AG-9AC7-S-13-0030_A2.pdf

PDF 129 KB Posted

Attached to
Martin's Dairy Campground Reconstruction
Solicitation number
AG-9AC7-S-13-0030
Issued by

View the file

Other files

File Type Posted
CA9_Rev7.dvb.pdf PDF
Amendment_1.pdf PDF
MARTINS-DAIRY-CG-PLANS.pdf PDF
Attach2_SPECIAL_PROJECT_SPECIFICATION_CSI.pdf PDF
Attach1_Supplement_to_FP03_Specifications.pdf PDF
CA9_mod_6_040513dvb.pdf PDF
PAL_Fire_Plan_030613.pdf PDF
AG-9AC7-S-13-0030.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-9AC7-S-13-0030

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

9AC7

REDDING CA 96002

3644 AVTECH PARKWAY SUITE 180

N CALIFORNIA ACQ SERVICE AREA

USDA FOREST SERVICE

04/17/2013000002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/10/2013

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

MARTIN'S DAIRY CAMPGROUND RECONSTRUCTION, KLAMATH NATIONAL FOREST

This amendment provides clarification between government-furnished and contractor-furnished products on the Schedule of Items to conform with the specifications. No changes to quantities or amounts have been made. Remove and replace the Schedule of Items with the attached document.

Wage Determination CA130009 is update to revision 7 dated 4/12/13. Remove and replace previous wage determination.

All other terms and conditions remain unchanged.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

MARILYN LADD

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

AG-9AC7-S-13-0030 Page 4 Martin’s Dairy Campground Reconstruction Amendment 2

SECTION B - Supplies or Services and Prices/Costs Schedule of Items

ITEM NO. DESCRIPTION PAY

UNIT

EST

QUANT

UNIT COST TOTAL COST

CAMPSITES/FAUCETS/SIGN AREAS ONLY

151(01)A Mobilization Base Package only LS ALL $__________ $__________ 157(14) Erosion Control Prevention Plan LS ALL $__________ $__________

201(04) Clear & Grub, Disposal of Tops 7 Limbs K, Logs K, Stumps K ACRE 1 $__________ $__________

10300(01) Picnic Table Government Furnished, Install Table & Table anchoring system

EA 6

10300(02) Lantern Hanger, Government Furnished EA 2 $__________ $__________

10300(04) Lantern Hanger - Remove, paint, re-install EA 4 $__________ $__________

11000(01) Fee Board Sign - Reset EA 1 $__________ $__________

10510(01) Pedestal Grill, Government Furnished EA 6 $__________ $__________

10510(03) Universal access fire ring, Government Furnished EA 3 $__________ $__________

10510(04) Fire Ring, Government Furnished EA 3 $__________ $__________

203(05) Klamath Stove - Remove & Dispose J EA 4 $__________ $__________

10600(01) Waste Receptacle HB1, Government Furnished EA 1 $__________ $__________

10600(02) Waste Receptacle HB2, Government Furnished EA 3 $__________ $__________

11000(02) Information Sign - Relocate EA 1 $__________ $__________

204(01)A Excavation - Campsites/Faucets/Sign Areas only Compaction E, Finishing A

CY 428

204(04)A

Unclassified Borrow, Government Furnished

- Campsites/Faucets/Sign Areas only Compaction E, Finishing A

CY 99

304(10)A

3/4" Minus Aggregate, Government Furnished - Campsites/Faucets/Sign Areas only Grading D Compaction A

CY 118

251(01)A Riprap, Government Furnished - Campsites/Faucets/Sign Areas only

CY 136

11200 Tent-Pad Bark Mulch Contractor Furnished CY 21 $__________ $__________

AG-9AC7-S-13-0030 Page 5 Martin’s Dairy Campground Reconstruction

ITEM NO. DESCRIPTION PAY

UNIT

EST

QUANT

UNIT COST TOTAL COST

251(61)A

Boulders, New, Government Furnished - Campsites/Faucets/Sign Areas only

EA 56

251(60) Boulders, Relocate Campsites/Faucets/Sign Areas only

EA 5

651(02)A Pit & Quarry Development LS ALL $__________ $__________

Subtotal $__________

CAMPSITE SPURS

204(01)B Excavation Spurs Compaction E, Finishing A CY 158 $__________ $__________

204(04)B Unclassified Borrow, Government Furnished Compaction E, Finishing A

CY 102

304(10)B

3/4" Minus Aggregate, Government Furnished Grading D Compaction A

CY 146

11100 Precast Concrete Wheel stop Contractor Furnished EA 6 $__________ $__________

Subtotal $__________

SOUTHWEST CAMPGROUND ROAD

204(01)C Roadway Excavation, Compaction E Finishing A CY 58 $__________ $__________

204(04)C

Unclassified Borrow, Government Furnished Compaction E Finishing A CY 17 $__________ $__________

304(10)C

3/4" Minus Aggregate, Government Furnished Grading D Compaction A CY 160 $__________ $__________

251(61)B

Boulders, Government Furnished, New - SW Turnaround only EA 71 $__________ $__________

Subtotal $__________

NORTHEAST CAMPGROUND ROAD

204(01)D Roadway Excavation, Compaction E Finishing A CY 146 $__________ $__________

204(04)D

Unclassified Borrow, Government Furnished Compaction E Finishing A CY 54 $__________ $__________

AG-9AC7-S-13-0030 Page 6 Martin’s Dairy Campground Reconstruction

ITEM NO. DESCRIPTION PAY

UNIT

EST

QUANT

UNIT COST TOTAL COST

304(10)D

3/4" Minus Aggregate, Government Furnished Grading D Compaction A CY 185 $__________ $__________

251(61)C

Boulders, Government Furnished, New - NE Turnaround only EA 29 $__________ $__________

251(01)B Class 2 Riprap, Government Furnished CY 3 $__________ $__________

207(01) Geotextile Type II-B Contractor Furnished SY 6 $__________ $__________

603(01)

18-inch Diameter Corrugated Metal Pipe Contractor Furnished, 0.064-inch Thickness for Steel or 0.060-inch Thickness for Aluminum Method A LF 26 $__________ $__________

Subtotal $__________

Base Package Total = $__________

OPTION 1 - REPLACE ALL WOOD POST BARRIERS W/ BOULDERS

251(61)D

Roadside Boulders Replacing Wood Posts, Government Furnished EA 155 $__________ $__________

151(01)B Mobilization LS ALL $__________ $__________

651(02)B Pit & Quarry Development LS ALL $__________ $__________

Option 1 Total = $__________

OPTIONAL WORK

The government expects to award Option 1 at time of award if sufficient funds are available; however the government reserves the right to exercise the option within 30 days after work has commenced if funding becomes available.

Amendment 2 changes shown in RED.

SF30_A2
A2_SOI
SECTION B - Supplies or Services and Prices/Costs Schedule of Items
Optional Work

File details come from the government source that posted it. Updated .