Solicitation.pdf

PDF 650 KB Posted

Attached to
Cow Creek Stewardship Federal contract opportunity
Solicitation number
AG-9A40-S-16-4002
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Cow Creek Stewardship, newest first.
File Type Posted
Amendment_No._4 __SF_30.pdf PDF
Amendment_No_3_-_SF-30.pdf PDF
Sch_of_items_Rd_9S09_Rock_Creek_Road.pdf PDF
Section_416.pdf PDF
Pre-bid_Attendance_Sheet.pdf PDF
Sch_of_items.pdf PDF
Amendment_No._2_.pdf PDF
Pre-bid_meeting_Agenda.pdf PDF
Appendix_A_table_for_Item_2_Road_Maintenance.pdf PDF
Appendix_C_Table_page_21_Road_Maintenance.pdf PDF
Amendment_1.pdf PDF
Wage_Determination_1977-0727.pdf PDF
Construction_Drawings.pdf PDF
Appendix-B.pdf PDF
Wage_Determination_CA29.pdf PDF
Appendix-D.pdf PDF
Appendix-A.pdf PDF
Contract_Area_Map.pdf PDF
Appendix-C.pdf PDF
FirePlan.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-9A40-S-16-4002

2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED

07/05/2016

PAGE OF PAGES

1 55

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

AG-9A40-C-16-4002

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BY CODE 8. ADDRESS OFFER TO

USDA Forest Service Sierra National Forest 1600 Tollhouse Road Clovis, CA 93611

USDA Forest Service Attn: Patrick J. Gallegos Sierra National Forest 1600 Tollhouse Road Clovis, CA 93611

9. FOR INFORMATION

CALL:

A. NAME

Patrick J. Gallegos

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 559 297-0706 ext. 4830

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

Cow Stewardship IRSC, Sierra National Forest

Note to Offerors:

Electronic submissions of proposals will not be accepted. Please mail hard copy proposals and bid bond to the address listed in block 8 above.

Tax Identification Number (TIN):____________________

DUNS:____________________

E-Mail Address:____________________________

11. The Contractor shall begin performance within 10 calendar days and complete by March 31, 2019 after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See F.)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and 1 copies to perform the work required are due at the place specified in Item 8 by 1600 (hour) local time 08/04/2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Computer Generated Prescribed by GSA FAR (48 CFR) 53.236-1(e)

RFP AG-9A40-S-16-4002

Cow Stewardship

PART I – THE SCHDULE

SECTION B- SERVICES AND PRICES

COW STEWARDSHIP IRSC

High Sierra Ranger District Sierra National Forest

B.1 Schedule of Service Items:

Item No. DESCRIPTION MM

UNIT

0F

MEAS

EST.

QTY UNIT PRICE TOTAL PRICE

MANDATORY ITEMS

1 Removal of Sawlog from Public lands

EA AC 1,352 XXXXXXXXX XXXXXXXXX

2 Biomass Thin and Stack at Landing EA AC 42.9 $________ $__________

3 Road Maintenance EA MI 39.81 $________ $__________

Road Reconstruction (See list of construction Items below Next page)

Optional items

Biomass Thin and Stack at Landing EA AC 838.6 $_________ $__________

Biomass Thin and Stack at Landing EA AC 516.9 $__________ $__________

Road Reconstruction

Road No. 9S09, Rock Creek Road Length: 12.65 MI

201(05) Clearing And Grubbing, Slash Treatment Methods For Tops And Limbs 11, Logs 8, Stumps 4, Utilization Of Timber 1

DQ STA 334.00 $__________ $__________

303(02) Recondition Roadbed, Compaction A

DQ STA 334.00 $__________ $__________

430(12) Place Cold Mix Asphalt In

Potholes Various Locations (Includes Tack Coat Material)

AQ TON 100.00 $__________ $__________

Total Price $___________

Road No. 9S09C, Upper Burn Length: 0.75 MI

201(05) Clearing And Grubbing, DQ STA 39.40 $__________ $_________

Slash Treatment Methods For Tops

And Limbs 11, Logs 8, Stumps 4, Utilization Of Timber 1

204(19)D Drainage Excavation, Type DQ LF 90.00 $__________ $_________ Leadoff Ditch

303(02) Reconditioning Of Roadbed, DQ STA 39.40 $__________ $_________

303(20)C Drainage Excavation, Construct DQ EA 9.00 $__________ $_________

Dip Total Price $____________

Road No. 9S10, Foster Ridge Length: 4.33 Mi

201(05) Clearing And Grubbing, Slash Treatment Methods For Tops And Limbs 6, Logs 8, Stumps 4, DQ STA 228.70 $__________ $_________

204(19)D Drainage Excavation, Type

DQ LF 85.00 $__________ $_________

251(02) Place Tunnel Muck

Material, FS Provided Material

DQ CY 11.00 $__________ $_________

301(09) Crushed Aggregate, Type

Surface Course, Grading 2, Compaction A

AQ TON 425.00 $__________ $_________

303(02) Reconditioning Of

Roadbed, Compaction A

DQ STA 228.70 $__________ $_________

303(20)D Drainage Excavation, Type

Reconstruct Dip

DQ EA 8.00 $__________ $_________

303(20)L Clean CMP Inlet/Outlet DQ EA 36.00 $__________ $_________

304(11) Crushed Aggregate, Type

Surface Course, Grading

AQ TON 425.00 $__________ $_________

430(12) Place Cold Mix Asphalt In Potholes Various Locations (Includes Tack Coat Material)

