Provide a new replacement septic system.
Solicitation number
AG-9A47-S-11-0005
Issued by

About this file

Solicitation Package

View the file

Other files

File Type Posted
PreQuotetour.pdf PDF
AMENDMENT1.PDF PDF
plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-9A47-S-11-0005

1. REQUEST NO.

5a. ISSUED BY

NAME

a. NAME

c. STREET ADDRESS

d. CITY

10. PLEASE FURNISH QUOTATIONS TO

THE ISSUING OFFICE IN BLOCK 5a ON

OR BEFORE CLOSE OF BUSINESS (Date)

2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG.1

RATING

6. DELIVERY BY (Date)

7. DELIVERY

9. DESTINATION

a. NAME OF CONSIGNEE

b. STREET ADDRESS

PAGE OF PAGES

5b. FOR INFORMATION CALL: (No collect calls)

TELEPHONE NUMBER

AREA CODE NUMBER

8. TO:

b. COMPANY

e. STATE f. ZIP CODE

c. CITY

d. STATE e. ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

THIS RFQ

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

IS IS NOT A SMALL BUSINESS SET ASIDEX

02/04/2011 491015

1 63

1330 BAYSHORE WAY

EUREKA CA 95501

SIX RIVERS NATIONAL FOREST

03/21/2011

SIX RIVERS NATIONAL FOREST

1330 BAYSHORE WAY

EUREKA

CA 95501

707 441-3668SUE RAY

02/18/2011 1630 PD

FOB DESTINATION

OTHER

(See Schedule)X

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Six Rivers National Forest Smith River NRA Gasquet CA

001 Replacement of exisiting septic tank and leach 1 LS field in accordance with the attached Product/Service Code: Z244 Product/Service Description: MAINT-REP-ALT/SEWAGE

EXIT;

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations

13. NAME AND ADDRESS OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

a. NAME OF QUOTER

AREA CODE

NUMBER

15. DATE OF QUOTATION

b. TELEPHONE are are not attached

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA - FAR (48 CFR) 53.215-1(a)

Smith River Septic Replacement

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

FIRE WAREHOUSE SEWER SYSTEM

Smith River NRA

Six Rivers National Forest

Del Norte County

B- 1 - SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

01050

Field Engineering

A. Construction Staking and Project

Control

Lump

Sum

01505

02110

Mobilization

Clearing and Grubbing

A. Septic System Including Leach

Field

02223 Excavation and Embankment

A. Existing Septic Tank Pit

B. Existing Fire Hose Maintenance

Concrete

C. 1500 Gal. Septic Tank &

Distribution Box

Lump

Sum

02610 Sanitary Sewer System

A. 1500 Gal. Septic Tank Assembly

B. Distribution Box

C. Leach Field, Infiltration Chamber

D. 3 Inch ABS Gravity Sewer Line with Clean Out

E. 4 Inch ABS Gravity Sewer Line with Clean Out

Each

Each

Lineal

Feet

Lineal

Feet

Lineal

Feet

Total $________

CONTRACTOR SHALL BE LICENSED IN THE STATE OF CALIFORNIA AND HAVE AN

ACTIVE CLASS A LICENSE (GENERAL ENGINEERING CONTRACTOR)

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price

Construction Contracts, shall not be in addition to the contract price. Include bond payments under 01505

Mobilization.

PART I - THE SCHEDULE

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

SMITH RIVER NRA

FIRE WAREHOUSE SEPTIC SYSTEM

Description/Specifications/Statement of Work

452.211-72 Statement of Work/Specifications. (FEB 1988)

452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)

C-1 GENERAL SPECIFICATIONS

C-1.1 – Scope of Work

The intent for this contract is to secure services for the installation of a replacement septic system on the Smith River National Recreation Area (NRA) of the Six Rivers National

Forest.

The work includes the furnishing of all labor, equipment, materials and supervision to install a new septic system as specified and shown on the drawings for the Smith River

Fire Warehouse, Building #2200 at the Forest Service Compound in Gasquet, California.

The contractor shall carefully examine the existing conditions and information, shall become familiar with the nature and location of the work, the conformation of the ground slopes and terrain, the nature of the soil and subsoil conditions, nature and extent of the materials that will be encountered during the contractor‟s operations and any existing site conditions that may affect the project, prior to the beginning of work.

Work shall be performed by California State Licensed Contractor with a Class A

License (General Engineering Contractor).

C-1.2 PROJECT LOCATION AND ACCESS

C-1.2-1 - Location

The project area is located in Del Norte County along State Highway 199 approximately

15 miles east of State Highway 101 in Gasquet, California.

C-1.2-2 - Access

From Eureka, California travel on Highway 101 north approximately 90 miles to

Crescent City. Travel approximately four miles north of Crescent City to State Highway

199. Take Highway 199 approximately fifteen miles east to the Forest Service

Compound and project site.

C-1.3 OPERATING SEASON

The estimated start work date is March 4, 2011.

C-1.4 CONTRACT TIME

The contractor shall complete the work in 15 calendar days. The time stated for completion shall include final cleanup of the premises.

