Attachment 1 - SOW.pdf
PDF 218 KB Posted
- Attached to
- RECOVERY - Bryant-Fir Bridge
- Solicitation number
- AG-9702-S-10-0443
About this file
Attachment 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AG-9702-S-10-0443-000001.pdf | ||
| AG-9702-S-10-0443 Part I.pdf | ||
| Attachment 4 - ARRA_California_Fire_Laws.pdf | ||
| Attachment 2 - Drawings.pdf | ||
| Attachment 6 - Davis Bacon.pdf | ||
| Attachment 7 - SF 24.pdf | ||
| Attachment 3 - Fire Plan.pdf | ||
| AG-9702-S-10-0443 Part II.docx | DOCX document | |
| Attachment 5 - Wage Determination CA9.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD SPECIFICATIONS FOR CONSTRUCTION
OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS -2003
DATE: 03/26/2010
PROJECT NAME: BRYANT FIR BRIDGE PROJECTS ARRA
THE FOLLOWING SPECIFICATIONS AND SPECIAL PROJECT
SPECIFICATIONS APPLY TO ALL ROADS UNLESS SHOWN OTHERWISE
ON DRAWINGS
Table of Contents
Table of Contents
Preface
101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid, Award, and Execution of Contract
102 Bid, Award, and Execution of Contract
103 - Scope of Work
Deletions
104 - Control of Work
Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources
105.02(a) Government-provided sources
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.07 Delete
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims
107.06 Contractor’s Responsibility for Work
107.09 Legal Relationship of the Parties
107.10 Environmental Protection
107.02 Protection and Restoration of Property and Landscape
108 - Prosecution and Progress
108 Delete
109 - Measurement and Payment
109 Deletions
109.02 Measurement Terms and Definitions
155 - Schedules for Construction Contracts
155 Delete
201 - Clearing and Grubbing
201.01 Description
203.01 Description
203.04 Removing Material
203.05 Disposing of Material
208 - Structure Excavation and Backfill for Selected Major Structures
208.04 General
251 - Riprap
251.03 General
301 - Untreated Aggregate Courses
301.03 General
301.04 Mixing and Spreading
301.05 Compacting
301.06 Surface Tolerance
301.08 Acceptance
301.09 Measurement
303 - Road Reconditioning
404 - Minor Hot Asphalt Concrete
404.04 Weather Limitations
404.06 Placing
404.07 Compacting (a)
553 - Prestressed Concrete
554 - Reinforcing Steel
556 - Bridge Railing
557 - Timber Structures
617 - Guardrail
629 – Rolled Erosion Control Products and Cellular Confinement Systems
629.01 Add the following:
641 – Temporary Detours
703 - Aggregate
703.05 Subbase, Base, Surface Course, and Screened Aggregate
705 - Rock
705.02 Riprap Rock
705.08 Channel Rock
709 - Reinforcing Steel and Wire Rope
718 - Traffic Signing and Marking Material
718.05 Aluminum Panels
Preface
Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of National Forest System Roads.
101 - Terms, Format, and Definitions
101.00_nat_us_07_25_2005
Required for all Metric contracts
101.01_nat_us_01_22_2009
Required in ALL contracts -- deletes references to TAR (Dept of Transportation Acquisition Regulations)
101.01 Meaning of Terms
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_nat_us_06_16_2006
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association Mine Safety and Health Administration National Institute of Standards and Technology National Electrical Safety Code West Coast Lumber Inspection Bureau
Add the following to (b) SI symbols:
mp Milepost ppm Part Per Million
101.04_nat_us_03_29_2007
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Bridge--No definition.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “purchaser”.
Culvert--No definition.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Add the following:
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Design Quantity--“Design quantity” is a Forest Service method of measurement from the FS-96 Forest Service Specifications for the Construction of Roads and Bridges. Under these FP specifications this term is replaced by the term “Contract Quantities”.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid, Award, and Execution of Contract
102.00_nat_us_02_16_2005
102 Bid, Award, and Execution of Contract
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_us_02_16_2005
Deletions
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
104.00_nat_us_06_16_2006
Deletions
Delete Sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Authorizes use of Forest Service Roads
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material
105.02_eldo_03_15_2010
105.02 Material Sources.
105.02(a) Government-provided sources.
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
Unless shown otherwise in the Drawings, all borrow material shall be obtained from commercial sources.
105.05_nat_us_05_12_2004
Required in all Contracts
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.07_nat_us_05_11_2004
106.07 Delete
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.05_nat_us_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.06_nat_us_06_16_2006
Use in all contracts
107.06 Contractor’s Responsibility for Work.
Delete the following from the first paragraph.
“except as provided in Subsection 106.07”.
107.09_nat_us_06_16_2006
107.09 Legal Relationship of the Parties.
Delete the entire subsection.
107.10_nat_us_06_16_2006
Requires hazardous spill plan & notification of spills
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
• Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
• Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
• Exact time and location of spill including a description of the area involved.
