Attachment 2_Drawings.pdf
PDF 5 MB Posted
- Attached to
- Timber Sale Roads Sourgrass Stewardship
- Solicitation number
- AG-9A40-S-09-0050
About this file
Attachment_2_Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_3.pdf | ||
| Amendment_2.pdf | ||
| Amendment 1.pdf | ||
| Attachment 3_Davis Bacon.pdf | ||
| Attachment 5_Bid Bond.pdf | ||
| Attachment 4_Fire Plan.pdf | ||
| Attachment 1 _Project Specifications.pdf | ||
| !Solicitation Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNITED STATES DEPARTMENT OF AGRICULTURE
FOREST SERVICE
REGION FIVE
OREGON
oREDlllNG
STANISLAUS NATIONAL FOREST
DRAWINGS FOR PROPOSED
T
CALAVERAS COUNTY, CA
t;r,n
ROCK SOURCE:
USE APPROVED COMMERCIAL SOURCE.
NOXIOUS WEED PLAN REQUIRED.
TABLE OF CONTENTS
LENGTH SHEET
NAME
(MILES) NO.
TITLE SHEET
LOCATION MAP 2
NOTES & LEGENDS 3
MATERIAL &
<\-6QUANTITIES
BLANK SHEET 7
6N11 1.92 8
6N11Y 0.71 9
6N11YA 0.08 10
6N58 5.87 11-15
6N588 0.10 16
6N59 1.28 17
6N59A 0.81 18
6N64 2.00 19-21
6N64F 0.36 22
6N65 0.30 23
6N68 0.75 24
6N70Y 1.15 25-26
GENERAL TYPICALS 27-35
TOTAL
RECONSTRUCTION
MILES = 15.33
STANISLAUS NATIONAL FOREST
SHEETS
APPROVED BY ~~~~~"------
GER
\...- ,....... -.'1 ~\
I--------=::::::::::::~.It:...---I__-- 6N6~.T~--
LEGEND
SOURGRASS ROADS
CONST_TYPE
_ RECONST_REQUIRED
• RECONST_OPll0NAL
SYSTEM ROADS
y--I .. _- .. / /6N64 q.-::::=-=
I
6N58E
PRIM_MAINT
- NOT MAINTAINED
- - MAINTENANCE LVL 1
= = MAINTENANCE LVL 2
= MAINTENANCE LVL3
.. . . MAINTENANCE LVL 4
= MAINTENANCE LVL5== HIGHWAYS
HYDROLOGY
STREAM TYPE
_ .... INTERMITANT
-SEASONAL
.c== PERENNIAL
_lakes land_status class o FS - PROCLAIMED o FS - NOT PROCLAIMED o OTHER - PROCLAIMED
L:', AOTHER - NOT PROCLAIMED
o STATE PARK
0.25 0.5
Miles
GENERAL NOTES
* Unless otherwise specified, notes apply to all roads.
* Reconstruction - Only trees 10"D.B.H or larger to be cleared are indicated on the plans ~ (T or TS). Trees of smaller diameter and brush of any size shall also be cleared as SHOWN ON THE
DRAWINGS.
* Tops of cut banks are designated decking sites for unmerchantable timber. SPEC 204
* Outslope 3% unless otherwise SHOWN ON
THE DRAWINGS.
| * | Construction Tolernce "J". |
| * | Cushion requirement is waived. |
| * | Reconstruction - Widen as necessary to |
obtain min. specified width. Cut slopes shall conform to existing.
* Fill slopes are 1 1/2: 1, back slopes are 1 : 1, unless otherwise SHOWN ON THE
DRAWINGS.
* Waterbars are to be installed at the end of each operating season and at the close of sale. SPEC 303
* Reconstruction- Suitable material removed from ditches, roadbed slides and culvert catch basins shall be incorporated into the roadbed.
* Unsuitable material shall be sidecast from the roadbed.
* At intersections, the roadbed shall be graded to assure blending of two riding surfaces for a distance of 50 linear feet.
* Seed and mulch where specified in the Drawings. Seeding and mulching is incidental to other pay items.
FOREST PROJECT ROAD NUMBER SHEET NO.NOTES AND LEGEND
STANISLAUS SOURGRASS
ABBREVIATIONS
C.Y. = Cubic yard C.M.P.A. = Corrugated Metal Pipe Arch L.F. = Linear Foot AC = Asphalt Concrete C.M.P. = Corrugated Metal Pipe ~ AB = Aggregate road base
IB = Inlet Basin Exist = Existing feature
CB = Catch Basin Const = Construct or install feature
DI = Drop Inlet
ROAD
SPECIAL NOTESNUMBER
ALL Rolling dips do not intercept ditches unless otherwise noted.
ROADS
Locations of work to be done will be staked on the ground by the Forest Service.
All roads used by Purchaser during road construction shall be maintained by Purchaser.
C.M.P. lengths are approximate. payment for C.M.P. will be for the lengths necessary to complete the job.
Waterbars drawn or listed on the Drawings are in critical locations. All other waterbars shall be placed according to the typicals. Waterbars are Drivable Waterbars unless noted otherwise.
Landings are· designated as disposal sites.
Existing culverts that are to be replaced shall be removed from government land at Contractors expense.
I
Forest Service will designate borrow sites as needed.
ALL ROADS MAY HAVE MOTORCYCLE OR OHV TRAFFIC. PURCHASER IS
RESPONSIBLE FOR PLACING CONSTRUCTION SIGNS ON ROADS WHEN OPERATING
EQUIPMENT ON THIS PROJECT.
CALL DIGGS 1-800-227-2600 FOR EXCAVATION NEAR BURIED UTILITIES
I
FOREST PROJECT NAME SHEET NO.
MATERIALS LIST AND QUANTITIES
STANISLAUS SOURGRASS
ROAD DATA ............................... _
~r '1;;\#.1"'.\#'" ••u." LI"'. '" Road No. 6N11 Road No. 6N11Y Road No. 6N11YA Road No. 6N58 Road No. 6N58B
Note: Note: Note: Note: Note:
Spec No. Item Description - BASE WORK Units Quantity IRemarks Quantity Remarks Quantity Remarks Quantity Remarks Quantity Remarks Sub Total
151(01) Mobilization - Applies to Project
LS
One time cost applies to all roads
Clearing & Grubbing, Disposal of Tops and I
201(05) Limbs-CHIP, Logs-DECK, and LS I 1 1
Stumps-SCATTER.
Brushing for Sight Clearance - Disposal Method
201(04) LS 1 1
Chipping
204(20)H Drainage Excavation, Type Turnpike Section LF 1000 1000
204(20)J Drainage Excavation, Type Swale Each 1 1
204(20)K Drainage Excavation, Type Rolling Dip Each 14 14
Reconditioning of Roadbed, Roller Compaction -
- - - 303(22) Mile - -1.57 1.57
Method B
Reconditioning of Roadbed,Culvert and Ditch
303(23) Mile 4.3 4.3Cleaning and Minor Grading for Haul
Aggregate Base, Grading B, Compaction Method
301(01) Ton 500 500
D
OPTIONAL WORK
151(02) Mobilization - Applies to This Road Only LS 1 1 1 1 4
Clearing &Grubbing, Disposal of Tops and
201(05) Limbs-CHIP, Logs-DECK, and LS 1 1 1 1 4 Stumps-SCATTER.
203(04) Removal and Disposal of Culverts Each 1 1
204(20)A Drainage Excavation, Type 3' Ditch LF 40 40
204(20)B Drainage Excavation, Type Catch Basin Each 1 1
204(20)F Drainage Excavation, Type Waterbar Each 5 2 3 10
204(20)J Drainage Excavation, Type Swale Each 4 4
204(20)K Drainage Excavation, Type Rolling Dip Each 34 34
Reconditioning of Roadbed, Roller Compaction 303(22) Mile 1.92 0.71 0.08 4.3 0.1 7.11
Method B
Aggregate Base, Grading B, Compaction Method!
301(01) Ton 500 500
24-lnch Corrugated Metal Pipe, 0.064-lnch thk
602(02)C LF 30 30FE, Method B.
i
GENERAL NOTES: UNLESS OTHERWISE SPECIFIED. I
A. SECTION 100 WITH SPECIAL PROJECT SPECIFICATIONS APPLY.
B. C.Y. = CUBIC YARD, L.F. = LINEAR FEET, L.S. = LUMP SUM. IC. CUBIC YARDS COMPACTED IN PLACE.
D. A • a = ACTUAL aUANTITIES,ao . = DESIGN aUANTITIES LSa. = LUMP SUM aUANTITIES.
----------- ----------- _____ J
FOREST PROJECT NAME SHEET NO.
MATERIALS LIST AND QUANTITIES
STANISLAUS SOURGRASS
ROAD DATA
Wlr'I;;",..-'I"''''' IIVI" LI"" I ""
Road No. 6N59 Road No. 6N59A Road No. 6N64 Road No. 6N64F Road No. 6N65 Note: Note: Note:
I
Note: Note:
ISpec No. Item Description - BASE WORK Units Quantity Remarks Quantity Remarks Quantity Remarks Quantity Remarks Quantity Remarks SubTotal
I 151(01) Mobilization - Applies to Project LS One time cost applies to all roads 1
201(05) Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, Logs-DECK, and Stumps-SCATTER. LS 1 1
201(06) Clearing & Grubbing, Disposal of Tops, Limbs and Stumps-SCATTER, Logs-DECK LS 1 1 2
204(20)F Drainage Excavation, Type Waterbar Each 1 1
204(20)K Drainage Excavation, Type Rolling Dip Each 22 22
204(50) Excavation Placement Method 5- Realignments LS 1 1 2
251(02) Machine Placed Keyed Riprap, 2' -4' Dia Rock w/Filled Voids
CY 40 40
253(01 ) Gabions, Galvanized - Includes 4-8" Cobble Fill CY 25 25
253(02) Reno Mattress, Galvanized - Includes 4-8" Cobble Fill CY 25 25
207(01) Earthwork Geotextiles- Cobble Fill w/Geotextile Fabric CY 40 40
301(02) Crushed Aggregate - 2"+ Ditch Rock w/Geotextile Fabric CY 25 25
303(22) Reconditioning of Roadbed, Roller Compaction - Method 8 Mile 2 0.17 2.17
602(03)A 36-lnch Metal End Section Each 1 1
18-lnch Corrugated Metal Pipe, 0.064-lnch thk FE, Method 602(02)8 LF 10 108. Extend Existing CMP.
