Amendment_1.doc

DOC document 49 KB Posted

Attached to
Bailey Forest Health Stewardship Project
Solicitation number
AG-9A63-S-12-0098
Issued by

View the file

Other files

File Type Posted
Amendment_3.doc DOC document
Amendment_2.doc DOC document
SIGN_IN.xlsx XLSX spreadsheet
BAILEY 7-12-12 Cruise File out.docx DOCX document
BAILEY Stewardship APPENDIX A.docx DOCX document
BaileyStewardship_20120810_FINAL.pdf PDF
Bailey Appendix_B_Tree_Measurement1.pdf PDF
Map_Current_20120730.pdf PDF
BAILEY Stewardship APPENDIX A.pdf PDF
Appendix_D.pdf PDF
BAILEY DRAWINGSp-Appendix_D.pdf PDF
APPENDIX C.pdf PDF
Solicitation.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

Bailey Stewardship

Page
1
Of
1
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req. No.
5. Project No.
Amendment 1
8/20/2012
6. Issued By:
Code
7. Administered By:
Code

USDA Forest Service Acquisition Management

1323 Club Drive

Vallejo, CA 94592

8. Name and Address of Contractor
(X)
9A. Amendment of Solicitation No.

AG-9A63-S-12-0098

9B. Dated (See Item 11)

X
7/31/2012

10A. Modification of Contract No.

10B. Date Issued (See Item 13)

Code
Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

[ X ] The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers [ X] is extended, [ ] is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning __1__ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)
A. This Change Order is issued pursuant to: (specify authority) The changes set forth in item 14 are made in the

Contract Order No. in item 10A.

B. The above numbered contract/order is modified to reflect the administrative changes set forth in Item 14. pursuant to the authority of FAR 43.103(b).

C. This supplemental agreement is entered into pursuant to authority of:

D. Other (specify type of modification and authority)

E. IMPORTANT: Contractor
[ ]
is not,
[ ]
is required to sign this document and return
1
copies

to the issuing office.

14. Description of Amendment/Modification:
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Add Timber Cruise Information- for information only- will not be part of the contract. (86 pages) Technical contact for this project is Jim Junette, 209-795-1381, ext. 333

Limited Operating Periods will not apply to road construction/maintenance.

Attached is Corrected Area Map which changes designation of Unit 38 to be a Biomass/Mastication Unit(1 pg).

Attached is Corrected Appendix A. No changes except order of items of work. The substitution changes the order of the work to agree with Section B, Schedule of Items. (10 pages) Payment and Performance Bonds will be required for the total of Item 1, Section B only.

Add: 52.228-15 Performance and Payment Bonds – Construction (NOV 2006)- by reference only Receipt of proposal date is changed to September 5, 2012 at 2 P.M. local time.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name and Title of Signer
16A. Name and Title of Contracting Officer

DAVID B. HALLEN

15B. Contractor/Offeror
Date Signed
16B. United States of America
Date Signed

(Authorized Signature)

(Signature of Contracting Officer)

NSN 7540-01-152-8070
30-105
STANDARD FORM 30 (REV.10-83)

PREVIOUS EDITION UNUSABLE

PRESCRIBED BY GSA

FAR (48CFR) 53.243

File details come from the government source that posted it. Updated .