AQ TON 1.00 $__________ $_________

607(10) Repair Cmp Outlet DQ EA 1.00 $__________ $_________

Total Price $___________

Road No. 9S62, Dinkey Lake Length: 1.58 Mi

301(09) Crushed Aggregate, Type AQ TON 575.00 $__________ $_________

2, Compaction A (14' Wide Road)

DQ STA 83.40 $__________ $_________

303(20)L Clean CMP Inlet/Outlet DQ EA 3.00 $__________ $_________

607(10) Repair CMP Inlet DQ EA 1.00 $__________ $_________

Total Price $___________

Road No 9S90, Cutts Length: 0.37 Mi

201(05) Clearing And Grubbing, Slash Treatment Methods For Tops and Limbs 11, Logs 8, Stumps 4, DQ STA 19.60 $__________ $_________

203(01) Remove Barriers DQ EA 2.00 $__________ $_________

DQ STA 19.60 $__________ $_________

Road No. 9S90A, Cutts Spur Length: 0.44 Mi

201(05) Clearing And Grubbing, Slash Treatment Methods For Tops And Limbs 11, Logs 8, Stumps 4, DQ STA 23.10 $__________ $_________

203(01) Remove Barriers DQ EA 2.00 $__________ $_________

204(19)D Drainage Excavation, Type DQ LF 50.00 $__________ $_________ Leadoff Ditch

204(71) Roadway Excavation

Reestablish Existing Alignment

DQ LS 1.00 $__________ $_________

301(09) Crushed Aggregate, Type

AQ TON 175.00 $__________ $_________

DQ STA 23.10 $__________ $_________

303(20)C Drainage Excavation, Construct Dip DQ EA 5.00 $__________ $_________

Road No.10S13M, Big Fir M Spur Length: 0.88 Mi

201(05) Clearing And Grubbing, Slash Treatment Methods For Tops And Limbs 11, Logs 8, Stumps 4, DQ STA 39.10 $__________ $_________

203(01) Remove Log LSQ LS 1.00 $__________ $_________

203(04)B Remove CMP From FS Land LSQ LS 2.00 $__________ $_________

DQ LF 85.00 $__________ $_________

204(71) Excavation Placement, Method 4 DQ CY 30.00 $__________ $_________

251(11) Hand Placed Riprap, Class

II DQ CY 47.00 $__________ $_________

301(09) Crushed Aggregate, Type Surface Course, Grading

AQ TON 450.00 $__________ $_________

DQ STA 39.10 $__________ $_________

Construct Dip DQ EA 12.00 $__________ $_________

303(20)L Clean CMP Inlet DQ EA 1.00 $__________ $_________

602(02)B

24-Inch Corrugated Metal Pipe, 0.064-Inch Thickness For Steel Or 0.060-Inch Thickness For Aluminum, Method B

AQ LF 55.00 $__________ $_________

602(03)B 24" Metal End Section AQ EA 1.00 $__________ $_________

Road No. 10S13MA, Big Fir MA Length: 0.21 Mi

201(05) Clearing And Grubbing, Slash Treatment Methods For Tops and Limbs 11, Logs 8, Stumps 4, DQ STA 11.00 $__________ $_________

204(19)D Drainage Excavation Type, DQ LF 40.00 $__________ $_________

251(71) Hand Placed Riprap, Class

II DQ CY 4.00 $__________ $_________

DQ STA 11.00 $__________ $_________

601(01) Mobilization LSQ LS 1.00 $__________ $_________

Construct Dip

DQ EA 4.00 $__________ $_________

Total Price $_____________

Road No. 10S406, American.

Length: 0.24 Mi

201(05)

Clearing And Grubbing, Slash Treatment Methods For Tops and Limbs 11, Logs 8, Stumps 4, DQ STA 12.70 $__________ $_________

DQ LF 60.00 $__________ $__________

DQ STA 12.70 $__________ $__________

303(20)C Drainage Excavation, Type

Construct Dip

DQ EA 4.00 $__________ $__________

Total Price $_____________

B.2 TIMBER/PRODUCT REMOVAL PRICE SCHEDULE:

SPECIES PRODUCT QUANTITY UNIT OF

MEASURE

MINIMUM

ACCEPTABLE

OFFER

OFFER

(FLAT)

TOTAL

OFFER

PP Sawtimber 341.23 CCF $5.00 $______ $________

SP Sawtimber 84.05 CCF $5.00 $______ $________

WF Sawtimber 10,859.80 CCF $19.89 $______ $________

IC Sawtimber 475.12 CCF $19.82 $______ $________

LP Sawtimber 1,608.32 CCF $1.00 $______ $________

Total – All Products $________

Note: These schedules are for pricing/payment purposes. See Instructions to Offerors for business proposal requirements.

Note: Price Proposals MUST be provided on ALL Items in Schedules B-1, Base and Option Work Activities and B-2, Timber or other products Removal Price Schedule.

B.3 LAND MANAGEMENT ACTIVITIES.

Performance of land management activities shall be in accordance with Section C – Project Description and Work Specifications. Payment for Land Management Work Activities in Schedule B- 1, will be made in Stewardship Credits in lieu of cash, as defined in Section G. All Base Work Activities shall be performed. Option activities are listed in order of planned priority. Award may be made for option items in any order that the Contracting Officer determines is in the best interest of the Government.

PART I - THE SCHEDULE

SECTION C - DESCRIPTION AND SPECIFICATIONS

General Clauses and Provisions Pertaining To All Items

C.1 AGAR 452.211-72 STATEMENT OF WORK/SPECIFICATIONS (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

C.2 PROJECT DESCRIPTION

(a) Description of Work – The Cow Project is located on the High Sierra Ranger District of the Sierra National Forest encompassing the area indicated on the Contract Area Map from the junction of McKinley Grove and Dinkey Creek Roads in the south to Tamarack Meadow and the Dinkey Roof Pendant Geological Area at the northern boundary. Project objectives include:

• Reduce fire risk to communities and firefighters

• Improve and maintain key wildlife habitat structures.

• Restore forest health to a more natural condition characteristic of frequent-fire forests.

To accomplish these objectives, the contract includes the following components: mechanical fuels reduction, sawtimber removal, biomass thinning and stacking at the landing, road maintenance and road reconstruction.

(b) Resulting Contract – Any resultant contract will be a Construction contract with requirements for timber removal.

(c) Project Location – Project is located in Township 9 South, Range 25 East, Sections 12, 13 and 24; Township 9 South, Range 26 East, Sections 7-10, 14-22 and 29-32;

Township 10 South, Range 26 East, Sections 3-10 and 16-18, Mount Diablo Base Meridian.

C.3 SPECIFICATIONS

Specifications for each Stewardship Activity individually described by an item number in Schedule B pages can be found in Appendix A. Specifications for timber removal can be found in Appendix B. Road Maintenance plans and specifications can be found in Appendix C. Road Construction plans and specifications can be found in Appendix D.

C.4 CONTRACT AREA MAP

The boundaries of Subdivisions or Payment Units and any cutting units thereof, are as shown on the attached "Contract Area Map," which is made a part hereof, and were, before solicitation, designated on the ground by Forest Service to meet the anticipated needs of the parties. The location of the Subdivisions or Payment Units and their approximate acreage are stated in Division A/AT. Subdivisions or Payment Units may be revised and additional ones may be established only by written agreement of both parties. Where applicable, the following are also identified on Contract Area Map:

(a) Identified claims limiting Contractor's rights;

(b) Boundaries of cutting units;

(c) Areas where leave trees are Marked to be left uncut;

(d) Roads listed

(e) Sources of base course, rock riprap and surface rock;

(f) Roads where log hauling is prohibited or restricted;

(g) Roads and trails to be kept open;

(h) Improvements to be protected;

(i) Locations of known historical sites;

(j) Maximum stump heights when more than one height is listed by areas;

(k) Skidding or yarding methods specified;

(l) Streamcourses to be protected;

(m) Other features required by Appendix B; and

(n) Boundaries of stewardship work activities.

C.5 GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the "Government Property" FAR clause 52.245-4 contained in Section I of the contract. Tunnel Muck.

SECTION D – PACKAGING AND MARKING

There are no clauses in this section.

SECTION E - INSPECTION AND ACCEPTANCE

E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.246-04 Inspection of Services – Fixed Price (AUG 1996)

52.246-12 Inspection of Construction (AUG 1996)

E.2 CONTRACTOR QUALITY CONTROL INSPECTION SYSTEM

The Contractor shall identify the quality control inspection system it will use to ensure that contract specifications will be achieved. At no time shall the contractor rely upon Government inspections to provide notification of unsatisfactory performance. The Contractor shall produce written inspection records in a format and at times and places satisfactory to the Contracting Officer. Inspection records shall be made available upon request of the Contracting Officer and be maintained until the date of contract closure. The Contracting Officer may observe the Contractor's inspection at any time and shall otherwise have unlimited access to the inspection data.

E.3 ACCEPTANCE

The Forest Service shall perform an inspection upon Contractor’s written request and assurance that work has been completed. Request shall be for a reasonable portion of work.

Acceptance may be made for all or portions of work.

E.4 GOVERNMENT QUALITY ASSURANCE SURVEILLANCE PLAN

Quality assurance plans specific to individual items will be found in Appendix A.

http://www.arnet.gov/far

SECTION F - DELIVERIES OR PERFORMANCE

F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:

http://www.acquisition.gov/far

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984) 52.247-55 F.O.B. Point for Delivery of Government-Furnished Property (JUN 2003)

F. 2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR

1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after receipt of Notice to Proceed or Task Order for specific work items, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than March 31, 2019.

The time stated for completion shall include final cleanup of the premises.

Performance shall be made only as authorized by orders issued in accordance with the Ordering clauses. Except as this contract otherwise provides, the Government shall order all services within the scope that are required by Government activities specified in the Schedule only with the vendor holding this contract for the specified services. Timber or other products Removal activities shall be scheduled and carried out in accordance with the Timber or other products Removal Specifications in Appendix B and as approved by the Contracting Officer.

