Amended 0006 38_AG-9702-S-10-0367 construction.doc
DOC document 816 KB Posted
- Attached to
- RECOVERY - Facilities Painting & Siding Project Federal contract opportunity
- Solicitation number
- AG-9702-S-10-0367
About this file
This is the revised construction solicitation referenced in Amendment 0006. You must use this one to submit your offer.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0008.pdf | ||
| Amendment 0007 pg 1.pdf | ||
| Amendment 0007 pg 2.docx | DOCX document | |
| Amendment 0006 pg 2.docx | DOCX document | |
| Amendment 0006 pg 1.pdf | ||
| 38_Amendment 0005.pdf | ||
| 38_Amendment 0004.pdf | ||
| SF 30.pdf | ||
| Part 2 of the new solicitation.pdf | ||
| Part 1 of the new solicitation.pdf | ||
| 38_Amendment 0002.pdf | ||
| 38_Amendment 0001.pdf | ||
| 38_Complete Solicitation AG-9702-S-10-0367.pdf | ||
| 38_AG-9702-S-10-0367.doc | DOC document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OMB APPROVAL NO. 2700-0042
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
AG-9702-S-10-0367
2. TYPE OF SOLICITATION
FORMCHECKBOX
SEALED BID (IFB)
FORMCHECKBOX
NEGOTIATED (RFP)
3. DATE ISSUED
28 JUN 2010
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUISITION/PURCHASE REQUEST NO.
374024, 373989, and 374033
6. PROJECT NO.
7. ISSUED BY
CODE
| AG9702 |
| 8. ADDRESS OFFER TO |
U. S. FOREST SERVICE
EROC-SW Contracting
1323 Club Dr.
Vallejo, CA 94592 See Section L – Instructions, Conditions and Notices to Offerors or Respondents for offer submittal requirements
9. FOR INFORMATION
CALL:
A. NAME
April Blodgett B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 707-562-9121 Email: ablodgett@fs.fed.us
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):
SPECIAL NOTICE
*RECOVERY* - This solicitation is funded in whole or part by funds from the American Recovery and Reinvestment Act (ARRA). The appropriate ARRA clauses are attached and will be applicable to any resulting contract award.
Price Range The Government's estimate is:
between $500,000 and $800,000.
All questions and clarifications must be submitted in writing to ablodgett@fs.fed.us.
11. The Contractor shall begin performance within 10 calendar days and complete it within 120 calendar days after receiving
FORMCHECKBOX
award, FORMCHECKBOX notice to proceed. This performance period is FORMCHECKBOX mandatory, FORMCHECKBOX negotiable. (See Schedule of Items.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES,” indicate within how many calendar days after award in Item 12B.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A.
The offers shall be submitted via www.fbo.gov for the performance of the work required in this solicitation which is due by June 10, 2010 at 2:00 p.m, local time (pacific time).
B.
An offer guarantee
FORMCHECKBOX
is, FORMCHECKBOX is not required. See FAR clause 52.228-1, Bid Guarantee.
C.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D.
Offers providing less than 30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
E. Offers must include the following information with their offer: email address of point of contact, Tax Identification Number (TIN), and Duns and Bradstreet number (DUNS).
NSN 7540-01-155-3212
1442-101
STANDARD FORM 1442
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
Email address:
16. REMITTANCE ADDRESS (Include only if different than Item 14)
TIN #
DUNS #
17.
The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within 30 calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds at 100% of the contract amount.
19. ACKNOWLEDGMENT OF AMENDMENTS
The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each
| AMENDMENT NO. |
| DATE |
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20B. SIGNATURE
20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO:
eroc-sw_invoices@fs.fed.us
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
FORMCHECKBOX
10 U.S.C. 2304(c)( )
FORMCHECKBOX
41 U.S.C. 253(c)( )
26. ADMINISTERED BY
CODE
| AG9702 |
| 27. PAYMENT WILL BE MADE BY |
U. S. FOREST SERVICE
EROC-SW Contracting
1323 Club Dr.
Vallejo, CA 94592
U. S. FOREST SERVICE
EROC-SW Contracting
1323 Club Dr.
Vallejo, CA 94592
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
FORMCHECKBOX
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
FORMCHECKBOX
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE
30C. DATE
31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
Computer Generated
STANDARD FORM 1442 BACK (REV. 4-85)
Table of Contents
Section B Supplies or Services and Prices/Costs Schedule of Items……………………..
Section C Description/Specifications/Statement of Work…………………………………… Section E Inspection and Acceptance………………………………………………………………….
Section F Deliveries or Performance…………………………………………………………………… Section G Contract Administration Data……………………………………………………………… Section H Special Contract Requirements…………………………………………………………….
Section I Contract Clauses…………………………………………………………………………………..
Section J List of Attachments……………………………………………………………………………… Section K Representations, Certifications, and other Statements of Offeror(s) or Respondent(s)……………………………………………………………………………… …
Section L Instructions, Conditions, and Notices to Offeror(s) or Respondent(s)…..
Section M Evaluation Factors for Award………………………………………………………………..
Your email address: __________________________________________________
Your Tax Identification Number (TIN): _____________________________
Your DUNs number: __________________________________________________
Reminder:
Please submit your original bid bond to:
U. S. Forest Service
EROC-SW - April Blodgett
1323 Club Dr.
Vallejo, CA 94592
Section B – Schedule of Items
Reqn 374024
1. Furnish all equipment, labor, supplies, supervision, transportation, and incidentals to perform work in accordance with the specifications contained herein. Government furnished property or materials will not be provided.
2. Schedule of Items:
SOLICITATION NO: AG-9702-S-10-0367 Rev A
| Requisition 374024 |
| Page 1 of 3 |
Project: Front Country R.D. - Painting and Siding
Forest: San Bernardino
BIDDERS PLEASE NOTE:
BEFORE PREPARING THIS PROPOSAL, CAREFULLY READ THE ENTIRE CONTENTS OF THIS SOLICITATION.
BIDDERS ARE FURTHER CAUTIONED TO FULLY INSPECT THE ENTIRE CONSTRUCTION SITE
AND INVESTIGATE TRANSPORTATION, WEATHER AND LOCAL LABOR CONDITIONS.