C-1.5 SITE INFORMATION AND LIMITATIONS

The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:

1. The Contractor will be responsible for construction signing and controlling access at the work site.

2. Water is available at the site for construction purposes.

3. Power is available at the site for construction purposes.

4. Contractor must provide sanitary facilities. Forest Service restrooms are not available for Contractor’s use.

5. Forest Service phones are not available for the Contractor’s use.

C-1.6 EQUIPMENT

All equipment shall be suitable for the purpose intended and shall meet all requirements of the Occupational Safety and Health Act. The Contracting Officer may order the removal or require the replacement of any unsatisfactory equipment.

All vehicles and machinery operating on or from the traveled way or road shoulder shall have flashing lights or rotary beacons operated continuously while work is in progress.

All equipment shall be equipped with a standard slow moving vehicle emblem. Truck headlights shall be on while operated. Backup warning devices shall be required on self-propelled equipment in excess of 8,000 pounds gross vehicular weight.

Vehicles and machinery not currently used in maintenance operation shall be parked off the traveled way at the approved location to minimize interference with normal use of the road.

C-1.7 EQUIPMENT CLEANING

To prevent the spread of Port Orford root disease, non-native plant species and invasive weeds the following will be required on the Smith River NRA.

All construction equipment shall be pressure washed before entering the Site. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brush guard assemblies will be required.

Unless otherwise agreed, Contractor shall clean all vehicles and equipment before entry into the district unless Forest Service waives the cleaning requirement in writing.

Thereafter, all vehicles and equipment that leave the district or enter infected portions of the district must be cleaned prior to their reentry, unless waived by the Forest Service.

All cleaning of vehicles or equipment shall be done at sites agreed to by Forest Service and the Contractor. The water used for washing will be from a source in non-infected drainages. Forest Service shall inspect all equipment prior to entry, as appropriate and determined necessary. Forest Service will determine infected and uninfected areas.

C.2 PROJECT SPECIFICATIONS

The following listed project specifications are a part of this solicitation and any resultant contract.

DIVISION 1 - GENERAL REQUIREMENTS

SECTION NO. TITLE

01010 - Summary of Work

01050 - Field Engineering

01505 - Mobilization

DIVISION 2 - SITE WORK

SECTION NO. TITLE

02110 - Clearing and Grubbing

02211 - Utility Trenching and Backfilling

02223 - Excavation and Embankment

02610 - Sanitary Sewer Systems

02931 - Erosion Control

SECTION 01010

SUMMARY OF WORK

PART 1 - GENERAL

1.1 DESCRIPTION:

A. Work under this contract includes, but is not limited to, the following items of work at the Smith River NRA Fire Warehouse Sewer System:

Provide for a new replacement septic system including; connection to the existing sewer lines, extending sewer lines to the new septic tank location, supply and install a new 1500 gallon septic tank, distribution box, effluent distribution lines and leach field. The work also includes demolition and disposal of the existing septic tank and fire hose maintenance slab. All disturbed areas are to be re-graded to conform to the surrounding grades and mulched.

1.2 LOCATION:

A. The project site is located within the town of Gasquet, California, on the

Smith River NRA Forest Service Compound in Del Norte County.

B. Project owner is the USDA, Six Rivers National Forest.

1.3 OWNER RESPONSIBILITY:

A. The Owner's responsibility for project construction includes:

1. Review and approve shop drawings, product data and submittals from the

Contractor.

2. Prepare and approve Contractor payment invoices and final payments.

3. Review and authorize contract change orders and/or extra work.

4. Provide project inspection and approval of Contractor‟s work.

5. Provide access to the site and staging areas for performance of specified work.

1.4 CONTRACTOR‟S USE OF PREMISES:

A. Construction camping within the site will not be allowed.

B. The Contractor shall conduct his operations to minimize inconvenience to the

Forest Service Employees and the public. The Contractor may close portions of the site during construction, providing temporary access lanes. The traffic control plan shall be developed and approved by the Owner and Project

Engineer.

C. Storage of construction materials shall be limited to those areas designated and approved by the Owner and site operator.

D. The contractor shall take precautions to locate and protect all existing utility lines. Notify utility companies and the Project Engineer prior to excavations in the vicinity of known utilities.

1. Should damage occur to an unknown utility, repairs shall be performed as directed by the Project Engineer. The Contractor is responsible for the cost to replace or repair damaged utilities.

E. The Contractor shall comply with all legal load requirements of the State of

California, County and City Jurisdictions when operating on area access roads. Damage to existing roadways from equipment operation or excessive loads shall be repaired by the Contractor at no additional cost to the Owner.

1.5 FIELD VERIFICATION:

A. The Contractor shall field-verify all new and existing dimensions and field conditions prior to starting work or ordering products.

1.6 CONTRACTOR-FURNISHED ITEMS:

A. The Contractor shall furnish all labor, materials and equipment necessary for the completion of the work, as specified.

1.7 OWNER-FURNISHED ITEMS:

A. As-built drawings of the Smith River NRA Forest Service Compound utility construction.

PART 2 - PRODUCTS

Not Used.