It is estimated that work will begin October 31, 2016. Actual date is negotiable based upon actual award date, prospective work and weather conditions.

Any restrictions on the Scheduling of Work for resource protection, etc. will be addressed in the Technical Specifications.

F.3 AGAR 452.211-74 PERIOD OF PERFORMANCE (FEB 1988)

The period of performance of this contract is from date of contract award through 3 years after date of contract award.

F.4 AGAR 452.236-75 MAXIMUM WORKWEEK – CONSTRUCTION SCHEDULE (NOV

1996)

Within 5 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following in writing for approval:

(a) A schedule as required by FAR clause 52.236-15 “Schedules for Construction

Contracts” and

(b) The hours (including the daily starting and stopping times) and days of the week the

Contractor proposes to carry out the work.

F.5 SCHEDULES AND REPORTS

Contractor shall provide the following submittals within 10 days after issuance of a Notice to Proceed or Task Order for review and/or approval, unless stated elsewhere in the specifications or otherwise mutually agreed:

ITEM DESCRIPTION COPIES

REQUIRED

Proposed progress schedule showing starting and completion dates of various phases of the work 2

List of proposed sub-contractors and their intended work. Sub-contractors must have Contracting Officer’s written approval prior to starting work on the project. Submit on Standard Form 1413.

Traffic Control Plan 2 Soil Erosion and Water Pollution Control Plan 2 Designation of Contractor personnel describing responsibilities and authorities 2

All schedules and reports shall be submitted to the contracting officer.

SECTION G – CONTRACT ADMINISTRATION DATA

General Clauses Pertaining To All Items

G.1 PAYMENT

It is anticipated that funds will be exchanged in the performance of this contract because the value of the timber or other products will not completely offset the value of the work to be performed. Payment shall only be made under this clause to the extent that the work performed will not be offset by the timber or other products value during the contract period.

When payment is made to the contractor for work performed, it will be made in accordance with FAR 52.232-1 – Payments, (Section I).

The value of work completed and timber or other products removed will be documented in a Stewardship Statement of Account produced by Timber Sale Accounting (TSA) monthly when harvesting operations are underway.

G.2 INCIDENTAL PAYMENT ITEMS

The intent of the contract is to provide for the complete performance of the project described in the contract. Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for items shown.

G.3 PRODUCT PAYMENT GUARANTEE

To guarantee payment for product in advance of cutting, Contractor may earn Stewardship Credits in advance of cutting, or provide a product payment guarantee in the form of an acceptable surety payment bond, irrevocable letter of credit (ILOC), cash, or a deposit in a Federal Depository negotiable securities of the United States.

Any earned stewardship credits and product payment guarantee together will maintain a minimum unobligated balance equal to the applicable charges for product the Forest Service estimates will be cut or removed in not less than 30 calendar days and not more than 60 calendar days, plus the value of any outstanding charges for product removed.

Securities shall be deposited through the Contracting Officer accompanied by a power of attorney and agreement authorizing the bond-approving officer to sell or collect such securities if payment is not made within 15 days of billing by Forest Service. The penal sum of such surety bond or the market value at time of deposit of such negotiable securities shall be the maximum amount of the payment guaranteed.

Product payment guarantee for a single contract shall be provided utilizing Form FS6500-12 Payment Bond.

Blanket Payment Bond:

a. Contractor may furnish an acceptable bond, or deposits securities, to guarantee payment for product from multiple contracts. Contractor shall not start cutting hereunder until this contract receives an allocation that will meet the obligation for product payment guarantee.

b. The amount of such bond or deposited securities shall be allocated to such contracts by the Forest Service. The Contractor shall provide the contact information for the Forest Service representative administering the blanket payment bond to the Contracting Officer. The Forest Service representative administering the blanket payment bond will provide the Contracting Officer with documentation showing the allocation to this contract.

c. When there is to be no product cutting or removal hereunder for 30 days or more and payment of current charges has been made, the allocation to this contract may be reallocated to other contracts at Contractor’s request.

d. Payment guaranteed with acceptable blanket payment bond for multiple contracts shall be provided utilizing Form FS-6500-12a Blanket Payment Bond.

G.4 REIMBURSEMENT FOR BOND PREMIUMS

The Contract Price includes the total amount for premiums that the Contractor attributes to the furnishing of the performance and/or payment bonds required by the contract. Reimbursement for bond premiums may be made in stewardship credits or cash.

G.5 STEWARDSHIP CREDITS

Stewardship Credits are credits that are earned and established when work listed in the B.1 Schedule of Supplies/Services has been performed and accepted. Stewardship credits shall be earned at the rate as shown in the Schedule. Earned credits may be used to pay for timber or other products value included in Schedule B.2. Unless otherwise indicated in the Schedules, credits will be earned based upon Actual Quantities accomplished and accepted.

G.6 ESTABLISHMENT OF STEWARDSHIP CREDITS

Notwithstanding references to payments in “Payment” clauses of this contract, payment for Stewardship Activities will be made with Product Value or other funding as indicated in the award document.