Schedule of Items
REQUISITION 374024
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEAS. |
| ESTD. QNTY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| MOBILIZATION |
| L.S.Q. |
| 1 |
| Job |
| 2 |
| SIDING |
| (01) |
| BUILDING 2509 BANNING FLAMMABLE STORAGE |
| L.S.Q. |
| 1 |
| Job |
| (02) |
| BUILDING 1532 CITY CREEK GARAGE |
| L.S.Q. |
| 1 |
| Job |
| (03) |
| BUILDING 1456 CITY CREEK OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (04) |
| BUILDING 2522 CITY CREEK FLAMMABLE STORAGE |
| L.S.Q. |
| 1 |
| Job |
| (05) |
| BUILDING 1616 DEL ROSA HOT SHOTS SHED |
| L.S.Q. |
| 1 |
| Job |
| (06) |
| BUILDING 2402 LYTLE CREEK BARN |
| L.S.Q. |
| 1 |
| Job |
| (07) |
| BUILDING 2004 MILL CREEK RS HOTSHOT OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (08) |
| BUILDING 2006 MILL CREEK RS MAIN OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (09) |
| BUILDING 1534 SYCAMORE GARAGE |
| L.S.Q. |
| 1 |
| Job |
| (10) |
| BUILDING 1467 WATERMAN BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| 3 |
| EXTERIOR PAINTING |
| (01) |
| BUILDING 1515 BANNING GARAGE |
| L.S.Q. |
| 1 |
| Job |
| (02) |
| BUILDING 2509 BANNING FLAMMABLE STORAGE |
| L.S.Q. |
| 1 |
| Job |
| (03) |
| BUILDING 1532 CITY CREEK GARAGE |
| L.S.Q. |
| 1 |
| Job |
| (04) |
| BUILDING 1456 CITY CREEK OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (05) |
| BUILDING 2522 CITY CREEK FLAMMABLE STORAGE |
| L.S.Q. |
| 1 |
| Job |
| (06) |
| BUILDING 2003 DEL ROSA HOTSHOT OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (07) |
| BUILDING 1616 DEL ROSA HOT SHOTS SHED |
| L.S.Q. |
| 1 |
| Job |
| (08) |
| BUILDING 2402 LYTLE CREEK BARN |
| L.S.Q. |
| 1 |
| Job |
Project: Front Country R.D. - Painting and Siding
| REQUISITION 374024 |
| Forest: San Bernardino |
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEAS. |
| ESTD. QNTY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| (09) |
| BUILDING 1486 LYTLE CREEK BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| (10) |
| BUILDING 2507 LYTLE CREEK GAS CANOPY |
| L.S.Q. |
| 1 |
| Job |
| (11) |
| BUILDING 1008 LYTLE CREEK RS LE OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (12) |
| BUILDING 2012 LYTLE CREEK OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (13) |
| BUILDING 2306 LYTLE CREEK RS WHSE/GARAGE |
| L.S.Q. |
| 1 |
| Job |
| (14) |
| BUILDING 1481 MILL CREEK BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| (15) |
| BUILDING 2005 MILL CREEK RS ANNEX BUILDING |
| L.S.Q. |
| 1 |
| Job |
| (16) |
| BUILDING 2004 MILL CREEK RS HOTSHOT OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (17) |
| BUILDING 2006 MILL CREEK RS MAIN OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (18) |
| BUILDING 2308 MILL CREEK RS WAREHOUSE |
| L.S.Q. |
| 1 |
| Job |
| (19) |
| BUILDING 2512 MILL CREEK WCF GAS CANOPY |
| L.S.Q. |
| 1 |
| Job |
| (20) |
| BUILDING 1468 MORMON ROCKS BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| (21) |
| BUILDING 2523 MORMON ROCKS GAS CANOPY |
| L.S.Q. |
| 1 |
| Job |
| (22) |
| BUILDING 1466 SYCAMORE BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| (23) |
| BUILDING 1534 SYCAMORE GARAGE |
| L.S.Q. |
| 1 |
| Job |
| (24) |
| BUILDING 1467 WATERMAN BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| (25) |
| BUILDING 2024 SBNF ATB AIR OPS BUILDING |
| L.S.Q. |
| 1 |
| Job |
| (26) |
| BUILDING 2215 SBNF ATB WAREHOUSE |
| L.S.Q. |
| 1 |
| Job |
| (27) |
| BUILDING 1540 SBNF ATB GARAGE (OLD) |
| L.S.Q. |
| 1 |
| Job |
| (28) |
| BUILDING 2029 SBNF HEADQUARTERS OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (29) |
| BUILDING 2647 SBNF HEADQUARTERS STORAGE/WAREHOUSE |
| L.S.Q. |
| 1 |
| Job |
Project: Front Country R.D. - Painting and Siding
| REQUISITION 374024 |
| Forest: San Bernardino |
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEAS. |
| ESTD. QNTY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 4 |
| INTERIOR PAINTING |
| (01) |
| BUILDING 2012 LYTLE CREEK OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (02) |
| BUILDING 2006 MILL CREEK RS MAIN OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (03) |
| BUILDING 2029 SBNF HEADQUARTERS OFFICE |
| L.S.Q. |
| 1 |
| Job |
PROJECT BID TOTAL
| NOTE: |
| The award may be made to more than one bidder. |
Each requisition number is considered one project, therefore no more than three awards will be made.
You may offer on one, two or all three projects to be considered responsive to the solicitation, however you must offer on each line item within that project to be responsive.
FRONT COUNTRY RANGER DISTRICT MAINTENANCE AND RECONSTRUCTION LOG
Requisition 37024
| DISTRICT |
| BLDG # |
| BUILDING NAME |
| GROSS FT |
| Interior Paint |
| Exterior Paint |
| Siding Replace/ Repair |
| Building Scope of Work |
| FC |
| 1515 |
| BANNING GARAGE |
| 1536 |
X
Paint exterior; no lead paint expected since building was constructed after 1978; roofing and fascia to be replaced and painted by others
| FC |
| 2509 |
| BANNING FLAMMABLE STORAGE |
| 200 |
| X |
| X |
| Paint exterior; no lead paint expected since building was constructed after 1978; roofing and fascia to be replaced and painted by others |
| FC |
| 1532 |
| CITY CREEK GARAGE |
| 1536 |
| X |
| X |
| Repair cracked stucco, & paint exterior; no lead paint expected since building was constructed after 1978; roofing and fascia to be replaced and painted by others |
| FC |
| 1456 |
| CITY CREEK OFFICE |
| 840 |
| X |
| X |
| Replace siding with Stucco, replace all trim, replace porch railing, and paint exterior including handrails and window bars; windows, roof, and fascia to be replaced and painted by others |
| FC |
| 2522 |
| CITY CREEK STORAGE FLAMMABLE |
| 200 |
| X |
| X |
| Replace siding with Stucco, replace all trim, and paint exterior; roofing and fascia to be replaced and painted by others |
| FC |
| 2003 |
| DEL ROSA HOTSHOT OFFICE |
| 1050 |
X
Paint exterior
| FC |
| 1616 |
| DEL ROSA HOTSHOT SHED |
| 200 |
| X |
| X |
| Replace siding with Stucco, replace all trim, & paint exterior; roofing and fascia to be replaced and painted by others |
| FC |
| 2402 |
| LYTLE CREEK BARN |
| 1502 |
| X |
| X |
| Replace missing aluminum siding corners & paint exterior; roofing and fascia to be replaced and painted by others |
| FC |
| 1486 |
| LYTLE CREEK BARRACKS |
| 1600 |
X
Paint interior and exterior; roofing and fascia to be replaced and painted by others
| FC |
| 2507 |
| LYTLE CREEK GAS CANOPY |
| 300 |
X
Paint doors, soffit, and trim; no lead paint expected since building was constructed after 1978; roofing and fascia to be replaced and painted by others
| FC |
| 1008 |
| LYTLE CREEK LE OFFICE |
| 2366 |
X
Replace missing aluminum siding corners, replace window trim on south side of bldg, paint patio area, repair garage doors, and paint all doors & Paint exterior - treat lead based paint on trim, eaves, and fascia per specifications.
| FC |
| 2012 |
| LYTLE CREEK OFFICE |
| 6765 |
| X |
| X |
Paint interior and exterior; no lead paint expected since building was constructed after 1978
| FC |
| 2306 |
| LYTLE CREEK WHSE/GARAGE |
| 1885 |
X
Paint exterior; existing fiber cement siding exterior
| FC |
| 1481 |
| MILL CREEK BARRACKS |
| 2876 |
X
Repair cracks in stucco and paint exterior; existing stucco exterior; roofing and fascia to be replaced and painted by others
| FC |
| 1521 |
| MILL CREEK REC GAR |
| 700 |
| X |
| X |
| Removed from Contract |
| FC |
| 2005 |
| MILL CREEK RS ANNEX BUILDING |
| 1634 |
X
Repair cracks in stucco and paint exterior; existing stucco exterior; windows, roofing, and fascia to be replaced and painted by others
| FC |
| 2004 |
| MILL CREEK RS HOTSHOT OFFICE |
| 1108 |
| X |
| X |
| Remove and abate ACM siding; replace ACM siding with stucco & paint exterior; windows, roofing, and fascia to be replaced by others |
| FC |
| 2006 |
| MILL CREEK RS MAIN 0FFICE |
| 3464 |
| X |
| X |
| X |
| Replace T1-11 wood siding on North facing walls, replace foundation screens, replace window trim on entire building & paint interior and exterior; existing T1-11 siding upper & stucco lower exterior; windows to be replaced by others; coordinate with window installer |
| FC |
| 2308 |
| MILL CREEK RS WAREHOUSE |
| 3088 |
X
Paint exterior; existing stucco exterior
| FC |
| 2512 |
| MILL CREEK WCF GAS CANOPY |
| 180 |
X
Paint trim, soffit, & doors; existing CMU block walls; roofing and fascia to be replaced and painted by others
| FC |
| 1468 |
| MORMON ROCKS BARRACK |
| 3558 |
X
Repair fascia, trim, and paint exterior; tested negative for lead based paint in 1999
| FC |
| 2523 |
| MORMON ROCKS GAS CANOPY |
| 500 |
X
Paint exterior; existing stucco exterior
| FC |
| 1466 |
| SYCAMORE BARRACKS |
| 1440 |
X
Paint exterior; no lead paint expected since building was constructed after 1978
| FC |
| 1534 |
| SYCAMORE GARAGE |
| 1984 |
| X |
| X |
| Repair damaged T1-11 siding and trim. Paint exterior; no lead paint expected since building was constructed after 1978; roofing and fascia to be replaced and painted by others |
| FC |
| 1467 |
| WATERMAN BARRACKS |
| 3558 |
| X |
| X |
Repair damaged fascia/trim and paint exterior; constructed in 1965; Fascia needs nailing, caulking, filling, etc. No painting of rollup garage doors. Remove and replace damaged stucco near drain line and repair cracks. Extend drain beyond wall.
| SO |
| 2024 |
| SBNF ATB AIR OPS BUILDING |
| 5181 |
X
Paint soffit and wood trim; no lead paint expected since building was constructed after 1978
| SO |
| 2215 |
| SBNF ATB WAREHOUSE |
| 1600 |
X
Paint soffit and wood trim no lead paint expected since building was constructed after 1978
| SO |
| 1540 |
| SBNF ATB GARAGE (OLD) |
| 3600 |
X
Paint exterior, treat lead base paint in door frames per specs; existing metal siding
| SO |
| 2029 |
| SBNF HEADQUARTERS OFFICE (168500sf) |
| 67299 |
| X |
| X |
Paint first floor hallways and interior core wall on northside of building near open areas, all restrooms on 1st/2nd floor, door frames, and exterior. Exterior includes all existing painted columns, shearwalls, wood soffit near entrance, roof flashing, metal mechanical screen on roof (inside and outside), and roof elevator enclosure.
| SO |
| 2647 |
| SBNF HEADQUARTERS STORAGE/WAREHOUSE |
| 7636 |
X
Patch and repair spalled concrete, holes, and other misc. items to provide uniform surfaces, & paint exterior. Exterior includes walls, garage door, flashing, and roof ladder cage.
| AG-9702-S-10-0367 REV A |
| SOLICITATION NO: |
Project: Mountaintop R.D. - Painting and Siding
Forest: San Bernardino
BIDDERS PLEASE NOTE:
BEFORE PREPARING THIS PROPOSAL, CAREFULLY READ THE ENTIRE CONTENTS OF THIS SOLICITATION.
BIDDERS ARE FURTHER CAUTIONED TO FULLY INSPECT THE ENTIRE CONSTRUCTION SITE
AND INVESTIGATE TRANSPORTATION, WEATHER AND LOCAL LABOR CONDITIONS.
Schedule of Items
REQUISITION 374033
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEAS. |
| ESTD. QNTY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
BASE BID
| 1 |
| MOBILIZATION |
| 2 |
| SIDING |
| (01) |
| BUILDING 2002 BIG BEAR CONFERENCE |
| L.S.Q. |
| 1 |
| Job |
| (02) |
| BUILDING 1004 BIG BEAR HOTSHOT OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (03) |
| BUILDING 1005 BIG BEAR HOTSHOT BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| (04) |
| BUILDING 1484 BIG BEAR ENGINE BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| (05) |
| BUILDING 1608 BIG BEAR RECREATION WOOD SHOP |
| L.S.Q. |
| 1 |
| Job |
| (06) |
| BUILDING 2304 BIG BEAR WAREHOUSE/GARAGE |
| L.S.Q. |
| 1 |
| Job |
| (07) |
| BUILDING 1612 BIG BEAR WOOD SHED |
| L.S.Q. |
| 1 |
| Job |
| (08) |
| BUILDING 1029 BIG PINE FLATS OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (09) |
| BUILDING 1533 BIG PINE FLATS GARAGE |
| L.S.Q. |
| 1 |
| Job |
| (10) |
| BUILDING 1517 CAMP ANGELUS GARAGE |
| L.S.Q. |
| 1 |
| Job |
| (11) |
| BUILDING 1031 CAMP ANGELUS OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (12) |
| BUILDING 1487 CONVERSE BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| (13) |
| BUILDING 2503 COTTONWOOD GAS CANOPY |
| L.S.Q. |
| 1 |
| Job |
| (14) |
| BUILDING 2026 HEAPS PEAK HELIPORT OFFICE |
| L.S.Q. |
| 1 |
| JOB |
| 3 |
| EXTERIOR PAINTING |
| (01) |
| BUILDING 2502 ARROWHEAD RS GAS CANOPY |
| L.S.Q. |
| 1 |
| Job |
| (02) |
| BUILDING 2014 ARROWHEAD RS OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (03) |
| BUILDING 2305 ARROWHEAD RS POLE WHSE |
| L.S.Q. |
| 1 |
| Job |
REQUISITION 374033
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEAS. |
| ESTD. QNTY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| (04) |
| BUILDING 2002 BIG BEAR CONFERENCE |
| L.S.Q. |
| 1 |
| Job |
| (05) |
| BUILDING 5907 BIG BEAR DISCOVERY CENTER |
| L.S.Q. |
| 1 |
| Job |
| (06) |
| BUILDING 1004 BIG BEAR HOTSHOT OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (07) |
| BUILDING 2505 BIG BEAR GAS CANOPY |
| L.S.Q. |
| 1 |
| Job |
| (08) |
| BUILDING 1005 BIG BEAR HOTSHOT BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| (09) |
| BUILDING 1484 BIG BEAR ENGINE BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| (10) |
| BUILDING 1608 BIG BEAR RECREATION WOODSHOP |
| L.S.Q. |
| 1 |
| Job |
| (11) |
| BUILDING 1020 BIG BEAR RESIDENCE |
| L.S.Q. |
| 1 |
| Job |
| (12) |
| BUILDING 2304 BIG BEAR WAREHOUSE/GARAGE |
| L.S.Q. |
| 1 |
| Job |
| (13) |
| BUILDING 1612 BIG BEAR WOOD SHED |
| L.S.Q. |
| 1 |
| Job |
| (14) |
| BUILDING 1029 BIG PINE FLATS OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (15) |
| BUILDING 1508 BIG PINE FLATS SHED |
| L.S.Q. |
| 1 |
| Job |
| (16) |
| BUILDING 2524 BIG PINE FLATS SHED |
| L.S.Q. |
| 1 |
| Job |
| (17) |
| BUILDING 1533 BIG PINE FLATS GARAGE |
| L.S.Q. |
| 1 |
| Job |
| (18) |
| BUILDING 1517 CAMP ANGELUS GARAGE |
| L.S.Q. |
| 1 |
| Job |
| (19) |
| BUILDING 1031 CAMP ANGELUS OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (20) |
| BUILDING 1487 CONVERSE BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| (21) |
| BUILDING 1488 COTTONWOOD BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| (22) |
| BUILDING 2503 COTTONWOOD GAS CANOPY |
| L.S.Q. |
| 1 |
| Job |
| (23) |
| BUILDING 1482 DEERLICK BARRACKS/GARAGE/CF VIC |
| L.S.Q. |
| 1 |
| Job |
| (24) |
| BUILDING 2026 HEAPS PEAK HELIPORT OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (25) |
| BUILDING 1538 NORTH SHORE VOLUNTEER SOTR/WKCTR |
| L.S.Q. |
| 1 |
| Job |
| (26) |
| BUILDING 1539 ROCK CAMP GARAGE |
| L.S.Q. |
| 1 |
| Job |
| (27) |
| BUILDING 1025 ROCK CAMP OFFICE |
| L.S.Q. |
| 1 |
| Job |
REQUISITION 374033
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEAS. |
| ESTD. QNTY |
| UNIT |
AMOUNT
| 4 |
| INTERIOR PAINTING |
| (01) |
| BUILDING 2014 ARROWHEAD RS OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (02) |
| BUILDING 5907 BIG BEAR DISCOVERY CENTER |
| L.S.Q. |
| 1 |
| Job |
| (03) |
| BUILDING (LEASE) BIG BEAR RANGER STATION OFFICE |
| L.S.Q. |
| 1 |
| Job |
BASE BID TOTAL
OPTIONS
| 5 |
| INTERIOR PAINTING |
| (01) |
| BUILDING 1005 BIG BEAR HOTSHOT BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| (02) |
| BUILDING 1487 CONVERSE BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| 6 |
| SIDING |
| (01) |
| BUILDING 2026 HEAPS PEAK HELIBASE OFFICE |
| A. REPLACE HORIZONTAL AND VERTICAL FIBER CEMENT SIDING WITH PREFINISHED CERTAINTEED FIBER CEMENT SIDING TO MATCH EXISTING, REMOVE SOUTH DOOR, AND FINISH TO MATCH EXISTING WALLS |
| L.S.Q. |
| 1 |
| JOB |
OPTIONS TOTAL
BASE BID PLUS OPTIONS TOTAL
| NOTE: |
| The award may be made to more than one bidder. |
Each requisition number is considered one project, therefore no more than three awards will be made.
You may offer on one, two or all three projects to be considered responsive to the solicitation, however you must offer on each line item within that project to be responsive.
MOUNTAINTOP RANGER DISTRICT MAINTENANCE AND RECONSTRUCTION LOG
REQUISITION 374033
| BUILDING NAME |
| GROSS FT |
| Interior Paint |
| Exterior Paint |
| Siding Replace/ Repair |
| Building Scope of Work |
| ARROWHEAD RS GAS CANOPY |
| 200 |
X
Replace all trim and paint exterior; no lead paint expected since building was constructed after 1978; roofing and fascia to be replaced and painted by others
| ARROWHEAD R.S. OFFICE |
| 6055 |
| X |
| X |
Paint interior and exterior; no lead paint expected since building was constructed after 1978; repair drywall in conference room
| ARROWHEAD R.S. POLE WHSE |
| 1444 |
X
Paint exterior; no lead paint expected since building was constructed after 1978; roofing and fascia to be replaced and painted by others
| BIG BEAR CONFERENCE |
| 700 |
| X |
| X |
| Replace existing aluminum lap siding with fiber cement lap siding, replace trim, & paint exterior; roofing and fascia to be replaced and painted by others |
| BIG BEAR DISCOVERY CENTER |
| 13512 |
| X |
| X |
Paint interior offices, conference center, and hallways (excludes main entrance foyer, exhibit hall, store, and kitchen); paint exterior wood; no lead paint expected since building was constructed after 1978
BIG BEAR RANGER STATION OFFICE
X
Paint interior
| BIG BEAR HOTSHOT OFFICE |
| 1220 |
| X |
| X |
| Replace existing aluminum lap siding with fiber cement lap siding, replace all trim, and paint exterior; treat lead based paint on trim and eaves, and fascia per specifications; roofing and fascia to be replaced and painted by others |
| BIG BEAR GAS CANOPY |
| 200 |
X
Paint exterior trim, soffits, & doors; no lead paint expected since building was constructed after 1978; roof and fascia to be replaced and painted by others
| BIG BEAR HOTSHOT BARRACKS |
| 1642 |
| X |
| X |
| X |
| Paint interior, Replace existing aluminum lap siding with fiber cement lap siding, replace all trim, and paint exterior; roofing and fascia to be replaced and painted by others |
| BIG BEAR ENGINE BARRACKS |
| 1600 |
| X |
| X |
| Replace existing aluminum lap siding with fiber cement lap siding, replace all trim, & paint exterior; roofing and fascia to be replaced and painted by others |
| BIG BEAR RECREATION WOODSHOP |
| 414 |
X
Repair T1-11 siding and paint exterior; Roofing and fascia to be replaced and painted by others
| BIG BEAR RESIDENCE |
| 1256 |
X
Paint exterior; tested negative for lead based paint on trim, fascia, and eaves; existing siding is aluminum lap siding; roofing and fascia to be replaced and painted by others
| BIG BEAR WAREHOUSE/GARAGE |
| 2805 |
X
Replace back T1-11 below windows, trim, water table, and flashing on west wall only. Replace lower 2 feet of T1-11 siding and lower trim on East wall only. Repair trim and siding at all other locations and paint exterior; roofing and fascia to be replaced and painted by others
| BIG BEAR WOOD SHED |
| 198 |
| X |
| X |
| Repair damaged aluminum siding, replace damaged corners/trim (from salvaged material from other buildings), and paint exterior; roofing and fascia to be replaced and painted by others |
| BIG PINE FLAT OFFICE |
| 923 |
| X |
| X |
| Replace all siding except north wall and covered patio. Replace all water table, trim, and flashing. Replace all shutters and foundation wall screens, and paint exterior. All new siding to match existing redwood siding material and dimension; building is identified as historical; roofing and fascia to be replaced and painted by others |
| BIG PINE FLATS SHED |
| 320 |
X
Replace damaged trim and paint exterior; roofing and fascia to be replaced and painted by others
| BIG PINE FLATS SHED |
| 90 |
X
Repair trim, seal wood holes in siding and soffit and paint exterior
| BIG PINE FLTS GARAGE |
| 1984 |
| X |
| X |
| Repair damaged fascia, trim, and siding. Paint exterior; no lead paint expected since building was constructed after 1978 |
| CAMP ANGELUS GARAGE |
| 320 |
| X |
| X |
| Replace siding on south side of building, lower half on north side, damaged garage trim, replace corner trim, and paint exterior; roofing and fascia to be replaced and painted by others |
| CAMP ANGELUS OFFICE (PREV. RES) |
| 923 |
| X |
| X |
| Replace siding on all south walls, lower half of north wall, and entire west wall; replace damaged trim pieces, water table, and foundation access panels and trim; replace shutters on west windows, replace missing screens on all windows, repair existing screens and windows, and paint exterior including shutters and handrails; roofing and fascia to be replaced and painted by others |
| CONVERSE BARRACKS |
| 3354 |
| X |
| X |
| X |
| Install prefinished CertainTeed fiber cement lap siding over existing T1-11 siding, replace all trim, and paint interior and exterior; roofing and fascia to be replaced and painted by others |
| COTTONWOOD BARRACKS/STATION |
| 3244 |
X
Paint interior and exterior; tested negative for lead based paint in 1992; roofing and fascia to be replaced and painted by others
| COTTONWOOD GAS CANOPY |
| 80 |
| X |
| X |
| Replace siding with cedar siding to match barracks; Paint exterior; roofing and fascia to be replaced and painted by others |
| DEERLICK BARRACKS/GARAGE/CF VIC |
| 3340 |
X
Paint Exterior; no lead paint expected since all of exterior siding prior to 1978 has been removed
| HEAPS PEAK HELIPORT OFFICE |
| 2704 |
X
Replace damaged or flaking fiber cement siding in kind and Paint exterior; no lead paint expected since building was constructed after 1978
| NORTH SHORE VOLUNTEER STOR/WKCTR |
| 3360 |
X
Paint exterior; no lead paint expected since building was constructed after 1978
| ROCK CAMP GARAGE |
| 3360 |
X
Paint exterior; no lead paint expected since building was constructed after 1978
| ROCK CAMP OFFICE |
| 550 |
X
Paint exterior; roofing and fascia to be replaced and painted by others
| AG-9702-S-10-0367 REV A |
| SOLICITATION NO: |
Project: San Jacinto R.D. - Painting and Siding
Forest: San Bernardino
BIDDERS PLEASE NOTE:
BEFORE PREPARING THIS PROPOSAL, CAREFULLY READ THE ENTIRE CONTENTS OF THIS SOLICITATION.
BIDDERS ARE FURTHER CAUTIONED TO FULLY INSPECT THE ENTIRE CONSTRUCTION SITE
AND INVESTIGATE TRANSPORTATION, WEATHER AND LOCAL LABOR CONDITIONS.
Schedule of Items
REQUISITION 373989
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEAS. |
| ESTD. QNTY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
BASE BID
| 1 |
| MOBILIZATION |
| 2 |
| SIDING |
| (01) |
| BUILDING 2310 IDYLLWILD 5-BAY WHSE |
| L.S.Q. |
| 1 |
| Job |
| (02) |
| BUILDING 2010 IDYLLWILD RS OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (03) |
| BUILDING 2208 KEENWILD GARAGE/WHSE OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (04) |
| BUILDING 1461 VISTA GRANDE BARRACKS A |
| L.S.Q. |
| 1 |
| Job |
| (05) |
| BUILDING 1462 VISTA GRANDE BARRACKS B |
| L.S.Q. |
| 1 |
| Job |
| (06) |
| BUILDING 1463 VISTA GRANDE BARRACKS C |
| L.S.Q. |
| 1 |
| Job |
| (07) |
| BUILDING 1526 VISTA GRANDE GARAGE |
| L.S.Q. |
| 1 |
| Job |
| 3 |
| EXTERIOR PAINTING |
| (01) |
| BUILDING 1465 ALANDALE BARRACKS GARAGE/OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (02) |
| BUILDING 2310 IDYLLWILD 5-BAY WHSE |
| L.S.Q. |
| 1 |
| Job |
| (03) |
| BUILDING 1609 IDYLLWILD WOODSHED |
| L.S.Q. |
| 1 |
| Job |
| (04) |
| BUILDING 1483 KEENWILD BARRACKS |
| L.S.Q. |
| 1 |
| Job |
| (05) |
| BUILDING 2208 KEENWILD GARAGE/WHSE OFFICE |
| L.S.Q. |
| 1 |
| Job |
| (06) |
| BUILDING 1019 KEENWILD RESIDENCE |
| L.S.Q. |
| 1 |
| Job |
| (07) |
| BUILDING 1436 KENWORTHY GARAGE #2 |
| L.S.Q. |
| 1 |
| Job |
| (08) |
| BUILDING 1021 KENWORTHY RESIDENCE |
| L.S.Q. |
| 1 |
| Job |
| (09) |
| BUILDING 1461 VISTA GRANDE BARRACKS A |
| L.S.Q. |
| 1 |
| Job |
| (10) |
| BUILDING 1462 VISTA GRANDE BARRACKS B |
| L.S.Q. |
| 1 |
| Job |
| (11) |
| BUILDING 1463 VISTA GRANDE BARRACKS C |
| L.S.Q. |
| 1 |
| Job |
REQUISITION 373989
| ITEM NO. |
| DESCRIPTION |
| METHOD OF MEAS. |
| ESTD. QNTY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| (12) |
| BUILDING 1526 VISTA GRANDE GARAGE |
| L.S.Q. |
| 1 |
| Job |
| 4 |
| INTERIOR PAINTING |
| (01) |
| BUILDING 2830 ALANDALE BARRACKS |
| L.S.Q. |
| 1 |
| Job |
BASE BID TOTAL
OPTION
| 5 |
| INTERIOR PAINTING |
| (01) |
| BUILDING 1483 KEENWILD BARRACKS |
| L.S.Q. |
| 1 |
| Job |
BASE BID PLUS OPTION TOTAL
| NOTE: |
| The award may be made to more than one bidder. |
Each requisition number is considered one project, therefore no more than three awards will be made.
You may offer on one, two or all three projects to be considered responsive to the solicitation, however you must offer on each line item within that project to be responsive.
SAN JACINTO RANGER DISTRICT MAINTENANCE AND RECONSTRUCTION LOG
REQUISITION 373989
| BLDG # |
| BUILDING NAME |
| GROSS FT |
| Interior Paint |
| Exterior Paint |
| Siding Replace/ Repair |
| Building Scope of Work |
| 1465 |
| ALANDALE BARRACKS/GARAGE/OFC |
| 2830 |
| X |
| X |
Treat interior mold, paint interior and exterior; treat lead based paint on trim; roofing and fascia to be replaced and painted by others
| 2310 |
| IDYLLWILD 5-BAY WHSE |
| 2511 |
| X |
| X |
| Repair exist T1-11 siding, replace T1-11 siding and trim on south side, replace bottom trim on east side, and paint exterior; roofing and fascia to be replaced and repainted by others; no painting of garage rollup doors required |
| 2010 |
| IDYLLWILD RS OFFICE |
| 5400 |
| X |
| X |
| Replace damaged and missing siding on backside of building with matching prefinished CertainTeed siding; touchup paint exterior siding and re-stain entrance woodwork; caulk and insulate around entrance doors; no lead paint expected since building was constructed after 1978 |
| 1609 |
| IDYLLWILD WOOD SHED |
| 190 |
X
Paint exterior; replace corner, bottom, and door trim; roofing and fascia to be replaced and painted by others
| 1483 |
| KEENWILD BARRACKS |
| 1600 |
| X |
| X |
Paint interior and exterior; existing wood siding to be stained; all exterior lead paint removed in 2001; roofing and fascia to be replaced and painted by others; interior wood paneling to be removed and drywall retextured by others
| 2208 |
| KEENWILD GARAGE/WHSE/OFFICE |
| 5248 |
| X |
| X |
| Replace damaged siding and paint exterior; no lead paint expected since building was constructed after 1978; existing metal siding; priming required; Nine qty. 18 ft. x 3 ft. siding sections and one qty. 4 ft. x 3ft. siding section to be replaced; one full height corner trim to be replaced; one garage door vertical trim to be replaced; reseal windows and penetrations through siding; repair and reseal gutters |
| 1019 |
| KEENWILD RESIDENCE |
| 1262 |
X
Paint exterior; roofing and fascia to be replaced and painted by others
| 1536 |
| KENWORTHY GARAGE #2 |
| 1984 |
X
Paint exterior; no lead paint expected since building was constructed after 1978; roofing and fascia to be replaced and painted by others
| 1021 |
| KENWORTHY RESIDENCE |
| 1430 |
X
Paint exterior; all exterior lead paint removed in 2002
| 1461 |
| VISTA GRANDE BARRACKS A |
| 1188 |
| X |
| X |
| Repair T1-11 siding; replace T1-11 siding and trim on south side of bldg., replace stair tread, landing and railing, replace foundation screens, & paint exterior including lower stucco foundation wall; no lead paint expected since building was constructed after 1978 |
| 1462 |
| VISTA GRANDE BARRACKS B |
| 1188 |
| X |
| X |
| Repair T1-11 siding, replace T1-11 siding and trim on south side of bldg., replace lower trim on east & west sides, replace stair tread, landing, and railing, replace foundation screens, & paint exterior including lower stucco foundation wall; no lead paint expected since building was constructed after 1978 |
| 1463 |
| VISTA GRANDE BARRACKS C |
| 1188 |
| X |
| X |
| Repair T1-11 siding, replace damaged bottom trim on south wall, replace upper west end gable T1-11 siding and trim, replace NW corner trim and upper 4 feet T1-11 siding near corner, replace stair tread, landing, and railing, replace foundation screens, & paint exterior including lower stucco foundation wall; no lead paint expected since building was constructed after 1978 |
| 1526 |
| VISTA GRANDE GARAGE |
| 3136 |
| X |
| X |
| Repair T1-11 siding; replace T1-11 siding and trim on south side, replace T1-11 on upper west end gable and 4ftx8ft section on SW corner, replace T1-11 and trim on east side, and replace trim around garage doors, and paint exterior; no lead paint expected since building was constructed after 1978; roofing and fascia to be replaced and painted by others |
Schedule C – Description/Specifications/Statement of Work
Reqn 374024, 374033 and 373989
INDEX
Technical Provisions
SECTION 1 – GENERAL
1.1 Scope
1.2 Principal Features
1.3 Construction Coordination
1.4 Demolition and Disposal
1.5 Utilities
1.6 Mold Treatment
1.7 Mobilization
SECTION 2 – SIDING AND PAINTING
2.1 Scope
2.2 General
2.3 Materials
2.4 Cleaning and Preparation of Surfaces
2.5 Paint Application
2.6 Thickness and Continuity
2.7 Installation of Removed Items
2.8 Paint Schedule
2.9 Cleaning
2.10 Stucco
TECHNICAL PROVISIONS - PAINT BUILDING EXTERIOR/INTERIOR AND REPLACE SIDING AND TRIM
SECTION 1 – GENERAL
1.1 SCOPE: The work to be performed under these specifications consists of furnishing all material, equipment, labor, and transportation and in performing all operations required for painting of surfaces on the exteriors and interiors of buildings and removal and replacement of designated siding; fascia; window and door trim; and the like according to the contract, in strict accordance with these specifications and the Maintenance and Reconstruction Log.
1.2 PRINCIPAL FEATURES: These contract specifications provide instructions and guidelines for performing siding replacement and painting work both in the interior and on the exterior of buildings on the National Forests in Southern California. The following paragraphs provide a description of the basic principal features of first the exterior and then the interior work as it is to be accomplished under these specifications.
1.2.1 EXTERIOR SURFACES: The work consists of exterior painting and siding replacement of each structure as called for on the Maintenance/Reconstruction Log, to include the following:
a. Remove designated siding, fascia, trim and replace with new materials as shown on the Maintenance/Reconstruction Log.
b.
Paint all new and/or previously painted exterior wood, metal and trim with two coats of paint (includes surface preparation), except unpainted masonry and concrete surfaces.
b.
Paint all exterior wood framed windows and trim with two coats of paint (includes surface preparation) and remove and replace all putty and caulking.
c.
Paint exterior side, both edges, top, bottoms, and trim of all exterior doors with two coats of paint (includes surface preparation).
d.
Remove all paint from masonry and concrete surfaces, including overspray and painted foundations, sills, porches, and trim of concrete or masonry.
1.2.2 INTERIOR PAINT: The work consists of interior painting of buildings, as called for by the contract, to include the following:
a.
Repair, putty, patch holes as needed. Replace wall base where it exists to match existing as close as reasonably possible.
b.
Paint two coats of paint on all previously painted walls. If wall base is wood, paint with two coats of trim color.
c.
Apply texture only as required to match existing wall texture.
d.
Install/repair corner beads, when required.
e. Permanently remove as needed any type of trim, chair rails, and similar items. Prepare the wall behind it to receive paint.
f. Repair drywall joints in which the tape and compound on the joints between sheets of drywall is damaged and requires repair to provide a uniform appearance prior to painting.
1.3 CONSTRUCTION COORDINATION: The Contracting Officer’s Representative (COR) will coordinate individual work dates with the availability of each building.
1.4 DEMOLITION AND DISPOSAL: All debris shall be placed in containers or removed from the job site each day. On completion of the project, the contractor shall remove all rubbish and accumulated material and scrap from the premises, leaving the job site in a clean, acceptable condition. Any adjacent areas which are damaged by the contractor due to demolition or removal shall be cleaned, repaired, or replaced to the satisfaction of the COR. All scrap and debris shall be disposed of off the installation at an approved landfill or recycling facility at the contractor’s expense.
1.5 UTILITIES: The government will provide reasonable utilities required for accomplishment of work. The contractor may utilize existing utility resources. This excludes specialized requirements that necessitate modification, alteration, or extension of existing systems.
1.6 MOLD TREATMENT: Where mold is present, clean the areas with a five (5) percent (%) bleach and ninety five (95) percent (%) water solution. After treating the area with the bleach solution, skim coat this area of drywall and re-texture it. The contractor shall mix, according to the manufacturer's directions, a mold inhibitor called "Super Mildex" made by Valspar Corporation or approved equal into the primer and apply the resultant product according to the manufacturer's direction. The recommended primer is Zinsser Corporation’s “Cover Stain Primer Sealer Stain Killer Bond Coat” or approved equal. Finally, apply two coats of paint.
1.7
MOBILIZATION
1.7.1 DESCRIPTION
This work shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.
1.7.2 MEASUREMENT AND PAYMENT
Progress payments will be made as follows:
(a) When 5 percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization, or 5 percent of the original contract amount, whichever is less, will be paid.
(b) When 10 percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization, or 10 percent of the original contract amount, whichever is less, will be paid(c) Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
The total of all payments shall not exceed the original contract amount for this item.
The quantities, as measured above, will be paid for at the contract unit price for Item 1, Mobilization.
SECTION 2 – SIDING AND PAINTING
2.1 SCOPE: The work covered by this Section of the Specification includes the furnishing of all paint, siding, labor, miscellaneous materials, and transportation and performing all operations in connection with siding replacement, interior, and exterior painting, completed in strict accordance with this specification.
2.2 GENERAL: The term “paint” as used herein includes emulsions, enamels, paints, varnishes, sealers, stains, waterproof coatings, cement-latex filler and other coatings whether used as a primer, intermediate, or finish coat. The term siding as used herein includes fiber cement siding, stucco, wood siding, composite siding containing asbestos, and metal siding.
2.3 MATERIALS: Materials shall conform to the minimum requirements of these specifications and the Maintenance/Reconstruction Log. Paint shall be furnished in sealed, unbroken containers that plainly show the designated name, formula or specification number, batch number, date of manufacture, manufacturer’s instructions, and name of manufacturer. Paints shall be furnished in containers not larger than 5 gallon capacity. Materials shall be homogeneous and show no separation that cannot be overcome by stirring. Paints stored more than 12 months shall not be used.
2.4
CLEANING AND PREPARATION OF SURFACES:
2.4.1
PREPARATION OF EXTERIOR SURFACES:
a. General: Surface preparation, prior to painting, shall be completed in accordance with paint manufacturers recommendations. Hardware, hardware accessories, lighting fixtures, and similar items in place and not to be painted shall be removed prior to surface preparation and painting operations or shall be otherwise protected. Gutters and downspouts shall be removed only as necessary to permit the complete painting of the items and adjacent surfaces. Such removal shall be done by workmen skilled in the trades involved. Exposed nails or other ferrous metals on surfaces to be painted with water-thinned paints shall be clean before applying paint or surface treatments. Oil and grease shall be removed with clean cloths and cleaning solutions. Cleaning solutions shall be low toxicity and shall have a flashpoint in excess of 100 degrees F. Cleaning and painting shall be accomplished in two separate phases. The first phase will include all preparation work and cleanup prior to any priming and painting. The contractor shall verify the actual area in square feet to be painted, and must receive approval of the COR prior to proceeding on to the second phase of priming and painting.
b. Siding: Existing siding, fascia, trim, and the like, designated to be replaced, shall be removed with appropriate care taken to avoid damage to existing improvements, such as sheathing, framing, doors, windows, rain gutters and downspouts. All materials removed shall be disposed of by recycling whenever possible. For materials not able to be recycled, they shall be disposed of by disposal at an approved hazardous waste site for hazardous materials or at a County landfill. New siding, fascia, trim and similar materials shall be installed and painted in accordance with manufacturer’s instructions/specifications. New siding shall be Stucco or Certainteed Fiber Cement Siding, as designated in the Maintenance and Reconstruction Log. For Certainteed siding, horizontal application shall be Prefinished or Stain Finish Cedar Lap (as designated on the Maintenance/Reconstruction Log), 5/16” thick, 9-1/4” width, with soffit and trim to match. Stucco shall conform to Section 3.10.
c. Wood Surfaces: Wood surfaces to be painted shall be cleaned of all dirt, oil, or other substances with mineral spirits, scrapers, sandpaper, and/or wire brush. All blistered, loose, and curled paint shall be removed from previously painted wood surfaces and disposed as non-hazardous waste. Where paint is not removed entirely, edges of paint shall be feather sanded. Where wood is deteriorated or pitted or warped due to age, weather, damage, etc., the wood will either be repaired with wood putty or similar material, or replaced with new wood of identical size and type as approved by the COR.
d. Ferrous Surfaces: Ferrous surfaces shall be cleaned of all dirt, loose rust, oil, grease, and other foreign matter which may impair adhesion of the coating. The surface then must be properly prepped so that paint will adhere to the ferrous surface. All loose, cracked, brittle, or non-adherent paint shall be removed and edges shall be feather sanded.
2.4.2
PREP OF INTERIOR SURFACES
a. General: Surface preparation, prior to painting, shall be completed as per paint manufacture’s recommendations. Furniture, wall hangings, hardware, hardware accessories, lighting fixtures, and similar items in place and not to be painted shall be removed prior to surface preparation and painting operations or shall be otherwise protected. Where hardware is attached to walls with hollow wall anchor bolts, existing anchor bolts will not be reusable. The contractor is to provide replacement anchor bolts of same size and type to re-attach hardware. Cleaning solutions shall be low toxicity and shall have a flashpoint in excess of 100 degrees F. Cleaning and painting shall be accomplished in two separate phases. The first phase will include all prep work and cleanup prior to any priming and painting. The contractor shall verify the actual area in square feet to be painted, and must receive the COR approval prior to proceeding on to the second phase of priming and painting.
b. De-glossing: All existing gloss surfaces which are to receive a water base coating shall be pretreated with a chemical de-glosser prior to painting to assure bonding with old finish.
2.4.3
PREPARATION OF SURFACES POTENTIALLY CONTAINING LEAD BASED PAINT
a. Many facility exteriors contain lead paint. In dealing with paint projects where paints have been identified as having known or presumed concentrations of lead, the contractor shall adhere to all applicable EPA, HUD and OSHA regulations. Those buildings that have been tested for the presence of lead based paint are identified in the Maintenance and Reconstruction Log as well as those buildings that were constructed after 1978 which would not need to be tested for the presence of lead based paint.
b. When the contractor encounters paint that is peeling or flaking, the contractor shall have workers certified for handling lead base paint remove samples of the paint for testing. The paint shall be tested by an approved testing authority. If lead is not present, , the contractor shall dispose of the material as a non-hazardous waste.
If the presence of lead is confirmed, the contractor shall immediately notify the Contracting Officer so that an equitable adjustment may be negotiated to cover the Contractor’s additional unanticipated cost. When the contract modification is signed by the Contracting Officer, the paint shall be removed from structures by stripping, wet sanding, or wet scraping following EPA, HUD and OSHA regulations and guidance. The contractor shall contain all debris and chips during work and remove from the work site daily. The contractor will collect and dispose of the lead paint waste generated during the course of the contract at an EPA approved treatment, storage, disposal facility (TSDF) and in accordance with all federal, state, and local environmental regulations. The contractor will utilize the Uniformed Hazardous Waste Manifest and Land Disposal Restrictions Form for all shipments of waste generated at each site. Prior to shipping these wastes from the site, contractor will coordinate the Uniformed Hazardous Waste Manifest with the COR for generator’s signature. A copy of the completed manifest indicating receipt by the disposal facility must be received by the COR within 35 days of the shipment date. The contractor shall follow all OSHA guidance on personnel protection measures and equipment.
1. The contractor shall notify building occupants and post signs conveying the hazards of work and debris one week prior to start of work.
2. All State of California regulations for permitting of lead paint removal shall be met by the contractor.
2.5
PAINT APPLICATION:
2.5.1 GENERAL: The finished surfaces shall be free from runs, drops, ridges, waves, laps, brush marks, spray laps, and variations in color, texture, and finish. The coverage shall be complete and each coat shall be so applied as to produce film of uniform thickness. Special attention shall be given to insure that all surfaces, including edges, corners, cracks, fissures, crevices, welds, and rivets receive a film thickness equal to that of adjacent painted surfaces. All fissures or openings in previously painted surfaces shall be thoroughly filled and sealed by applied coating. Adjacent areas and installations shall be protected by use of drop cloths, or other approved precautionary measure. Metal or wood surfaces adjacent to surfaces to receive water-thinned coatings should be made damp during extremely dry periods of weather. The Contracting Officer shall be notified immediately if there is any lifting or raising of old paint by new application. Application of new coating shall cease until a corrective action has been determined and approved by the Contracting Officer.
2.5.2 COATING PROCESS: Sufficient time shall elapse between successive coats to permit proper drying. This period shall be modified as necessary to suit adverse weather conditions. Paint shall be considered dry for recoating when paint feels firm, does not deform or feel sticky under moderate pressure of the thumb, and the application of another coat of paint does not cause lifting or loss of adhesion of the undercoat.
2.5.3 STORAGE, MIXING, and THINNING: At time of application, paint shall show no signs of hard settling, excessive skinning, livening, or other deterioration. Emulsion paints shall be protected from exposure to cold weather. Paint shall be thoroughly stirred, strained, and kept at a uniform consistency during application. Paints of different manufactures shall not be mixed together. Where necessary to suit conditions of surface, temperature, and method of application, packaged paint other than cement-emulsion filler may be thinned immediately before application per manufacturer’s instructions, but not in excess of one pint of suitable thinner per gallon.
2.5.4 ATMOSPHERIC CONDITIONS: Paints shall be applied only to surfaces that are completely free of surface moisture as determined by sight or touch. While painting is being done, the temperature of the surface to be painted and of the atmosphere in contact therewith shall be at or above 450 F.
2.5.5 TIME BETWEEN SURFACE PREPARATION and PAINTING: Surfaces that have been cleaned, pretreated, or otherwise prepared for painting shall be given a coat of material within 24 hours after such preparation has been completed, and before any deterioration of the prepared surface. Where prepared surface has deteriorated or 24 hours has elapsed without the specified coating being applied, the conditioning process will be repeated to restore required surface.
2.5.6 APPLICATION METHOD: Paint may be applied by spraying, brushing or rolling.
a. Spraying: Spraying will only be permitted on a case by case basis and must be approved in advance by the COR. Spraying shall be of a style and quality that will enable proper application of paint. The spraying should be done so that a smooth application is obtained as nearly uniform in thickness as possible.
b. Brushing: Brushing shall be of a style and quality that will enable proper application of paint. Contractor shall follow manufacturer’s instructions for application of paint by brushing. There shall be no brush marks left in the applied paint. Surfaces not accessible to brushes shall be painted by daubers, sheepskins, or painting mitts.
c. Rollers: Roller application is permissible if complete covering is attained without build-up or thin spots. Paint rollers shall be of the style and quality to insure proper application, continuity and thickness. Paint applied by roller shall conform to manufacturer’s instructions.
2.6
THICKNESS AND CONTINUITY:
To the maximum extent possible, paint shall be applied as a continuous film of uniform thickness free of pores. Any thin spots or areas missed in the application shall be repainted at no additional cost to the government.
2.7 INSTALLATION OF REMOVED ITEMS: Following completion of painting of each space, items removed under paragraph 2.4, shall be reinstalled by experienced and competent workers. Any damage to said items will be corrected at the contractor’s expense.
2.8
PAINT SCHEDULE:
2.8.1 GENERAL: All currently painted surfaces shall receive surface preparation, and 2 coats of paint. All new surfaces will receive surface preparation, a prime coat, and 2 coats of paint. Colors will be specified in each delivery order. Benjamin Moore and Company products listed are given to establish the type and quality of products to be used. Other products of equivalent quality may be submitted to the Contracting Officer for review and approval. Top line products of Pratt & Lambert, Sherwin-Williams, Fuller-O’Brien, Olympic, and Pittsburgh paints are equivalent to those listed in this specification. Contractor shall submit color samples from selected vendor for each of the finish items in the following Paint Schedules.
2.8.2
EXTERIOR PAINT SCHEDULE
a. New wood siding or trim use Benjamin Moore Fresh Start All Purpose Alkyd Primer (N024/C024).
b. Wood/Cement Fiber siding use Benjamin Moore Moorgard Exterior Low-Lustre Paint (N103).
c. Wood siding use Benjamin Moore Alkyd Transparent Stain (N323/C323).
d. Doors and Trim use Benjamin Moore IronClad Alkyd Low Lustre Metal and Wood Enamel (C163).
e. Concrete and Concrete Block paint and sealer use Benjamin Moore Acrylic Masonry Sealer, 066 over existing paint and use Benjamin Moore Acrylic Elastomeric Waterproof Coating – low luster 055 as a topcoat.
f. Metal siding use Benjamin Moore IronClad Alkyd Low Lustre Metal and Wood Enamel (C163).
2.8.3 INTERIOR PAINT SCHEDULE
a. Walls use Benjamin Moore Regal Eggshell Paint (N319).
b. Doors, trim, and cabinets use Benjamin Moore Regal Semi-Gloss Paint (N333).
2.9 CLEANING: All cloths and cotton waste must be placed in closed metal containers or destroyed at the end of each day. Upon completion of the work, all staging, scaffolding, and containers shall be removed from the site or destroyed in an approved manner.