PART 3 - EXECUTION

Not Used.

END OF SECTION

SECTION 01050

FIELD ENGINEERING

1.01 SECTION INCLUDES

A. General Conditions: Basic site engineering requirements may also be described in other sections of these Specifications.

B. Contractor‟s use of survey control.

C. Contractor‟s grade setting.

D. Project record documents.

E. Survey and layout.

1.02 CONTRACTOR‟S QUALITY CONTROL

A. The Contractor shall employ an experienced grade setter to maintain the construction stakes and ensure that the earthwork portion of the project is being constructed to the design grades.

B. Provide copies of all grade sheets to the Engineer immediately after compiling each phase of project layout or as requested by the Engineer.

C. Minimum accuracy for required work is as follows:

1. Grade: Vertical Tolerance: +/- 0.05 feet, Horizontal Tolerance: +/-

0.5 feet.

2. Culverts and ditches: Horizontal Tolerance: +/- 0.5 feet, Vertical

Tolerance: +/- 0.05 feet.

3. Structures: Horizontal Tolerance: +/- 0.5 feet (location), Vertical

Tolerance: +/- 0.05 feet.

1.03 SUBMITTALS

A. Contractor‟s staking plan, if requested, including ASCII file of point coordinates, elevation and descriptions.

B. Contractor‟s staking notes, if requested.

C. Staking notes shall be submitted within two days of request by the Engineer.

3.01 EXAMINATION

A. The Contractor shall verify locations of survey control points prior to starting work.

B. The Contractor shall promptly notify the Engineer of any survey control discrepancies that are discovered.

C. The Contractor shall be responsible for establishing and maintaining temporary elevation control as required to complete the improvements in the contract documents. Elevation control locations (temporary benchmarks) and elevation updates shall be kept current and be available at the

Construction site at all times.

3.02 CONTRACTOR PROVIDED SURVEY

A. The Contractor shall provide construction staking, and grade setting. The

Contractor shall replace any lost or damaged stakes at his or her own cost.

PART 4 – MEASUREMENT & PAYMENT

4.01 MEASUREMENT AND PAYMENT

Payment for “Field Engineering” shall be included in the bid schedule as a lump-sum item. All surveying and survey associated materials necessary to perform the work shall be included in the cost for “Field Engineering”.

SECTION 01505

MOBILIZATION

1.01 SCOPE:

A. This work consists of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.

1.02 MEASUREMENT AND PAYMENT

A. The accepted quantities will be paid for at the contract unit price for item 01505

B. Progress payments will be made as follows:

1. The Government will pay to the Contractor in the first progress payment the total premium paid by the Contractor to obtain bonds. This payment shall not be in addition to the contract price and will be included in Item 01505, Mobilization.

2. When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.

3. When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid.

4. Upon completion of all work on the project, any unpaid amount for item 01505, Mobilization, will be paid.

C. The total of all payments will not exceed the original contract amount for item 01505, PART 2 – PRODUCTS

Not Applicable

PART 3 – EXECUTION

Not Applicable

4.01 Measurement and Payment - Payment will be made for work included under this section.

Payment for this work will be included in the contract unit price for Section 01505 -

SECTION 02110

CLEARING AND GRUBBING

1.01 SECTION INCLUDES

A. Removal of trees, shrubs, boulders, vegetative materials and other objectionable material within the limits of excavation.

1.02 REGULATORY REQUIREMENTS

A. Waste material removed from the site shall be disposed of in conformance with Federal, State, and local requirements. Any disposal shall be included in the Contractor‟s costs for clearing and grubbing.

B. Coordinate clearing work with other on-site construction.

Not used.

3.01 SURFACE CONDITIONS

A. It will be the responsibility of the Contractor to estimate the amount of material to be cleared, grubbed, and removed based on a thorough inspection of the site and drawings.

3.02 PROTECTION

A. Locate, identify, and protect utilities to remain.

B. Protect trees, plant growth, and features designated to remain as final landscaping.

C. Protection of persons and property:

1. Protect bench marks, survey control points, and existing structures from damage or displacement.

2. Barricade open depressions and holes occurring as part of this work and post warning lights on property adjacent to or with public access. Operate warning lights from dawn to dusk each day and as otherwise required.

D. Remove only trees designated for removal.

E. Protect critical environmental and cultural areas from damage.

3.03 CLEARING AND GRUBBING

A. Clear and grub construction areas of all surface and subsurface material, as required, to remove any and all obstructions within the limits of the improvements.

3.04 STOCKPILING AND DISPOSAL

A. The Contractor shall dispose any material that cannot be used for top dressing off site.

PART 4 – MEASURMENT AND PAYMENT

4.01 MEASUREMENT AND PAYMENT

A. Payment for “Clearing & Grubbing” shall be included in the bid schedule as a lump-sum item.

SECTION 02221

UTILITY TRENCHING AND BACKFILLING

1.1 DESCRIPTION: The work of this section consists of trenching, backfilling, for the construction and installation of pipelines, leach field lines, conduits and cables. All trenching will be open cut except as noted on the drawings.