Stewardship Credits will be established on a monthly basis. Stewardship credits will be established for the number of units of each activity that have been completed and accepted.

Acceptance may be for all, or a reasonable portion of, any specific activity.

Stewardship credits will not be established for work that is in progress that has not been accepted by the Forest Service. No credits will be established for work performed under terms of Schedule B.2.

G.7 CONTRACTOR CERTIFICATION

Monthly, as Stewardship Credits are established, the Contractor shall furnish the following certification (Contractor Certification - Earned Stewardship Credits) or credit will not be received.

CONTRACTOR CERTIFICATION - EARNED STEWARDSHIP CREDITS

COW STEWARDSHIP PROJECT

I hereby certify, to the best of my knowledge and belief, that--

(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;

(2) Payments to subcontractors and suppliers have been made, and timely payments will be made for the work activities covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;

(3) This request for progress payments/credits does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and

(4) This certification is not to be construed as final acceptance of a subcontractor's performance.

(Name)

(Title)

(Date)

G.8 EXCESS STEWARDSHIP CREDITS

In the event there are excess (unused) established Stewardship Credits when all of the included timber or other products has been cut and removed the Forest Service, at its option, shall either add more timber or other products or make cash payment for the unused credits.

G.9 EXCESS TIMBER OR OTHER PRODUCTS VALUE

In the event the value of the included timber or other products exceeds the total value of all of the mandatory activities plus the ordered optional activities, the Contractor shall make cash payment for the excess timber or other products value.

G.10 REFUND OF EXCESS CASH

If at any time the credit balance of the Stewardship Statement of Account exceeds the charges for timber or other products removed to date and for timber or other products that the Forest Service estimates will be cut within the next 60 calendar days, any portion of such excess from cash in the account shall be refunded if requested by Contractor. If no cutting is planned within the next 60 calendar days, refund of the entire unencumbered cash balance may be made.

After a refund, deposits shall be made to meet the requirements of the clause entitled, “PRODUCT PAYMENT GUARANTEE” before additional timber or other products may be cut.

G.11 FINAL PAYMENT - RELEASE OF CLAIMS

The Government shall pay the amount due the Contractor under this contract after—

(1) Completion and acceptance of all work;

(2) Presentation of a properly executed voucher; and

(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)

A post award conference with the successful offeror is required. It will be scheduled within TBD days after the date of contract award. The conference will be held at the High Sierra Ranger District Office, and will include discussion of contract terms and work performance requirements, work progress schedule and fire prevention/suppression and safety plans.

H.2 FAR 52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by visual observation.

(b) Additional informational material made available to contractors including but not limited to environmental documentation, timber cruise data, timber removal report and appraisal, maps, access permits, etc.

H.3 AGAR 452.237-74 KEY PERSONNEL (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel:

• Overall Project Manager

• Logging Supervisor

• Fuels Treatment Supervisor

• Road Construction Supervisor(s) – supervising work in the timber removal specifications as well as other road work, maintenance and obliteration.

• Individual Sub-Managers – Individuals supervising individual sub-contracts for work items not covered by personnel noted previously herein.

(b) During the first 90 days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutes, and any additional information requested by the Contracting Officer.

Proposed substitutes should have comparable qualifications to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

H.4 AGAR 452.236-72 USE OF PREMISES (NOV 1996)

(a) Before any camp, quarry, borrow pit, storage, detour, or bypass site, other than shown on the drawings, is opened or operated on USDA land or lands administered by the USDA, the Contractor shall obtain written permission from the Contracting Officer. A camp is interpreted to include a campsite or trailer parking area of any employee working on the project for the Contractor.

(b) Unless excepted elsewhere in the contract, the Contractor shall (i) provide and maintain sanitation facilities for the work force at the site and (ii) dispose of solid waste in accordance with applicable Federal, State and local regulations.

H.5 SAFETY

Contractor’s Operations shall facilitate Forest Service’s safe and practical inspection of Contractor’s Operations and conduct of other official duties on Contract Area. Contractor has all responsibility for compliance with safety requirements for Contractor's employees. In the event that a conflict develops between the requirements of this contract or agreed upon methods of proceeding hereunder and State or Federal safety requirements, the contract shall be modified and Contractor may request an equitable adjustment…

H.6 REQUIREMENTS OF RIGHTS-OF-WAY

Contractor’s road construction and use on rights-of-way shall be confined to said rights-of-way and limited by the related easements and stipulations, if any, unless Contractor makes other arrangements that will not infringe upon or adversely affect the grantee’s rights. Said easements or right-of-way documents are available in the offices of the Forest Supervisor and District Ranger.

H.7 USE OF ROADS BY CONTRACTOR

Contractor is authorized to maintain roads, bridges, and other transportation facilities, as needed for harvesting Included Timber or other products on National Forest and other lands where Forest Service has such authority. The location and clearing widths of all Temporary Roads or facilities shall be agreed to before construction is started. Contractor is authorized to cut and use for construction without charge construction timber or other products designated by agreement.

Except as provided herein, Contractor is authorized to use existing National Forest roads and Specified Roads, when such use will not cause damage to the roads or National Forest resources and when hauling can be done safely. If Contractor’s use of an existing temporary or National Forest system road cannot be satisfactorily accommodated without reconstruction, Contractor shall be authorized to use such road upon agreement as to the minimum reconstruction work that Contractor shall perform before hauling.

The Contract Area Map shows existing temporary or permanent roads that for such reasons as limitations in structural capacity, safety, and protection of soil, water, and roads:

(a) Cannot be used for log hauling or

(b) May be used only under the restrictive limitations stated therein.

Contractor's use of existing roads identified on Contract Area Map by the following codes is prohibited or subject to restrictive limitations, unless agreed otherwise:

Code Use Limitations

X Hauling prohibited R Hauling restricted U Unsuitable for hauling prior to completion of agreed reconstruction P Use prohibited A Public use restriction W Regulation waiver

Roads coded A will be signed by the Forest Service to inform the public of use restrictions.

Contractor's use of roads coded R, A, or W shall be in accordance with the following restrictions:

Restricted Road List

Road Number

Road Name

Termini From To

Map Legend

Description of Restrictions

09S010 Foster Ridge MP 6.0 MP 7.5 P Use Prohibited 09S401 Big Saddle 09S010 MP 0.32 A Closed to Public Use

09S401A Willow 09S401 End A Closed to Public Use 09S402 Salmo 09S010 End A Closed to Public Use

09S009 Rock Creek Road Hwy 168 Dinkey

Creek Road U Unsuitable for hauling prior to completion of agreed reconstruction

09S009C Upper Burn 09S009 End U Unsuitable for hauling prior to completion of agreed reconstruction

09S010 Foster Ridge 09S069 MP 4.5 U Unsuitable for hauling prior to completion of agreed reconstruction

09S062 Dinkey Lakes 09S010 MP 1.52 U Unsuitable for hauling prior to completion of agreed reconstruction

09S090 Cutts 09S002 End U Unsuitable for hauling prior to completion of agreed reconstruction

09S090A Cutts A Spur 09S090 End U Unsuitable for hauling prior to completion of agreed reconstruction

10S013M Big Fir M Spur MP 0.34 10S406 U Unsuitable for hauling prior to completion of agreed reconstruction

10S013MA Big Fir MA 10S013M End U Unsuitable for hauling prior to completion of agreed reconstruction

10S406 American 11S040 10S036 U Unsuitable for hauling prior to completion of agreed reconstruction

H.8 ROAD MAINTENANCE

Contractor shall maintain roads, commensurate with Contractor’s use, in accordance with Road Maintenance Requirements and the Road Maintenance Specifications. Performance of road maintenance work by Contractor may be required prior to, during, or after each period of use. The timing of work accomplishment shall be based on Contractor’s Progress Schedule.

H.9 TRAFFIC CONTROL PLAN

Unless otherwise agreed in writing, when Contractor’s Operations are in progress adjacent to or on Forest Service controlled roads and trails open to public travel, Contractor shall furnish, install, and maintain all temporary traffic controls that provide the user with adequate warning of hazardous or potentially hazardous conditions associated with Contractor’s Operations.

Contractor and Forest Service shall agree to a specific Traffic Control plan for each individual project prior to commencing operations. Devices shall be appropriate to current conditions and shall be covered or removed when not needed. Except at otherwise agreed, flagmen and devices shall be as specified in the “Manual on Uniform Traffic Control Devices for Streets and Highways” (MUCD) and as shown on Plans, Contract Area Map, Traffic Control Plan or in specifications attached hereto.

H.10 USE BY OTHERS

Forest Service shall have the right to use any road constructed by Contractor under this contract for any and all purposes in connection with the protection and administration of the National Forest. Other parties, in connection with the logging of tributary National Forest timber, may use roads constructed by Contractor hereunder when such use will not materially interfere with Contractor’s Operations. Such third party use shall be contingent upon the third party paying a fair share of maintenance cost commensurate with such commercial use.

Unless otherwise provided, Forest Service shall authorize other uses of roads constructed by Contractor hereunder only if:

(a) Forest Service makes appropriate arrangements to relieve Contractor of related maintenance costs commensurate with such other uses and

(b) Such other uses will not materially interfere with Contractor’s Operations.

Where Contractor reconstructs a road having established use, the use during reconstruction and thereafter by Contractor shall be such as to reasonably accommodate such established use. Contractor shall have the right to use such reconstructed road without material additional interference from other users.

H.11 CONFORMITY WITH DRAWINGS AND SPECIFICATIONS

Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.

H.12 LOCAL MATERIAL SOURCES

(a) Designated Sources--Sources of local materials will be designated on the drawings.

The Government assumes responsibility for the quality and quantity of material in the source.

The Contractor shall determine the equipment and work required to produce the specified product.

The Contractor shall utilize all suitable material in the source. The designation of source will include the rights of the Contractor to use certain area(s) for plant site, stockpiles, and haul roads. Any Contractor royalty payment requirements will be stated below.

When materials are subject to weight measurement, the weight/volume relationship used for determination of designed quantities will be shown on the Drawings.

Should the designated source, due to causes beyond the control of the Contractor, contain insufficient suitable material, the Government will provide another source with an equitable adjustment in accordance with the Differing Site Conditions and Changes clauses.

