38-AG-9702-S-10-0297.docx

DOCX document 130 KB Posted

Attached to
RECOVERY Lake Davis Area Water System Replacement
Solicitation number
AG-9702-S-10-0297
Issued by

About this file

Solicitation Document

View the file

Other files

File Type Posted
PRE BID ATTENDEES.xlsx XLSX spreadsheet
Pre Bid Q and A_R.docx DOCX document
35_Maps Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-9702-S-10-0297

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

AG-9702-S-10-0297

2. TYPE OF SOLICITATION

|_| SEALED BID (IFB)

|X| NEGOTIATED (RFP)

3. DATE ISSUED

June 7 2010

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

377647

6. PROJECT NO.

7. ISSUED BY CODE

8. ADDRESS OFFER TO

U.S. Forest Service EROC-SW Contracting 1323 Club Dr.

Vallejo, CA 94592

See Block 8

9. FOR INFORMATION
CALL:
A. NAME

Marla Lefevre B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS) 707-562-9123 or mplefevre@fs.fed.us 707-562-8672

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

*RECOVERY* - This solicitation is funded in whole by funds from the American Recovery and Reinvestment Act (ARRA).

Price Range

The Government's estimate is between $500,000 and $1,000,000.

This acquisition is for Small Business only ALL Proposal Documents must be submitted via the FBO website or to the EROC SW office on CD/DVD Companies Submitting a proposal must be registered in CCR

11. The Contractor shall begin performance within 10 calendar days after receiving the notice to proceed. Start date is anticipated to begin in the Spring of 2011

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? YES

(If “YES,” indicate within how many calendar days after award in Item 12B.)

|X| YES|_| NO
12B. CALENDAR DAYS

10 days after award

13. ADDITIONAL SOLICITATION REQUIREMENTS:
A.Electronic offers to perform the work required are due at the place specified in Section L by 2:00 PM – 6 July 2010 local time. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B.An offer guarantee|X| is,|_| is not required.
C.All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D.Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-32121442-101STANDARD FORM 1442 (REV. 4-85)
Computer GeneratedPrescribed by GSA
FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.
DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
|_| 10 U.S.C. 2304(c)( )|_| 41 U.S.C. 253(c)( )
26. ADMINISTERED BYCODE
27. PAYMENT WILL BE MADE BY

COR

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

|_|28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
|_|29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)

PART I—THE SCHEDULE

SECTION B--SUPPLIES OR SERVICES AND PRICES/COSTS SCHEDULE OF ITEMS

ITEM NO.
DESCRIPTION
METHOD OF MEASURE
QUANTITY
PAY UNIT
UNIT PRICE
TOTAL

SCHEDULE OF ITEMS

Grasshopper-Grizzly Campground-Improvements

Schedule of items shall be determined in Phase II

$ N/A

SECTION C--DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

Statement of Work

1. Offeror shall prepare and submit a proposal for Phase Two in accordance with Section L, ELEMENTS OF PROPOSAL - Phase Two. Detailed instructions and specific requirements of the project shall be provided in the Phase II process.

2. Upon award, the contractor shall be required to perform the following work in accordance with Section F:

A. Conduct any data, sub-surface, or record surveys needed to properly and adequately design, layout, and construct the various components of the project.

B. Prepare and submit a preliminary Construction Schedule and Schedule of Items.

3. Prior to commencing construction activities, the contractor shall submit for government review the following documents:

A. Plans, drawings, specifications (Based on CSI MasterFormat), etc., representing a significant portion of the work, including:

i. Drawings showing the locations of the pipe lines and water hydrants.

ii. Calculations and hydraulic design of the complete new potable water system

iii. Specifications for the facilities, fixtures, materials, and construction requirements of the pipelines and fittings

iv. Connection Plan for the existing well and tanks

v. Final Construction Schedule and Schedule of Items.

B. Additional plans, drawings, and specifications generated during the course of the project shall be submitted to the government for review as soon as available.

C. The government shall have no less then 15 days to reply to these proposals and submittals. If a proposal or submittal is rejected, the government shall have a further 15 days to review and reply to any subsequent proposal(s) or submittal(s).