619(02) Gate, Steel, Size 16 feet Each 1 ' 1
Drainage Excavation, Type Rocked Dip(lncludes 204(20)L 1 1
Aggregate and Geotectile Cloth) Each
OPTIONAL WORK
I 151(02) Mobilization - Applies to This Road Only LS 1 1 1
Clearing & Grubbing, Disposal of Tops and Limbs-CHIP, 201(05) LS 1 1Logs-DECK, and Stumps-SCATTER.
Clearing & Grubbing, Disposal of Tops, Limbs and 201(06) LS 1 1 1Stumps-SCATTER, Logs-DECK
204(20)F Drainage Excavation, Type Waterbar Each 7 3 4 14
204(20)J Drainage Excavation, Type Swale Each 1 1
204(20)K Drainage Excavation, Type Rolling Dip Each 5 2 2 7
204(50) Excavation Placement Method 5- Realignments LS 1 1
I 303(22) Reconditioning of Roadbed, Roller Compaction - Method 8 Mile 1.28 0.81 0.19 0.3 2.28 i
L _______________________~
FOREST PROJECT NAME SHEET NO.
MATERIALS LIST AND QUANTITIES
STANISLAUS SOURGRASS 6
ROAD DATA
____._1 _ ...... -
~r'I:"lr'I",", I IVI.. U,", I '"' Road No. 6N68 Road No. 6N70Y Road No. Road No. Road No.
Note: Note:
Note: Note: Note:
Spec No. Item Description - BASE WORK Units Quantity Remarks Quantity Remarks Quantity Remarks Quantity Remarks Quantity Remarks SubTotal
151(01) Mobilization - Applies to Project LS One time cost applies to all roads 1
204(20)H Drainage Excavation, Type Turnpike Section LF 150 150
204(50) Excavation Placement Method 5- Realignments LS 1 1
Aggregate Base, Grading B, Compaction Method 301(01) Ton 50 50
619(02) Gate, Steel, Size 16 feet Each 1 1
OPTIONAL WORK
151(02) Mobilization - Applies to This Road Only LS 1 1
Clearing & Grubbing, Disposal of Tops and
201(05) Limbs-CHIP, Logs-DECK, and LS 1 1 2 Stumps-SCATIER. 1
204(20)F Drainage Excavation, Type Waterbar Each 22 25 47
Reconditioning of Roadbed, Roller Compaction 303(22) Mile 0.75 1.15 1.9
Method B I
GENERAL NOTES: UNLESS OTHERWISE SPECIFIED.
A. SECTION 100 WITH SPECIAL PROJECT SPECIFICATIONS APPLY.
B. C.Y. = CUBIC YARD. L.F. = LINEAR FEET. L.S. = LUMP SUM.
C. CUBIC YARDS COMPACTED IN PLACE.
D. AQ. = ACTUAL QUANTITIES. DQ. = DESIGN QUANTITIES. LSQ. = LUMP SUM QUANTITIES.
CONCEPTUAL
FOREST SALE NAME ROAD NUMBER SHEET NO.
NO SCALE
STANISLAU~ SOURGRASS
NOTES (BLANK SHEET)
ROAD 6N11
MAINTAIN INSLOPE/OUTSLOPE CONFIGURATION. CLEARING NO SOURGRASS 6N11
CLEARINGS REQUIRED. MAINTAIN EXISTING DRAINAGE FEATURES.
/ - 'IIP6'~
.; '-~;.. :.11.11ALL WORK OP 10 I •• ~~ •••••••••• • • •• •
10156 .... - -. - - .....: \ EOP :I I · I
·• ·• I ••I I••
I ·• I·• ••I a 8768 I•• \~
,;>: --'v" .....,NTAIN :
us ! '-0 24~...........1I ... ,,,I •••••••••••••••••••• ...............,~. I PVT I
· J·
55491 I MAiNtAIN 18 clip
•...... co. •
II :........................•....~.......,~~
•• ·•I I• •• ·I I
••I I·•I •· I
·• I
• US fI-----.....".,=""._-----------~ • •••••••••••••••••••••••••••••••••••••
11 •••• 11 ••'."••••••11."· PVT I
us !PVT I o 500
FEET
PROJECT ROAD NUMBER SHEET NUMBER ROAD 6N11Y
RECONSTRUCT ROAD TO A MIN 12"WIDTH. OUTSLOPE ROAD 3%. SOURGRASS 6N11Y
CLEARING 16"MIN WIDTH.
ALL WORK OPldONAL 20 •••·••-=9 ~,p k..,...--------------------i'i'............• .. • .. • ..• .. • .. • .. • .. • ..• .. • .. • .. • .. • .. • .. • .. • .. • .. • .. • ..• .. • ..• .. • .. • ~ft, """"''\\: _ __~/J ~. 17 9--:;= - = = :::==.
~II; ~INTAIN
• 12 CMP
\\. ...-:.7I/! ~~:::::::==== '~r==:;;--
II • ...-:.~
I ~====~~ ~~~~ 161It • ~--- --.:;:::::::-~---:;:::::::.:;;......-o • ..-::;7 ---=-- CONST\\~ US. PVT h~7 570 WB\\~ : s 7-::::- 7 RECONST
~ • Oro~r:J-::::::--::::- 812 328 ~ • h~ .1014· CONST SWALE EXISTING~ --~~.
.::::::.~~ __ :::==:::===:::===-!-=========:;::::;~ MAINTAIN SWALE LANDING
~ ~...--:--:::::::::- ~-::;::::. • 24 CM~~~~ ~==:::==~ • P
1293 9MAINTAIN
MAINTAIN -;?-?,93286 36 CMP
18 CMP -?'CONST
WB 2896 :29 2045 933. ... ~-?'-?'
30 CONS~ EXISTING h-::? RECONST PVT ~
SWALE. I A~~I;;;;'::;:." ~~:-~~• • 1 ......1.11 ••1.".11.11.".".11." ••1••I~....1••11." • .......................... t 9 3071 ! US 9· ~ MAINTAIN 18(;MP /l
CONST 40 F1=DITCH LT ;/
3733 DRAIN TO C~P. i'
EXISTING
LANDING
•· 4t EOP · t ~ t· ~
•: /l9
• #: t -•: t t
• -::::::======O.§...N58 4
• ~ --.::::=-.:::::_ /li ~-::::- -====~
..f'·••• II II o 500 1,000
• II• II FEET
http:1.".11.11.".".11
PROJECT ROAD NUMBER SHEET NUMBER ROAD SN11YA
RECONSTRUCT ROAD TO A 12"MIN WIDTH. OUTSLOPE ROAD
SOURGRASS 6N11YA 10
3%. CLEARING 1S"MIN WIDTH.
ALL WORK OPTIONAL _~~~~?'
()O~\):.~ -:::--:::
__ ~;o..--=-
~-;:::::.~,'l
------- -====~ '\<'===-------====================- ...............•... 63
/ CONST
WB
PVT •••• I • I I • II • II ••••••••••• I • I •••••• I • I ••• I • I I • I •• I ••• i •• I • I • •••••• • I' ••• • II • • I • II .1•• 11 ••••••••••1 ••••• 1 ••••••1.1•• 11 .".11 •••••••••
US
~ 445
"'-EXISTING
LANDING
EOP
o 100 200
ROAD SN58
STA 0 TO 22733 OPTIONAL WORK -MAINTAIN INSLOPE/OUTSLOPE CONFIGURATION. SOURGRASS 6N 11
CLEARING -CLEAR ON~ INSIDE EDGE 8' FROM EDGE OF R~D. OTHE~ISE MINIMUM ~~~~~~~~~~5_8~~~~~~~~~
CLEARING IS 1S'. CONSTRUCT DIPS WHERE NOTED.
REQUIRED WORK - CLEAN ALL DITCHES, CLEAN CULVERTS AND DO MINOR GRADING
NECESSARY FOR HAUL. WHERE SHOWN IN DRAWINGS CLEAR CURVES 8' OUTSIDE EDGE FOR
SIGHT CLEARANCE
~~----------------------------------------~__~BRUSHCURVEFORSIGHTCLEARANCE
4412 -REQUIRED
MAINTAIN
4568 48 CMP
MAINTAINus 4217
LANDING MAINTAIN THE FOLLOWING APPLIES TO ALL DIPS ON 6N58:
4744 SWALE DIPS DO NOT INTERCEPT DITCH LINE MAINTAIN 4696 \
18 CMP NTAIN\ DIPS SHALL BE CONSTRUCTED TO PASS A
18 CMP \ LOWBED.
PVT
i j
5971 5213 / 3714CONST
. t:::t::: Q 2· ... MAINTA!~ _. __ == =:= ~:= == CONST DIP •. _ •• - •• - ::= :-'~~.= ::= ::= =Df8 Crtlff5-- •• -. :
•• - •• - •• - CONST ! DIP
DIP j
PVT i
3340 /
RECOr;4ST
DIP /
3003 ,/ MAINl.AIN
18 CMP 478
6682 :/
.I MAINTAIN
--PROP LINE 18 CMP
2749 (
STA 1632 TO 2262 MAINtAIN
PLACE 180 TON 3/4 AB@18 C~P
4"DEPTH, 12' WIDTH
, (OPTIONAL WORK)
RECONST
DIP
2262 -
II \ MAINTAIN
t·
18 CMP
MAINTAIN
18 CMP
o 500 1,000
SHEET 1
CONST
--I-• I-• I
US
12976 CaNST
DIP
12714
PROP LINE
CONST
DIP
SOURGRASS 6NS8
PVT •....•....•....•....•....•....•....•....•
us
9238 PROP LINE
CONST
DIP
88~ MJiNTAIN
18:GMP
CaNST
DIP
ALL WORK OPTIONAL
DIPS DO NOT INTERCEPT DITCH
MAINTAIN
18 CMP •....•....•....•
CONST
DIP
~9:I~TAIN
30 12
582g
MAINTAIN
24CMP
CONST
DIP
10790
DIP
10687
MAINTAIN
CATTLE GUARD
..• DIP"'..;,.. ...............:/~NST
o 500 1,000 ....•...
18 CMP J,
•.• 11.11."."·"·"·"
MAINTAIN
18 CMP
FEET SHEET 2
73.14
13 SOURGRASS 6N58
18287 .11 ....11.11." J~QW\
.1.~'1a ••".".II." ~~~~TAIN CONST
,_ ••••11 • •••••••11•
PVT
'. US
••11
14039•
I CONST
: 13783 DIP
I•i
MAINTAIN
18 CMP
·• I I ·• I
·• I
12870
....--MAINTAIN
..........11. 11 ... MAINTAIN
i 18 CMP
-i I
I
17300•·• CaNST
I DIP
16774
MAINTAIN•• 18 CMPI
I ·• I I
11.11 ••'.
