AG-9AC7-S-13-0030_A2.pdf
PDF 129 KB Posted
- Attached to
- Martin's Dairy Campground Reconstruction
- Solicitation number
- AG-9AC7-S-13-0030
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CA9_Rev7.dvb.pdf | ||
| Amendment_1.pdf | ||
| MARTINS-DAIRY-CG-PLANS.pdf | ||
| Attach2_SPECIAL_PROJECT_SPECIFICATION_CSI.pdf | ||
| Attach1_Supplement_to_FP03_Specifications.pdf | ||
| CA9_mod_6_040513dvb.pdf | ||
| PAL_Fire_Plan_030613.pdf | ||
| AG-9AC7-S-13-0030.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
AG-9AC7-S-13-0030
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
9AC7
REDDING CA 96002
3644 AVTECH PARKWAY SUITE 180
N CALIFORNIA ACQ SERVICE AREA
USDA FOREST SERVICE
04/17/2013000002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/10/2013
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
MARTIN'S DAIRY CAMPGROUND RECONSTRUCTION, KLAMATH NATIONAL FOREST
This amendment provides clarification between government-furnished and contractor-furnished products on the Schedule of Items to conform with the specifications. No changes to quantities or amounts have been made. Remove and replace the Schedule of Items with the attached document.
Wage Determination CA130009 is update to revision 7 dated 4/12/13. Remove and replace previous wage determination.
All other terms and conditions remain unchanged.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
MARILYN LADD
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
AG-9AC7-S-13-0030 Page 4 Martin’s Dairy Campground Reconstruction Amendment 2
SECTION B - Supplies or Services and Prices/Costs Schedule of Items
ITEM NO. DESCRIPTION PAY
UNIT
EST
QUANT
UNIT COST TOTAL COST
CAMPSITES/FAUCETS/SIGN AREAS ONLY
151(01)A Mobilization Base Package only LS ALL $__________ $__________ 157(14) Erosion Control Prevention Plan LS ALL $__________ $__________
201(04) Clear & Grub, Disposal of Tops 7 Limbs K, Logs K, Stumps K ACRE 1 $__________ $__________
10300(01) Picnic Table Government Furnished, Install Table & Table anchoring system
EA 6
10300(02) Lantern Hanger, Government Furnished EA 2 $__________ $__________
10300(04) Lantern Hanger - Remove, paint, re-install EA 4 $__________ $__________
11000(01) Fee Board Sign - Reset EA 1 $__________ $__________
10510(01) Pedestal Grill, Government Furnished EA 6 $__________ $__________
10510(03) Universal access fire ring, Government Furnished EA 3 $__________ $__________
10510(04) Fire Ring, Government Furnished EA 3 $__________ $__________
203(05) Klamath Stove - Remove & Dispose J EA 4 $__________ $__________
10600(01) Waste Receptacle HB1, Government Furnished EA 1 $__________ $__________
10600(02) Waste Receptacle HB2, Government Furnished EA 3 $__________ $__________
11000(02) Information Sign - Relocate EA 1 $__________ $__________
204(01)A Excavation - Campsites/Faucets/Sign Areas only Compaction E, Finishing A
CY 428
204(04)A
Unclassified Borrow, Government Furnished
- Campsites/Faucets/Sign Areas only Compaction E, Finishing A
CY 99
304(10)A
3/4" Minus Aggregate, Government Furnished - Campsites/Faucets/Sign Areas only Grading D Compaction A
CY 118
251(01)A Riprap, Government Furnished - Campsites/Faucets/Sign Areas only
CY 136
11200 Tent-Pad Bark Mulch Contractor Furnished CY 21 $__________ $__________
AG-9AC7-S-13-0030 Page 5 Martin’s Dairy Campground Reconstruction
ITEM NO. DESCRIPTION PAY
UNIT
EST
QUANT
UNIT COST TOTAL COST
251(61)A
Boulders, New, Government Furnished - Campsites/Faucets/Sign Areas only
EA 56
251(60) Boulders, Relocate Campsites/Faucets/Sign Areas only
EA 5
651(02)A Pit & Quarry Development LS ALL $__________ $__________
Subtotal $__________
CAMPSITE SPURS
204(01)B Excavation Spurs Compaction E, Finishing A CY 158 $__________ $__________
204(04)B Unclassified Borrow, Government Furnished Compaction E, Finishing A
CY 102
304(10)B
3/4" Minus Aggregate, Government Furnished Grading D Compaction A
CY 146
11100 Precast Concrete Wheel stop Contractor Furnished EA 6 $__________ $__________
Subtotal $__________
SOUTHWEST CAMPGROUND ROAD
204(01)C Roadway Excavation, Compaction E Finishing A CY 58 $__________ $__________
204(04)C
Unclassified Borrow, Government Furnished Compaction E Finishing A CY 17 $__________ $__________
304(10)C
3/4" Minus Aggregate, Government Furnished Grading D Compaction A CY 160 $__________ $__________
251(61)B
Boulders, Government Furnished, New - SW Turnaround only EA 71 $__________ $__________
Subtotal $__________
NORTHEAST CAMPGROUND ROAD
204(01)D Roadway Excavation, Compaction E Finishing A CY 146 $__________ $__________
204(04)D
Unclassified Borrow, Government Furnished Compaction E Finishing A CY 54 $__________ $__________
AG-9AC7-S-13-0030 Page 6 Martin’s Dairy Campground Reconstruction
ITEM NO. DESCRIPTION PAY
UNIT
EST
QUANT
UNIT COST TOTAL COST
304(10)D
3/4" Minus Aggregate, Government Furnished Grading D Compaction A CY 185 $__________ $__________
251(61)C
Boulders, Government Furnished, New - NE Turnaround only EA 29 $__________ $__________
251(01)B Class 2 Riprap, Government Furnished CY 3 $__________ $__________
207(01) Geotextile Type II-B Contractor Furnished SY 6 $__________ $__________
603(01)
18-inch Diameter Corrugated Metal Pipe Contractor Furnished, 0.064-inch Thickness for Steel or 0.060-inch Thickness for Aluminum Method A LF 26 $__________ $__________
Subtotal $__________
Base Package Total = $__________
OPTION 1 - REPLACE ALL WOOD POST BARRIERS W/ BOULDERS
251(61)D
Roadside Boulders Replacing Wood Posts, Government Furnished EA 155 $__________ $__________
151(01)B Mobilization LS ALL $__________ $__________
651(02)B Pit & Quarry Development LS ALL $__________ $__________
Option 1 Total = $__________
OPTIONAL WORK
The government expects to award Option 1 at time of award if sufficient funds are available; however the government reserves the right to exercise the option within 30 days after work has commenced if funding becomes available.
Amendment 2 changes shown in RED.
| SF30_A2 |
| A2_SOI |
| SECTION B - Supplies or Services and Prices/Costs Schedule of Items |
| Optional Work |
File details come from the government source that posted it. Updated .