4. Existing toilet hydrants (AS SHOWN ON THE DRAWINGS) are to be demolished and all materials are to be removed from government land. All existing distribution lines are to remain in place. New hydrants may occupy the same or an adjacent location.

5. New accessible hydrants (accessible spigots) will be placed throughout the campground. The government estimates the number of hydrants to be around 35 give or take.

6. All exposed potable water pipelines (currently active or abandoned) within 10’ of the newly installed potable water lines shall be removed. The remaining pipes may remain in place. All exposed sewer lines shall be considered active and shall remain undisturbed except as required to make new connections. It is not the intent of this project to reconstruct or replace any part of the existing septic systems.

7. Not more then sixty days after award, the contractor shall submit for government approval the following:

A. Water System Testing and Sanitation Plan.

B. Closeout Procedures.

C. Commissioning Plan and Process

8. The government will provide survey data, existing drawings, and other available data to offerors in the Phase II process.

PROJECT LOCATION

Project is located at Grasshopper Flat and Grizzly Campgrounds at the south east shore of Lake Davis.

The site is reached by traveling east two miles from Portola, CA on Highway 70, then north six miles on County Road 113 (Grizzly Creek Road).

SECTION D--PACKAGING AND MARKING

For this Solicitation, there are NO clauses in this Section.

SECTION E--INSPECTION AND ACCEPTANCE

FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

Clause Number
Title
Date
52.246-12
Inspection of Construction
AUG 1996

INSPECTION

Inspection Procedures and Requirements will be included in the Special Project Specifications. Inspection shall comply with FAR 52.246-12

FINAL CLEANUP

Before final acceptance, all areas occupied by the Contractor in connection with the work shall be cleaned of all Contractor's rubbish, excess materials, temporary structures, and equipment, and all parts of the work area shall be left in a neat and presentable condition.

SECTION F--DELIVERIES OR PERFORMANCE

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

Clause Number
Title
Date
52.242-14
Suspension of Work
APR 1984

FAR 52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984) Alternate I (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 28, 2011. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by September 27, 2010. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

AGAR 452.236-75 MAXIIMUM WORKWEEK-CONSTRUCTION (NOV 1996)

Within five calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:

(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and

(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work.

The maximum workweek that will be approved is seven days.

SECTION G--CONTRACT ADMINISTRATION DATA

MEASUREMENT AND PAYMENT

Payment shall be made in accordance with the Schedule of Items, the Standard Specifications, and/or the Special Project Specifications.

GOVERNMENT-FURNISHED PROPERTY

There is no government furnished material for this project

DESIGNATION OF CONTRACTING OFFICER'S REPRESENTATIVE

(Completed during Phase-II) The Contracting Officer designates the Contracting Officer's Representative(s) (COR). The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)

On all matters that pertain to the contract terms, the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

SECTION H--SPECIAL CONTRACT REQUIREMENTS

FAR 52.236-4 PHYSICAL DATA (APR 1984)

Except as is specifically noted below or as SHOWN ON THE DRAWINGS, no physical date is available from the government.

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by data survey. (SEE Section J)

FAR 52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)

Except for the campground potable water system, no utilities are available at the work site(s).

PRODUCT SUBSTITUTION

CONTRACTOR'S REPRESENTATION & RESPONSIBILITY

A. In making formal request for substitution the Contractor represents he/she:

1. Have investigated proposed product and determined that it is equal to or superior in all respects to that originally specified.

2. Will provide same warranties and bond for substitute as for originally specified product.

3. Will coordinate installation of accepted substitution into the work, and will make such changes as may be required for the work to be complete in all respects.

4. Will waive claims for additional costs caused by substitution, which may subsequently become apparent.

5. Cost data is complete and includes related costs under the contract, but not:

a.Costs under separate contracts.
b.Contracting Officer costs for redesign or revision of contract documents.

B. The Contractor assumes full responsibility that the substitution and/or alternate items or procedures proposed will meet the job requirements.

C. The Contractor is solely responsible for the cost of redesign and modifications to this and other parts of the work caused by the substitutions or alternates furnished.

