SF_30 _MODIFICATION_2.docx

DOCX document 30 KB Posted

Attached to
RECOVERY - Plumbing Supplies
Solicitation number
AG-9702-S-10-0525
Issued by

About this file

AMENDMENT 2

View the file

Other files

File Type Posted
SF_30 _MODIFICATION_1.docx DOCX document
P301 100 .pdf PDF
rfp ci plumbing supplies 1.docx DOCX document
01010-plumbing supplies.docx DOCX document
USFS CR PLUMBING CUTSHEETS.pdf PDF
P201 100 .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
PAGE OF PAGES
1
2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
TWO (2)
July 13, 2010
380593
6. ISSUED BY
CODE
7. ADMINISTERED BY (If other than Item 6)
CODE

USDA Forest Service – AQM CO Denise G Hinds 208 Cruz Alta Taos NM 87571

SAME AS BLOCK 6

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.
X
AG-9702-S-10-0525

9B. DATED (SEE ITEM 11)

June 29, 2010

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers X is extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

|_|
D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return ___ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

THE SOLICITATION IS AMENDED AS FOLLOWS: RECEIPT OF RESPONSES IS EXTENDED UNTIL TUESDAY, JULY 20, 2010 @ 2:30 P.M. MDT

This soliciation is NOT set aside for HUBZone.

Cast Iron fittings – not threaded.

Clarification on specifications for products listed on page 2. Clarifications are bolded text.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Denise G Hinds, Contracting Officer
15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED
Denise G Hinds
July 9, 2010

(Signature of person authorized to sign)

(Signature of Contracting Officer)

AMENDMENT NO. 2 SOLICIATION AG-9702-S-10-0525 PAGE 2 OF 2

Item No.
Item Description
Est. Qty
Unit
15
Shock Arrestor - provide size capable of handling 24 Fixture Units. Size varies between manufacturers, so size is not specified
2
ea
30
Wall mounted carrier (concealed metal) – JR Smith, Zurn, or Watts are all acceptable
4
ea
43
Sink with faucet and trim (see schedule) – Configuration to match that of purchased trim. Kohler K-647-CP suggested in cut sheets
1
ea
55
Drinking Fountain and trim (see schedule) - Standard fountain, no additional requirements
1
ea
67
MSB w/ vacuum breaker faucet and trim (schedule) – no larger than 24” x 24”
1
ea
69
3” Ø adjustable Brass “P”-trap w/ cleanout -

Cast iron no-hub p-trap acceptable

1
ea
78
Floor drain assembly (schedule) – 3” outlet size; strainer size to match floor drain; polished brass finish; bottom outlet
2
ea
80
2” Ø Brass “P”-trap w/ cleanout -

Cast iron no-hub p-trap is acceptable

2
ea
86
Water heater (see schedule) - 6 gallon size;

2 kw; 240-1; one element

1
ea
128
2½” Ø C.I. vent pipe - 3” is acceptable
20
lf

From the bid schedule in RFP AG-9702-S-10-0525, the following clarifications are provided for the items listed below:

115
½” Ø type L copper pipe - comes in 20’ rolls, submit your price for exact number of rolls inclusive of overage.
84
lf
116
¾”Ø type L copper pipe - comes in 20’ rolls, submit your price for exact number of rolls inclusive of overage.
66
lf
117
¾”Ø type M copper pipe - comes in 20’ rolls, submit your price for exact number of rolls inclusive of overage.
30
lf
123
1½” Ø. DWV copper. waste pipe - comes in 20’ rolls, submit your price for exact number of rolls inclusive of overage.
5
lf
129
3/8” Ø type L copper pipe - comes in 20’ rolls, submit your price for exact number of rolls inclusive of overage.
10
lf

File details come from the government source that posted it. Updated .