Schedule of Items
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_No._4 __SF_30.pdf | ||
| Sch_of_items_Rd_9S09_Rock_Creek_Road.pdf | ||
| Amendment_No_3_-_SF-30.pdf | ||
| Section_416.pdf | ||
| Amendment_No._2_.pdf | ||
| Pre-bid_meeting_Agenda.pdf | ||
| Pre-bid_Attendance_Sheet.pdf | ||
| Appendix_A_table_for_Item_2_Road_Maintenance.pdf | ||
| Appendix_C_Table_page_21_Road_Maintenance.pdf | ||
| Amendment_1.pdf | ||
| Solicitation.pdf | ||
| Wage_Determination_1977-0727.pdf | ||
| Construction_Drawings.pdf | ||
| Appendix-B.pdf | ||
| Wage_Determination_CA29.pdf | ||
| Appendix-D.pdf | ||
| Appendix-A.pdf | ||
| Contract_Area_Map.pdf | ||
| Appendix-C.pdf | ||
| FirePlan.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP AG-9A40-S-16-4002
Amendment No. 1 Cow Stewardship
PART I – THE SCHDULE
SECTION B- SERVICES AND PRICES
COW STEWARDSHIP IRSC
High Sierra Ranger District Sierra National Forest
B.1 Schedule of Service Items:
Item No. DESCRIPTION MM
UNIT
0F
MEAS
EST.
QTY UNIT PRICE TOTAL PRICE
MANDATORY ITEMS
1 Removal of Sawlog from Public lands
EA AC 1,352 $________ $__________
2 Biomass Thin and Stack at Landing EA AC 42.9 $________ $__________
3 Road Maintenance EA MI 38.02 $________ $__________
Road Reconstruction (See list of construction Items below Next page)
Optional items
Biomass Thin and Stack at Landing EA AC 838.6 $_________ $__________
Biomass Thin and Stack at Landing EA AC 516.9 $__________ $__________
Road No. 9S09, Rock Creek Road See list of Items page 3 below
Road No. 9S10, Foster Ridge Length: 4.33 Mi
201(05) Clearing And Grubbing, Slash Treatment Methods For Tops And Limbs 6, Logs 8, Stumps 4, Utilization Of Timber 1
DQ STA 228.70 $__________ $_________
204(19)D Drainage Excavation, Type
Leadoff Ditch
DQ LF 85.00 $__________ $_________
251(02) Place Tunnel Muck
Material, FS Provided Material
DQ CY 11.00 $__________ $_________
301(09) Crushed Aggregate, Type
Surface Course, Grading 2, Compaction A
AQ TON 425.00 $__________ $_________
303(02) Reconditioning Of
Roadbed, Compaction A
DQ STA 228.70 $__________ $_________
303(20)D Drainage Excavation, Type
Reconstruct Dip
DQ EA 8.00 $__________ $_________
303(20)L Clean CMP Inlet/Outlet DQ EA 36.00 $__________ $_________
430(12) Place Cold Mix Asphalt In Potholes Various Locations (Includes Tack Coat Material)
AQ TON 1.00 $__________ $_________
607(10) Repair Cmp Outlet DQ EA 1.00 $__________ $_________
Total Price $___________
Optional items
Road No. 9S09, Rock Creek Road Length: 12.65 Mi
204(19)D Drainage Excavation, Type 2’ Deep Roadway Ditch DQ LF 13,358 $__________ $_________
301(09)
Crusted Aggregate, Type Surface Course, Grading 2, Compaction A (2” Depth)
AQ Ton 1,560 $__________ $_________
303(02) Recondition Roadbed, Compaction A DQ STA 528 $__________ $_________
303(20)L Clean CMP Inlet/Outlet DQ EA 116 $__________ $_________
Total Price $___________