SUBMITTALS

The following shall be submitted on this project:

Title
Referenced by Specification No.
Time of Government Approval After Submittal

TO BE DETERMINED IN PHASE II

SHOP DRAWINGS

The following shop drawings shall be submitted on this project:

Title
Referenced by Specification No.
Time of Government Approval After Submittal

TO BE DETERMINED IN PHASE II

MATERIAL CERTIFICATIONS AND TESTING REPORTS

The following material certifications and/or testing reports shall be submitted on this project:

Title
Referenced by Specification No.

TO BE DETERMINED IN PHASE II

AGAR 452.215-73 POST AWARD CONFERENCE (NOV 1996)

List desired location and number of days after award for post award conference.

A post award conference with the successful offeror is required. It will be scheduled and held within ten days after the date of contract award. The conference will be held at

Beckwourth Ranger District Office 23 Mohawk Highway Rd Blairsden CA 96103

PUBLIC OFFICIALS NOT PERSONALLY LIABLE

There shall be no personal liability upon the Contracting Officer or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them by, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.

LANDSCAPE PRESERVATION

All site work shall be in complience with 52.236-9, 52.237-2, & AGAR 4236.71, ~73, ~74 and the following project specific requirements:

Wash water or waste from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to nor more than that of the stream into which it is discharged.

Wash water or waste from concrete or aggregate operations shall be contailed, removed from the site, and disposed of off government land.

Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.

All petroleum products or other hazardous substances (as defined in 29 CFR 1910.120) shall not be released on or into land, rivers, streams, and impoundments, or into natural or manmade channels leading thereto. Servicing of all equipment shall be done only in the areas approved by the Contracting Officer or their designated representative. The Contractor shall dispose of waste oil, vehicle oil filters (drained of free-flowing oil), and oily rags in accordance with applicable State and Federal regulations and such material shall be transported off government property in accordance with State and Federal regulations.

The Contractor shall notify the Contracting Officer, or designated representative, of any hazardous materials (as defined in 29 CFR 1910.120) to be used on the job and shall have Material Safety Data Sheets (MSDS) for those materials available on the job. All such materials shall be labeled in accordance with federal and state regulations.

CONTRACTOR'S USE OF EXISTING ROADS

The Contractor is authorized to use roads in the immediate construction project area for performance of work under this contract. The authorization is limited to roads necessary for direct access between the construction area and storage sites, disposal areas, and other work areas designated in the contract.

The roads authorized for use will be subject to the following general conditions:

(1) State laws governing traffic rules and equipment requirements on State and County Highways.

(2) Federal Regulations contained in 36 CFR 261.12. These regulations prohibit use in excess of State Codes for weight and size, damaging a road while using it, and blocking a road open to use by others.

The Contractor shall be responsible for and perform road maintenance commensurate with his use of Forest Service roads in the construction area.

ROAD USE AND MAINTENANCE

Use of Roads

(a) The Contractor is authorized to use roads that are a part of the construction project and those Forest Service roads designated below for performance of work under this contract.

Road No.

Termini Authorizations, Restrictions & Requirements

Maintenance Required (Yes or No)

23N20X
County Road 112

Yes

23N06Y
County Road 112

Yes

(b) If the Contractor requests use of a National Forest road or segment not designated for his use, the Forest Service may authorize such use if not in conflict with the current Road Rules document. Authorization to use such additional roads may include maintenance requirements and use limitations.

(c) The roads authorized for use will be subject to the following provisions.

1. The Road Rules in the current Region 10 Road Rules Document are applicable to all commercial road users. This document is available for inspection at the office of the Forest Supervisor and shall be applicable except when modified by provisions of the contract.

2. State laws governing traffic rules and equipment requirements on State and County highways.

3. Federal regulations contained in 36 CFR 261.12. These regulations prohibit use of vehicles or equipment in excess of State legal highway loads or posted limits without valid State and Forest Service overload permits, damaging a road while using it, and blocking a road open to use by others, except as may be otherwise provided in the contract.

Load Limits - All vehicles and equipment shall not exceed State legal highway loads and widths or posted limits without valid State and Forest Service overload, overwidth permits. Forest Service overload permits for this project may be obtained from the District Ranger.

4. Federal Regulations contained in 36 CFR 261.54 as applied to the area by an order issued under 36 CFR 261.50. These regulations authorized the Forest Service, as a sovereign act, to issue additional restrictions and closures any time conditions warrant. Such closures will be in addition to those shown in the current Road Rules Document and will be posted on the road.