• Containment procedures.
• Summary of any communications the Contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
• Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
107.10_05_us_05_04_2007
Required in R5 contracts: Adds reference to road BMPs
107.02 Protection and Restoration of Property and Landscape
Meet the requirements chapters 10, 11, and 12.2 in their entirety of “Water Quality Management for National Forest System Lands in California Best Management Practices” dated September
108 - Prosecution and Progress
108.00_nat_us_02_16_2005
108 Delete.
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.00_nat_us_02_17_2005
109 Deletions
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
109.02_nat_us_06_16_2006
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
Change the following:
“(b) Cubic yard” to “(c) Cubic yard”.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
155 - Schedules for Construction Contracts
155.00_nat_us_05_11_2004
155 Delete.
Delete Section 155 in its entirety.
201 - Clearing and Grubbing
201.01_nat_us_02_18_2005
Use in all FS contracts that include Section 201
201.01 Description
Replace with the following
This work consists of clearing and grubbing within clearing limits and other designated areas.
201.04_nat_us_02_22_2005
Include in FS contracts with Section 201
201.04 Clearing.
Delete subsection (d) and replace with the following:
(d) Do not cut vegetation less than 3 feet tall and less than 3 inches in diameter, that is within the clearing limits but beyond the roadway and not in a decking area, and that does not interfere with sight distance along the road.
Add the following:
(e) Trim branches of remaining trees or shrubs to give a clear height of 14 feet above the roadbed unless otherwise indicated. Trim tree limbs as near flush with the trunk as practicable.
(f) Remove brush from log decks. Deck logs so that logs are piled parallel to one another; can be removed by standard log loading equipment; will not damage standing trees; will not interfere with drainage, and will not roll. Keep logs in log decks free of brush and soil.
203 - Removal of Structures and Obstructions
Include in FS contracts with sections 201 and 203
203.01 Description.
Delete and replace with the following:
This work consists of disposing of construction slash and debris, salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions.
Existing vented fords, including concrete, steel, asphalt, and excess construction materials shall be demolished and removed from government land. Clean rock and uncontaminated soils may be used on site, otherwise material shall be hauled to the designated disposal site.
203.04_nat_us_02_18_2005
Include in FS contracts with Section 203
203.04 Removing Material.
See note for Item 203 on the Materials List and Quantities sheet in the contract drawings.
Adds several FS disposal methods: windrowing, scattering, chipping, grinding, and more
203.05 Disposing of Material.
Remove items (b) & (c) and add the following:
(e) Chipping or Grinding. Use an approved chipping machine to grind slash and stumps greater than 3 inches in diameter and longer than 3 feet. Deposit chips or ground woody material on embankment slopes or outside the roadway to a loose depth less than 6 inches. Minor amounts of chips or ground woody material may be permitted within the roadway if they are thoroughly mixed with soil and do not form a layer.
(f) Decking Firewood Material. Remove brush from decks. Limb and deck logs that do not meet Utilization Standards according to Subsection 201.04 as directed by the CO. Cut logs to lengths less than 30 feet. Ensure that logs stacks are stable and free of brush and soil.
(j) Removal to designated locations. Remove construction slash to designated locations.
203.08_nat_us_02_24_2005
Include in all contracts containing Section 201 and 203. Clarifies payment for construction slash disposal.
203.08 Payment
Add the following:
Disposal of construction slash will be compensated under the designated pay item in Section 201.
204.06_nat_us_03_02_2005
208 - Structure Excavation and Backfill for Selected Major Structures
208.04_nat_us_08_05_2009
Includes subsections 04,09,13; for use with bridge and culvert construction projects, adds definitions, submittal times, and limits over exc.
measurement
Construction Requirements
208.04 General.
Add the following to the end of the second sentence of the third paragraph:
"... to the CO a minimum of 5 days prior to beginning excavation work."
Add the following to the end of the third sentence of the third paragraph:
"...to the CO a minimum of 15 days prior to installation."
208.09 Foundation Preparation.
Add the following after the first paragraph:
The foundation elevation is defined as the bottom of footings, for spread footing placement; the bottom of the pile cap, for construction of pile foundations; and the toe of the wall, for construction of retaining walls, except wingwalls at bridges.
Replace all material from any over-excavation below the designated footing elevation with concrete, compacted gravel, or foundation fill at the direction of the CO.
When boulders or irregular, fractured, or seamed bedrock precludes excavation to the designated footing elevation without further loosening of previously solid material, the CO may order removal of such loose material and allow payment for concrete, gravel, or structural backfill that is required to restore foundation material to the designated elevation
208.13 Measurement.
Add the following to the second paragraph:
(f) Material excavated to construct end walls or wing walls which lie outside the excavation limits specified above.
Add the following paragraph:
Foundation over-excavation and the resulting replacement material will not be measured for payment unless the CO determines the over-excavation was unavoidable because of the nature of the material.
251 - Riprap
251.03_nat_us_08_05_2009
Includes subsections 03,08; for use on bridge and culvert projects with riprap
Construction Requirements
251.03 General.
Place riprap under or adjacent to structures before placing prefabricated superstructure units or constructing superstructure falsework unless otherwise approved by the CO.
251.08 Measurement.
Payment for excavation and embankment required for placement of riprap is indirectly included in the pay item for riprap. Geotextiles associated with riprap are included in the price of the riprap.
301 - Untreated Aggregate Courses
301.00_05_us_07_27_2005
Entire specification - takes "treatment sections" out
301.03 General.
Add the following:
Request approval in writing of the roadbed before placing aggregate.
If the aggregate is produced and stockpiled before placement, handle and stockpiled according to Section 320. Establish stockpile sites at locations approved. Clear and grub stockpile sites according to Section 201.
301.04 Mixing and Spreading.
Delete the first two sentences of the first paragraph and add the following:
Adjust the moisture content to obtain a uniform mixture with a moisture content within 2 percent of the optimum moisture content. Spread the aggregate in a uniform layer, with no segregation of size, and to a loose depth that will provide the required compacted thickness.
When placing aggregate over geotextile, place aggregate in a single lift to the full depth specified.
Route and distribute hauling and leveling equipment over the width and length of each layer.
301.05 Compacting.
Delete the first and third paragraphs and add the following:
Compact the aggregate using one of the following methods as specified:
(a) Compaction Method A. Compact the aggregate by operating spreading and hauling equipment.
(b) Compaction Method C. Compact each layer of aggregate to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 99, method C or D.
(c) Compaction Method D. Compact each layer of aggregate to a density of at least 95 per-cent of the maximum density, as determined by AASHTO T 180, method C or D.
For all compaction methods, blade the surface of each layer during the compaction operations to remove irregularities and produce a smooth, even surface. When a density requirement is specified, determine the in place density and moisture content according to AASHTO T 310 or other approved test procedures.
301.06 Surface Tolerance.
Add the following:
Thickness and Width requirements:
The maximum variation from the compacted specified thickness is ½ inch. The compacted thickness is not consistently above or below the specified thickness and the average thickness of 4 random measurements for any ½ mile of road segment is within + ¼ inch of the specified thickness.
The maximum variation from the specified width will not exceed +12 inches at any point. The compacted width is not consistently above the specified width and the average of any four random measurements along any ½ mile of road segment is within +4 inches of the specified width.
301.08(b) Plasticity Index.
Add the following to the first sentence: “and under 703.05(c)(1)”.
301.08 Acceptance
Delete the second paragraph and add the following:
Aggregate gradation and surface course plasticity index will be evaluated under Subsection
106.04. Other aggregate quality properties will be evaluated under 106.02 and 106.04.
301.09 Measurement.
Delete the second and third paragraphs and add the following:
Table 301-1 Field Density Requirements.
Table 301-1: Delete laboratory and field density requirements for base, subbase, and surfacing and replace with the following:
Material or Product
Type of Acceptance (Subsection)
Characteristic Category Test Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Moisture Density
Method C-1 --- R-1 Marshall “ “ “ Before using in work
Method D --- AASHTO T
Method D-1 --- R-1 Marshall “ “ “ “
Compaction
NC ABC Measured and tested conformance (Subsection 106.04)
Method C, C- 1, D, D-1
--- AASHTO T
310 or other approved procedures
1 per 500 t In-place --- Before placing the next layer
Table 301-1: Add the following:
Table 301-1—Acceptance Sampling and Testing Requirements.
Material or Product
Type of Acceptance (Subsection)
Characteristic Category Test Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
NC ABC Measured and tested conformance (Subsection 106.04)
Plastic Limit - AASHTO T
1 per each 1,000 T
From the windrow or roadbed after processing
Yes 4 Hours
Table 301-1—Acceptance Sampling and Testing Requirements.
Material or Product
Type of Acceptance (Subsection)
Characteristic Category Test Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Aggregate Width
Measured and tested conformance (Subsection 106.04)
Width - - 4 per each
0.5 mi
Roadbed after processing
- 4 Hours
Aggregate Thickness
Measured and tested conformance (Subsection 106.04)
Thickness - - 4 per each
0.5 mi
Roadbed after processing
- 4 Hours
Additive Measured and tested conformance (Subsection 106.04)
Amount of Additive
- 1 per each 1,000 T
From the windrow or roadbed after processing
No 4 Hours
303 - Road Reconditioning
303.00_01_us_10_11_2006
Replaces FP 303
Delete Section 303 in its entirety and replace with the following.
Description
303.01 This work consists of reconditioning bridge approaches, ditches, shoulders, roadbeds, parking areas, turnouts, approach road intersections, cattleguards, asphalt surfaces and aggregate surfaces. Construct outslopes, clean and maintain all roadbed drainage structures when shown on the plans. Work also includes the supply and placement of borrow material where Shown In The drawings.
Material
303.02 Conform to the following Subsection:
Water 725.01
303.03 Ditch Reconditioning. Remove all slide material, sediment, vegetation, and other debris from the existing ditches and culvert inlets and outlets. Reshape ditches and culvert inlets and outlets to achieve positive drainage and a uniform ditch width, depth, and grade. Dispose of waste as shown on the plans.
303.04 Shoulder Reconditioning. Repair soft and unstable areas according to Subsection
204.07. Remove all slide material, vegetation, and other debris from existing shoulders including shoulders of parking areas, turnouts, and other widened areas. Dispose of waste as shown on the plans.
303.05 Roadbed Reconditioning Repair soft and unstable areas according to Subsection
204.07. Remove all organic, deleterious material larger than 6 inches from the top 6 inches of subgrade. Dispose of waste as shown on the plans. Scarify, rip and shape the traveled way and shoulders at locations and to the depth and width designated on the plans. Remove surface irregularities and shape to provide a uniform surface.
Dispose of rock larger than 4 inches brought to the surface during scarification in areas designated on the plans.
For portions of roads not requiring scarification, the roadbed may contain rocks larger than 4 inches provided they do not extend above the finished roadbed surface. Reduce in place or remove rock extending above the finished roadbed surface. Dispose of removed rock in areas designated on the plans.
Compact using the following method as specified:
(a) Compaction A. Operate equipment over the full width.
(b) Compaction B. Operate rollers over the full width of each layer until visual displacement ceases, but not fewer than three complete passes. Use rollers that meet the following requirements:
(1) Steel wheeled rollers, other than vibratory, capable of exerting a force of not less than 250 pounds per inch of width of the compression roll or rolls.
(2) Vibratory steel wheeled rollers equipped with amplitude and frequency controls with a minimum weight of 6 tons, specifically designed to compact the material on which it is used.
(3) Pneumatic-tired rollers with smooth tread tires of equal size that will provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 psi.
303.06 Aggregate Surface Reconditioning. Repair soft and unstable areas to the full depth of the aggregate surface and according to Subsection 204.07. Scarify to the depth of the aggregate surface or to a depth of 8 inches, whichever is less, and remove surface irregularities. Reshape, finish, and compact the entire aggregate surface according to Section 308.
303.07 Roadway Reconditioning. Perform all the applicable work described in Subsections
303.03 through 303.06.
Maintain the existing cross slope or crown unless otherwise shown on the plans. Establish a blading pattern that will retain the surfacing on the roadbed and provide a through mixing of the materials within the completed surface width.
Blade and shape the subgrade for both surfaced and unsurfaced roads when moisture content is suitable for compaction.
303.08 Pulverizing. Scarify the surface to the designated depth and width. Pulverize all material to a size one and one half times the maximum sized aggregate or to 1½ inches, whichever is greater. Mix, spread, compact, and finish the material according to Section 301.
303.09 Borrow and Embankment. Work shall conform to Section 204 – Excavation and Embankment and Section 105.02(a) Government-provided sources.
303.10 Acceptance. See Table 303-1 for sampling and testing requirements. Road reconditioning work will be evaluated under Subsections 106.02 and 106.04.
Measurement & Payment
303.11 The accepted quantities will be measured and paid at the contract price per unit of measurement for the Section 303 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
404 - Minor Hot Asphalt Concrete
404.04_nat_us_03_02_2005
Include in all contracts with Section 404 -- modifies weather limitations
404.04 Weather Limitations.
Change 35o F to 45o F:
404.06_nat_us_03_02_2005
Include in all contracts with 404 -- adds requirement of written approvals before placing asphalt; adds joint construction requirements
404.06 Placing.
Add the following:
Do not place asphalt until the CO has approved in writing the area where it will be placed.
Delete the last sentence and replace with the following:
Offset the longitudinal joint of one layer at least 6 inches from the joint in the layer immediately below. Make the longitudinal joint in the top layer along the centerline of two-lane roadways or at the lane lines of roadways with more than two lanes. Offset transverse joints in succeeding layers and in adjacent lanes at least 10 feet, where possible.
404.07_nat_us_03_02_2005
Include in contracts with 404 for roadway paving
404.07 Compacting (a).
Delete and replace with the following:
(a) Roadway paving. Thoroughly and uniformly compact the surface a minimum of three passes with rollers that meet one of the following requirements:
(1) Steel-wheeled rollers, other than vibratory type, capable of exerting a force of not less than
1.5 ton/feet of width of the compression roll or rolls.
(2) Vibratory steel-wheel rollers with a minimum mass of 5 ton, equipped with amplitude and frequency controls, and designed to compact asphalt concrete.
(3) Pneumatic-tire rollers with smooth tread tires of equal size that provide a uniform compacting pressure for the full width of the roller and capable of exerting a ground pressure of at least 80 lbf/in2.
Perform initial compaction while the mixture is above 250 °F. Perform finish rolling with steel-wheel rollers and continue until no roller tracks remain.
553 - Prestressed Concrete
553.02_05_us_12_03_2009
Region 5 Use for all bridge contracts that contain Prestressed Concrete
Section 553 – PRESTRESSED CONCRETE
Materials
553.02 Conform to the following Section and Subsections:
Add the following materials and paragraph:
High strength non-shrink grout 725.22 (c)
Structural steel 555
Use Class P concrete in prestressed members unless otherwise SHOWN ON THE DRAWINGS.
Design the concrete mix in accordance with Subsection 552.03 with a 28-day design compressive strength as SHOWN ON THE DRAWINGS. Do not permit lightweight concrete unless otherwise SHOWN ON THE DRAWINGS.
Construction Requirements
553.03 Method Approval.
Delete the entire section and replace with the following:
Notify the CO a minimum of 10 days prior to fabrication of any prestressed members.
Inspect all prestressed concrete members by one of the following methods, unless otherwise SHOWN ON THE DRAWINGS or in the SUPPLEMENTAL SPECIFICATIONS:
• Use the quality control engineer of a plant certified by the Prestressed Concrete Institute (PCI). Submit a copy of the transmittal letter of the latest PCI inspection with the shop drawings. Furnish a copy of all testing and inspection reports to the CO upon delivery of the members to the jobsite.
• Use an independent licensed professional engineer experienced in prestressed concrete girder inspection to certify that the prestressed members were built in accordance with the drawings and specifications. Furnish, along with the certification, a copy of all testing and inspection reports to the CO upon delivery of the members to the jobsite.
Ensure that the prestressed members conform to the dimensional tolerances as given in Table 553-1.
Perform prestressing by pretensioning methods. Submit four copies of shop drawings for prestressed members and one copy of reproducible detailed drawings of the method, material, and equipment proposed for approval at least 21 days before starting prestressing.
Show the following:
(a) Method and sequence of stressing.
(b) Complete specifications, details, and test results for the prestressing steel and anchoring devices.
(c) Anchoring stresses.
(d) Arrangement of the prestressing steel in the members to include the strand pattern at midspan and at center span of bearing; and the location of total strand center of gravity at midspan, at hold-down points, at quarter points, and at centerline of bearing.
(e) Tendon elongation calculations for jacking procedures to be used, to include the calibration curve for the gauge and jacking system, the stress-strain curve for the prestressed strands, and the pressure gauge readings.
(f) Number, spacing, and method of draping pretensioned strands.
(g) The prestressing bed layout and overall length between grips at fixed and jacking ends, and the type of equipment to be used.
(h) Other substantiating calculations for the prestressing method.
(i) Certification of wire or strand taken in accordance with Subsection 709.03.
(j) Concrete mix design.
Provide the signature and seal of a licensed professional engineer on all shop drawings and calculations prepared for fabrication of prestressed members.
The CO will review mix designs and approve shop drawings prior to fabrication of prestressed members.
553.05 Concrete.
Add the following sentence after the first paragraph:
As a minimum, use Class P(AE) (air-entrained) concrete according to Section 552 for the top 2 inches of the precast member.
553.07 Pretensioned Members.
Add the following paragraph after the first sentence:
Cast pretensioned members in commercial prestressing plants that are PCI-Certified Plants in Product Group B—Bridges, category B3 (Prestressed Straight Strand Bridge Members) or category B4 (Prestressed Draped Strand Bridge Members), as applicable to the members to be manufactured.
553.08 Storing, Transporting, and Erecting.
Add the following paragraphs to the end of the section:
Advise the CO a minimum of 48 hours before prestressed girders for multibeam bridges are to be field welded, and before any field grout or mortar is to be placed.
Adjust, if necessary, multibeam girders by using galvanized steel shims the same length and width as the bearing pad or plate. Allow no more than 1/4 inch vertical difference between top of adjacent beam edges at each end of the span. When an asphalt wearing surface or cast-in-place deck is to be placed on top of the prestressed beams, allow a vertical tolerance of only 1/2 inch. Do not load beams to make them assume the same camber as an adjacent beam.
Perform abrasive blasting on the keyway surfaces of all multibeam prestressed concrete members to provide a new and clean concrete surface that is free of carbonated concrete and other contaminants, and to expose parts of the large aggregate beneath the concrete paste.
Use high-pressure water blasting (3,000 psi or more) to remove all debris and loosened paste in the keyways immediately prior to placing high-strength non-shrink grout (grout). Remove all freestanding water and allow keyways to completely surface dry. Test for the presence of carbonated concrete when directed by the CO or called for by the SUPPLEMENTAL SPECIFICATIONS. Repeat abrasive blasting and water washing as needed if tests indicate the presence of carbonated concrete.
Use grout in keyways between multibeam members and to patch defects, blockouts, or other areas on the concrete roadway portion of the structure 1 inch or more in depth and over 1 inch in width. Patch smaller areas on the concrete roadway with grout.
Maintain air and concrete keyway temperatures between 45°F and 85 °F before placing grout.
Maintain the temperature within these limits until grout placement and application of curing method is completed.
Use grout on all anchor bolts and dowels to make all repairs.
Strike off exposed grout surfaces flush with the same surface texture finish as the surrounding concrete as soon as the grout has set sufficiently. Cure the exposed surface as specified in Subsection 552.15. When artificial means are used to control the curing temperature of the grout, as during hot or cold weather, the CO will approve the method in advance. Use combustion heaters only if fully vented outside their enclosure. Store all dry grout materials and mixing and placing equipment such that their temperature is above freezing. Warm mixing water to provide grout at desired temperature, but ensure that it is at 85 °F or less when mixed with the dry materials. Use ice as part of the mixing water provided it is completely melted prior to the introduction of the water to the dry materials.
Ensure that patching grout is the same color as the parent concrete.
Ensure that all field welding meets the requirements specified in Section 555. When welding or burning on precast members, attach the ground lead directly to the base metal; reject any precast prestressed member used as a conductor for the ground, and replace the member without compensation.
554 - Reinforcing Steel
554.03_nat_us_06_20_2007
Includes subsections 03,08,11; for bridge and culvert projects with field placed reinforcing steel.
Construction Requirements
554.03 Order Lists.
Delete the first paragraph and replace with the following:
Do not submit order lists or bending diagrams for approval.
554.08 Placing & Fastening.
Delete the first sentence and replace with the following:
Place, fasten, and support the bars according to the CRSI Manual of Standard Practice. Use precast concrete blocks or metal supports, but only use precast mortar blocks in areas permanently hidden from view in the completed structure.
Measurement
554.11 Method.
Add the following to the end of the second paragraph:
Do not measure or include reinforcing steel fabricated into the prestressed member.
556 - Bridge Railing
556.01_nat_us_07_03_2007
Includes subsections 01,02,05; for use on bridge projects with bridge railing.
556.01
Prior to acceptance of the completed structure, clean the bridge and approach rail of all foreign matter, including dirt, cement paste and petroleum products, leaving these surfaces in the same condition as when they left the fabricator. Use hand tool, solvent and blast cleaning as required but use power tool cleaning only as approved.
Material.
556.02
Galvanized coating repair 717.07 Structural steel tubing 717.01(h)
556.05 Steel Railing.
Add the following at the beginning of the first sentence.
"Except as provided for in the supplemental specifications or shown on the plans, ... "
Add the following:
For galvanized rail, galvanize in accordance with AASHTO M111, and furnish nuts, bolts, and washers galvanized in accordance with AASHTO M 232. Repair minor abrasions, cuts and all damaged areas with a galvanized coating in accordance with 717.07.
557 - Timber Structures
557.00_05_us_06_07_2006
Standard R5 Timber Bridge Supplemental Specification
Replace FP-03 Section 557 with the following Supplemental Specification:
Section 557—Timber Structures
Description
557.01 Work. Furnish, fabricate, erect, and paint structural timber, including all required yard lumber and hardware.
Materials 557.02 Requirements. Furnish material that conforms to specifications in the following section and subsections:
Hardware & Structural Steel ............................................... 716.02 Painting ............................................................................… 563 Structural Glued Laminated Timber .................................... 716.04 Treated Structural Timber & Lumber .................................. 716.03 Treated Timber Piles .......................................................… 715.02 Untreated Structural Timber & Lumber ..........................… 716.01
Furnish the following compliance certificates to the CO upon delivery of the materials to the jobsite:
(a) Verification of compliance with grading rules and species of timber and lumber. Provide certification by an agency accepted as competent by the American Lumber Standards Committee (ALSC).
(b) Lot certification of each charge for preservative, penetration in inches, and retention in pounds per cubic foot (assay method) by a qualified independent inspection and testing agency. In addition, have the producer of the treated products provide written certification that Best Management Practices (BMP’s) in accordance with “Best Management Practices for Treated Wood in Western Aquatic Environments,” published by the Western Wood Preservation Institute (WWPI) and Canadian Institute of Treated Wood, were followed, including a description and appropriate documentation of the applicable BMP’s used.
(c) Certification from a qualified inspection and testing agency indicating that all glued laminated members are in accordance with the requirements of American National Standard for Wood Products, “Structural Glued Laminated Timber” (ANSI/AITC A190.1), modified as SHOWN ON THE DRAWINGS.
(d) Such other certifications as SHOWN ON THE DRAWINGS.
Incise all glued laminated and solid sawn members thicker than 2 inches in accordance with AWPA standard C1, unless otherwise SHOWN ON THE DRAWINGS.
Provide shop drawings for all timber 21 days in advance of fabrication when SHOWN ON THE DRAWING. Show all dimensions and fabrication details for all cut, framed, or bored timbers.
Construction 557.03 General. Perform the work under Section 208. Furnish structural lumber and timber of the required stress grade.
Clear stacks of weeds, rubbish, or other objectionable material from the ground under and in the vicinity of all stored material. Place the bottom layer of material at least 8 inches above the ground level. Provide sufficient support to prevent sagging.
Open-stack untreated material to shed water. Stack material in layers on spacers (stickers) that extend across the full width of the stack to allow for free air circulation. Align all stickers vertically and space them at regular intervals.
Close-stack treated material to shed water.
Protect material from the weather. If covered, use sheet material such as water-resistant paper or opaque polyethylene film. Do not cover with impervious membranes, such as polyethylene film, during dry weather. Slit individual wrappings full length or puncture on the lower side to permit drainage of water.
Store and protect glued laminated timber in accordance with the recommendations for Loading and Handling, Job Site Storage, and Erection in “Recommended Practice for Protection of Structural Glued Laminated Timber During Transit, Storage, and Erection,” published by the American Institute of Timber Construction, AITC 111.
Use slings or other devices to protect corners of heavy construction timbers and banded packages of lighter construction timber.
557.04 Treated Timber. Fabricate timbers before treatment. Handle treated timber according to the Consumer Information Sheet published by AWPA. Do not cut, frame, or bore treated timber after treatment unless approved by the CO. Handle treated timbers carefully and do not drop, damage outer fibers, or penetrate the surface with tools. Do not use cant dogs, hooks, or pike poles. In coastal waters, do not cut or bore timber below the high water mark.
For timbers originally treated with pentachlorophenol, creosote, creosote solutions, or waterborne preservatives, field treat all cuts, abrasions, bolt holes, and recesses that occur after treatment with two liberal applications of a compatible preservative in accordance with the requirements specified in AWPA standard M4, Standard for the Care of Pressure-Treated Wood Products.
Unless otherwise specified, copper naphthenate solutions may be used for field treatments of material originally treated with copper naphthenate, pentachlorophenol, creosote, creosote solution, or waterborne preservatives. Prepare the preservative solution by blending copper naphthenate preservative that meets P8 requirements with a solvent conforming to AWPA standard P9. Ensure that the resulting preservative solution concentration contains a minimum of 2 percent copper metal.
Plug all unused holes with preservative-treated plugs. Perform all field-applied preservative treatment with necessary precautions so as to prevent any soil and/or water contamination.
557.05 Untreated Timber. Coat the following untreated timber surfaces in accordance with AWPA standard M4:
(a) All ends and tops, and all contact surfaces of posts, sills, and caps.
(b) All ends, joints, and contact surfaces of bracing and truss members.
(c) All surfaces of timber bumpers and the back faces of bulkheads.
(d) All other timber that will be in contact with earth.
557.06 Workmanship. Cut and form all lumber and construction timber so all joints will have even bearing over the entire contact surface. Do not use shims in making joints. Construct all joints to be closed. Drive nails and spikes to set the heads flush with the wood surface. Use the same end, face, and edge of the timber member for all layout dimensions. Bore all holes from mating faces.
557.07 Holes for Bolts, Dowels, Rods, & Lag Screws. Bore all holes before preservative treating the wood. Bore holes for round drift bolts and dowels 1/16 inch smaller in diameter than that of the bolt or dowel to be used. Ensure that the diameter of holes for square drift bolts or dowels is equal to the side dimension of the bolt or dowel.
Bore holes for machine bolts with a bit 1/16 inch larger than the diameter, except when galvanized bolts are specified. In this case, drill all holes 1/8 inch greater than the bolt size.
Bore holes for lag screws with a bit not larger than the body of the screw at the base of the thread. Drill the depth of lag screw boltholes 1 inch less than the length under the screw head and with a diameter approximately 75 percent of the shank diameter.
557.08 Hardware. Furnish the hardware as SHOWN ON THE DRAWINGS, as specified below.
(a) Bolts & Washers. Finally tighten all nuts to provide proper bearing, and cut off excess bolt lengths of more than 1 inch. After final tightening, check or burr all bolts effectively with a pointing tool to prevent loosening of the nuts.
Use malleable iron washers with a diameter approximately three times the bolt diameter under all bolt heads or nuts in contact with wood. Use cast-iron washers when the timber is in contact with the ground. Use square washers only when SHOWN ON THE DRAWINGS or with the approval of the CO.
(b) Galvanizing. Unless otherwise SHOWN ON THE DRAWINGS, ensure that all hardware for timber structures is galvanized, except for the glued laminated deck panel dowels. Ensure that all fasteners, including nails, spikes, bolts, washers, and timber connectors, other than malleable iron, are galvanized.
557.09 Countersinking. Countersink nuts and bolt heads where SHOWN ON THE DRAWINGS. Paint recesses formed for countersinking with an approved preservative, except in railing. After bolts or screws are in place, fill the holes with hot pitch or other approved filler.
557.10 Framing. Do not slab or trim treated piles for fitting sway or sash braces. Fill all gaps that occur between braces and piles with treated blocks so that the bracing is securely fastened to the piles.
557.11 Framing Bents. Bed mud sills firmly, evenly, and level to solid bearing, and tamp in place.
When concrete is cast and dowels are used for anchoring sills and posts, install dowels (3/4 inch minimum diameter) that project at least 6 inches above the tops of the pedestals.
Carefully finish concrete pedestals supporting framed bents so that sills or posts bear evenly on the pedestals.
Provide firm, uniform bedding for mud sills. Make sills bear true and even on mud sills, piles, or pedestals. Drift bolt sills with bolts that extend into the mud sills or piles for at least 6 inches. Where possible, remove all earth in contact with sills for circulation of air around the sills.
557.12 Posts. Fasten posts to pedestals with dowels not less than 3/4 inch in diameter that extend at least 6 inches into the posts, or with other types of connectors as SHOWN ON THE DRAWINGS. Fasten posts to sills using one of the following methods, as SHOWN ON THE
DRAWINGS:
(a) With dowels not less than 3/4 inch in diameter that extend at least 6 inches into posts and sills.
(b) With drift bolts not less than 3/4 inch in diameter driven diagonally through the base of the post and extending at least 7 inches into the sill. Drive drift bolts into holes at a 45° angle to enter the post at least 6 inches above the post base.
(c) With other types of connectors as SHOWN ON THE DRAWINGS.
557.13 Pile Bents. Treat, furnish, and drive piles in accordance with Section 551.
557.14 Caps for All Bents. Make timber caps bear even and uniform over the tops of the supporting posts or piles, with their ends in alignment. Secure all caps with drift bolts and set approximately at the center of and extending into the posts or piles at least 9 inches.
557.15 Bracing. Bolt the ends of bracing through the pile, post, cap, or sill. Brace intermediate intersections with posts or piles with bolts or spikes, as required. In all cases, use galvanized spikes in addition to bolts.
Make all bracing bear firmly against the pile or cap to which it is bolted. Provide and place shims as necessary to prevent bending the bracing more than 1 inch out of line when bracing bolts are tightened.
Where the space between the bracing and cap or pile is less than 1 inch, shims need not be used.
Where the space between the bracing and the cap or pile is 1 1/2 ± 3/8 inch, place two ogee washers, with their narrow faces together, or other approved washers on each bolt that passes through the space.
Where the space between the bracing and the cap or pile is over 2 inches, use wooden shims of the proper thickness. Fabricate the wooden shims from White Oak or from other approved hardwood. Do not use built-up wooden shims. Make wooden shims from a single piece of lumber with the width not less than 4 inches, and the length not less than the width of the bracing measured along the cap or pile. Do not adze, trim, or cut any treated member to avoid the use of shims.
557.16 Stringers. Place solid sawn stringers in position so that knots near edges are in the top portions of the stringers.
Outside stringers may have butt joints with the ends cut on a taper. Lap interior stringers to take bearing over the full width of the floor beam or cap at each end. Separate the lapped ends of untreated stringers by at least 1/2 inch for air circulation. Securely fasten the lapped ends with drift bolts, as required. Stagger the joints where stringers are two panels in length.
Install cross-bridging between stringers as SHOWN ON THE DRAWINGS. If timber cross-bridging members are used, cut for a full bearing at each end against the sides of the stringers.
Place cross-bridging at the center of each span or as SHOWN ON THE DRAWINGS.
557.17 Plank Floors. Use plank that is surfaced on four sides (S4S).
Single-ply timber floors consist of a single thickness of planks supported on stringers. Lay the planks heart side down with 1/4 inch space between them for seasoned material, and with tight joints for unseasoned material. Spike each plank securely to each stringer. Carefully grade the planks as to thickness and lay so that no two adjacent planks vary in thickness by more than 1/16 inch.
Two-ply timber floors consist of two layers of flooring supported on stringers. Pressure treat the lower layer with creosote oil or with another preservative as SHOWN ON THE DRAWINGS.
Lay the top layer either diagonal or parallel to the centerline of roadway as required. Securely fasten each floor piece to the lower layer. Stagger joints at least 3 feet. Where the top layer is placed parallel to the centerline of the roadway, use special care to securely fasten the ends of the flooring. Bevel the ends of top layer members at each end of the structure.
557.18 Transversely Nail-Laminated Decks. Use 2 inch nominal thickness laminations;
surface one edge hit or miss 1/8 inch scant (SIE–H or M 1/8 inch scant), and one side hit or miss 1/8 inch scant (SIS–H or M 1/8 inch scant).
Place the laminations on edge and at right angles to the centerline of the roadway. Spike each piece to the preceding piece at each end and at approximately 18-inch intervals, with the galvanized spikes driven alternately near the top and bottom edges. Use spikes of sufficient length to pass through two pieces and at least halfway through the third piece.
Where timber stringers are used, toenail every other piece to every other stringer. Use the size spikes specified. When steel stringers are used, securely attach the pieces using approved galvanized metal clips.
Use pieces of sufficient length to bear on at least four stringers. Do not splice pieces between stringers. Space end joints on any one stringer no closer than every third piece.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .