01010-plumbing supplies.docx

DOCX document 21 KB Posted

Attached to
RECOVERY - Plumbing Supplies
Solicitation number
AG-9702-S-10-0525
Issued by

About this file

Attachment 1

View the file

Other files

File Type Posted
SF_30 _MODIFICATION_2.docx DOCX document
SF_30 _MODIFICATION_1.docx DOCX document
P301 100 .pdf PDF
rfp ci plumbing supplies 1.docx DOCX document
USFS CR PLUMBING CUTSHEETS.pdf PDF
P201 100 .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 1

SECTION 01010

Plumbing Supplies

SUMMARY OF WORK AND SPECIAL CONDITIONS

PART 1 GENERAL

1.01 SUMMARY

A. Description of Work: The work is comprised of, but not necessarily limited to: Delivering typical plumbing supplies and materials to the Camino Real Ranger Station, 15160 SR 75, Penasco, New Mexico.

B. Location: The delivery and storage point under this contract is located at the Camino Real Ranger Station, Taos County, Penasco, New Mexico.

1.02 REFERENCES

A. Please see attached technical specification ‘Plumbing Materials’ and the attached plumbing technical drawings for appropriate technical references.

B. The word ‘Contractor’ shall be taken to mean the material supplier in these specifications and other documents related to this contract.

1.03 QUALITY ASSURANCE

A. Code and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as if they were given in full text.

B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern. The Contracting Officer’s Representative shall be notified in the event of such a conflict.

1.04 DELIVERY, STORAGE, AND HANDLING

A. Delivery: The Contractor shall protect products, incorporated into the work, from damage while in transit to the site.

B. Handling: The Contractor shall load and unload products in such manner that protects them from damage until accepted on job site by the Government.

1.05 PROJECT/SITE CONDITIONS

A. Access to the Work: Contractor shall coordinate with Government for all access to the site.

1.06 SEQUENCING AND SCHEDULING

A. Requirements: The Contractor shall be responsible for operations necessary to complete the work, including coordination with the Contracting Officer’s Representative, relative to the Government’ requirements. Work shall be scheduled in such a manner as to avoid delays in overall construction and permit proper installation of work.

1.07 MISCELLANEOUS REQUIREMENTS

A. Not Applicable

1.08 CONSTRUCTION SCHEDULE AND PROGRESS CHARTS:

Contractor shall deliver all products to the project site. The exact time of delivery will be scheduled with the COR.

PART 2 PRODUCTS

2.01 GOVERNMENT FURNISHED PROPERTY

A. No Government Furnished Property supplied for this contract action.

PART 3 EXECUTION

3.01 PROTECTION

A. Damage: Repair of damage to materials resulting from loading, transit, and offloading shall be the responsibility of the Contractor and shall not be initiated prior to notification of the COR. Any material damaged beyond repair as determined by the COR shall be replaced immediately by the contractor.

END OF SECTION