(b) Contractor-Furnished Sources--When the material sources are not designated as provided above or the Contractor elects not to use designated sources, the Contractor shall be responsible for providing the specified product with no adjustment in contract price, unless weight/volume relationship differences between designated source material and Contractor-furnished source material result in financial disadvantage to the Government. Quality testing shall be the responsibility of the Contractor. Test results shall be furnished to the Contracting Officer.

H.13 SAMPLES, TESTS, CITED SPECIFICATIONS

Reference made in the contract to specifications, standards, or test methods adopted by AASHTO, ASTM, GSA, or other recognized National technical associations, shall mean specifications, standards, or test methods (including interim or tentative issues) which are in effect on the date of the solicitation.

H.14 AGAR 452.236-76 SAMPLES AND CERTIFICATES (FEB 1988)

When required by the specifications or the Contracting Officer, samples, certificates, and test data shall be submitted after award of the contract, prepaid, in time for proper action by the Contracting Officer or his/her designated representative. Certificates and test data shall be submitted in triplicate to show compliance of materials and construction specified in the contract performance requirements.

Samples shall be submitted in duplicate by the Contractor, except as otherwise specified, to show compliance with the contract requirements. Materials or equipment for which samples, certifications or test data are required shall not be used in the work until approved in writing by the Contracting Officer.

H.15 PROTECTION OF LAND SURVEY MONUMENTS

Forest Service shall appropriately designate on the ground all known survey monuments, section corners, and other corner accessories. Forest Service shall post identifying signs on two sides of each known bearing tree.

Forest Service shall arrange protective or perpetuative action that does not cause unnecessary delay to Contractor in authorized clearings, such as Clearcutting Units and road construction, and in other instances where damage to monuments, section corners, and other corner accessories is unavoidable.

Contractor shall protect all known survey monuments, witness corners, reference monuments, and bearing trees against avoidable destruction, obliteration, or damage during Contractor’s Operations. If any known monuments, corners, or accessories are destroyed, obliterated, or damaged by Contractor’s Operations, Contractor shall hire the appropriate county surveyor or a registered land surveyor to reestablish or restore at the same location the monuments, corners, or accessories at no additional cost to the Government. Such surveyors shall use procedures in accordance with the Bureau of Land Management “Manual of Instructions for the Survey of the Public Lands of the United States” for General Land Office surveys and in accordance with State law for others. Contractor shall record such survey in appropriate county records.

H.16 PROTECTION MEASURES NEEDED FOR PLANTS, ANIMALS, CULTURAL

RESOURCES, AND CAVE RESOURCES

1. Areas, known by Forest Service prior to contract solicitation, needing special measures for the protection of plants, animals, cultural resources, and/or cave resources are shown on Contract Area Map and/or identified on the ground, and shall be treated as follows:

a. Unless agreed otherwise, wheeled or track laying equipment shall not be operated in areas identified as needing special measures except on roads, landings, tractor roads, or skid trails. Contractor may be required to backblade skid trails and other ground disturbed by Contractor’s Operations within such areas in lieu of cross ditching.

b. Unless agreed otherwise, trees will not be felled into areas identified as needing special measures.

c. Contractor shall conduct operations in a manner that does not damage or disturb identified areas. In the event that protective measures identified by the Forest Service are for any reason inadequate, Contracting Officer may delay or interrupt Contractor’s operations, under this Contract, and/or modify this Contract.

d. Contractor shall immediately notify the Forest Service if its operations disturb or damage any area identified as needing special protection, and shall immediately halt its operations in the vicinity of such area until the Forest Service authorizes continued operations. In the event that Contractor's operations disturb or damage an area identified as needing special protection, then Contractor shall reimburse the Forest Service for the full cost and expense of any evaluative and remedial measures undertaken by the Forest Service in connection with such disturbance or damage. Such payment shall not relieve Contractor from civil or criminal liability under applicable law.

2. Nothing contained in this clause shall establish, or be deemed to establish any express or implied warranty on the part of the Forest Service that the Forest Service has identified all areas within the Contract Area requiring special protection, or that measures prescribed by the Forest Service for protection of such areas are adequate.

3. Following contract solicitation, additional areas needing special measures for protection may be discovered or identified; protective measures may be revised or newly prescribed; and, additional species of plants and/or animals may be added to federal lists of protected species. In such event, Contracting Officer may delay or interrupt Contractor’s operations, under this Contract, and/or modify this Contract.

4. Discovery, by either the Contractor or the Forest Service, of additional areas, resources, species, or members of species needing special protection shall be promptly reported to the other party.

H.17 PROTECTION OF RESIDUAL TREES

Contractor's Operations shall not unnecessarily damage young growth or other trees to be reserved.

H.18 SANITATION AND SERVICING

Contractor shall take all reasonable precautions to prevent pollution of air, soil, and water by Contractor’s Operations. If facilities for employees are established on Contract Area, they shall be operated in a sanitary manner. In the event that Contractor’s Operations or servicing of equipment result in pollution to soil or water, Contractor shall conduct cleanup and restoration of the polluted site to the satisfaction of Forest Service.

Contractor shall maintain all equipment operating on Contract Area in good repair and free of abnormal leakage of lubricants, fuel, coolants, and hydraulic fluid. Contractor shall not service tractors, trucks, or other equipment on National Forest lands where servicing is likely to result in pollution to soil or water. Contractor shall furnish oil-absorbing mats for use under all stationary equipment or equipment being serviced to prevent leaking or spilled petroleum-based products from contaminating soil and water resources. Contractor shall remove from National Forest lands all contaminated soil, vegetation, debris, vehicle oil filters (drained of free-flowing oil), batteries, oily rags, and waste oil resulting from use, servicing, repair, or abandonment of equipment.

H.19 PREVENTION OF OIL SPILLS

If Contractor maintains storage facilities for oil or oil products on Contract Area, Contractor shall take appropriate preventive measures to ensure that any spill of such oil or oil products does not enter any stream or other waters of the United States or any of the individual States.

If the total oil or oil products storage exceeds 1,320 gallons in containers of 55 gallons or greater, Contractor shall prepare a Spill Prevention Control and Countermeasures Plan. Such plan shall meet applicable EPA requirements (40 CFR 112), including certification by a registered professional engineer.

Contractor shall notify Contracting Officer and appropriate agencies of all reportable (40 CFR

110) spills of oil or oil products on or in the vicinity of Contract Area that are caused by Contractor’s employees agents, contractors, Subcontractors, or their employees or agents, directly or indirectly, as a result of Contractor’s Operations. Contractor will take whatever initial action may be safely accomplished to contain all spills.

H.20 HAZARDOUS SUBSTANCES

Contractor shall notify the National Response Center and Contracting Officer of all releases of reportable quantities of hazardous substances on or in the vicinity of Contract Area that are caused by Contractor’s employees, agents, Subcontractors or their employees or agents, directly or indirectly, as a result of Contractor’s Operations, in accordance with 40 CFR 302.

H.21 EQUIPMENT CLEANING

In order to prevent the spread of noxious weeds into the Contract Area, Contractor shall be required to clean all off-road logging and construction equipment prior to entry on to the Contract Area. This cleaning shall remove all soil, plant parts, seeds, vegetative matter, or other debris that could contain or hold seeds. Only logging and construction equipment so cleaned and inspected by the Forest Service will be allowed to operate within the Contract Area. All subsequent move-ins of equipment to the Contract Area shall be treated in the same manner as the initial move in. "Off-road equipment" includes all logging and construction machinery, except for log trucks, chip vans, service vehicles, water trucks, pickup trucks, cars, and similar vehicles.

Contractor shall employ whatever cleaning methods are necessary to ensure that off-road equipment is free of noxious weeds. Equipment shall be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools is not required.

Unless otherwise agreed, Contractor shall give the forest service at least 24 hours notice when equipment is ready for inspection. Notification will include an agreed upon location where the equipment will be available for inspection by the forest service.

New infestations of noxious weeds, of concern to Forest Service and identified by either Contractor or Forest Service, on the Contract Area or on the haul route, shall be promptly reported to the other party. Contractor and Forest Service shall agree on treatment methods to reduce or stop the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office.

H.22 EROSION PREVENTION AND CONTROL

Contractor’s Operations shall be conducted reasonably to minimize soil erosion. Equipment shall not be operated when ground conditions are such that excessive damage will result. The kinds and intensity of erosion control work done by Contractor shall be adjusted to ground and weather conditions and the need for controlling runoff. Erosion control work shall be kept current immediately preceding expected seasonal periods of precipitation or runoff.

If Contractor fails to do seasonal erosion control work prior to any seasonal period of precipitation or runoff, Forest Service may temporarily assume responsibility for the work and any unencumbered deposits hereunder may be used by Forest Service to do the work. If needed for such work, Contractor shall make additional deposits on request by Forest Service.

Any money deposited or used for this purpose shall be treated as cooperative deposits.

H.23 STREAMCOURSE PROTECTION

“Streamcourses” that are subject to provisions of this Section are shown on Contract Map.

Unless otherwise agreed, the following measures shall be observed to protect Streamcourses:

(a) Contractor’s Operations shall be conducted to prevent debris from entering Streamcourses, except as may be authorized under paragraph (d). In event Contractor causes debris to enter Streamcourses in amounts that may adversely affect the natural flow of the stream, water quality, or fishery resource, Contractor shall remove such debris as soon as practicable, but not to exceed 2 days, and in an agreed manner that will cause the least disturbance to Streamcourses.

(b) Culverts or bridges shall be required on Temporary Roads at all points where it is necessary to cross Streamcourses. Such facilities shall be of sufficient size and design and installed in a manner to provide unobstructed flow of water and to minimize damage to Streamcourses. Trees or products shall not be otherwise hauled or yarded across Streamcourses unless fully suspended.

(c) Wheeled or track-laying equipment shall not be operated in Streamcourses, except at crossings designated by Forest Service or as essential to construction or removal of culverts and bridges.

(d) Flow in Streamcourses may be temporarily diverted only if such diversion is necessary for Contractor’s planned construction and Forest Service gives written authorization. Such flow shall be restored to the natural course as soon as practicable and, in any event, prior to a major storm runoff period or runoff season.

H.24 MEADOW PROTECTION

Reasonable care shall be taken to avoid…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .