Att 2 8N20 DRAWINGS FINAL.pdf
PDF 5 MB Posted
- Attached to
- RECOVERY-Sugarpine Road Decommissioning
- Solicitation number
- AG-9702-S-10-0268
About this file
Att 2 - Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A-10.pdf | ||
| Attach 1 Amendment 6.pdf | ||
| A-9 SF-30.pdf | ||
| A-8 SF-30.pdf | ||
| Att 1 REVISED PART I SECTION B.doc | DOC document | |
| A-7 SF-30.pdf | ||
| Att 1 REV PART I SECTION B.doc | DOC document | |
| A-6.pdf | ||
| Att 2 REV SPS and Table of Contents.pdf | ||
| Att 3 REV 8N20 DRAWINGS FINAL.pdf | ||
| A-5 SF-30.pdf | ||
| A-4 SF-30.pdf | ||
| S-10-0268 A-3 SF-30.pdf | ||
| A-2.pdf | ||
| A-1 SF-30.pdf | ||
| Att 4 Fire Plan.doc | DOC document | |
| Att 1 SPS and Table of Contents.pdf | ||
| Att 3 Wage Determination Amador CA9.pdf | ||
| RFQ.doc | DOC document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Billy Ellis Revised
Deer Valley
BM
P e d d l e r
H i l l
BM 7102
PEDDLER HILL
VISTA POINT
Camp Winton
Dufrene Camp
BEAR RIVER RESORT
Boat Ramp
CA-88
08 N03
08N31
N1
09N
25 0 8N
08N03F
AMA-2 44
N30
08N21
N1
08N 14G
08N31B
N2
8 08 N2
N1
9B
AMA-246
08N1 4H
08N30A
08N28 B
08N20H
09N25B
08N03D
N3
1A
08 N20J
08N22
09N13
N0
N2
1E
08N08
N0
3FW
08N 30
B
08N20K
08N03J
08N30C
08N
N1
8A
0 9 N
09N25A
08N03FS
08 N8 3
08N27
08N 0 8
A
N2
1D
08N2 0C
N2
0F
N2
1B
08N 03H
08N0 3H
N
UVCA
-88
Lit tle
Be ar
Riv er
Sugar Pine Creek
Onion Valley Creek
Upper Pardo e C ree k
Peddler Creek
Pa rdo e C ree k
Rattlesnake Creek
Lower Bear River Reservoir
Be ar
Riv er
Re ser voi r
01 0405
36 3135 34
8N20 ROAD
DECOMMISSIONING
LOCATION MAP
0 0.5 10.25 Miles
LEGEND
ROAD RECONSTRUCTION
CONST_TYPE
RECONST
DECOM
SYSTEM ROADS
OPER_MAINT
MAINT LVL 1
MAINT LVL 2
MAINT LVL 3
MAINT LVL 4
MAINT LVL 5
HIGHWAY
HYDROLOGY
STR_TYPE
PERENIAL
INTERMITTENT
EPHEMERAL
! DITCH/CANAL
LAKES
PARCEL INFO
OWNERSHIP
FOREST SERVICE
SIERRA PACIFIC IND
CALIFORNIA STATE
ELDORADO COUNTY
PUBLIC AGENCY
PUBLIC UTILITY DIS
PRIVATE PROPERTY
T.
N.
R.15 E R. 16 E.
PROJECT AREA
VICINITY MAPPrinting Date: Friday, January 29, 2010 File: 8N20 AREA MAP2.mxd
18436
CONST
WB
19152
CONST
WB
19058
CONST
WB
18618
CONST
WB
18344
CONST
WB
18234
CONST
WB 18113
CONST
WB
17965
CONST
WB
19282
CONST
WB
19588
CONST
WB
19800
CONST
WB
20048
CONST
WB
20550
CONST
WB
21162
CONST
WB
23164
CONST
WB
21670
CONST
DIP
22189
CONST
DIP
23086
CONST
WB
20141
CONST
SWALE
20716
CONST
SWALE
22867
CONST
SWALE
13403
CONST 24X30 CMP
W/CATCH BASIN
14002
CONST 24X30 CMP
W/CATCH BASIN
14542
CONST 24X30 CMP
W/CATCH BASIN
15939
CONST 24X30 CMP
W/CATCH BASIN
16431
CONST 24X30 CMP
W/CATCH BASIN
16996
CONST 24X30 CMP
W/CATCH BASIN
15707
EXIST
18 CMP
15228
EXIST
36 CMP14256
EXIST
18 CMP
13728
EXIST
18 CMP
13143
EXIST
24 CMP
12219
EXIST
18 CMP
10781
EXIST
END AB
18966
REMOVE
18 CMP
20511
REMOVE
18 CMP
20977
REMOVE
18 CMP
17717
BEGIN DECOMMISSIONING
PLACE 6 ROCK BARRICADE
21934
REMOVE 18 CMP
INSTALL 24"X30 CMP
22493
REMOVE 18 CMP
INSTALL 36"X 30'CMP
21274
PLACE 6 ROCK
BARRICADE
21626
MAINTAIN
18 CMP
12798
BEGIN
RECONSTION
19382
CONST
WB
19920
CONST
WB
23329
CONST
DIP
19509
CONST
SWALE
20828
CONST
SWALE
23383
EXIST 18 CMP
EOP
14840
CONST 24X30 CMP
W/CATCH BASIN
18797
REMOVE
18 CMP
19745
REMOVE
18 CMP
17822
REMOVE
18 CMP
21389
END DECOM
22835
REMOVE 36" CMP
INSTALL 83"X 57" X 30'
CMP ARCH
PLACE 24 TON AB
17351
CLEAN OUT
18 CMP
CAMOFLAGE
500 LF ROAD
CAMOFLAGE
500 LF ROAD
STA 12798 TO 17717
RECONSTUCT
EXISTING ROAD
ALL WORK OPTIONAL
STA 17717 TO 21389
DECOMMISSION
EXISTING ROAD
ALL WORK REQUIRED
STA 21389 TO 23383
RECONSTRUCT
EXISTING ROAD
ALL WORK REQUIRED
08N20
08N20H
N2
1E
N2
08N20K
AMA-24
08N
C
N2
1D
08N20J 08 N2
1B
Lit tle
Bear Ri ve r
Lower Bear River Reservoir
Lower Bear River Reservoir
0 0.1 0.2 Miles
NOTE:
ROAD 8N20 - DECOMMISSION ROAD- CAMOFLAGE
ROAD 500 LF BEGINNING AND END OF ROAD. REMOVE
EXISTING METAL PIPES WHERE INDICATED. INSTALL
WATERBARS AND SWALES WHERE STAKED. INSTALL
ROCK BARRICADES.
PROJECT SHEET NUMBER
8N20 DECOM
OPTIONAL ROAD WORK - GRADE AND SHAPE
ROAD, PULL DITCHES, CLEAN EXISTING CMPS,
INSTALL NEW CMPS WHERE INDICATED.
File details come from the government source that posted it. Updated .