1.2 QUALITY ASSURANCE:

A. All references to percent of maximum density shall be as determined by

ASTM D1557, Method C, at a moisture content determined to be suitable for such density. Moisture-density curves shall be prepared in a certified soils testing laboratory.

B. In-Place Soil Density Testing: Procedures used be in accordance with ASTM

D1556-82, Density of Soil in Place by the Sand-Cone Method, or ASTM

D2922-81, Density of Soil and Soil-Aggregate in Place by Nuclear Methods

(shallow depth).

Test locations will be selected at the discretion of the Project Engineer.

1.3 PROJECT CONDITIONS:

A. Arrange construction sequences to provide the shortest practical time that the trenches will be open to avoid hazard to the public and to minimize the possibility of trench collapse. Trenches in traffic areas shall be plated or otherwise protected from the public.

1.4 EXCAVATION CLASSIFICATION: Regardless of the nature of material excavated, all excavation will be considered unclassified.

2.1 GENERAL: All backfill material shall be approved before use and be free of cinders, ashes, ice, frozen soil, large hard clods, organic debris, or other deleterious items. Trench excavation materials may be used as approved by the

Project Engineer.

2.2 MATERIALS FOR SELECT BACKFILLING:

A. The class or type of backfill material shown on the plans and designated in these specifications shall meet the following criteria:

1. Clean Sand Class 1 Material: Three types of materials are acceptable; 1) naturally occurring (not crushed) rounded sand, 2) crushed sand, and 3) decomposed granite. All material shall be free from clay, organic, or other deleterious material, shall have a sand equivalent of at least 50, and shall meet the following percent passing by weight gradations:

Natural Crushed Decomposed

Sieve Size Sand Sand Granite

1-1/2” 100 ---

3/4” 75-100 100 100

No. 4 55-100 75-100 75-100

No. 200 0-5 0-15 0-5

2. 6" Minus Native Backfill: Select excavated earth, free from stones or lumps exceeding 6” in greatest dimension, vegetative matter, or other deleterious material.

3.1 TRENCH CLEARING:

A. The maximum width of clearing for utility trenches shall be 10 feet unless otherwise directed by the Project Engineer. Trench spoils shall not be placed over or around uncleared vegetation unless specifically approved by the

3.2 TRENCH EXCAVATION:

A. This work shall consist of pipe trench excavation regardless of character of surface and subsurface conditions including location of underground facilities, blasting, over-excavating and shoring.

1. Paved Areas: Areas paved with asphalt or concrete shall be marked for alignment and trench width. Asphalt and concrete paving, or sidewalks, shall be cut with a saw in neat parallel lines. The cut lines shall be at least

6” outside each edge of the trench width to prevent overbreaking and cracking of the paved surfaces.

2. Trench Configuration: The trench shall be excavated to allow the pipe to be aligned in the approximate center. Trench widths shall permit the pipe to be laid and joined properly and to allow for proper placement and compaction of backfill material. In no case shall the trench width be less than the pipe O.D. plus 16 inches. The trench side walls shall be as near vertical as possible, except where sloping is permitted by the Project

Engineer. The trench bottom shall provide a firm, uniform and continuous bedding for the pipe. Properly sized and placed bell holes shall be provided at each joint. Mounding of trench bottom to support pipe will not be allowed.

3. Over Excavation: Trenches for all types of ABS pipeline materials shall be over excavated to provide for a minimum 6-inch sand (class 1) bedding. Trenches for ductile iron pipe shall be over excavated by a minimum of 6 inches in areas of rock, hardpan, shale or other unsuitable bedding materials, all as shown on the plans.

Any areas of trench over excavated beyond the lines and grades shown on the plans or specified herein shall be brought back up to proper grade using suitable materials as approved by the Project Engineer. This material shall be compacted to the specified degree prior to placing any pipe or sand bedding in the trench.

4. Trench Spoils: Excess material generated from the trench excavation shall be disposed of offsite at an approved receiving station or as directed by the

3.3 SHORING AND SHEETING: Construct and maintain all shoring, sheeting, barricades, and slope layback necessary to protect the excavation, as needed for the safety of the employees and as required by applicable State and Federal laws.

3.4 BACKFILLING:

A. Native material removed from the trench may be used for backfill material provided it meets all of the requirements set forth on the plans and in these specifications. Native backfill material may be mechanically screened to meet these requirements.

B. The Contractor shall import the type and quantities of backfill materials not found on the job site at his own cost.

C. Compaction: Use vibratory compactors for sands and gravels (noncohesive soils). Use mechanical tampers for sand and gravel containing a significant portion of fine-grained material, such as silt and clay (cohesive soils). Hand tamp around pipe or cable to protect the lines until adequate cushion is attained. Puddling or water flooding for consolidation of backfill or compaction by wheel rolling with construction equipment will not be permitted. Compaction shall be 90 percent of maximum density.

D. Utility Installation: Shape the trench bottom to ensure uniform contact with the full length of the installed line and remove any sharp-edged materials that might damage the line. Compaction shall be maintained beneath the line.

E. Select Backfill: Fill by hand placement around the utility to just over half depth, and compact in a manner to ensure against lateral or vertical displacement. Place select backfill to 12 inches above the utility line by hand placement in not more than 6-inch layers. Compact each layer to 90 percent of maximum density.

F. Sand-Cement Slurry Backfill: All water main, service line and sewer crossings under paved roadways shall be backfilled from 6” above the pipe to the underside of the replacement paving with sand-cement slurry, except as shown otherwise on the plans. The pipeline shall be bedded and backfilled to

6” above the pipe with Class 1 material prior to placing the sand-cement slurry.

3.5 SURFACE FINISH WORK:

A. Paved Areas: Replace removed paving and base course with new material of equal or better quality and of the same texture and color as the adjacent paved areas. Saw cut pavement edge to a true line and broom as needed prior to paving.

B. Concrete Walks and Patios: Replace removed concrete and base course with new material of equal or better quality and of the same texture and color as the adjacent concrete areas. Saw cut concrete edge to a true line and broom as needed prior to replacing concrete.

C. Open Areas: Grade all disturbed areas to a finish ordinarily obtained from a blade grader, with no abrupt changes in grade or irregularities that will hold water.

D. Drainage Ditches: Restore drainage ditches to appropriate line and grade, using surface erosion-prevention techniques approved by the Project

E. Clean-Up: Prior to final inspection and acceptance, remove all rubbish and excess material for disposal as approved, and leave area in a neat, satisfactory condition.

PART 4 - MEASUREMENT AND PAYMENT

4.1 PAYMENT: Payment for costs incurred under this section shall be included in the Bid Schedule under pay items listed in "Sanitary Sewer System". No separate measurement or payment shall be made.

SECTION 02223

EXCAVATION AND EMBANKMENT

1.1 DESCRIPTION: The work of this section consists of excavation, backfill and grading for: septic tank installation, septic tank removal, fire hose maintenance slab removal. The work also includes the demolition and disposal of the existing septic tank and fire hose maintenance slab concrete.

A. Material sampling and testing will be the responsibility of the Contractor. All tests shall be performed by an independent certified testing laboratory. The

Contractor shall cooperate by rerouting equipment or by temporarily closing the work area being tested. Correct deficiencies before placing additional backfill.

B. ASTM 1557, Method C, will be used to determine maximum density, and

ASTM D2922-81, or a standard nuclear method, will be used to determine in-place density. In-place densities specified are minimums and may be exceeded.

1.3 CLASSIFICATION: All excavation will be considered unclassified regardless of the nature of material encountered.

1.4 RELATED SECTIONS: Clearing and Grubbing, Section 02110.

2.1 EXISTING EMBANKMENT MATERIAL: Free from frozen material, debris, muck, detrimental quantities of organic materials, and other unsuitable materials.

2.2 IMPORTED BORROW:

Backfill for septic tank removal shall be "1-1/2" Minus Aggregate Base" and shall conform to the requirements of State of California Department of Transportation

Standards Specifications, Class 2, 1-1/2 - inch maximum aggregate base.

2.3 SURPLUS MATERIAL: Excess and unsuitable material from trenches, excavation for sewer system components and site grading shall be disposed of off site at an approved receiving station or as directed by the Project Engineer.

3.1 GROUND SURFACE PREPARATION: Complete clearing and grubbing.

Where new material is to be placed on compacted sub-grade, scarify ground surface to provide bond between old and new material.

3.2 PROTECTION OF UTILITIES: Locate all existing underground utilities prior to excavation. Mark and protect underground utilities designated to remain.

3.3 EXCAVATION: Excavate to lines and grades shown on the drawings. Keep excavation free from water during construction. Stockpile as directed, excavated material to be used in embankment construction.

3.4 EARTH EMBANKMENT: Place embankment material in layers not exceeding 8 inches loose measurement. Compact each layer before placing the next layer, continually leveling and manipulating to ensure uniform moisture and density.

Maintain proper moisture content to obtain specified density.

3.5 DENSITY REQUIREMENT:

A. Sewer System Components: Compact each layer to not less than 90 percent relative density, as determined by ASTM D1557, Method C.

B. Density requirements are minimums and may be exceeded.

3.6 DITCHES: Construct drains, channels and ditches for culverts as shown or as directed. Round and trim ditch slopes neatly to line. Final flow line grade shall be reasonably uniform to provide free drainage without puddling.

3.7 SUBGRADE TOLERANCE: The finished roadway, walks and trail surged elevations shall not vary above or below the theoretical grade more than .10 foot.

Finished sub-grade elevations for building pads shall not vary more than .05 feet.

3.8 SLOPE FINISHING:

A. Grading: Grade to produce a reasonably uniform surface. Blend slopes smoothly with adjacent terrain and round cut slope, as shown on the drawings..

Hand rake as necessary to prepare areas to be mulched.

3.9 DISPOSAL: Disposal of unsuitable materials shall be off site at an approved receiving station or as directed by the Project Engineer

4.1 Measurement shall be as follows:

A. Existing Septic Tank Pit ..................................................lump sum

B. Existing Fire Hose Maintenance Concrete………………lump sum

C. 1500 Gallon Septic Tank and Distribution Box ..............lump sum

4.2 Payment for each item includes full compensation for furnishing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in excavating, moisture conditioning, screening, removal of deleterious or unsuitable material, compacting, removal and disposal of excess material and/or import borrow as needed to establish the lines and grades, complete in place, as shown on the plans, as specified in these special provisions, and as directed by the Project

SECTION 02610

SANITARY SEWER SYSTEMS

1.1 DESCRIPTION:

A. Furnish and install sanitary sewer collection, treatment and disposal system and associated accessory items as shown on the drawings and as specified herein. Items include, but are not necessarily limited to, the following:

1. Septic tank and covers.

2. Distribution Box.

3. Sanitary sewer gravity pipelines, effluent distribution lines, clean-outs, fittings and associated accessories.

4. Infiltration chambers and inspection ports.

A. Requirements of regulatory agencies:

1. Safety Regulations:

a. Williams-Steiger Occupational Safety and Health Act of 1970.

b. State of California, California Administrative Code, Title 8 Industrial

Relations, Chapter 4, Subchapter 4, „Construction Safety Orders‟ and other State and Local agencies having jurisdiction.

c. All trenching work shall conform to Trench Construction Safety

Orders of California State Industrial Accident Commission and

Section 02221.

1.3 REFERENCES:

A. American Society for Testing and Materials (ASTM):

1. Designation: D2661 - ABS DWV sewer pipe and D3034 - polyvinyl chloride (pvc) gravity sewer pipe.

1.4 SUBMITTALS

A. Submit manufacturer‟s data and/or fabrication drawings for, all pipes, manhole risers, septic tanks, infiltration chambers and appurtenances installed under this section. No items shall be incorporated into the work until submittals are approved by the Project Engineer.

2.1 MATERIALS

A. Gravity sanitary sewer pipelines shall be ABS DWV pipe for sanitary sewers conforming to ASTM Designation: D2661.

B. Concrete for structures shall be 5-sack minimum transit mix with a minimum compressive strength of 2,500 psi at 28 days, three-inch (3”) slump and maximum 3/4” aggregate. Pre-cast concrete structures shall conform to the size and dimensions as shown on the drawings and be as manufactured by

Cook Concrete Products or approved equal.

C. Manhole risers and lids shall be as manufactured by Orenco Systems, Inc., Sutherland, Ore. (503) 673-0165 or approved equal.

D. Sand, soil and aggregate materials for the sewer system and effluent disposal field shall conform to Section 02221Trench Excavation and Backfill and

02223 „Excavation and Embankment‟.

E. Leach Field assembly shall be constructed from Quick 4 standard infiltration chambers as manufactured by Infiltrator Systems Inc. 7 Glenoak Court, Chico, CA 95926, 866-511-6070, www.infiltratorsystems.com.

3.1 GENERAL:

A. This work shall consist of installing the pipe, fittings, appurtenances and locating wire.

3.2 HORIZONTAL ALIGNMENT:

A. The Contractor shall follow the horizontal alignment as staked in the field.

The Contractor‟s attention is directed to Section 01050 „Field Engineering‟ for staking requirements. The horizontal alignment shall follow the staked alignment with a maximum variation of plus or minus 6 inches on straight sections and plus or minus 12 inches on curved sections.

3.3 VERTICAL ALIGNMENT:

A. The vertical alignment shown on the plans shall be maintained within the limits described herein. If construction staking is required, the Contractor shall comply with requirements for construction staking, as described in

Section 01050.

http://www.infiltratorsystems.com/

3.4 SEPARATION:

A. All water line installations shall conform to the „California Waterworks

Standards‟ contained in Section 64630, Title 22, California Administrative

Code. Among others, these standards specify separation requirements between water mains and sanitary sewer lines.

3.5 PIPE LENGTHS:

A. Pipe lengths shall be selected so that pipe can be installed through horizontal or vertical curves, or any combination thereof, without exceeding the maximum joint deflection as recommended by the manufacturer, or maximum pipe barrel deflection, as allowed by these specifications. All curves exceeding these requirements shall be made with fittings, or by selecting shorter pipe lengths. Individual pipe lengths shall not be less than one half the standard length unless approved by the Contracting Officer.

3.6 TESTING OF SANITARY SEWERS:

A. After cleaning, per Section 3.02 C, each section of sewer constructed shall be tested in accordance with acceptable „Low Pressure Air Test for Sanitary

Sewers‟ methods.

B. Testing of pressure sewer lines shall utilize procedures set forth in “Testing and Disinfecting of Water Lines. Disinfecting of sewer lines will not be required

3.7 PRE-CAST CONCRETE MANHOLES AND SEPTIC TANKS

A. Frames and Covers: Septic tank frames and covers shall be of the type and size shown on the drawings. Lids and covers shall be set 2" above finish grade unless otherwise herein specified or otherwise stated on the drawings.

B. Pipe Connections to Structures:

1. Pipe connections to septic tanks and other structures shall be made by connecting to precast fittings or carefully breaking an opening in the wall of the manhole or structure and inserting the end of the pipe through the opening to flush with the inside wall. These connections shall be finished so that entrances are smooth.

In breaking out the opening, care shall be taken that the inserted pipe is at no point more than two inches (2”) away from the opening. This annular space shall be tightly paced with a „dry‟ cement mortar or concrete grout. Surfaces to be in contact with the mortar shall be thoroughly moistened and then scrubbed with

Portland cement paste. The mortar shall be trowelled smooth and flush and the interior surface of the manhole or structure.

2. All sewer pipe shall be connected to structures and manholes by means of a flexible joint within one (1) pipe diameter or two feet (2‟) of the structure, whichever is greater.

C. Septic tank installations shall be to lines and grades as shown on the drawings.

Individual units shall be installed level and plumb with joints, frames, covers and connections conforming to the provisions of this specification.

3.8 TEMPORARY EROSION CONTROL:

A. The Contractor shall take whatever measures necessary to prevent excessive erosion of areas disturbed by this work and shall prevent sediments from leaving the work areas. Measures may include, but not be limited to filter fabric fences, straw bail dikes, interceptor swales, or other methods, all as approved by the Project Engineer.

B. Straw bales shall be placed across streams downstream of the areas to be disturbed prior to working in the area. Enough bales shall be used so as to adequately cross and filter the stream. Bales shall be placed in a row with their ends tightly abutting the adjacent bale so as not to allow normal stream flows to pass around, between, or underneath the bales.

C. Each bale shall be staked in place with at least 3 No. 4 rebar stakes, each of which must penetrate firm ground by 18”. The first stake in each bale shall be driven toward the previously laid bale to force the bales together.

3.9 FINAL CLEAN-UP:

A. All areas over and around the trench and appurtenances, and all other areas and surfaces disturbed by the construction activities shall be restored to an equal or better condition as existed prior to the start of construction.

4.1 Measurement shall be as follows:

A. 1500 Gal. Septic Tank Assembly ....................................each

B. Distribution Box ..............................................................each

C. Leach Field, Infiltration Chamber....................................lineal foot

D. 3" ABS Gravity Sewer Line with C/O ............................lineal foot

E. 4" ABS Gravity Sewer Line with C/O ............................lineal foot

4.1 Measurement and payment for each item includes all pipe, fittings, clean-outs and appurtenances for the completed work, including trenching and backfill for leach field and sewer lines.

SECTION 02931

EROSION CONTROL

1.1 DESCRIPTION: The work of this section consists of the placement of erosion control material (straw mulch) on disturbed soil surfaces impacted by construction of this project. Areas to be treated include all trenched areas and demolition sites not otherwise treated, ditch lines and all other areas disturbed by work associated with this project.

1.2 REGULATORY REQUIREMENTS:

A. Provide certificate of compliance from authority having jurisdiction, indicating straw is “weed free”.

1.3 DELIVERY, STORAGE AND PROTECTION:

A. Deliver and store straw in a dry location until ready to apply to disturbed soil.

2.1 MATERIALS

A. Mulching Material:

1. Oat, rice or wheat straw, free from weeds, foreign matter detrimental to plant life, and dry. Hay or chopped cornstalks are not acceptable.

3.1 EXAMINATION:

A. Verify that prepared soil base is ready to receive the work of this section.

3.2 PREPARATION OF SUBSOIL

A. Prepare subsoil to eliminate uneven areas and low spots. Maintain lines, levels, profiles and contours. Make changes in grade gradual. Blend slopes into level areas.

B. Remove foreign materials, weeds and undesirable plants and their roots.

Remove contaminated subsoil.

3.3 MULCH

A. Oat, rice or wheat straw (dry method) shall be chopped and applied by mechanical blowers at the rate of 3,000 lbs. per acre (70 lbs. per 1,000 square feet), and be uniform throughout the seeded area. Straw may also be applied by hand at the same rate of placement.

4.2 PAYMENT: Payment for costs incurred under this section shall be included in the Bid Schedule under "Excavation and Embankment". No separate measurement or payment shall be made.

Inspection and Acceptance

52.246-12 Inspection of Construction. (APR 1996)

52.246-1 Contractor Inspection Requirements. (APR 1984)

The Contractor is responsible for performing or having performed all inspections and tests necessary to substantiate that the supplies or services furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers' parts. This clause takes precedence over any Government inspection and testing required in the contract's specifications, except for specialized inspections or tests specified to be performed solely by the Government.

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.acquisition.gov

Deliveries or Performance

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than March 21, 2011. The time stated for completion shall include final cleanup of the premises.

52.252-2 Clauses Incorporated by Reference. (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.acquisition.gov

452.236-75 Maximum Workweek - Construction Schedule. (NOV 1996)

Within 5 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following in writing for approval:

(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposes to carry out the work.

The maximum workweek that will be approved is seven (7).