16017
MAINTAIN
18 CMP
, 15865 't-CONST
,'..... _. DIP
18 CMP 18374 DIP
STING
8065 LANDING
CaNST
DIP
18453
REMOVE EXIST CMP
INSTALL 24"X30 CMP
W/CATCH BASIN
(OPTIONAL WORK)
BRUSH CURVE FOR
SIGHT CLEARANCE
REQUIRED
BRUSH CURVE FOR SIGHTCLEARANCE
REQUIRED
o 500 1,000
FEET
•• 18 CMP
31•• ••• SHEET 3
27538
PROP LINE
US i PVT
END AS PLACEMENT
1 27581
DIP
26762
CONST
LOD 60FT LT
27259
CONST
LOD 60FT LTSTi- CONST
".. -- ---.. ---=::-::::""":lJ::-::=i"'-;~~.... .", 26338
CONST~DIP ___
SEE TYPICALS
. --~~MAl CM I
ROAD 6N5S
STA 22733 TO EOP UNLESS NOTED OTHERWISE, ALL WORK SHOWN IS REQUIRED.
SOURGRASS 6N58
RECONSTRUCT ROAD FULL WIDTH. OUTSLOPE 3%. CLEARING -CLEAR INSIDE EDGE S"
FROM EDGE OF ROAD. CLEAR OUTSIDE EDGE 4" FROM EDGE OF ROAD.
25183"
25265 -7-~===-CONST 48 CMP ___ .......I
26186 MAINT~\. DIP /' ,24184
MAINTAIN 25951 18 CMP .", ~ ,_ jMAINTAI
18CMPjCONST ......~~ - 24757 V 18 CMP
- DIP ...... ---- ---".. IJ'I MAINTAIN ~
| ",, II 2511 0 18 CMP 24083--- /j MAINTAIN | CONST |
| 25648 // 72 CMP | // / DIP |
CONSTDIP / /
TURNPIKE STA 25648 TO 26430 /23659
PLACE 320 TON 3/4 AB /~MAINTAIN
()6~~~~:;"'-- @'4"DEPTH AND 14' WIDTH I 48 CMP
~~~ PTIONAL WOR ~23501
.....,,;;; :;;.- / CONST.....,,;;;~,.::;...-__CLEAN OUTLET DIP: - END TU ~r-:::::-~ 227331-v-........... ,...-_~______--""\
CHANNEL 60LF - .", 23300
I ~==============~~ p,ROp" LINE .:.SEGIN ,OUTSL9p'ING,3%. 22923 / ' MAINTAIN
-:;::::::~~--r ~ CLEARING'REQUIREMENT.CHANGE. MAINTAIN\ / I( 23102 18 CMP
.....,,;;;~==~;...-- : // END:OP.TIONA~WORK-=SEGIN j 8 CMP ~ "'CONST
-:::::-?' I Ii REQUIRED WORK.
DIP PVT
1~111..11 .11 .11 .11 .11.11.11.11.11.11.11.
11.11.11.11.11.11.11.11.11.11 .1STA 26430 TO STA 27430 CONST US
II. CONSTRUCT TURNPIKE - INSTALL LEAD OFF DITCHES DIP
WHERE SHOWN ON THE PLANS OR STAKED ON THE 29 PLACE 500 TON 3/4"AB GROUND. PAYMENT SHALL BE FOR ALL WORK REQUIRED TO @ 6"DEPTH, 12' WIDTH
COMPLETE. ROCK PAID SEPERATELY. SEE TYPICAL. TU:;\; 1'1 i<F SECTION 22235
MAINTAIN
48CMP 14' MIN 1
·• I CROWN RD
·• 3%
"---" --"'---,/ - --------1--------------- -~'>-..<..~J~I-----r-· ·
ORIGI~,~_ ROAD GRADE ~I
21639PVT ••
| I US 20756 | \ UTILIZE EXCAVATED j |
| ~" MATERIAL IN ROADWAY --"·• | CONST |
INSTALL LEAD CIII DIP DITC'TS !II LOCATIOr\S ·• 20554 STAK~D ON THE GROUN8I MAINTAIN
·• I 18 CMP
2042019342 · I
MAINTAIN CONST '-4/1"
DIP18CMP ALL WORK OPTIONAL
o 500 1,000
FEET
SHEET4
http:11.11.11.11.11.11.11.11.11.11 http:11.11.11.11.11.11.11
I\\, ROAD NUMBER SHEET NUMBER
II 6N58
1/ -: 15
,.,//19 " ~~
It ",..1)
//'" N
US
............•..Ii ..• ..·.. ----------------.
, .. \I'...............~ (0".".".".".". .............................. ~ (1-------\I __ -_~~~6N58E _~....\---------------------J
" ~\ PVT \ ~ •••" '\ • \, ~ II \ ~ US: "U
.. ,,: I 1<
" • :US I
• • I 275·· -4
" "0' , 38 '\'''' ..~ I I PROP LINE :" "'l "",'1= la ENOAB PLACEMENT ",,0 I1
,,'Ii \'1/1 27581 . ~ ....""'\ ~ " ~ \~ 2840027951 .i,\ ,,' '" I \ ,1 29137 '- ... jCON~~~~~i- CONST~:
\ 29785 . U ~ LCtST ... ... DIP DIP!
ffO '\ 30013 MAINTAIN Ii _ 01. rotl. .... --- .... --~~-~~CONST 18CMP h["'--- -~--~:,----- .. - ....." \ i , '\29282 ! \ 2884.9-./<\28598 :~,!!!#=~~~~~ ~~W;~ ~ ... ~I!f!'-- 29400 .__.~MAINTAIN -i--~P CONST MAINTAiiii36CMP' --!
'" CONST "2'rCMP--'. LINE DIP CLEAN OUTLET • ' .~"_\\~' /,_~_-.P/.. If" I HANNEL60LF :
01 / • C 1~" , 30656 /' / / /,I• - --."-----~~~~~:: _ ~ ,~,"L1('CONSJ:--- ././ : _.,-F-==~~-' I 29
___ \ jl 7' 1 -",,-:;''''' • 30 __ /_ : ~_\,,~;:,/?.... 1_...,~=--"~ / ___:::.o;:::::;:.::::~::::============- I ~~ ,.. US
N ...?
uuu _.~~~~- -=~~ . _............. t --======::::===::::::===-- f' """", ~"",__ ,~~. I'RECONST DIP ~,,*~~~""'*> _. PVT· II. II. II. II. I · .. ~ ~ ~~--"-~"3fnn~~. ~-~- - -... -~ -' .~ -=~=-
I
EOP ,*"_,,,- '....~""===--------~--""- . . ·1
(Jl_____-- • C_?~>
I1 .~~=-- -~~""'~~~~~~~~~~
•1 --==~~~~~~"
19342 1 MAINTAIN ••o 1~OO 1• ..........~5~O~O~======~~ 18 CMP
~HEET 5
1ann~ ,-"'. -.
PROJECT ROAD NUMBER SHEET NUMBER ROAD SN58B
RECONSTRUCT ROAD TO 121 WIDTH. OUTS LOPE ROAD 3%.
SOURGRASS 6N588 16
CLEARING 1SI MIN WIDTH.
ALL WORK OPTIONAL
20 539
CONST
I~~NAROUND
,,1$ f am
••• II •••••••1'. _•• _•••••••••••- ••- •••~ ~ ••••••- ••• II••• - ••• • • • • • - ••••••••••• - ••• • • - •••••••• - II - • • - • •••• - •
•• II - II. II. II. II. II. II. II - II. II. II. 441 PVTIII
·''-CONST
\\ WB
lI'
--__ - oc.N58~::::::::-::::::::-':;:::;' ~_- ~~~ u~~
.f'
187 ~
RECO~T
BE~ CLEARING
b~
29 '/
148 MAINTAIN
MAINTAIN VALLEY DITCH
METAL GATE ACROSS INTERSECTION
~=---=r--/ .,/ --- I!
I!
I!
AI!
:::1/ c::51!
I!
I!
I!
I!
II
ROAD 6N59
STA 0 TO 4434 PROTECT BURIED UTILITIES - CALL USA DIGS.
MAINTAIN INSLOPE/OUTSLOPE CONFIGURATION, CLEARING 16 ' MIN.
STA 4434 TO EOP RECONSTRUCT ROAD TO 12' WIDTH, OUTSLOPE
ROAD 3%.
ALL WORK OPTIONAL
••••· I I
• us i
/1 :
tI I tI:~.coI»
,~~ j ~~ 8
PVT
~"- h-::7· --= === iii- iFi"i1IiI ............ -------, ••••••••••••••••••••••••••••••••••• TI
MAINTAIN
32 SWALE
MAINTAIN
DIP
MAINTAIN
18CMP
UTILITY POLES
PROTECT
DIP
I ·•
'I i j
6N59
""" tt"~=::~~""-
I I I
I I j
I _~• •••• 11 ••••••••••••••••1 ••1 •••••••••••••
\ : ( 33
\ i \ \. : \"\ I
\. i i \'C i " j.\ :
i \( ! i.
o 500 1,000
~~:=;:;;:;;;,r............ •
ROAD 6N59A - PROJECT ROAD NUMBER SHEET NUMBER •RECONSTRUCT ROAD TO 12" MIN WIDTH. OUTSLOPE ROAD 3% . - SOURGRASS 6N59A 18CLEARING 16 • MIN. LIGHT CLEARING - LOP AND SCATTER SLASH. •-•·•ALL WORK OPTIONAL EXCEPT WHERE NOTED
EXISTING
LANDING
EOP
40 0 M
II. II. II. II.
o
MAINTAIN
24 CMP 4046
INTAIN
CMP
MAINTAIN
SWALE
RECONST
DIP
II. II. II. II. II. II. II. II. II.-
100 200 300 400 500
FEET
·1172
MAINTAIN
1240 18 CMP
PROP LINE
EXIST LANDING
MAINTAIN
DIP
; 925 \.
RECONST
DIP 971
MAINTAIN
24CMP
CONST 521
DIP CONST
. : MAINTAlf\J
\. WB 255
DIP
! 18 CMP ...
\. EXISTING
\LANDING
CONST
CONST
MAINTAIN
DIP
WB
--US. PVT
PROJECT ROAD NUMBER SHEET NUMBER ROAD 6N64
MAINTAIN INSLOPE/OUTSLOPE CONFIGURATION UNLESS SHOWN OTHERWISE.
SOURGRASS 6N64 19CLEARING -CLEAR INSIDE EDGE 8' FROM EDGE OF ROAD. WHEN SHOWN IN THE 18
D~INGS CLEAR 8' OUTSIDE EDGE FOR SIGHT CLEARANCE. OTHE~ISEL~~~~~~~~~~'t'~~~~~~~~~~~~~l
MINIMUM CLEARING IS 16'
5421 /
| WW~Gr~============i:==========::::::~~~======:i~~~~----------~\ | CONST1EMP |
| • LOW WATER CROSSING-NOTES: | SEE 1PICALS- _" |
\ /5358 ", LOW WATER CROSSING SHALL BE CONSTRUCTED WHEN '. " EXISTING ' ...
| ", \ | __ ARCH PIPE 9X16 , ..., .. |
| STREAM FLOWS ARE MINIMAL. .. " | I WATER SOURCE .",.,,' |
\. "- .... _ ... ~// , STA 4873 TO 5300' .,
GRADE AND SHAPE CROSSING GRADE TO \. - ............ ~ .., * ,- OUTSLOPE ROAD 3% \,
| ACCOMODATE CHIP VANS. USE CRUSHED ROCK AS A \. ~ | \. |
| SURFACE COARSE. \, ,,4492'/ | \. |
) " '. ", g~NS1") ~8XI~TAIN \\
ALL WORK REQUIRED !/ 3729 4145 / 36 CMP I • ...'...... II
/3381 CONST MAINTAIN • \
/ -MAINTAIN~IP ~4 CMP BRUSH CURVE FOR - _. \,
SIGHT CLEARANCE
18 CMP , - 4221 • \
••• I •••1. I ••••• 3289 ] CONST :! '\.,
CONST---. 3888 DIP ....• 2984 DIP I MAINTAIN sQ(JTli FQRK MOKEl,UMlvE.B!VER/
| ,." - -'-""- - -,,," | MAINTAIN .1 18 CMP BRUSH CURVE FOR I | ||
| 18 CMP SIGHT CLEARANCE :•• | 2718 --i | 2187 cONSTA' •_ | CONST~ DIP BRUSH CURVE FOR |
- 1927 DIP SIGHT CLEARANCE
| ! 19 MAINTAIN~ ..... \.; 2678 •-• 18 CMP /' MAINTAIN | I |
| • | 1843 2427 18 CMP |
| 24 | i CONST---1' CONST I |
| : DIP ( _ DIP US | .............................. |
• '" ! PVT~ US ...... ....--- r-:11. ' \
.................. II·TLl::I,j - L708 '!'II. II. MAINTAIN i MAINTAIN ••
PVT 18 CMP \ 18 CMP I
\ 61 m- \ ~ 0') •a;1 c9 -.,-
•(0 •-•- ••• !.•..•1 •••1 .1•••1 ••••1 •••••• 1 ••1 .1•••••
00..''\0 -------:;::::.-:;::::;.0 500 1,000 •
•• \"I~----~ ~-::::::;:.;;-yO-
,pFEE - /j
| ~~f~ | -• « | SHEET 1 ~~~ | I |
| ~~ | • ~ |
PROJECT ROAD NUMBER SHEET NUMBER ROAD 6N64
STA 5600 TO EOP RECONSTRUCT ROAD 14' MIN WIDTH. OUTSLOPE SOURGRASS 6N64 20
ROAD 3%. CLEARING - CLEAR OUTSIDE EDGE 3' FROM EDGE OF ROAD
MINIMUM CLEARING IS 16'
ALL WORK REQUIRED
- I - - ••• " ." ......- -/: /.........•..•
• ••• ••• :, ............... i
J i18 i 13 t, !
10133 8773 i INSTALL - .LCONST - 84E>2--.. 8158 - \.
: METAL GATE 8986 DIP MAINT'V\EXISTING 36 CMP \
I 9917 /18 CMPj INSTALL 36" METAL END SECTION \"MAINT ';;j--- _
'-- : /CONST 24CMP - '" ~. \
10143 • ...... DIP ~76"7 '-"., / ~
PROP LINE 6N64 8052 .: / \ . 7772 \IV '
9966 i ......1...... 9147 CON&,. ' •. /MAINTl--,.., MAINT. 9641 CONST DIP! Y 18 CMP
18 CMF! CONST 9481 DIP f \ i DIP CONST \-\ I5421 /....::;-::::
...::.:;::::::=~:::::r'"PVT i US DIP \ \ ,....::-:;:::...... :TEMP LOW XING X ~:::""-::-...... i............t!' \. \ r_";i. // :SEE TYP.\. 7350 ~// '
\. VCONST ~/' !
//\. 1 DIP 'I
5606 q 5358 \ ...., \ 6472 CONST\ i' IA.RCH PIPE 9X16
DIP .,It ~V\1ATER SOURC\ \ MAINT \- 6291
\.) 18 CMP LCONST
7060, / ..... '" DIP , (Q~(Qf7Oj()"\.... /
CONST \_
DIP \. - '"",, / I' \19
\. 6844 6053 ~ - \ \
\ MAINT _ CONST/ \... 18 CMP' 'DIP - \ 5868' I
,,".",-/\ EXISTING LANDING
! USE AS DISPOSAL OF
i . / /EXCAVATED MATERIAL
J I o 500 1,000 I
FEET ~---_ i SHEET 2 " ---' I
APPROXI5IICY
4 TO S' COBBLE
FORGABIONS. ROAD ~AY = 14' ~:;~ATTRESS
3X3GABION
BASKH .------11.0'------...--£.0'---+
~.O'-
LfNGTH OF CABIONS AND FILL AREA WITH COBBLE.
BLANKETS ARE AT THE ENCASE WITH 12 OZ.
PURCHASERS OPTION 31.0- NON-WOIIbN GEOTEXflLE
(6', 9'OR 12'). FIIBRIC. APPROX40CY
CONSTRUCT WITH l' SAG FOR
LOWPOINT
CRUSf-ED ROCK DEPTH
VARIES; 12" MAX TO 4' MIN
APPROX25CY
...I I-
TEMP XINC:
VERTICLE
CURVE
r- 5110R600'r3 ,0 ---- ---- ---- ---- ---- - 5100~ - --- ~ - 5090-, ~
I!; - 5080 ~o
'" I- 5070 r- 5060
DATUM 5050
ill ru 00 (") 0'1 (") "<t 0- 0'1 "<t C1'00 0 ru
00 ~lf> ~o \Q 1':0 "n_ 1n Ir,o -In ~o ~Lf) ~o LQ ~o qo LQ n
!"lln ~_o ~~ §g~-If) ~o CD Lf)D 0'1 In ()\"<t O'IcYl
Olnolnfilln If) III
CURVE
REM
1-24",3-1
REMOVE E ROCKS
CONST
WB
i
REMOVE
18" TIS RT
18"T/S RT :
ROAD 6N64F
STA 0 TO 900 RECONSTRUCT ROAD TO 12' MIN WIDTH. OUTSLOPE ROAD 3%. CLEARING SOURGRASS 6N64F
- REMOVE TREES AND STUMPS FOR CURVE WIDENING - SCATTER STUMPS, TREAT
SLASH IN UNIT, MINIMUM CLEARING IS 16'.
STA 900 TO EOP WORK OPTIONAL
UNO
CONST ROCKED DIP
24 TON 2-4'~CLEAN CRUSHED-ROCK. PLACE
L_-------50'X15' 12 OZ GEOTEXTILE FABRIC.
GRADE APPROACH FOR CHIP VAN HAUL
793CURVE WIDEN ING
RT 15 REMOVE
35" TIS RT
REMOVE· -',lIiiiooo
18"T/S RT""~ .
r 483
~ 380 REMOVE
I "CONST
CURVE\li7iiA"rll~~=Fk--/ WB
I REMOVE 24 "TIS RT
126 I
END INTERSECTION I
REALIGNMENT
II
If ~
IJ ~
II ~
II TRUCK TURN AROUND
/j
CLEAR OF BRUSH AND DEBRIS
\I
\I
\\g
1/
1/
IJ
o 0.1
.p ~
~ Miles#
IGN INTERSECTION.
MOVE 1-32, 3-18", 5-12" TIS
BLEND GRADE INTO 6N64.
SPREAD EXCAVATED MATERIAL
ON ROAD AND COMPACT. 19
MAINTAIN
36CMP
MAINTAIN
12CMP
MAINTAIN
12CMP PVT
MAINTAIN
SWALE "i\O,~,,;~¥f!lri ..,..
MAINTAIN
24CMP
CONST
DIP
I ·• I
PVT! US · I
I ·• I ·• I I I •· I
1----------------;.' •••••••••••• 1 •••••• 1 .11.11.11 ••1.11.11.11.11.11.11.11.11 • 11 .1••11.11.11.11:~I. us
PROJECT ROAD NUMBER SHEET NUMBERROAD6N65
RECONSTRUCT ROAD TO 121 MIN WIDTH. OUTSLOPE ROAD 3%.
SOURGRASS 6N65
CLEARING 161MIN WIDTH. LOP AND SCATTER SLASH.
ALL WORK OPTIONAL
24 1599
I .~ :':111l)1 I~ cotil ~jl'
• ,<""I ' i ~
RECONST
SWALE
- 19
EOP
PVTIUS••
I o
PROJECT ROAD NUMBER SHEET NUMBER ROAD6N68
RECONSTRUCT ROAD TO 12' MIN WIDTH.
SOURGRASS 6N68 24
OUTSLOPE ROAD 3%. CLEARING 16'MIN WIDTH.
PLACE WATERBARS AT THE "i
:/FOLLOWING LOCATIONS OR AS
STAKED ON THE GROUND BY THE CO. /
STATION CONDITION FEATURE ,/
63 CONST WB ./
140 CONST WB I ............................ 225 CONST WB
357 CONST WB
453 CONST WB ,./
592 CONST WB
698 CONST WB
\18788 CONST WB
1071 CONST WB
1162 CONST WB
1339 CONST WB
1405 CONST WB
1-533 CONST WB
1807 CONST WB
1928 CONST WB
./ 2044 CONST WB
/ 2139 CONST WB
I 2293 CONST WB
i 2706 CONST WB
/ 3484 CONST WB
3664 CONST WB/
/ 3905 CONST WB
ALL WOR~OPTIONAL
I I · · I I
MAINTAIN
METAL GATE
/ : "g
/ I . \\~ US
i ___--.i-/-/---------------=•..• .~t ..................• ,985 / ~f PVT
.I,.. /~.IV;'~8A6NJ~IN I
1\ i IIII'i' /c :
.I 20
TURNAR
I i o 500
FEET
I
CONST
EOP
1,000
EXCEPT
o
MAINTAIN
18CMP
CONST
BEGIN TURNPIKE
REPLACE
VALLEY DRAIN
AFTER HAUL
STA50TO 150 ___
CONSTRUCT TURNPIKE
SEE TYP.
