up.

EXECUTION

3.01 INSTALLATION OF SINGLE GRILLS: The grills shall be placed in accordance with the manufacturer's instructions and as shown on the drawings. The Contractor shall install the

AG-9AC7-S-11-0030 Page 8 Martin’s Dairy Campground Reconstruction optional utility shelf on all single pedestal grills in accordance with the manufacturer’s instructions.

3.02 UNIVERSAL ACCESS FIRE RINGS: The fire rings shall be placed in accordance with the manufacturer's instructions and recommendations at the locations designated by the Forest Service. The Contractor shall install the optional heat shield in accordance with the manufacturer’s instructions. The ring shall be placed/anchored on a concrete pad and the Contractor shall place coarse rock (3/4” minus) inside fire ring to a depth 9“from top of ring.

3.03 FIRE RING: The fire rings shall be placed in accordance with the manufacturer's instructions and recommendations at the locations designated by the Forest Service. The Fire Ring shall be anchored to a concrete pad in accordance with the drawings at the location designated by the Forest Service.

3.04 CONCRETE: All concrete required for installation of grills and fire rings shall be paid for under Item 10510

MEASUREMENT AND PAYMENT

SCHEDULE OF ITEMS. All labor and materials necessary for the complete installation shall be included in this item.

4.02 PAYMENT: The quantities, as measured above, shall be paid for at the unit price per each cooking grill installed and accepted.

PAY ITEM PAY UNIT

10510(01) Single Pedestal Grill ……………………..……………………………..…. EA Model N-24 B2 with Utility Shelf B2

10510(03) Universal Access Fire Ring…………………………………....…….…...….EA Model FS-30/18/PA with HS-F Heat Shield

10510(04) Fire Ring………..………………………...…………….....................…...….EA Model FS-30/9/TB

AG-9AC7-S-11-0030 Page 9 Martin’s Dairy Campground Reconstruction

SECTION 10600 – WASTE RECEPTACLES

furnishing all materials, labor and equipment and installing new waste receptacles in accordance with this specification at the locations shown on the drawings.

a. Waste Receptacles: The waste receptacles shall be furnished and installed by the Contractor.

a. Hid-A-Bag Mini 1: The waste receptacles are galvanealed steel 21”W x 34”D x 42”H with two rigid runners with predrilled holes, assembled and are manufactured by BearSaver, 1390 S. Milliken Ave., Ontario, CA 91761 Phone 1-909-605-7780. Model HB2G-N. Color: Forest Brown. Weight 155 lbs.

b. Hid-A-Bag Mini 2: The waste receptacles are galvanealed steel 38”W x 34”D x 42”H with two rigid runners with predrilled holes, assembled and are manufactured by BearSaver, 1390 S. Milliken Ave., Ontario, CA 91761 Phone 1-909-605-7780. Model HB2G-N. Color: Forest Brown. Weight 225 lbs.

b. Concrete: Concrete shall be in accordance with Section 601.

c. Rebar:Rebar shall be in accordance with Section 554.

d. Attaching Hardware: 1/2 “Galvanized J bolts and flanged nuts.

e. Storage: Government furnished materials will be stored at Mt Hebron Work Center.

Contact Joe Hoisington at (530) 398-5772 (office) or (530) 905-3715 (cell) to make arrangements for pickup.

INSTALLATION OF NEW WASTE RECEPTACLES: New receptacles shall be furnished and installed at the locations designated by the Forest Service.

MOUNTING PADS: The trash bins shall have a concrete mounting pad cast into the prepared soil in accordance with the drawings at locations designated by the Forest Service. Construction of pads are paid under Item 10601(01) or 10600(02).

ATTACHING HARDWARE: The receptacles shall be held in place by ½” galvanized J bolts embedded in concrete and flanged nuts. Bolts and nuts shall be furnished by the Contractor.

AG-9AC7-S-11-0030 Page 10 Martin’s Dairy Campground Reconstruction

SCHEDULE OF ITEMS. All labor, materials, and equipment necessary to completely furnish and install new waste receptacles shall be included in this item.

4.02 PAYMENT: The quantities, as measured above, shall be paid for at the unit price per each waste receptacle installed and accepted.

PAY ITEM PAY UNIT

10600(01) Waste Receptacle HB1…………………………………………………….EA

10600(02) Waste Receptacle HB2…………………………………………………….EA

AG-9AC7-S-11-0030 Page 11 Martin’s Dairy Campground Reconstruction

SECTION 11000 – INFORMATION BOARDS

furnishing all materials, labor and equipment to relocate and re-install an existing information board and re-plumb and existing information board. Information boards to be installed in accordance with this specification at the locations shown on the drawings or as designated by the Engineer.

A. Information Boards: The information boards shall be furnished by the government and relocated and/or re-plumbed and installed by the Contractor.

RE-PLUMB EXISTING INFORMATION BOARD: The Contractor shall re-plumb the information board at the location shown on the drawings or as designated by the Engineer. The mounting height of both information boards shall match. Native soil shall be compacted to 90% compaction.

RELOCATION & INSTALLATION OF EXISTING INFORMATION BOARD: The information board is currently installed in the campground and will require relocation to the info/fee station. The Contractor shall remove and relocate the existing information board and install the information board at the locations shown on the drawings or as designated by the Engineer. The mounting height shall be 30” from ground surface to bottom edge of board.

SCHEDULE OF ITEMS. All labor, materials, and equipment necessary to furnish and install new information boards shall be included in this item.

4.02 PAYMENT: Payment shall be made for the information board installed, and accepted.

PAY ITEM PAY UNIT

11000(01) Information Boards – Reset ………...................…...........….EA 11000(02) Information Boards – Relocate .…….................…...........….EA

AG-9AC7-S-11-0030 Page 12 Martin’s Dairy Campground Reconstruction

SECTION 11100 – PRECAST CONCRETE WHEEL STOP

GENERAL

DESCRIPTION: The work performed in this section includes furnishing all materials, labor and equipment to pick up, transport and install new precast concrete wheel stops in accordance with this specification at the locations shown on the drawings.

PRODUCTS

Precast Concrete Wheel Stop: Wheel stops shall have a minimum dimensions of 6” high, 8” wide and 6’ long with two existing holes for securing onto the road surface.

EXECUTION

Precast Concrete Wheel Stop: Wheel stops shall be secured with (2) 5/8” diameter x 24” rebar driven to full depth at the locations shown on the drawings. Final placement shall be approved by the engineer.

MEASUREMENT AND PAYMENT

MEASUREMENT: The method of measurement will be DESIGNATED in the SCHEDULE OF ITEMS. All labor, materials, and equipment necessary to completely furnish and install the wheel stops shall be included in this item.

PAYMENT: The quantities, as measured above, shall be paid for at the unit price per each for each wheel stop installed and accepted.

Pay Item Pay Unit 11100 Precast Concrete Wheel Stop . . . . . . . . . . . .. .. . . . . . . . . . . .. . .. . . . .EA

AG-9AC7-S-11-0030 Page 13 Martin’s Dairy Campground Reconstruction

SECTION 11200 – TENT PAD STRINGY BARK & WOOD

GENERAL

DESCRIPTION: The work performed in this section includes furnishing all materials, labor and equipment to pick-up, transport and install new bark mulch in accordance with this specification at the tent pad locations shown on the drawings.

PRODUCTS

Stringy Bark & Wood: Bark Mulch shall have a particle size between ½-2” diameter and between 2-6” long in length size. Stringy Bark and Wood shall be weed free with no visisble contamination. Stringy Bark and Wood color to be approved by the engineer.

EXECUTION

Bark Mulch: Stringy Bark and Wood shall be installed according to manufacturer specifications.

The ground beneath the bark mulch shall be compacted and thoroughly moistened prior to placing the bark mulch. Stringy Bark and Wood shall not be placed on slopes steeper than 2:1 (H:V). Stringy Bark and Wood to be placed evenly over bare compacted soil to a average compaceted depth of 4 inches. There shall be no visislbe contamination in the bark mulch when placing it in the field. Final placement shall be approved by the engineer.

MEASUREMENT AND PAYMENT

MEASUREMENT: The method of measurement will be DESIGNATED in the SCHEDULE OF ITEMS. All labor, materials, and equipment necessary to completely furnish and install the stringy bark and wood shall be included in this item.

PAYMENT: The quantities, as measured above, shall be paid for at the unit price per each cubic yard installed and accepted.

Pay Item Pay Unit 11200 Tent Pad Stringy Bark & Wood . . . . . . . . . .. .. . . . . . . . . . . .. . .. . . . .CY