Amendment_1.doc
DOC document 49 KB Posted
- Attached to
- Bailey Forest Health Stewardship Project
- Solicitation number
- AG-9A63-S-12-0098
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_3.doc | DOC document | |
| Amendment_2.doc | DOC document | |
| SIGN_IN.xlsx | XLSX spreadsheet | |
| BAILEY 7-12-12 Cruise File out.docx | DOCX document | |
| BAILEY Stewardship APPENDIX A.docx | DOCX document | |
| BaileyStewardship_20120810_FINAL.pdf | ||
| Bailey Appendix_B_Tree_Measurement1.pdf | ||
| Map_Current_20120730.pdf | ||
| BAILEY Stewardship APPENDIX A.pdf | ||
| Appendix_D.pdf | ||
| BAILEY DRAWINGSp-Appendix_D.pdf | ||
| APPENDIX C.pdf | ||
| Solicitation.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
Bailey Stewardship
| Page |
| 1 |
| Of |
| 1 |
| 2. Amendment/Modification No. |
| 3. Effective Date |
| 4. Requisition/Purchase Req. No. |
| 5. Project No. |
| Amendment 1 |
| 8/20/2012 |
| 6. Issued By: |
| Code |
| 7. Administered By: |
| Code |
USDA Forest Service Acquisition Management
1323 Club Drive
Vallejo, CA 94592
| 8. Name and Address of Contractor |
| (X) |
| 9A. Amendment of Solicitation No. |
AG-9A63-S-12-0098
9B. Dated (See Item 11)
| X |
| 7/31/2012 |
10A. Modification of Contract No.
10B. Date Issued (See Item 13)
| Code |
| Facility Code |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ X] is extended, [ ] is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting and Appropriation Data (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (X) |
| A. This Change Order is issued pursuant to: (specify authority) The changes set forth in item 14 are made in the |
Contract Order No. in item 10A.
B. The above numbered contract/order is modified to reflect the administrative changes set forth in Item 14. pursuant to the authority of FAR 43.103(b).
C. This supplemental agreement is entered into pursuant to authority of:
D. Other (specify type of modification and authority)
| E. IMPORTANT: Contractor |
| [ ] |
| is not, |
| [ ] |
| is required to sign this document and return |
| 1 |
| copies |
to the issuing office.
| 14. Description of Amendment/Modification: |
| (Organized by UCF section headings, including solicitation/contract subject matter where feasible.) |
Add Timber Cruise Information- for information only- will not be part of the contract. (86 pages) Technical contact for this project is Jim Junette, 209-795-1381, ext. 333
Limited Operating Periods will not apply to road construction/maintenance.
Attached is Corrected Area Map which changes designation of Unit 38 to be a Biomass/Mastication Unit(1 pg).
Attached is Corrected Appendix A. No changes except order of items of work. The substitution changes the order of the work to agree with Section B, Schedule of Items. (10 pages) Payment and Performance Bonds will be required for the total of Item 1, Section B only.
Add: 52.228-15 Performance and Payment Bonds – Construction (NOV 2006)- by reference only Receipt of proposal date is changed to September 5, 2012 at 2 P.M. local time.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. Name and Title of Signer |
| 16A. Name and Title of Contracting Officer |
DAVID B. HALLEN
| 15B. Contractor/Offeror |
| Date Signed |
| 16B. United States of America |
| Date Signed |
(Authorized Signature)
(Signature of Contracting Officer)
| NSN 7540-01-152-8070 |
| 30-105 |
| STANDARD FORM 30 (REV.10-83) |
PREVIOUS EDITION UNUSABLE
PRESCRIBED BY GSA
FAR (48CFR) 53.243