(REQUIRED)
CONST
WB
976 ••
MAINTAIN I
24CMP •
I I I
MAINTAIN
PROP LINE
MAINTAIN
LANDING
PVTi US I I I r-141 MIN---j
! CROWN RD II
I 3% I
- -~/ -----ORIG~N-A~ RtAc--GF;AD-E------ ----TC/
\ UTII_:Zf fXCI\VATED j
STA OTO EOP
INSTALL DRIVABLE
WATERBARS
1602 ""
~ MATFRIAI_ IN ROAIJWAY~
INSTAU_ I_tAD OFF DITCHES A i LOCATIONS SlAKED ON lHE CROUND
'" ~Q~~;r.11 .11.11.11 ;;"1 .11.11.11.11.11.11.11.11.11.11.11.11.11.
WB ..,~
CONST
WB
MAINTAIN
18CMP
MAINTAIN 18
CLEAN INLET CHAN
30 LF
CONST
WB
ROAD 6N70Y
RECONSTRUCT ROAD TO A 12' MIN WIDTH. OUTSLOPE ROAD 3%. SOURGRASS 6N70Y 25
CLEARING 16'MIN WIDTH.
PLACE 75 TON AB ALL WORK OPTION @ 6"DEPTH 12'WIDTH
TJRr\PIKE SEC rieNWHERE NOTED OTHE WISE
I
I
I 0 500 1,000
·• SHEET 1 I FEET
3904 PROP LI N E
CONST
PVT WB
CONST 5365
PROP
LINE
II ~~.II.II _.C;~N~l
WB
PVT iUS
SOURGRASS 6N70Y
EXISTIN
LANDIN
ALL WORK OPTIONAL EXCEPT
WHERE NOTED
US
MAINTAIN
24CMP
EOP
'5641
PROP LINE
CONST
WB 5008
CONST
WB
II- :2//
~II
CII
1/
II0 500 1,000 , =!I
FEET S 2
CONCEPTUAL
FOREST SAlE NAME ROAD NUMBER SHEET NO.
NO SCALE
STANISLAU SOURGRASS All Roads
~-- WIDTH-....-.I
VARIES
CLEARING
HEIGHT
(14 ft.)
BACKSLOPE -~...
CLEAN DITCH AND INLET
CLEAN OU TLET
CLEARING NOTES:
1. Clearing slash disposal methods shall be designated in the Schedule of Items or Shown On The Drawings.
2. Hazard trees will be marked by Forest Service prior to falling operations.
Treatment of logs and limbs shall be treated as specified in the Specifications.
3. Clearing slash disposal sites shall be designated on the plans or the ground by the Forest Service.
4. Clear small trees «10"dbh) and brush from all existing ditches, catch basins and inlet basins.
5. Clear small trees «10"dbh) and brush above all CMP inlets greater than 24" (>24") for a distance of 10 linear feet either side of CMP.
6. Side cast all masticated material onto fill slopes. Remove masticated material from all drainage inlets and ditches.
7. Where 'TREAT WITHIN UNITS" is specified, scatter slash within adjacent units. Slash treatment will then be treated with that specified for unit.
ROAD RECONSTRUCTION DETAILS #
.----CLEARING LlMITS---i
BRUSH CMP INLETS .,..-....~... FOR SIGHT CLEARANCE
RECONDITIONING OF ROADBED:
1. Outslope road bed 3% whenever possible. Remove all outside berms.
When this is impractical relieve berm every 50 linear feet.
2. Clean inlets and outlets of all existing metal pipes.
3. Clean and reshape all existing road ditches, leadoff ditches, dips, and waterbars to the lines specified in the typicals.
4. When 'Maintain Inslope/Outslope Configuration' is specified, reshape road bed to the existing width and inslope/outslope configuration (MEIOC).
5. Drain all low points, ponds, swales.
6. Construction of lead-off ditches are incidental to road work or other pay items.
NO SCALE
ROADWAY DITCH
TYP 3' DITCH
1------ 3'-------I
GENERAL NOTES:
1. WHEN POSSIBLE, UTILIZE SUITABLE EXCAVATED
MATERIAL IN ROADBED.
ROADWAY DITCH
TYP 4' DITCH
I- 4'------1·1
GENERAL NOTES:
1. WHEN POSSIBLE, UTILIZE SUITABLE EXCAVATED
MATERIAL IN ROADBED.
FOREST SALE NAME ROAD NUMBER SHEET NO.
STANISLAU SOURGRASS All Roads
Purchaser shall construct Lead Off Ditches as need to ensure proper drainage of Swale. Lead-Off Ditches are
GRADED SWALE incidental to the construction of Swale - construction.
GRADE
25' 25'T
LEAD OFF DITCH
1. LEAD OFF DITCH BOTTOM SHALL BE SLOPED
TO PROVIDE PROPER DRAINAGE.
VARIES
| Ii ~-.-.-1__~~7. | 'L..~...II_IL---__~ |
| VARIES | ~'-____--'V --.;::"--- |
t '--NOTED ON DRAWINn.---tl-I
ROADWAY
CULVERT
DITCH BOTTOM
Lead-Off Ditches are considered incidental to other Pay Items and will not be measured of paid for seperately.
OUTLET DIP ON LOWEST HEIGHT FILL SLOPE
Purchaser shall construct Lead Off Ditches as needed to ensure proper drainage of Dips. Lead-Off Ditches are incidental to. the construction of Dip construction.
3: 1 MAX FOR VEHICLE CROSSING.
15'---\
\ SLOPE
FOREST SALE NAME ROAD NUMBER SHEET NO.
NO SCALE
SOURGRASS All Roads 29WATERBAR
NOTES: WATERBARS
FOR HIGH CLEARANCE VEHICLES
1. ALL WATER BARS SHALL BEGIN AT THE
INTERSECTION OF THE ROAD BED WITH THE BACK
SLOPE AND RUN ACROSS THE ENTIRE WIDTH OF
THE ROAD BE~
2. ALL WATER BARS SHALL HAVE FREE FLOWING
OUTLETS. CONSTRUCTION OF LEAD-OFF DITCHES
ARE INCIDENTAL TO WATER BAR CONSTRUCTION
3. WHEN LOCATION STAKES ARE USED, THEY
DESIGNATE THE OUTLET LOCATION.
NON - DRIVABLE WATERBARS
20' I / BEGIN CUT
END CUT
V t' -~~,r-~18~"
~.. ==:--=-.....:...!-.... ROAD GRADE~ '-~
\ t ROLLING DIP DETAILNOTES: SECTION
1. THE DESIGN VEHICLE OR CRITICAL VEHICLE
FOR THIS DIP DESIGN IS A MODEL 62 FIRE
ENGINE.
2. ENTIRE LENGTH OF DIP SHALL BE
OUTSLOPED 5% TO 7%.
3. ROLLING DIP STATIONS ARE APPROXIMATE.
LOCATIONS OF THE DIPS WILL BE STAKED ON
THE GROUND AT THE LOW POINT OF THE DIP
BY THE FOREST SERVICE BEFORE
CONSTRUCTION.
DIFF. IN ELEV.ORIGINAL ROAD GRADIENT BOTTOM TO
GRADIENT A TOP OF DIP
0 % - 10 ro-/- 4 % +.80'
10 % - 20 %- 4 % -.80'
CONCEPTUAL
FOREST SALE NAME ROAD NUMBER SHEET NO.
NO SCALE
I~·---------c--------~-
STANISLAU SOURGRASS All Roads 30
~-r-----------D--------~~~------ E-------.~I
INTERSECTION
4 A 8 C D E F G H J K L M N P
30° 2.00 W 3.7 81.6 56.0 - 13.1 35.0 74.7 4.0 56.0 - 200.0 15.0 56.0 + 0.87 W
45° 1.41 W 21.2 69.0 60.4 - 11.0 25.0 63.2 6.2 60.4 - 120.0 25.0 60.4 + 0.50 W
60° 1.16 W 36.6 65.8 60.0 55.5 10.5 20.0 68.4 12.5 70.4 8.9 100.0 35.0 70.4 + 0.29 W
90° 1.00 W 25.3 54.7 25.3 54.7 8.8 - 38.4 - 38.4 8.8 30.0 30.0 38.4
TYPE T X*L _____ IS 25 75
IL 50 100
2S 25 75
T 2L 50 100 t I~--+-."-:-I'~===-X-=---=------i--:""Ir--~-- I. T I. X-----t'1-,-TJTURNOUT TYPE 1
• UNLESS OTHERWISE
S OR L SHOWN ON PLANS
TURNOUT TYPE 2
S OR L
FOREST SALE NAME ROAD NUMBER SHEET NO.
NO SCALE
STANISLAUS SOURGRASS All Roads
DRAINAGE CONSTRUCTION DETAILS
SKEW DIAGRAM
DO NOT RAISE OUTLET
<t ABOVE ORIGINAL GROUND
B.O.P. -L~r-\---l.--I-'-+-I~ E.O.P.OR STREAM BED .A,4!l2.....--
NOTE: SKEW ANGLE WILL BE SHOWN~llk ON THE PLANS.
BOTTOM WIDTH MAY VARY WHEN
CATCH BASIN IS CONSTRUCTED CATCH BASIN
IN NATURAL DRAINAGE.
| NOTE· MINIMUM COVER OVER CULVERT AT SHOULDER | '-------- 22' ------1-1 |
| . | SHALL BE 12 INCHES BELOW SUBGRADE FOR SURFACED |
AND 18 INCHES BELOW SUBGRADE FOR UNSURFACED.
METHOD OF BACKFILLING PIPE
OUTLET DITCH
SECTION A-A
1.S·1 c..'\
TOP OF CUT
INLET BASIN
RIPRAP IF REQUI ED
l' DEEP AND 18 HIGH
ON SLOPES.
TOP OF CUT
RIPRAP IF REQUII3ED G
1 DEEP AND 18 HI H
ON SLOPES.
MATERIAL TO BE 'j ~ CULVERT
DEPOSITED IN BOTH DIAMETER .
SIDESOF DITCH ~
U
30"
MINIMUM
.-..-- 36" MIN. -_-1
BARRIER
ROCK
111111 =11111 11111= II iiiii iiiii -
BURY
CONCEPTUAL
FOREST SALE NAME ROAD NUMBER SHEET NO.
NO SCALf STANISLAU SOURGRASS All Roads 32
EARTH AND LOG BARRICADE DETAIL
VARIABLE ROAD GRADEl
~8' MIN.
12' MAX. "I 4' MIN.
t
4' MIN.
t I
~8' MIN.
12' MAX.
--!!CAV~
ook----+_ 4' MIN.
t
4' MIN.
ROCK BARRIER t
PROFILE VIEW
ROCK TO GREATEST
HORIZONTAL DIMENSION
DEFINE MAIN ROAD TO BE CONSTRUCTED
| SET FRACTURES | PARALLEL TO ROAD. BERM TO BE |
| BELOW GRADE | PLACED AWAY FROM MAIN ROAD. |
NOTES
NOTES (1) PLACE 20" X 12' LOG IN EMBANKMENT AND COVER
WITH AT LEAST ONE FOOT OF EMBANKMENT MATERIAL.
(1) BARRIER ROCKS SHALL BE A MINIMUM SIZE OF 30" X 36". BOULDERS MAY BE USED IN LIEU OF LOGS WITH WRITTEN
NO LOCAL GOVERNMENT SOURCE IS AVAILABLE. APPROVAL BY THE ENGINEER.
(2) DISTURBED EARTH BECAUSE OF INSTALLATION OF ROCK (2) ROAD BARRICADES SHALL BE CONSTRUCTED AT BARRIER SHALL BE BLENDED INTO THE SURROUNDING GROUND. LOCATIONS STAKED BY THE ENGINEER.
(3) WHEN LOCATION STAKES ARE USED, THEY DESIGNATE THE
(3) DRAWINGS NOT TO SCALE.CENTER OF ROCK BARRIER.
WHEN SPECIFIED, CROSS DITCH TO
~--------------------------------16'--------------------------------~
6'-6'
- -DIA. PIPE
3·.lJ" 2'·11' 2'·9"
3'-6"
.------ 4' DIA. PIPE
6- DIA. PIPE
TRAVELED WAY
CONCEPTUAL
FOREST SALE NAME ROAD NUMBER SHEET NO.
NO SCALE STEEL SINGLE LANE
STANISLAU SOURGRASS All Roads 33
ROAD CLOSURE GATE
,,---~!EE GATE LOCK lYPICALS
GATE LOCK TYPICALS
2'·9'
3'-6"
• DIA. BOLT ASTM A325
LOCK BOLT
3'.()" '--- 3'-()" MANUfACTURE
3 - STEEl LOCK
NOTES BOLTS
1. PIPE SHALL MEET THE REQUIREMENTS OF ASTM A53 GRADE B.
2. PIPE SIZES SHOWN ARE FOR STANDARD WEIGHT BLACK IRON PIPE (SCH.40).
3. GATES SHALL RECEIVE ONE COAT OF ZINC-RICH PRIMER, ORGANIC VEHICLE lYPE
AND ONE COAT OF VINYL GREEN (91-2.15). SURFACE PREPARATION AND PRIMING
SHALL BE AS RECOMMENDED BY THE PAINT MANUFACTURE.
4. CONCRETE SHALL BE IN ACCORDANCE WITH SPECIFICATION 602 - METHOD C.
5. OVER EXCAVATED POST HOLES SHALL BE FILLED WITH CONCRETE.
6. ROAD CLOSURE SIGN AND REFLECTIVE MARKERS SHALL BE INSTALLED BY CONTRACTOR.
7. CONTRACTOR SHALL FURNISH TO THE FOREST SERVICE ONE COMPLETE LOCK BAR SET
AND TWO LOCK BOLTS FOR EACH GATE INSTALLATION.
LOCK BAR SET
S. GATE AND LOCKING MECHANISM SHALL BE INSPECTED BY THE FOREST SERVICE PRIOR TO GATE
INSTALLATION. Manufacture 3 curved lockbars and 2 straight
9. LOCATION OF GATES WILL BE LOCATED ON THE GROUND BY THE FOREST SERVICE. LAYOUT OF THE lockbars from 1/4" steel.
GATE POSTS SHALL BE THE CONTRACTORS RESPONSIBILIlY.
10ROAD CLOSED SIGN SHALL MEET MUTCD REQUIREMENTS FOR
TYPE R1'-2. (1 REQUIRED,)
11 BARRICADE MARKERS SHALL MEET MUTCD REQUIREMENTS FOR
TYPE 1. COLOR - BLACK at WHITE, (2 REQUIRED.)
12DBJECT MARKERS SHALL MEET MUTCD REQUIREMENTS FOR
TYPE 2. (6 REQUIRED.)
GATE.DWG
~REST POSTS
INSTALL FOR OPEN
AND CLOSED OSITION
__, ... " ...., ,un..
FOREST SALE NAME ROAD NUMBER SHEET NO.
NO SCALE
STANISLAUS SOURGRASS All Roads
TRAFFIC CONTROL DEVICES
GENERAL NOTES
1. DESIGNS FOR SIGNS AND BARRICADES SHOWN ABOVE ARE IN ACCORDANCE WITH M5-7
MINIMUM STANDARDS IN THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
FOR STREETS AND HIGHWAYS" LATEST EDITION.
2. SIGNS SHALL BE MADE FROM SUITABLE MATERIALS WHICH ARE IN ACCORDANCE
WITH ALL STATE AND FEDERAL SPEC.
3. SIGNS MAY BE MADE OF WOOD OR METAL WOOD -5/8" PLYWOOD MANUFACTURED
WITH ALL SPECIAL WATERPROOF GLUE. METAL SIGNS-16 GAUGE SHEET STOCK
WITH EMBOSSED OR VITRIFIED FINISH. WHEN EMBOSSED THE DETAILS OF THE
DESIGN ARE RAISED FROM THE BACKGROUND OF THE DESIGN NOT LESS THAN
.100" NOR MORE THAN .125". A CARDBOARD SIGN MAY BE USED IF APPROVED
BY THE ENGINEER.
4. REGULATORY SIGNS SHALL BE RECTANGULAR IN SHAPE WITH THE LARGER
DIMENSION VERTICAL AND HAVE BLACK AND WHITE LEGEND OR BACKGROUND.
ALL REGULATORY SIGNS UNLESS DEFINITELY EXCEPTED IN THE SPECIFICATIONS.
SHALL BE REFLECTORIZED OR ILLUMINATED.
5. ALL SIGNS. UNLESS DEFINITELY EXCEPTED IN THE SPECIFICATIONS. SHALL BE
DIAMOND SHAPED (SQUARE WITH ON DIAGONAL VERTICAL) AND SHALL HAVE A
HIGHWAY ORANGE BACKGROUND WITH A BLACK LEGEND. ALL WARNING SIGNS
HAVING SIGNIFICANCE DURING THE HOURS OF DARK SHALL BE REFLECTORIZED OR
ILLUMINATED.
6. SIGNS SHALL BE LOCATED WHERE THEY WILL BE CONSPICUOSL Y VISIBLE DAY AND
NIGHT ON THE RIGHT HAND SIDE OF APPROACHING TRAFFIC. THEY SHALL BE
FACING TRAFFIC AND LOCATED WHERE THEY CAN BE SEEN AT ALL TIMES BY 3' TO 3 1/2'
APPROACHING DRIVERS WITH A MINIMUM OF EFFORT.
7. WHEN A SIGN IS REQUIRED FOR AN EXTENDED PERIOD. IT SHALL BE FASTENED
TO 4 X 4 POSTS WITH 2. 3/S" CARRIAGE BOLTS. PORTABLE SUPPORTS ARE
PERMITTED FOR SHORT PERIODS PROVIDED THE CONSTRUCTION IS SUCH THAT
I 'it>
TYPE 111 BARRICADE
TYPE or
SUPPORT
VARIES
WIND OR OTHER AGENTS CANNOT READILY UPSET THE SIGN. TYPE 11S. SIGN M4-10R SHALL BE ERRECTED AT THE BEGINNING OF DETOURS. ALONG
DETOURS AT 1/4 MILE· INTERVALS AND AT ROAD JUNCTIONS ALONG DETOURS IN
A GREATLY ENLARGED SIZE IN THIS SIGN IS PRESCRIBED FOR USE ON
BARRICADES IN THE ROADWAY WHERE A ROAD IS CLOSED FOR CONSTRUCTION OR TYPE
MAJOR MAINTENANCE OPERATIONS.
WIDTH or RAIL9. SIGN W20-1 SHALL BE ERRECTED 1500' FROM EACH END OF CONSTRUCTION LENGTH or RAILOPERATIONS.
10. SIGN W21 -3 AND W11-1 SHALL BE ERRECTED AT EACH END OF AREAS WHERE WIDTH or STRIPES
HEAVY EQUIPMENT IS IN OPERATION AND SHALL BE REPEATED EVERY 1/2 MILE. HEIGHT
IF THE OPERATION EXTENDS OVER ONE MILE. TYPE or FRAME
11. OTHER SIGNS SHOWN ABOVE SHALL BE USED AS INDICATED BY THEIR DESIGN. FLEXIBILITY
12. IF OTHER SIGNS NOT SHOWN ARE REQUIRED THEY SHALL ALSO CONFORM IN
DESIGN TO THOSE SHOWN IN THE MANUAL OF UNIFORM TRAFFIC CONTROL
DEVICES.
13. SELECTION AND PLACEMENT OF ALL SIGNS SHALL BE SUBJECT TO APPROVAL OF
THE ENGINEER.
14. LIGHTING DEVICES SUCH AS FLASHERS. TORCHES. LANTERNS. AND ELECTRIC
LIGHTS SHALL BE PLACED AND MAINTAINED FROM SUNSET TO SUNRISE AT ALL
POINTS OF HAZARD AND AT ALL SIGNS INDICATING CAUTION.
15. SIGNS TO BE INSTALLED ON ALL HAUL ROADS AND CONSTRUCTION SITES TO
PROVIDE ADEQUATE WARNING TO ALL USERS.
BARRICADE 1YPE 1 BARRICADE
1 11 111
8' WIN-12' WAX. 8' W...,-12· WAX. 8' WIN-12' WAX.
S'-8' 3' WIN.-4' WAX. 3' WIN.-VARIABLE WAX.
6 IN. 6 IN. S IN.
3 FT. WIN. 3' WIN.-3 1/2' WAX. ~ FT. WIN.
W:~~¥If~ LIGHT '.' FRAME
POST OR SKIDS
ESSENTIALLY MOVABLE PORTABLE ESSENTIALLY PERUANENT
SHEET 1 OF 2
oETO UR_""r-
I FOREST SALE NAME ROAD NUMBER SHEET NO.
NO SCALE TRAFFIC CONTROL DEVICES
SPECIFICATION 88-TRAFFIC CONTROL SIGNS: PERMANENT DEVICES IN ACCORDANCE WITH DRAWINGS; SOURGRASS All Roads 35 FOREST SERVICE FURNISHES MATERIALS. i..-__L...--_____L...--_____.l.-_-=..:::__--f
C6.33 OR CT6.33 - SAFETY: TEMPORARY DEVICES APPLICABLE TO AGREEMENT ON SPECIFIC
TRAFFIC CONTROL PLANS FOR INDIVIDUAL PROJECTS SUCH AS LOG HAUL ON SINGLE LANE ROADS, ROAD CONSTRUCTION, ROADSIDE FALLING, SKIDDING, OR LOADING OPERATIONS, ETC. PURCHASER
FURNISHES MATERIALS.
7·
1----- 24· -----t II--.-- 48· ---I S·_
T J 1/2·t=~.~
AH EAD -r-~S·_ 7"
24·DETOUR 1 ...
M4-8 M4-10R W1-6 W20-1 W20-2d 24· X 12· 24· X 9·
4S· X 24· 48· X 48· 48· X 48"
5· SERIES B LETTERING RIGHT OR LEFT
J. SERIES D LETTERING BLACK MRfNI RIGHT OR LEFT. 7" SERIES C LETTERING 8· SERIES C LETTERING
5· 4· 5· 4·5· 5·
6·
5·STOP 5·
4· ROUGHJ 1/2·
J 1/4·
6· 4·
5·AHEAD
5· ROAD
W21-3
J6. X J6.W20-2c
5· SERIES D LETTERING
48· X 48· ff' SERIES C LETTERING
W3-1 W5-2 W8-6 W20-2d30· X 30· J6. X J6. 3D" X 30·
6· SERIES D lETTERING 5· SERIES D LETTERING 5· SERIES D lETTERING s· J.
5·
5· 5' TO ' 5·
5· ~~...:..J 11/111· -+-~...:..J1/4· 5· 5·
5·
--r----t-=-J1/4·
5'
W21-2 24· X 24·
5· SERIES C LETTERING
2' 6·W8-7 W21-1 W11-1 o 0____---+30· X 30· 30· X 30· 3D" X 30·
POST SHALL BE DOUGLAS FIR, TREATED FOR GROUND CONTACT, .4OPCF,
5· SERIES D LETTERING 5· SERIES C LEnERtNG 5· SERIES D L.ETTERN; AUMONIACAL COPPER ZINC ARSENATE (ACZA)
SHEET 2 OF 2
| TABLE OF CONTENTS: |
| undefined: |
| LENGTH MILESTITLE SHEET: |
| Row1: |
| Row1_2: |
| undefined_2: |
| LENGTH MILESRow2: |
| LENGTH MILESNOTES LEGENDS: |
| LENGTH MILESQUANTITIES: |
| undefined_3: |
| LENGTH MILESBLANK SHEET: |
| undefined_4: |
| undefined_5: |
| undefined_6: |
| 115GENERAL TYPICALS: |
| undefined_7: |
| APPROVED BY tL: |
| undefined_8: |
| MAINTENANCE LVL 3: |
| undefined_9: |
| Miles: |
| 1: |
| 2: |
| undefined_10: |
| undefined_11: |
| PROJECT: |
| STANISLAUS SOURGRASS: |
| ROAD NUMBER: |
| SHEET NO: |
| Const Construct or install: |
| ALL ROADS: |
| 6N11Note: |
| 6N11YNote: |
| 6N11YANote: |
| 6N58Note: |
| 6N58BNote: |
| ROAD DATARow1: |
| Item Description BASE WORK: |
| Remarks: |
| Remarks_2: |
| Remarks_3: |
| Remarks_4: |
| Mobilization Applies to Project: |
| QuantityOne time cost applies to all roads: |
| RemarksOne time cost applies to all roads: |
| One time cost applies to all roadsLS: |
| One time cost applies to all roadsLS_2: |
| One time cost applies to all roadsLS_3: |
| One time cost applies to all roadsLS_4: |
| One time cost applies to all roadsLS_5: |
| One time cost applies to all roadsLS_6: |
| 1_2: |
| Quantity1: |
| Remarks1: |
| One time cost applies to all roadsLS_7: |
| One time cost applies to all roadsLS_8: |
| One time cost applies to all roadsLS_9: |
| One time cost applies to all roadsLS_10: |
| One time cost applies to all roadsLS_11: |
| One time cost applies to all roadsLS_12: |
| 1_3: |
| Quantity1_2: |
| Remarks1_2: |
| One time cost applies to all roadsLF: |
| One time cost applies to all roadsLF_2: |
| One time cost applies to all roadsLF_3: |
| One time cost applies to all roadsLF_4: |
| One time cost applies to all roadsLF_5: |
| One time cost applies to all roadsLF_6: |
| 1000: |
| Quantity1000: |
| Remarks1000: |
| One time cost applies to all roadsEach: |
| One time cost applies to all roadsEach_2: |
| One time cost applies to all roadsEach_3: |
| One time cost applies to all roadsEach_4: |
| One time cost applies to all roadsEach_5: |
| One time cost applies to all roadsEach_6: |
| 1_4: |
| Quantity1_3: |
| Remarks1_3: |
| Drainage Excavation Type Rolling Dip: |
| One time cost applies to all roadsEach_7: |
| One time cost applies to all roadsEach_8: |
| One time cost applies to all roadsEach_9: |
| One time cost applies to all roadsEach_10: |
| One time cost applies to all roadsEach_11: |
| One time cost applies to all roadsEach_12: |
| 14: |
| Quantity14: |
| Remarks14: |
| One time cost applies to all roadsMile: |
| One time cost applies to all roadsMile_2: |
| One time cost applies to all roadsMile_3: |
| One time cost applies to all roadsMile_4: |
| One time cost applies to all roadsMile_5: |
| One time cost applies to all roadsMile_6: |
| 157: |
| Quantity157: |
| Remarks157: |
| One time cost applies to all roadsMile_7: |
| One time cost applies to all roadsMile_8: |
| One time cost applies to all roadsMile_9: |
| One time cost applies to all roadsMile_10: |
| One time cost applies to all roadsMile_11: |
| One time cost applies to all roadsMile_12: |
| 43: |
| Quantity43: |
| Remarks43: |
| One time cost applies to all roadsTon: |
| One time cost applies to all roadsTon_2: |
| One time cost applies to all roadsTon_3: |
| One time cost applies to all roadsTon_4: |
| One time cost applies to all roadsTon_5: |
| One time cost applies to all roadsTon_6: |
| 500: |
| Quantity500: |
| Remarks500: |
| 30101Row1: |
| TonOPTIONAL WORK: |
| One time cost applies to all roadsOPTIONAL WORK: |
| One time cost applies to all roadsOPTIONAL WORK_2: |
| One time cost applies to all roadsOPTIONAL WORK_3: |
| One time cost applies to all roadsOPTIONAL WORK_4: |
| One time cost applies to all roadsOPTIONAL WORK_5: |
| One time cost applies to all roadsOPTIONAL WORK_6: |
| 500OPTIONAL WORK: |
| One time cost applies to all roadsOPTIONAL WORK_7: |
| QuantityOPTIONAL WORK: |
| RemarksOPTIONAL WORK: |
| 500OPTIONAL WORK_2: |
| 1_5: |
| 1_6: |
| 1_7: |
| 5001: |
| Remarks1_4: |
| 1LS: |
| One time cost applies to all roadsLS_13: |
| 1_8: |
| 1_9: |
| 1_10: |
| Remarks1_5: |
| 1Each: |
| One time cost applies to all roadsEach_13: |
| 1Each_2: |
| One time cost applies to all roadsEach_14: |
| 1Each_3: |
| One time cost applies to all roadsEach_15: |
| 1_11: |
| 11: |
| Remarks1_6: |
| 1LF: |
| One time cost applies to all roadsLF_7: |
| 40: |
| 140: |
| 140_2: |
| 140_3: |
| Remarks40: |
| Drainage Excavation Type Catch Basin: |
| 1Each_4: |
| One time cost applies to all roadsEach_16: |
| 40Each: |
| One time cost applies to all roadsEach_17: |
| 1Each_5: |
| One time cost applies to all roadsEach_18: |
| 1_12: |
| 11_2: |
| Remarks1_7: |
| 1Each_6: |
| One time cost applies to all roadsEach_19: |
| 5: |
| 2_2: |
| 12: |
| Remarks3: |
| 1Each_7: |
| One time cost applies to all roadsEach_20: |
| 4: |
| 24: |
| 14_2: |
| 34: |
| Remarks4: |
| 1Each_8: |
| One time cost applies to all roadsEach_21: |
| 4Each: |
| One time cost applies to all roadsEach_22: |
| 2Each: |
| One time cost applies to all roadsEach_23: |
| 34_2: |
| 334: |
| Remarks34: |
| 192: |
| 071: |
| 008: |
| 43_2: |
| Remarks01: |
| 192Ton: |
| 071_2: |
| 008_2: |
| 500_2: |
| 01500: |
| Remarks500_2: |
| 192LF: |
| LF: |
| 071LF: |
| One time cost applies to all roadsLF_8: |
| 008LF: |
| One time cost applies to all roadsLF_9: |
| 30: |
| 0130: |
| Remarks30: |
| GENERAL NOTES UNLESS OTHERWISE SPECIFIED A SECTION 100 WITH SPECIAL PROJECT SPECIFICATIONS APPLY B CY CUBIC YARD LF LINEAR FEET LS LUMP SUM C CUBIC YARDS COMPACTED IN PLACE D AQ ACTUAL QUANTITIES DQ DESIGN QUANTITIES LSQ LUMP SUM QUANTITIES: |
| fill_193: |
| r IrII I IUII 1 I 1Row1: |
| 6N59Note: |
| 6N59ANote: |
| 6N64Note: |
| 6N64FNote: |
| 6N65Note: |
| ROAD DATARow1_2: |
| Item Description BASE WORK_2: |
| Remarks_5: |
| Remarks_6: |
| Remarks_7: |
| Remarks_8: |
| Mobilization Applies to Project_2: |
| QuantityOne time cost applies to all roads_2: |
| RemarksOne time cost applies to all roads_2: |
| One time cost applies to all roadsLS_14: |
| One time cost applies to all roadsLS_15: |
| One time cost applies to all roadsLS_16: |
| One time cost applies to all roadsLS_17: |
| 1_13: |
| Quantity1_4: |
| Remarks1_8: |
