Attachment 2 - Drawings.pdf

PDF 6 MB Posted

Attached to
RECOVERY - Bryant-Fir Bridge Federal contract opportunity
Solicitation number
AG-9702-S-10-0443
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Southwest

About this file

Attachment 2

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY - Bryant-Fir Bridge, newest first.
File Type Posted
AG-9702-S-10-0443-000001.pdf PDF
Attachment 5 - Wage Determination CA9.pdf PDF
Attachment 6 - Davis Bacon.pdf PDF
Attachment 7 - SF 24.pdf PDF
Attachment 3 - Fire Plan.pdf PDF
AG-9702-S-10-0443 Part II.docx DOCX document
AG-9702-S-10-0443 Part I.pdf PDF
Attachment 4 - ARRA_California_Fire_Laws.pdf PDF
Attachment 1 - SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Strawberry

Camp Sacram ento

Phil lips

Twin Bridges

Pinecrest Camp

Kyburz

OWENS CAMP

Camp Schneider

Camp Cody

(BSA)

LOVERS LEAP

FORTYTWO

MILE

CREEK

LYONS

P A

C I F

I C C

R E S

T N

A T

I O

N A

L

S C

E N

I C

T R

A I L

Eagle Rock

PONY

EXPRESS

China Flat

Prospect

A M A D O R

P L A C E R V I L L E

R A N G E R

R A N G E R

D I S

T R

I C T

D I S

T R

I C T

N A T I O N A L F O R E S T

E L D O R A D O

R A N

GE

R

R A N

G E R

P L A C E R V I L L E

P A C I F I C

P L

A C

E R

V

IL

L E

R A N G E R

B A

S I

N M

A N

A G

E M

E N

T

U N

I T

L A K E

R A N G E R

W I L D E R N E S S B O

U N D A R Y

P A C

I F I C

P L A C E R V I L

L E

R D R D

¬«50

0603 02 01

07 08

09 10

19 20

26 2627

25 29

06 05 04

15 141314

1715 16

11N09

T AMARC K PINES

SAYL E S RD BR

YA

NT

C

R RD

Aspen Creek

Bryan Creek

South Fork Ameri can

River

SAYLES CANYON

Legend

SYSTEM RD STATUS

OPER_MAINT

MAINT LVL 1

MAINT LVL 2

MAINT LVL 3

MAINT LVL 4

MAINT LVL 5

HIGHWAY

HYDROLOGY

Str_Type

PERENNIAL

INTERMITTENT

EPHEMERAL

! PIPELINE

CANAL/DITCH

CONTOURS

ELEV

MINOR

MAJOR

LAND STATUS

OWNNERSHIP

ELDORADO NATIONAL FOREST

PRIVATE

R.17 E.

0 0.1 0.2 Miles

BRYANT/FIR BRIDGE PROJECT LOCATION AND SIGN MAP

BRYANT/FIR

BRIDGE

T.11N.

A.R.R.A. SIGNANDROAD CLOSED SIGN (W20-3)

ACCESS TO PVTPROPERTY TO BEALLOWED DURINGCONSTRUCTION

S. LAKE TAHOE

PL

AC

ERVILLE

W

R IGHTS R D

SILVER FORK RD

BRYANT/FIR

BRIDGE

PROJECT

F

GENERAL NOTES:

CONTRACTOR RESPONSIBLE FOR SETTING ADEQUATE HORIZONTAL AND VERTICAL CONTROL AND REFERENCE POINTS FOR BRIDGE SUBSTRUCTURE AND SUPERSTRUCTURE COMPONENTS. SEE SECTION 152 - CONSTRUCTION SURVEY AND STAKING.

DEWATERING, COFFERDAMS AND EROSION CONTROL ARE INCIDENTAL TO PAY ITEM 208 - STRUCTURAL EXCAVATION AND

BACKFILL FOR SELECTED MAJOR STRUCTURES.

ALL ROADS USED BY CONTRACTOR DURING ROAD CONSTRUCTION SHALL BE MAINTAINED BY CONTRACTOR.

EXISTING CULVERT INSTALLATION, INCLUDING CONCRETE, STEEL, ASPHALT AND EXCESS CONSTRUCTION MATERIALS, SHALL BE DEMOLISHED AND REMOVED FROM GOVERNMENT LAND. SUITABLE CLEAN ROCK AND UNCONTAMINATED SOILS MAY BE

USED ON SITE, OTHERWISE MATERIAL SHALL BE HAULED TO DISPOSAL SITE.

EXCESS MATERIAL GENERATED FROM DRAINAGE EXCAVATION SHALL BE DISPOSED OF AT THE DESIGNATED DISPOSAL SITE.

ALL ROADS MAY HAVE MOTORCYCLE OR OHV TRAFFIC. PURCHASER IS RESPONSIBLE FOR PLACING CONSTRUCTION SIGNS ON

ROADS WHEN OPERATING EQUIPMENT ON THIS PROJECT.

¬«50

INSTALL SIGN R11-3A

11N32

11N

Silver Fork American River

South Fork American River

Beanville Creek

33 35

00 60

50005200

DISPOSAL

SITE

SILVER FO RK RD

1.40 MILES

DISPOSAL

SITE

PROJECT SHEET NUMBER

BRYANT FIR

13 MILES

DISPOASL SITE

MAP

TWIN

BRIDGES

KYBURZ

STRAWBERRY

KYBURZ

TEMPORARY CONSTRUCTION ACCESS.

HIGH CLEARANCE VEHICLES ONLY.

ASPE N C

R R

D

47 MILESTONE RD 2

Billy Ellis Text Box

PRICE INCLUDED IN RIPRAP

Billy Ellis Polygonal Line

File details come from the government source that posted it. Updated .