TRAFFIC CONTROL

The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.

The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagman and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.

The Contractor shall furnish, erect, maintain, and remove when notified any project identification signs shown on the drawings

Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.

AGAR 452.237-74 KEY PERSONNEL (FEB 1988)

(a) The Contractor shall assign to this contract the following key personnel:
SEE SECTION L
.

(b) During the first ninety (90) days of performance, the Contractor shall make no substitutions of key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer within 15 calendar days after the occurrence of any of these events and provide the information required by paragraph (c) below. After the initial 90-day period, the Contractor shall submit the information required by paragraph (c) to the Contracting Officer at least 15 days prior to making any permanent substitutions.

(c) The Contractor shall provide a detailed explanation of the circumstances necessitating the proposed substitutions, complete resumes for the proposed substitutions, and any additional information requested by the Contracting Officer. Proposed substitutes should have comparable qualififcations to those of the persons being replaced. The Contracting Officer will notify the Contractor within 15 calendar days after receipt of all required information of the decision on substitutions. The contract will be modified to reflect any approved changes of key personnel.

SAFETY

SEE SPECIFICATION SECTION 0135

ADDITIONAL REQUIREMENTS OR RESTRICTIONS

NONE

SECTION I--CONTRACT CLAUSES

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

www.arnet.gov/far/ www.usda.gov/procurement/policy/agar.html

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

Clause No
Title
Date
16.2
OPTIONS
52.202-1
DEFINITIONS
JUL 2004
52.203-3
GRATUITIES
APR 1984
52.203-5
COVENANT AGAINST CONTINGENT FEES
APR 1984
52.203-6
RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT
SEPT 2006
52.203-7
ANTI-KICKBACK PROCEDURES
JUL 1995
52.203-8
CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY
JAN 1997
52.203-10
PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY
JAN 1997
52.203-12
LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
SEP 2007
52.203-15
Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009
MAR 2009
52.204-4
PRINTED OR COPIED DOUBLE- SIDED ON RECYCLED PAPER
AUG 2000
52.204-7
CENTRAL CONTRACTOR REGISTRATION
APR 2008
52.209-6
PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
SEPT 2006
52.211-18
VARIATION IN ESTIMATED QUANTITY
JUL 2005
52.215-2
AUDIT AND RECORDS – NEGOTIATION (Alternate I)
MAR 2009
52.219-4
NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS CONCERNS
JUL 2005
52.219-8
Utilization of Small Business Concerns
MAY 2004
52.219-9
SMALL BUSINESS SUBCONTRACTING PLAN – ALTERNATE II (Oct 2001) (Applicable if > $1 Million)
SEPT 2007
52.219-14
LIMITATIONS ON SUNCONTRACTING (Applicable if > $1 Million)
DEC 1996
52.219-16
LIQUIDATED DAMAGES --SUBCONTRACTING PLAN (Applicable if > $1 Million)
JAN 1999
52.219-23
NOTICE OF PRICE EVALUATION ADJUSTMENT FOR SMALL DISADVANTAGED BUSINESS CONCERNS
OCT 2008
52.219-25
SMALL DISADVANTAGED BUSINESS PARTICIPATION PROGRAM – DISADVANTAGED STATUS AND REPORTING (Applicable if > $1 Million)
APR 2008
52.222-3
CONVICT LABOR
JUN 2003
52.222-4
CONTRACT WORK HOURS AND SAFETY STANDARDS ACT -- OVERTIME COMPENSATION
JUL 2005
52.222-6
DAVIS-BACON ACT
JUL 2005
52.222-7
WITHHOLDING OF FUNDS
FEB 1988
52.222-8
PAYROLLS AND BASIC RECORDS
FEB 1988
52.222-9
APPRENTICES AND TRAINEES
JUL 2005
52.222-10
COMPLIANCE WITH COPELAND ACT REQUIREMENTS
FEB 1988
52.222-11
SUBCONTRACTS (LABOR STANDARDS)
JUL 2005
52.222-12
CONTRACT TERMINATION - DEBARMENT
FEB 1988
52.222-13
COMPLIANCE WITH DAVIS-BACON AND RELATED ACT REGULATIONS
FEB 1988
52.222-14
DISPUTES CONCERNING LABOR STANDARDS
FEB 1988
52.222-15
CERTIFICATION OF ELIGIBILITY
FEB 1988
52.222-21
PROHIBITION OF SEGREGATED FACILITIES
FEB 1999
52.222-26
EQUAL OPPORTUNITY
APR 2002
52.222-27
AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION
FEB 1999
52.222-35
EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, AND OTHER ELIGIBLE VETERANS
SEPT 2006
52.222-36
AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES
JUN 1998
52.222-37
EMPLOYMENT REPORTS ON SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, AND OTHER ELIGIBLE VETERANS
SEPT 2006
52.222-54
EMPLOYMENT ELIGIBILITY VERIFICATION
JAN 2009
52.223-5
POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION
AUG 2003
52.223-6
DRUG-FREE WORKPLACE
MAY 2001

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

Clause No
Title
Date
52.223-14
TOXIC CHEMICAL RELEASE REPORTING
AUG 2003
52.225-13
RESTRICTIONS ON CERTAIN FOREIGN PURCHASES
JUN 2008
52.227-1
AUTHORIZATION AND CONSENT
DEC 2007
52.227-2
NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT
DEC 2007
52.227-4
PATENT INDEMNITY -- CONSTRUCTION CONTRACTS
DEC 2007
52.228-2
ADDITIONAL BOND SECURITY
OCT 1997
52.228-11
PLEDGES OF ASSETS
FEB 1992
52.228-12
PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS
OCT 1995
52.228-14
IRREVOCABLE LETTER OF CREDIT
DEC 1999
52.228-15
PERFORMANCE AND PAYMENT BONDS – CONSTRUCTION
NOV 2006
52.229-3
FEDERAL, STATE, AND LOCAL TAXES
APR 2003
52.230-1
COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION
OCT 2008
52.230-2
COST ACCOUNTING STANDARDS
OCT 2008
52.230-3
DISCLOSURE AND CONSISTENCY OF COST ACCOUNTING PRACTICES
OCT 2008
52.230-6
ADMINISTRATION OF COST ACCOUNTING STANDARDS
MAR 2008
52.232-5
PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS
SEP 2002
52.232-9
LIMITATION ON WITHHOLDING OF PAYMENTS
APR 1984
52.232-17
INTEREST
OCT 2008
52.232-18
AVAILABILITY OF FUNDS
APR 1984
52.232-23
ASSIGNMENT OF CLAIMS
JAN 1986
52.232-27
PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS
OCT 2008
52.232-33
PAYMENT BY ELECTRONIC FUNDS TRANSFER - CENTRAL CONTRACTOR REGISTER
OCT 2003
52.233-1
DISPUTES – ALTERNATE I (DEC 1991)
JULY 2002
52.233-3
PROTEST AFTER AWARD
AUG 1996
52.236-2
DIFFERING SITE CONDITIONS
APR 1984
52.236-3
SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK
APR 1984
52.236-5
MATERIAL AND WORKMANSHIP
APR 1984
52.236-6
SUPERINTENDENCE BY THE CONTRACTOR
APR 1984
52.236-7
PERMITS AND RESPONSIBILITIES
NOV 1991
52.236-8
OTHER CONTRACTS
APR 1984
52.236-9
PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS
APR 1984
52.236-10
OPERATIONS AND STORAGE AREAS
APR 1984
52.236-11
USE AND POSSESSION PRIOR TO COMPLETION
APR 1984
52.236-12
CLEANING UP
APR 1984
52.236-13
ACCIDENT PREVENTION – Alternate I (NOV 1991)
NOV 1991
52.236-15
SCHEDULES FOR CONSTRUCTION CONTRACTS
APR 1984
52.236-16
QUANTITY SURVEYS – Alternate I (APR 1984)
APR 1984
52.236-17
LAYOUT OF WORK
APR 1984
52.236-21
SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, ALTERNATE I
APR 1984
52.236-26
PRECONSTRUCTION CONFERENCE
FEB 1995
52.242-13
BANKRUPTCY
JUL 1995
52.243-4
CHANGES
AUG 1987
52.245-1
GOVERNMENT PROPERTY
JUN 2007
52.245-2
GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES
JUN 2007
52.246-21
WARRANTY OF CONSTRUCTION
MAR 1994
52.248-3
VALUE ENGINEERING – CONSTRUCTION
SEPT 2006
52.249-2
TERMINATION FOR CONVENIENCE OF THE GOVERNMENT – Alternate I (SEP 1996)
MAY 2004
52.249-10
DEFAULT (FIXED-PRICE CONSTRUCTION)
APR 1984
52.253-1
COMPUTER GENERATED FORMS
JAN 1991

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

Clause No
Title
Date
452.232-70
REIMBURSEMENT FOR BOND PREMIUMS – FIXED-PRICE CONSTRUCTION CONTRACTS
NOV 1996
452.236-71
PROHIBITION AGAINST USE OF LEAD-PAINT
NOV 1996
452.236-72
USE OF PREMISES
NOV 1996
452.236-73
ARCHEOLOGICAL OR HISTORIC SITES
FEB 1988
452.236-74
CONTROL OF EROSION, SEDIMENTATION AND POLLUTION
NOV 1996
452.236-76
SAMPLES AND CERTIFICATES
FEB 1988
452.236-77
Emergency Response “NOTE:*Fire Protection Requirements

The Contractor shall comply with and/or complete the attached forms:

(1) Fire Protection and Suppression Requirements.

NOV 1996

52.203-15 – Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (Mar 2009)

(a) The Contractor shall post notice of employees rights and remedies for whistleblower protections provided under section 1553 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111–5).

(b) The Contractor shall include the substance of this clause including this paragraph (b) in all subcontracts.

52.204-11 – American Recovery and Reinvestment Act—Reporting Requirements (Mar 2009)

(a) Definitions. As used in this clause— “Contract,” as defined in FAR 2.101, means a mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing. In addition to bilateral instruments, contracts include (but are not limited to) awards and notices of awards; job orders or task letters issued under basic ordering agreements; letter contracts; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications. Contracts do not include grants and cooperative agreements covered by 31 U.S.C. 6301, et seq. For discussion of various types of contracts, see FAR Part 16.

“First-tier subcontract” means a subcontract awarded directly by a Federal Government prime contractor whose contract is funded by the Recovery Act.

“Jobs created” means an estimate of those new positions created and filled, or previously existing unfilled positions that are filled, as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as ‘‘full-time equivalent’’ (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.

“Jobs retained” means an estimate of those previously existing filled positions that are retained as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as ‘‘full-time equivalent’’ (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.

“Total compensation” means the cash and noncash dollar value earned by the executive during the contractor’s past fiscal year of the following (for more information see 17 CFR 229.402(c)(2)):

(1) Salary and bonus.

(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123 (Revised 2004) (FAS 123R), Shared Based Payments.

(3) Earnings for services under non-equity incentive plans. Does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.

(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.

(5) Above-market earnings on deferred compensation which is not tax-qualified.

(6) Other compensation. For example, severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property if the value for the executive exceeds $10,000.

(b) This contract requires the contractor to provide products and/or services that are funded under the American Recovery and Reinvestment Act of 2009 (Recovery Act). Section 1512(c) of the Recovery Act requires each contractor to report on its use of Recovery Act funds under this contract. These reports will be made available to the public.

(c) Reports from contractors for all work funded, in whole or in part, by the Recovery Act, and for which an invoice is submitted prior to June 30, 2009, are due no later than July 10, 2009. Thereafter, reports shall be submitted no later than the 10th day after the end of each calendar quarter.

(d) The Contractor shall report the following information, using the online reporting tool available at http://www.FederalReporting.gov .

(1) The Government contract and order number, as applicable.

(2) The amount of Recovery Act funds invoiced by the contractor for the reporting period. A cumulative amount from all the reports submitted for this action will be maintained by the government’s on-line reporting tool.

(3) A list of all significant services performed or supplies delivered, including construction, for which the contractor invoiced in this calendar quarter.

(4) Program or project title, if any.

(5) A description of the overall purpose and expected outcomes or results of the contract, including significant deliverables and, if appropriate, associated units of measure.

(6) An assessment of the contractor’s progress towards the completion of the overall purpose and expected outcomes or results of the contract (i.e., not started, less than 50 percent completed, completed 50 percent or more, or fully completed). This covers the contract (or portion thereof) funded by the Recovery Act.

(7) A narrative description of the employment impact of work funded by the Recovery Act. This narrative should be cumulative for each calendar quarter and only address the impact on the contractor’s workforce. At a minimum, the contractor shall provide—

(i) A brief description of the types of jobs created and jobs retained in the United States and outlying areas (see definition in FAR 2.101). This description may rely on job titles, broader labor categories, or the contractor’s existing practice for describing jobs as long as the terms used are widely understood and describe the general nature of the work; and

(ii) An estimate of the number of jobs created and jobs retained by the prime contractor, in the United States and outlying areas. A job cannot be reported as both created and retained.

(8) Names and total compensation of each of the five most highly compensated officers of the Contractor for the calendar year in which the contract is awarded if—

(i) In the Contractor’s preceding fiscal year, the Contractor received—

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and

(ii) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986.

(9) For subcontracts valued at less than $25,000 or any subcontracts awarded to an individual, or subcontracts awarded to a subcontractor that in the previous tax year had gross income under $300,000, the Contractor shall only report the aggregate number of such first tier subcontracts awarded in the quarter and their aggregate total dollar amount.

(10) For any first-tier subcontract funded in whole or in part under the Recovery Act, that is over $25,000 and not subject to reporting under paragraph 9, the contractor shall require the subcontractor to provide the information described in (i), (ix), (x), and (xi) below to the contractor for the purposes of the quarterly report. The contractor shall advise the subcontractor that the information will be made available to the public as required by section 1512 of the Recovery Act. The contractor shall provide detailed information on these first-tier subcontracts as follows:

(i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor’s parent company, if the subcontractor has a parent company.

(ii) Name of the subcontractor.

(iii) Amount of the subcontract award.

(iv) Date of the subcontract award.

(v) The applicable North American Industry Classification System (NAICS) code.

(vi) Funding agency.

(vii) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.

(viii) Subcontract number (the contract number assigned by the prime contractor).

(ix) Subcontractor’s physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable.

(x) Subcontract primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable.

(xi) Names and total compensation of each of the subcontractor’s five most highly compensated officers, for the calendar year in which the subcontract is awarded if—

(A) In the subcontractor’s preceding fiscal year, the subcontractor received—

(1) 80 percent or more of its annual gross revenues in Federal contracts (and subcontracts), loans, grants (and subgrants), and cooperative agreements; and

(2) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), and cooperative agreements; and

(B) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986.

(End of clause)

52.215-2 -- Audit and Records – Negotiation (Mar 2009)

(a) As used in this clause, “records” includes books, documents, accounting procedures and practices, and other data, regardless of type and regardless of whether such items are in written form, in the form of computer data, or in any other form.

(b) Examination of costs. If this is a cost-reimbursement, incentive, time-and-materials, labor-hour, or price redeterminable contract, or any combination of these, the Contractor shall maintain and the Contracting Officer, or an authorized representative of the Contracting Officer, shall have the right to examine and audit all records and other evidence sufficient to reflect properly all costs claimed to have been incurred or anticipated to be incurred directly or indirectly in performance of this contract. This right of examination shall include inspection at all reasonable times of the Contractor’s plants, or parts of them, engaged in performing the contract.

(c) Cost or pricing data. If the Contractor has been required to submit cost or pricing data in connection with any pricing action relating to this contract, the Contracting Officer, or an authorized representative of the Contracting Officer, in order to evaluate the accuracy, completeness, and currency of the cost or pricing data, shall have the right to examine and audit all of the Contractor’s records, including computations and projections, related to --

(1) The proposal for the contract, subcontract, or modification;

(2) The discussions conducted on the proposal(s), including those related to negotiating;

(3) Pricing of the contract, subcontract, or modification; or

(4) Performance of the contract, subcontract or modification.

(d) Comptroller General or Inspector General.

(1) The Comptroller General of the United States, an appropriate Inspector General appointed under section 3 or 8G of the Inspector General Act of 1978 (5 U.S.C. App.), or an authorized representative of either of the foregoing officials, shall have access to and the right to—

(i) Examine any of the Contractor’s or any subcontractor’s records that pertain to and involve transactions relating to this contract or a subcontract hereunder; and

(ii) Interview any officer or employee regarding such transactions.

(2) This paragraph may not be construed to require the Contractor or subcontractor to create or maintain any record that the Contractor or subcontractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e) Reports. If the Contractor is required to furnish cost, funding, or performance reports, the Contracting Officer or an authorized representative of the Contracting Officer shall have the right to examine and audit the supporting records and materials, for the purpose of evaluating --

(1) The effectiveness of the Contractor’s policies and procedures to produce data compatible with the objectives of these reports; and

(2) The data reported.

(f) Availability. The Contractor shall make available at its office at all reasonable times the records, materials, and other evidence described in paragraphs (a), (b), (c), (d), and (e) of this clause, for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in Subpart 4.7, Contractor Records Retention, of the Federal Acquisition Regulation (FAR), or for any longer period required by statute or by other clauses of this contract. In addition --

(1) If this contract is completely or partially terminated, the Contractor shall make available the records relating to the work terminated until 3 years after any resulting final termination settlement; and

(2) The Contractor shall make available records relating to appeals under the Disputes clause or to litigation or the settlement of claims arising under or relating to this contract until such appeals, litigation, or claims are finally resolved.

(g)(1) Except as provided in paragraph (g)(2) of this clause, the Contractor shall insert a clause containing all the terms of this clause, including this paragraph (g), in all subcontracts under this contract. The clause may be altered only as necessary to identify properly the contracting parties and the Contracting Officer under the Government prime contract.

(2) The authority of the Inspector General under paragraph (d)(1)(ii) of this clause does not flow down to subcontracts.

(End of Clause)

FAR 52.225-21 — Required Use of American Iron, Steel, and Other Manufactured Goods—Buy American Act—Construction Materials (Mar 2009)

(ii) Definitions. As used in this clause— “Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

“Domestic construction material” means—

(1) An unmanufactured construction material mined or produced in the United States; or

(2) A construction material manufactured in the United States.

“Foreign construction material” means a construction material other than a domestic construction material.

“Manufactured construction material” means any construction material that is not unmanufactured construction material.

“Steel” means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.

“United States” means the 50 States, the District of Columbia, and outlying areas.

“Unmanufactured construction material” means raw material brought to the construction site for incorporation into the building or work that has not been—

(1) Processed into a specific form and shape; or

(2) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials.

(b) Domestic preference.

(1) This clause implements—

(i) Section 1605 of the American Recovery and Reinvestment Act of 2009 (Recovery Act) (Pub. L. 111-5), by requiring, unless an exception applies, that all iron, steel, and other manufactured goods used as construction material in the project are produced in the United States; and

(ii) The Buy American Act (41 U.S.C. 10a-10d) by providing a preference for unmanufactured domestic construction material.

(2) The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraph (b)(3) and (b)(4) of this clause.

(3) This requirement does not apply to the construction material or components listed by the Government as follows:

------------------------NONE-----------------------------------------------

[Contracting Officer to list applicable excepted materials or indicate “none”]

(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that—

(i) The cost of domestic construction material would be unreasonable.

(A) The cost of domestic iron, steel, or other manufactured goods used as construction material is unreasonable when the cumulative cost of such material will increase the cost of the contract by more than 25 percent;

(B) The cost of unmanufactured construction material is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available quantities and of a satisfactory quality; or

(iii) The application of the restriction of section 1605 of the Recovery Act or the Buy American Act to a particular construction material would be inconsistent with the public interest.

I Request for determination of inapplicability of Section 1605 of the Recovery Act or the Buy American Act.

(1)

(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including—

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

I Quantity;

(D) Cost;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(4) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed cost comparison table in the format in paragraph (d) of this clause.

(iii) The cost of construction material shall include all delivery costs to the construction site and any applicable duty.

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to section 1605 of the Recovery Act or the Buy American Act applies and the Contracting Officer and the Contractor…

This is the start of the file's text. The full file is on GovTribe.