| One time cost applies to all roadsLS_18: |
| One time cost applies to all roadsLS_19: |
| 1_14: |
| 11_3: |
| 1_15: |
| Quantity1_5: |
| Remarks1_9: |
| Drainage Excavation Type Waterbar: |
| One time cost applies to all roadsEach_24: |
| One time cost applies to all roadsEach_25: |
| 1Each_9: |
| One time cost applies to all roadsEach_26: |
| 1Each_10: |
| One time cost applies to all roadsEach_27: |
| 1_16: |
| Quantity1_6: |
| Remarks1_10: |
| Drainage Excavation Type Rolling Dip_2: |
| One time cost applies to all roadsEach_28: |
| One time cost applies to all roadsEach_29: |
| 1Each_11: |
| One time cost applies to all roadsEach_30: |
| 22: |
| 122: |
| Quantity22: |
| Remarks22: |
| Excavation Placement Method 5 Realignments: |
| One time cost applies to all roadsLS_20: |
| One time cost applies to all roadsLS_21: |
| 1_17: |
| 221: |
| 1_18: |
| Quantity1_7: |
| Remarks1_11: |
| One time cost applies to all roadsCY: |
| One time cost applies to all roadsCY_2: |
| 1CY: |
| One time cost applies to all roadsCY_3: |
| 40_2: |
| 140_4: |
| Quantity40: |
| Remarks40_2: |
| One time cost applies to all roadsCY_4: |
| One time cost applies to all roadsCY_5: |
| 1CY_2: |
| One time cost applies to all roadsCY_6: |
| 25: |
| 125: |
| Quantity25: |
| Remarks25: |
| One time cost applies to all roadsCY_7: |
| One time cost applies to all roadsCY_8: |
| 1CY_3: |
| One time cost applies to all roadsCY_9: |
| 25_2: |
| 125_2: |
| Quantity25_2: |
| Remarks25_2: |
| One time cost applies to all roadsCY_10: |
| One time cost applies to all roadsCY_11: |
| 1CY_4: |
| One time cost applies to all roadsCY_12: |
| 40_3: |
| 140_5: |
| Quantity40_2: |
| Remarks40_3: |
| One time cost applies to all roadsCY_13: |
| One time cost applies to all roadsCY_14: |
| 1CY_5: |
| One time cost applies to all roadsCY_15: |
| 25_3: |
| 125_3: |
| Quantity25_3: |
| Remarks25_3: |
| One time cost applies to all roadsMile_13: |
| One time cost applies to all roadsMile_14: |
| 1Mile: |
| One time cost applies to all roadsMile_15: |
| 2_3: |
| 017: |
| Quantity017: |
| Remarks017: |
| 36lnch Metal End Section: |
| One time cost applies to all roadsEach_31: |
| One time cost applies to all roadsEach_32: |
| 1Each_12: |
| One time cost applies to all roadsEach_33: |
| 1_19: |
| 0171: |
| Quantity1_8: |
| Remarks1_12: |
| One time cost applies to all roadsLF_10: |
| One time cost applies to all roadsLF_11: |
| 10: |
| 110: |
| 01710: |
| Quantity10: |
| Remarks10: |
| Gate Steel Size 16 feet: |
| One time cost applies to all roadsEach_34: |
| One time cost applies to all roadsEach_35: |
| 10Each: |
| One time cost applies to all roadsEach_36: |
| 1_20: |
| 0171_2: |
| Quantity1_9: |
| Remarks1_13: |
| One time cost applies to all roadsEach_37: |
| One time cost applies to all roadsEach_38: |
| 10Each_2: |
| One time cost applies to all roadsEach_39: |
| 1 Each: |
| One time cost applies to all roadsEach_40: |
| 1_21: |
| Quantity1_10: |
| Remarks1_14: |
| 20420LRow1: |
| EachOPTIONAL WORK: |
| One time cost applies to all roadsOPTIONAL WORK_8: |
| One time cost applies to all roadsOPTIONAL WORK_9: |
| 10OPTIONAL WORK: |
| One time cost applies to all roadsOPTIONAL WORK_10: |
| 1 OPTIONAL WORK: |
| One time cost applies to all roadsOPTIONAL WORK_11: |
| 1OPTIONAL WORK: |
| One time cost applies to all roadsOPTIONAL WORK_12: |
| QuantityOPTIONAL WORK_2: |
| RemarksOPTIONAL WORK_2: |
| 1OPTIONAL WORK_2: |
| Mobilization Applies to This Road Only: |
| 1_22: |
| 101: |
| 1 1: |
| 11_4: |
| Remarks1_15: |
| 1_23: |
| 101_2: |
| 1 1_2: |
| 11_5: |
| 11_6: |
| Remarks1_16: |
| 1LS_2: |
| One time cost applies to all roadsLS_22: |
| 10LS: |
| One time cost applies to all roadsLS_23: |
| 1 LS: |
| One time cost applies to all roadsLS_24: |
| 1_24: |
| Remarks1_17: |
| Drainage Excavation Type Waterbar_2: |
| 7: |
| 3: |
| 1 3: |
| 4_2: |
| 14_3: |
| Remarks4_2: |
| Drainage Excavation Type Swale: |
| 7Each: |
| One time cost applies to all roadsEach_41: |
| 1_25: |
| 1 1_3: |
| 41: |
| 11_7: |
| Remarks1_18: |
| Drainage Excavation Type Rolling Dip_3: |
| 5_2: |
| 2_4: |
| 1 2: |
| 42: |
| Remarks2: |
| 5LS: |
| One time cost applies to all roadsLS_25: |
| 2LS: |
| One time cost applies to all roadsLS_26: |
| 1 LS_2: |
| One time cost applies to all roadsLS_27: |
| 1_26: |
| 21: |
| Remarks1_19: |
| 128: |
| 081: |
| 1 081: |
| 019: |
| Remarks03: |
| 5Row1: |
| 6: |
| Road No: |
| Road No_2: |
| Road No_3: |
| 6N68Note: |
| 6N7OYNote: |
| Note: |
| Note_2: |
| Note_3: |
| ROAD DATARow1_3: |
| Item Description BASE WORK_3: |
| Remarks_9: |
| Remarks_10: |
| Remarks_11: |
| Remarks_12: |
| Mobilization Applies to Project_3: |
| QuantityOne time cost applies to all roads_3: |
| RemarksOne time cost applies to all roads_3: |
| One time cost applies to all roadsLF_12: |
| One time cost applies to all roadsLF_13: |
| 150: |
| Quantity150: |
| Remarks150: |
| One time cost applies to all roadsLS_28: |
| One time cost applies to all roadsLS_29: |
| 1_27: |
| Quantity1_11: |
| Remarks1_20: |
| One time cost applies to all roadsTon_7: |
| One time cost applies to all roadsTon_8: |
| 50: |
| Quantity50: |
| Remarks50: |
| One time cost applies to all roadsEach_42: |
| One time cost applies to all roadsEach_43: |
| 1_28: |
| Quantity1_12: |
| Remarks1_21: |
| 61902Row1: |
| Gate Steel Size 16 feetRow1: |
| EachRow1: |
| One time cost applies to all roadsRow5: |
| One time cost applies to all roadsRow5_2: |
| 1Row1: |
| One time cost applies to all roadsRow5_3: |
| One time cost applies to all roadsRow5_4: |
| One time cost applies to all roadsRow5_5: |
| One time cost applies to all roadsRow5_6: |
| One time cost applies to all roadsRow5_7: |
| QuantityRow6: |
| RemarksRow6: |
| 1Row1_2: |
| 61902Row2: |
| EachOPTIONAL WORK_2: |
| One time cost applies to all roadsOPTIONAL WORK_13: |
| One time cost applies to all roadsOPTIONAL WORK_14: |
| 1OPTIONAL WORK_3: |
| One time cost applies to all roadsOPTIONAL WORK_15: |
| One time cost applies to all roadsOPTIONAL WORK_16: |
| One time cost applies to all roadsOPTIONAL WORK_17: |
| One time cost applies to all roadsOPTIONAL WORK_18: |
| One time cost applies to all roadsOPTIONAL WORK_19: |
| QuantityOPTIONAL WORK_3: |
| RemarksOPTIONAL WORK_3: |
| 1OPTIONAL WORK_4: |
| 1_29: |
| 11_8: |
| Quantity1_13: |
| Remarks1_22: |
| 1_30: |
| 1_31: |
| Quantity1_14: |
| Remarks1_23: |
| 22_2: |
| 25_4: |
| Quantity25_4: |
| Remarks25_4: |
| 075: |
| 115: |
| Quantity115: |
| Remarks115: |
| 30322Row1: |
| Reconditioning of Roadbed Roller Compaction Method BRow1: |
| MileRow1: |
| 075Row1: |
| One time cost applies to all roadsRow11: |
| 115Row1: |
| One time cost applies to all roadsRow11_2: |
| One time cost applies to all roadsRow11_3: |
| One time cost applies to all roadsRow11_4: |
| One time cost applies to all roadsRow11_5: |
| One time cost applies to all roadsRow11_6: |
| QuantityRow12: |
| RemarksRow12: |
| 19Row1: |
| 30322Row2: |
| Reconditioning of Roadbed Roller Compaction Method BRow2: |
| MileRow2: |
| 075Row2: |
| One time cost applies to all roadsRow12: |
| 115Row2: |
| One time cost applies to all roadsRow12_2: |
| One time cost applies to all roadsRow12_3: |
| One time cost applies to all roadsRow12_4: |
| One time cost applies to all roadsRow12_5: |
| One time cost applies to all roadsRow12_6: |
| QuantityRow13: |
| RemarksRow13: |
| 19Row2: |
| 30322Row3: |
| Reconditioning of Roadbed Roller Compaction Method BRow3: |
| MileRow3: |
| 075Row3: |
| One time cost applies to all roadsRow13: |
| 115Row3: |
| One time cost applies to all roadsRow13_2: |
| One time cost applies to all roadsRow13_3: |
| One time cost applies to all roadsRow13_4: |
| One time cost applies to all roadsRow13_5: |
| One time cost applies to all roadsRow13_6: |
| QuantityRow14: |
| RemarksRow14: |
| 19Row3: |
| 30322Row4: |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .