Amendment_1.pdf
PDF 19 KB Posted
- Attached to
- Callahan Water Pipe Placement
- Solicitation number
- AG-9AC7-S-11-0068
About this file
Amendment No. 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CA9_dvb dtd 093011.mht | MHT file | |
| sf-30.pdf | ||
| RevisedDrawings_Plans.pdf | ||
| Solicitation.pdf | ||
| Drawings_Plans.pdf | ||
| DavisBaconWageDetermination_CA9.pdf | ||
| CSI_Specifications.pdf | ||
| CountyEncroachmentPermit.pdf | ||
| Fire Plan.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID
CODE
PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3.EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NUMBER (if applicable) 001 09/01/2011 525081
6. ISSUED BY: CODE: 7. ADMINISTERED BY (If other than 6.): CODE:
USDA, Forest Service Northern California Acquisition Service Area 3644 Avtech Parkway Redding, CA 96002
8. NAME AND ADDRESS OF CONTRACTOR 9A. AMENDMENT OF SOLICITATION NUMBER
X AG-9AC7-S-11-0068
9B. DATED (see item 11) 08/23/2011
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (see item 13)
CODE FACILITY
11. THIS ITEM APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS
[ ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [X] is extended, [ ] is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy(s) of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amend-ment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.-
12. ACCOUNTING AND APPROPRIATION DATA (if applicable)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
[ ] A. THIS CHANGE ORDER IS PURSUANT TO: (specify authority)
[ ] B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
[ ] C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF: FAR Part 13
[ ] D. OTHER (specify type of modification and authority)
E. Contractor [ ] is, [ ] is not required to sign this document and return original copy(s) to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible).
The purpose of Amendment No. 1 is to provide clarification to several items, extend the deadline for proposals to September 8, 2011 at 4:00 pm PDT, and to attach revised drawings:
1. The drawing on Sheet 7 are staight line plans revealing obstacles to avoid. These are reference points showing how the City has installed their water line.
2. The County Encroachment Permit requirement for Class II aggregate base is applicable to STA 12+25 where existing waterline underlies paved shoulder (see Sheet 6). However, as shown on Sheet 8, the backfill around pipes shall be Class 1 with Class 3 select native backfill to be placed above 10 inches. Furthemore as shown on Sheet 9 cement slurry backfill shall be used where pavement is to be replaced at STA 12+25. This cement slurry requrirement supersedes the County requirement for Class II aggregte base backfill.
See continuation attached.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Lara Newburn
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
__________________________ BY:_/s/ Lara Newburn _____
(Signature of authorized person) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 SF 30 (REV. 10/83)
PRESCRIBED BY GSA/PREVIOUS EDITION UNUSABLE FAR (48 CFR) 53.243
PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT - Attachment to SF 30 2 2
ISSUANCE DATE FOREST PROJECT NAME
09/01/2011 Callahan Water Pipe Replacement
MODIFICATION NUMBER ORIGINAL CONTRACT AMOUNT
List below (or on attached sheet, if necessary) each proposed modification identified by Item Number, location of station, etc., giving the reasons for the modifications.
Description Continued
3. Because of the existing conditions, the depth where pipe will be laid will not be 36 inches as required in the County Encroachment Permit. The depth will be similar to the depth of the City water line, which is roughly 18 inches.
4. The drawing on Sheet 9 has been revised to reference STA 12+25 which is the only location where asphalt pavement is expected to be replaced. If pavement is damaged by the Contractor in other areas, it will be replaced at the contractor’s expense.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
NSN 7540-01-152-8070 30-105 SF 30 (REV. 10/83)
PRESCRIBED BY GSA/PREVIOUS EDITION UNUSABLE FAR (48 CFR) 53.243
File details come from the government source that posted it. Updated .