Contract Clauses

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (DEC 2010)

52.211-18 Variation in Estimated Quantity. (APR 1984)

52.219-6 Notice of Total Small Business Set-Aside. (JUN 2003)

52.222-3 Convict Labor. (JUN 2003)

52.222-6 Davis-Bacon Act. (JUL 2005)

52.222-7 Withholding of Funds. (FEB 1988)

52.222-8 Payrolls and Basic Records. (JUN 2010)

52.222-9 Apprentices and Trainees. (JUL 2005)

52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)

52.222-11 Subcontracts (Labor Standards). (JUL 2005)

52.222-12 Contract Termination - Debarment. (FEB 1988)

52.222-13 Compliance with Davis-Bacon and Related Act Regulations. (FEB 1988)

52.222-14 Disputes Concerning Labor Standards. (FEB 1988)

52.222-15 Certification of Eligibility. (FEB 1988)

52.222-21 Prohibition of Segregated Facilities. (FEB 1999)

52.222-26 Equal Opportunity. (MAR 2007)

52.222-27 Affirmative Action Compliance Requirements for Construction. (FEB 1999)

52.222-36 Affirmative Action for Workers with Disabilities. (OCT 2010)

52.223-6 Drug-Free Workplace. (MAY 2001)

52.223-15 Energy Efficiency in Energy-Consuming Products. (DEC 2007)

52.224-1 Privacy Act Notification. (APR 1984)

52.224-2 Privacy Act. (APR 1984)

52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)

52.227-4 Patent Indemnity--Construction Contracts. (DEC 2007)

52.228-2 Additional Bond Security. (OCT 1997)

52.228-11 Pledges of Assets. (SEP 2009)

52.228-12 Prospective Subcontractor Requests for Bonds. (OCT 1995)

52.228-14 Irrevocable Letter of Credit. (DEC 1999)

52.232-5 Payments under Fixed-Price Construction Contracts. (SEP 2002)

52.232-23 Assignment of Claims. (JAN 1986)

52.232-27 Prompt Payment For Construction Contracts. (OCT 2008)

52.232-33 Payment by Electronic Funds Transfer - Central Contractor Registration. (OCT 2003)

52.233-1 Disputes. (JUL 2002)

52.233-3 Protest after Award. (AUG 1996)

52.236-2 Differing Site Conditions. (APR 1984)

52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)

52.236-5 Material and Workmanship. (APR 1984)

52.236-6 Superintendence by the Contractor. (APR 1984)

52.236-7 Permits and Responsibilities. (NOV 1991)

52.236-8 Other Contracts. (APR 1984)

52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)

52.236-10 Operations and Storage Areas. (APR 1984)

52.236-11 Use and Possession Prior to Completion. (APR 1984)

52.236-12 Cleaning Up. (APR 1984)

52.236-13 Accident Prevention. (NOV 1991)

52.236-15 Schedules for Construction Contracts. (APR 1984)

52.236-16 Quantity Surveys. (APR 1984)

52.236-17 Layout of Work. (APR 1984)

52.236-21 Specifications and Drawings for Construction. (FEB 1997)

52.236-26 Preconstruction Conference. (FEB 1995)

52.243-5 Changes and Changed Conditions. (APR 1984)

52.244-6 Subcontracts for Commercial Items. (DEC 2010)

52.245-1 Government Property. (AUG 2010)

52.246-21 Warranty of Construction. (MAR 1994)

52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). (APR 1984)

52.249-10 Default (Fixed-Price Construction). (APR 1984)

452.236-72 Use of Premises. (NOV 1996)

452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996)

452.236-76 Samples and Certificates. (FEB 1988)

452.236-77 Emergency Response. (NOV 1996)

52.204-7 Central Contractor Registration. (APR 2008)

(a) Definitions. As used in this clause--

"Central Contractor Registration (CCR) database" means the primary Government repository for Contractor information required for the conduct of business with the Government.

"Data Universal Numbering System (DUNS) number" means the 9-digit number assigned by Dun and Bradstreet, Inc.

(D&B) to identify unique business entities.

"Data Universal Numbering System +4 (DUNS+4) number" means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

"Registered in the CCR database" means that--

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the CCR database; and

(2) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record "Active". The Contractor will be required to provide consent for TIN validation to the Government as a part of the CCR registration process.

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the CCR database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation "DUNS" or "DUNS +4" followed by the DUNS or DUNS +4 number that identifies the offeror's name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the CCR database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number--

(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the

United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.

The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company Physical Street Address, City, State, and Zip Code.

(iv) Company Mailing Address, City, State and Zip Code (if separate from physical).

(v) Company Telephone Number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the CCR database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering.

Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) The Contractor is responsible for the accuracy and completeness of the data within the CCR database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the CCR database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the CCR database to ensure it is current, accurate and complete. Updating information in the CCR does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g)(1)(i) If a Contractor has legally changed its business name, "doing business as" name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to (A) change the name in the CCR database; (B) comply with the requirements of Subpart 42.12 of the FAR; and (C) agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor must provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (g)(1)(i) of this clause, or fails to perform the agreement at paragraph (g)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the CCR information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the "Suspension of Payment" paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the CCR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .