SF_30 Mod 2 Hayden Flat.doc
DOC document 330 KB Posted
- Attached to
- RECOVERY Hayden Flat Campground Well Connections
- Solicitation number
- AG-9702-S-10-0259
About this file
Replaces sections B and C of the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A Hayden Flat Campground.docx | DOCX document | |
| HaydenFlatCG_Amended Drawings-map.pdf | ||
| Pre-Bid Attendees_5-26-2010_HaydenFlatCG.pdf | ||
| SF_30 Mod 1.doc | DOC document | |
| Attachment 1- Map and Drawings.pdf | ||
| Attachment 3 - Wage Determinationr.docx | DOCX document | |
| 38_Solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1. CONTRACT ID CODE |
| PAGE OF PAGES |
| 1 |
| 1 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 00002 |
| 6/2/2010 |
| 6. ISSUED BY |
| CODE |
| 9702 |
| 7. ADMINISTERED BY (If other than Item 6) |
| CODE |
| 9702 |
USDA Forest Service Pacific Southwest Region, EROC 1323 Club Drive
Vallejo, CA 94592
USDA Forest Service
Pacific Southwest Region, EROC
1323 Club Drive
Vallejo, CA 94592
| 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) |
| (X) |
| 9A. AMENDMENT OF SOLICITATION NO. |
FORMCHECKBOX
AG-9702-S-10-0259
9B. DATED (SEE ITEM 11)
5/7/2010
FORMCHECKBOX
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (X) |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN |
THE CONTRACT ORDER NO. IN ITEM 10A.
FORMCHECKBOX
| X |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b). |
FORMCHECKBOX
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
FORMCHECKBOX
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor FORMCHECKBOX is not FORMCHECKBOX is required to sign this document and return 1 copies submitted w/Bid to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
This modification is to provide a revised schedule of items and statement of work / specification. Additionally, attached is the list of modified drawings and the sign in sheet of site visit attendees. The response date for bids is hereby extended June 16, 2010 Bid bonds are required to be 10 % of the total bid price. Bid bonds must be mailed to 1323 Club Drive Vallejo CA 94592. The rest of the bid package may still be submitted electronically VIA the FBO Website.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
Yolanda Mitchell Contracting Officer
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
(Signature of person authorized to sign)
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
| 30-105 |
| STANDARD FORM 30 (REV. 10-83) |
Prescribed by GSA
FAR (48 CFR) 53.243
REVISED SECTION B –REPLACES THE SCHEDULE OF ITEMS IN THE ORIGINAL SOLICITATION IN ITS ENTIRETY
SHASTA-TRINITY N.F.
HAYDEN FLAT CAMPGROUND REHABILITATION
CONNECT WELL TO WATER DISTRIBUTION SYSTEM
WITH OPTIONS
THE BIDDER MUST BID ALL ITEMS AND PROVIDE UNIT PRICES FOR OPTIONAL ITEMS. GOVERNMENT MAY AWARD NONE OR ANY COMBINATION OF THE OPTION ITEMS.
SCHEDULE OF ITEMS
Item Number
| Description of Pay Item |
| Method of |
Measure
EST.
Quantity Pay Unit
| Unit Price |
| Total Amount |
| 01900 |
| Mobilization |
| L.S.Q. |
| 1 |
| Lump |
Sum
| 02510(02) |
| Water Distribution System: |
2 Inch Bronze Gate Valve (tank)
| A.Q. |
| 2 |
| EA |
| 02510(08)A |
| Water Distribution System: |
Multiple Utilities (from well)
2"SCH40PVC-WATER &
Anixter Control Cable
| A.Q. |
| 290 |
| LF |
| 02510(08)B |
| Water Distribution System: |
Multiple Utilities (to storage tank)
3"SCH40PVC-WATER,
2"SCH40PVC-WATER &
Anixter Control Cable
| A.Q. |
| 560 |
| LF |
| 02670 |
| Verticle Water Well: |
Pump, Wellhead & Float Switches
| L.S.Q. |
| 1 |
| Lump Sum |
TOTAL BASE BID =
OPTIONS
| OPTION 1 |
| NEW ELECTRICAL SERVICE |
| 02510(08)C |
| Water Distribution System: |
Multiple Utilities (from well)
1"SCH40PVC-WATER &
Electrical Wire in 1 Inch PVC Conduit
| A.Q. |
| 150 |
| LF |
| 016010(01)A |
| Electrical Equipment & Connections: New 100amp Metered Service Panel |
| L.S.Q. |
| 1 |
| Lump |
| 016010(02)A |
| Electrical Wire in 1 Inch PVC Conduit |
| A.Q. |
| 50 |
| LF |
OPT 1 Total =
| OPTION 2 |
| EXISTING ELECTRICAL SERVICE |
| 02510(08)D |
| Water Distribution System: |
Multiple Utilities (from well)
1"SCH40PVC-WATER &
Electrical Wire in 1 Inch PVC Conduit
| A.Q. |
| 460 |
| LF |
| 02510(08)E |
| Water Distribution System: |
Multiple Utilities (from well)
3"SCH40PVC-WATER &
Electrical Wire in 1 Inch PVC Conduit
| A.Q. |
| 480 |
| LF |
| 016010(01)B |
| Electrical Equipment & Connections: Existing 100amp Metered Service Panel |
| L.S.Q. |
| 1 |
| Lump |
| 016010(02)B |
| Electrical Wire in 1 Inch PVC Conduit |
| A.Q. |
| 90 |
| LF |
| 016010(04) |
| Pull Box: 10-1/4" X 16-3/4" |
| A.Q. |
| 4 |
| EA |
OPT 2 Total =
| OPTION 3 |
| GENERATOR |
| 016010(01)C |
| Electrical Equipment & Connections: |
Generator and Enclosure
| L.S.Q. |
| 1 |
| Lump Sum |
| OPTION 4 |
| MAIN LINE |
| 02510(01)A |
| Water Distribution System: |
3"SCH40PVC-WATER
| A.Q. |
| 650 |
| LF |
| OPTION 5 |
| MAIN LINE |
| 02510(01)B |
| Water Distribution System: |
3"SCH40PVC-WATER
| A.Q. |
| 560 |
| LF |
| OPTION 6 |
| LATERALS |
| 02510(01)C |
| Water Distribution System: |
2"SCH40PVC-WATER
| A.Q. |
| 420 |
| LF |
| OPTION 7 |
| LATERALS |
| 02510(01)D |
| Water Distribution System: |
1"SCH40PVC-WATER
| A.Q. |
| 600 |
| LF |
All Options Total =
TOTAL BASE BID + OPTIONS =
REVISED SECTION C –REPLACES THE SPECIFICATIONS IN THE ORIGINAL SOLICITATION IN ITS ENTIRETY
HAYDEN FLAT CAMPGROUND REHABILITATION – CONNECT WELL TO WATER DISTRIBUTION SYSTEM
SPECIAL SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 1
| 01010 |
| SUMMARY OF WORK |
| 01043 |
| JOB SITE ADMINISTRATION |
| 01060 |
| REGULATORY REQUIREMENTS |
| 01315 |
| SCHEDULES AND REPORTS |
| 01340 |
| SUBMITTALS |
| 01640 |
| PRODUCT HANDLING |
| 01700 |
| CLEANING OF EQUIPMENT |
| 01711 |
| CLEAN UP AND DISPOSAL |
| 01730 |
| OPERATION AND MAINTENANCE DATA |
| 01741 |
| MANUFACTURER’S WARRANTIES |
| 01900 |
| MOBILIZATION |
DIVISION 2
| 02100 |
| CLEARING |
| 02111 |
| REMOVAL OF STRUCTURES AND OBSTRUCTIONS |
| 02322 |
| EXCAVATION, BACKFILL, COMPACTION UTILITIES |
| 02510 |
| WATER DISTRIBUTION SYSTEM |
| 02670 |
| VERTICAL WATER WELL |
| 02675 |
| DISINFECTION OF WATER DISTRIBUTION SYSTEM |
DIVISION 16
| 16010 |
| GENERAL PROVISIONS ELECTRICAL |
| 16050 |
| BASIC MATERIALS AND METHODS |
| 16400 |
| ELECTRICAL SERVICE AND DISTRIBUTION |
SPECIAL SPECIFICATIONS
SECTION 01010
SUMMARY OF WORK
PART 1 GENERAL
1.01 SCOPE: The work specified in this contract is to connect the new vertical water well to the existing water storage tank with optional power utility hookups at Hayden Flat Campground, Del Loma, California. Work shall include all labor, equipment, materials, and incidentals necessary to complete the following:
BASE BID: Install waterlines and tank float controls/switches, submersible well pump, wellhead components, pump protector and controls, isolation valves, and other related appurtenances as specified herein and AS SHOWN ON THE DRAWINGS.
BID OPTIONS: In addition to the above work, if additional funding becomes available at least one of the following options shown in the schedule of items shall be awarded to provide a power to operate the well pump and waterline replacement. These are to be considered bid options and may be awarded by the Government anytime during this contract.
1.02
MEASUREMENT AND PAYMENT:
A.
MEASUREMENT
Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as included in the payment for items shown.
B.
PAYMENT
The quantities as measured above will be paid for at the contract unit price as shown on the Bid Schedule. Such payments shall be considered full compensation for completing this work in accordance with these specifications and the drawings.
1.03 LOCATION: Hayden Flat Campground is located just north of the Trinity River, off of Highway 299-West (T5N, R7E, SW ¼ of Section 24; Lat 40°47’05”N, 123°20’33”W; APN# 008-230-08-00) approximately 30 miles west of Weaverville, CA and 30 miles east of Willow Creek, CA From the town of Weaverville, CA - travel approximately 30 miles west on CA Hwy 299-West to the town of Del Loma, CA. Travel approximately another 0.8miles west of Del Loma, CA to Hayden Flat Campground (Appendix A).
1.04 GOVERNMENT FURNISHED: Vault toilets are on the site for use by the CONTRACTOR.
1.05 WORK COORDINATION: Campground is scheduled to be closed after the Labor Day weekend to accommadate this contract work and therefore, any changes to the start work date will need to be reviewed by the Forest Recreation staff and approved by the Contracting Officer. The Contractor shall coordinate the work, scheduling and any necessary traffic control with the Contracting Officer.
1.06 WORK BY OTHERS: It shall be the CONTRACTORS responsibility to schedule any required work with the PG&E for their services when required.
PART 2 PRODUCTS
2.01 MATERIALS: AS SHOWN ON THE DRAWINGS and as specified elsewhere herein.
PART 3 EXECUTION
3.01 AS SHOWN ON THE DRAWINGS and specified elsewhere herein.
3.02 SAFETY: The contractor has sole responsibility for the safety of the workers and all other person who may be affected by the work.
END OF SECTION 01010
SPECIAL SPECIFICATIONS
SECTION 01043
JOB SITE ADMINISTRATION
PART 1 GENERAL
1.01 SCOPE: The work of this section consists of traffic control, storage and protection of construction materials, coordination of the various work trades, safety, security, dust control, parking control, protection of finished work and contractor quality control.
MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for the work specified in this section.
PART 2 PRODUCTS
Not Applicable
PART 3 EXECUTION
3.01 TRAFFIC CONTROL: The CONTRACTOR shall control traffic in and out of the project site so it does not interfer with state highway traffic flow or access to campground host area. Coordinate traffic flow with the CONTRACTING OFFICER.
3.02
STORAGE AND PROTECTION OF CONSTRUCTION MATERIAL:
A. The CONTRACTOR shall:
1. Store work products to be used in such a manner as to protect the products from damage.
2. Maintain packaged materials with seals unbroken and labels intact until time of use.
B. The CONTRACTING OFFICER may reject as non-complying any damaged product or material.
C. The CONTRACTING OFFICER will designate a storage area within the project site. The storage of materials, vehicles and equipment shall be confined to this area unless aprroved otherwise by the Contacting Officer.
3.03 COORDINATION OF WORK TRADES: The CONTRACTOR shall coordinate the work of all trades to insure completion of the project within the contract time.
3.04 SAFETY: Safety for all persons on the job site shall be the sole responsibility of the CONTRACTOR.
3.05
SECURITY AND WORK SITE ACCESS:
A. The CONTRACTOR, at all times, shall be responsible for providing security for their equipment and materials delivered to the jobsite.
B. The CONTRACTOR will have access to the project site during normal work hours. The CONTRACTOR shall make arrangements with the CONTRACTING OFFICER for access to the project site during off-duty hours, however, such access shall not jeopardize the security at the government facility.
C. The CONTRACTOR shall be responsible for all damages occurring during these off-duty hours which are the result of CONTRACTOR’S actions or failure to provide security.
3.06 DUST ABATEMENT: It shall be the responsibility of the CONTRACTOR for dust abatement of the project site.
3.07 CONSTRUCTION VEHICLES: The CONTRACTING OFFICER will designate an area for construction related vehicle parking. The CONTRACTOR will be required to keep all construction related vehicles in this area.
3.08 PROTECTION OF GOVERNMENT PROPERTY: The CONTRACTOR shall not damage the other buildings trees and Government property at the job site.
3.09 CONTRACTOR QUALITY CONTROL: The CONTRACTOR shall provide quality control to ensure compliance with applicable regulations and standards, and the drawings, specifications, and provisions of the contract.
END OF SECTION 01043
SPECIAL SPECIFICATIONS
SECTION 01060
REGULATORY REQUIREMENTS
PART 1 GENERAL
1.01 SCOPE: This section describes the codes and standards which apply to the work in this contract. Additional codes and standards may apply by federal, state or local regulation and as specified elsewhere in the specifications.
1.02 CODES AND STANDARDS
A. The following codes and standards shall apply to the work in this contract:
1. International Building Code (IBC), 2006 Edition
2. Uniform Plumbing Code (UPC), 2006 Edition
3. Uniform Mechanical Code (UMC), 2006 Edition
4. Uniform Fire Code (UFC), 2006 Edition
5. National Electrical Code (NEC), 2005 Edition
6. American Water Works Association (AWWA)
7. National Sanitation Foundation (NSF)
8. American National Standards Institute (ANSI)
9. American Society for Testing and Materials (ASTM)
10. Underwriter's Laboratories, (UL)
11. National Fire Protection Association (NFPA)
12. International Association of Plumbing and Mechanical Officials (IAPMO)
13. American Institute of Steel Construction (AISC)
14. American Iron and Steel Institute (AISI)
B. Unless otherwise specified in this contract, reference to a specific standard or specification shall mean the latest edition or amendment in affect on the date of the invitation to bid.
C. Additionally, beginning January 1, 2010, California state law prohibits the introduction into commerce of any pipe, pipe or plumbing fitting, or fixture intended to convey or dispense water for human consumption that is not “lead free” as defined in statute. (Health & Saf. Code, § 116875, subd.(b), effective January 1, 2010 as specified in SB 1334, Stat. 2008, c.580.)
1.03 DEFINITIONS: Administrative Authority as used in the Uniform Mechanical Code, the Uniform Plumbing Code and the National Electrical Code, International Building Code and Uniform Fire Code shall be the CONTRACTING OFFICER.
1.04 MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for the work specified in this section.
PART 2 PRODUCTS
NOT APPLICABLE
END OF SECTION 01600
SPECIAL SPECIFICATIONS
SECTION 01315
SCHEDULES AND REPORTS
DESCRIPTION: Work included in this Section includes the requirements for the submittal of the Contractor's proposed work schedule for the project, an erosion control if applicable, and a breakdown of the Contractor's bid amount for the purpose of making progress payments.
MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for the work specified in this Section. Payment for such work will be included in the bid price for Mobilization Section 01900.
2.01
SUBMITTALS:
A. The submittal of a detailed operation plan/work schedule prepared as described below and a safety work plan per section C, and an erosion control plan shall be on reproducible paper or in an approved alternative form.
B. The submittal of the cost breakdown shall be on standard size paper and shall include three copies.
WORK SCHEDULE: Within 15 days of the issuance of the Notice to Proceed, the Contractor shall submit to the Contracting Officer for approval a proposed work schedule for the Project. Such schedule shall be in the form of a bar graph or other approved format and shall include the timing for each major phase of the work. The schedule shall include the sequencing of the various phases of the work and work specialties, and shall constitute a basis for the evaluation of time extensions in the negotiations for changes. The Contractor shall update such approved schedule as necessary when significant changes occur during the progress of the work.
COST BREAKDOWN: Within 15 days of the issuance of the Notice to Proceed, the Contractor shall submit to the Contracting Officer for approval a breakdown of the Lump Sum Unit Price for the project for the purposes of computing monthly progress payments and for use in determining costs for proposed changes to the Contract. Such breakdown shall include each separate phase of the work by Section but need not separate labor from material costs.
EROSION CONTROL PLAN: Within 15 days of the issuance of the Notice to Proceed, the Contractor shall submit to the CONTRACTING OFFICER for approval an erosion control plan when construction and/or maintenance activities occur outside of the Normal Operating Season (NOS). The NOS is between May 15 to October 15th.
END OF SECTION 01315
SPECIAL SPECIFICATIONS
SECTION 01340
SUBMITTALS
PART I GENERAL
SCOPE: This work consists of furnishing shop drawings, pertinent data, catalog cut sheets, submittals of technical information required in other special specifications such as pump curves, wellhead plumbing layout, and electrical equipment layout, and wiring diagrams, and requests for substitutions. Specification describes the review time for submittals, shop drawings, and substitutions.
MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for the work specified in this section.
PART 2 PRODUCTS
Not Applicable
PART 3 EXECUTION
3.01
SUBMITTALS
A. Shop Drawings: Provide three sets of blueline or blackline prints, including one reproducible, as required elsewhere herein. Make drawings accurately and to a scale large enough to show all pertinent aspects of the item and its connection to the work. Shop drawing, specifications, and construction drawings shall be submitted as specified and shall show any revision date.
Catalog Data: Provide catalog cuts, data, pertinent information, and other items specified or as directed by the CONTRACTING OFFICER. Clearly indicate by circling or highlighting each Item.
APPROVALS: Approval of substitutions and shop drawings will be made within 14 calendar days of the receipt of the submittal. Upon approval two copies of the approved shop drawings, prints and other items will be returned to the CONTRACTOR. The CONTRACTING OFFICER will retain the reproducible.
RESUBMITTAL: When a resubmittal is required, one print so indicating will be returned to the CONTRACTOR. After revisions of the original, three new copies including one reproducible shall be submitted for approval.
TIMING: Make submittals far enough in advance of the scheduled dates of installation to provide time for reviews, for securing necessary approvals, for possible revisions and resubmittals and for placing orders and securing delivery.
3.05 No portion of the work requiring a shop drawing or catalog data shall be started nor shall any materials be fabricated or installed prior to the approval of such Item.
END OF SECTION 01340
SPECIAL SPECIFICATIONS
SECTION 01640
PRODUCT HANDLING
DESCRIPTION: Work includes protecting products scheduled for use in the work by means including, but not necessarily limited to, those described in this section.
QUALITY ASSURANCE: Include within the CONTRACTOR'S quality assurance program such procedures as are required to assure full protection of work and materials.
1.03 TESTING LABORATORY RECOMMENDATIONS: Except as otherwise approved by the CONTRACTING OFFICER, determine and comply with testing Laboratory's recommendations on product handling, storage and protection.
1.04
PACKAGING:
A. Delivery of products to the job site:
1. Maintain packaged materials with seal unbroken and labels Intact until time of use.
2. Promptly remove damaged material and unsuitable items from the job site, and promptly replace with material meeting the specified requirements, at no additional cost to the Government.
The CONTRACTING OFFICER will reject as non‑complying such material and products that do not bear identification satisfactory to the CONTRACTING OFFICER as to grade, quality, and other pertinent information.
1.05
PROTECTION:
Protect finished surfaces over which equipment and materials are handled.
Maintain finished surfaces suitably protected until accepted by the Government.
1.06
REPAIRS AND REPLACEMENTS:
In event of damage, promptly make replacements or repairs to the item as directed and approved by the CONTRACTING OFFICER and at no additional cost to the Government.
Additional time required to secure replacements and to make repairs will not be considered by the CONTRACTING OFFICER to justify an extension of the contract time.
1.07 MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for work specified in this section.
END OF SECTION 01640
SPECIAL SPECIFICATIONS
SECTION 01700
CLEANING OF EQUIPMENT
PART 1 GENERAL
1.01 SCOPE: This work consists of removing all soil and vegetative matter from equipment prior to moving to the project area.
1.02 MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for the work specified in this section.
CLEANING EQUIPMENT REQUIREMENTS:
A. Noxious weeds
To prevent the spread of noxious weeds on National Forest Land, CONTRACTOR shall ensure that all equipment is free of soil, seeds, vegetative matter, or other debris that could hold seeds. CONTRACTOR shall employ whatever cleaning methods necessary to ensure compliance with the terms of this specification and shall notify the Contracting Officer prior to moving each piece of equipment onto National Forest land. Notification will include identifying the location of the equipment’s most recent operations. Upon request of the CONTRACTING OFFICER, arrangements shall be made to inspect each piece of equipment prior to it being placed into service. If it is determined by the Contracting Officer that noxious weeds are present in a project, cleaning may also be required before moving between work areas within the same project. The Contracting Officer will approve locations for this additional equipment cleaning.
The CONTRACTOR shall certify in writing compliance with the terms of this specification prior to each start up of operations. Measures taken to ensure compliance for equipment used at the start of operations or mobilized later will be identified in the certification. For the purposes of this specification, “equipment” includes all machinery except for lowboys, pickup trucks, cars or other vehicles used to transport personnel on a daily basis.
B. Port Orford Cedar root rot and Sudden Oak Death Syndrome
To prevent the spread of Phytophora lateralis (Port Orford Cedar root) and/or Phytophthora ramorum (Sudden Oak Death Syndrome) the CONTRACTOR shall clean any vehicles or equipment moved from infected areas before use in the project area.
Cleaning shall consist of the removal of soil by steam cleaning or use of a high-pressure hose. The CONTRACTING OFFICER will inspect cleaned equipment and vehicles prior to mobilization into the project area.
END OF SECTION 01700
SPECIAL SPECIFICATIONS
SECTION 01711
CLEAN UP AND DISPOSAL
PART I GENERAL
SCOPE: This work consists of the cleanup required in areas affected by the construction, the final cleanup of the project, and the disposal of refuse and excess material resulting from construction operations.
MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for the work specified in this section.
PRODUCTS: All cleaning materials and equipment used shall be selected and used with care to avoid damaging the surfaces cleaned.
PART 3 EXECUTION
EXCESS MATERIALS AND REFUSE: All refuse and unused materials generated by the CONTRACTOR'S operations including wood, asphalt, concrete, vegetative materials and the like shall be removed from the project site and disposed of off Government land in accordance with local regulations.
CLEAN–UP DURING CONSTRUCTION: The CONTRACTOR as required to prevent accidents to personnel and protect all work in‑place shall perform clean‑up. Construction clean‑up shall consist of the removal of all trash, scrap, debris, and excess materials from any workspace or walking surface that may cause the tripping or sliding of workers, ladders, equipment, and the like.
FINAL CLEAN‑UP: Immediately prior to the CONTRACTOR'S request for final inspection of the project, a thorough final cleanup of the entire project site shall be performed.
QUALITY OF CLEAN‑UP:
A. Site: Remove all trash, debris, and surplus excavated material. No items shall be left or discarded elsewhere on the site. Items that will be discarded shall be removed from Government property and disposed of in accordance with all applicable state and local regulations.
G. General: Remove paper labels from exposed fixtures and equipment only after respective items have been inspected, verified, and approved to assure that each complies with requirements of the Specifications and Drawings. Labels and plates that are permanently attached to equipment shall not be removed. Remove paint and clean all permanent labels so that they are legible.
SALVAGEABLE ITEMS: Salvageable items not intended for use in this contract and not specifically designated to remain on the property of the Government shall become the property of the CONTRACTOR.
END OF SECTION 01711
SPECIAL SPECIFICATIONS
SECTION 01730
OPERATION AND MAINTENANCE DATA
SCOPE: The work of this section shall include but not be limited to the compilation of data and information for each item of equipment and apparatus and furnishing this data and information in the form of Operation and Maintenance Manuals.
SUBMITTALS:
Submit two copies of the preliminary draft of the operation and maintenance manuals to the CONTRACTING OFFICER for review and comments.
Unless otherwise directed in other sections of these specifications or in writing by the CONTRACTING OFFICER, submit three copies of the final Operation and Maintenance Manual to the CONTRACTING OFFICER prior to instructions to operation and maintenance personnel.
1.03
MEASUREMENT‑AND PAYMENT:
No separate measurement or payment will be made for the work specified in this section.
B. No final payment will be made until the CONTRACTOR provides the CONTRACTING OFFICER with three sets of the final, CONTRACTING OFFICER approved, Operation and Maintenance Manual.
MANUAL:
Format:
1. Size: 8‑1/2 inches x 11 inches.
2. Paper: White bond, min. 20-pound weight.
3. Text: Neatly typed.
4. Drawings: As per CONTRACTING OFFICER’S directions.
5. Fly Sheets: Separate each section of manual with neatly prepared flysheets briefly describing contents of the ensuing portion.
6. Binding: Three ring binders or other CONTRACTING OFFICER approved method.
7. Measurements: U.S. Standard units such as feet, inches, pounds, etc.
8. Front & Back Covers: Durable material.
9. Indexing: As per CONTRACTING OFFICER’s direction.
The Manuals shall include the following information and data:
1. Project name, location, and address on the front cover.
2. CONTRACTOR'S name, address, and phone number located inside the front cover, including his endorsement.
3. McCloud Office Operation and Maintenance Manual shall be printed on the front cover.
4. CONTRACTING OFFICER’S approval, signature, and date.
5. Complete table of contents.
6. Summary of start‑up, shut‑down, and emergency instructions.
7. Complete operations instructions.
8. Summary of maintenance (chart form).
9. Complete maintenance instructions including lubrication and disassembly and reassembly Instructions.
10. Complete nomenclature of all parts and replacement parts for all equipment including name and address of the nearest vendor, and all other data pertinent to procurement procedures.
11. Manufacturer's bulletins, catalog cuts, model number, serial number, and all other pertinent data necessary to completely describe the item or equipment installed in this project. Clearly indicate the item concerned.
12. Include a copy of all warranties and guarantees issued.
13. Such other data as required and specified elsewhere herein.
PRELIMINARY DRAFT:
A. Prepare a preliminary draft of each proposed manual.
B. Show the general arrangement, nature of contents in each portion, probable number of drawings and their size and proposed method of Indexing, binding and covering.
C. Secure the CONTRACTING OFFICER’S approval prior to proceeding.
FINAL DRAFT:
A. Complete the final operations and maintenance manuals in strict accordance with the approved preliminary drafts and the CONTRACTING OFFICER’S review comments.
B. The CONTRACTOR shall make all revisions as directed by the CONTRACTING OFFICER and shall then secure the CONTRACTING OFFICER’S final approval.
C. The CONTRACTOR shall certify ‑by endorsement thereon that each of the manuals is complete and accurate.
END OF SECTION 01730
SPECIAL SPECIFICATIONS
SECTION 01741
Manufacturer’s WARRANTIES
PART I GENERAL
SCOPE: The work of this Section consists of the assignment of manufacturer’s warranties for products incorporated into the work.
MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for the work specified in this section.
QUALITY ASSURANCES: Warranties for the following shall be provided if applicable:
All mechanical equipment and controls.
All electrical items, equipment, and controls.
C.
All plumbing items, equipment, and controls.
D.
All other products not specified herein but for which the manufacturer provides a warranty.
PART 3 EXECUTION
3.01 All warranties shall be executed in the name of Sharon J. Heywood, Forest Supervisor, Shasta‑Trinity National Forests, 3644 Avtech Parkway, Redding, CA 96002. The CONTRACTOR shall file the original copy of each manufacturer's warranty in a loose-leaf binder. Copies of warranties shall be included with the Operations and Maintenance Manuals as specified elsewhere herein. The binder shall be given to the CONTRACTING OFFICER at or prior to the Final Inspection.
END OF SECTION 01741
SPECIAL SPECIFICATIONS
SECTION 01900
MOBILIZATION
SCOPE: This work of this section shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site. Mobilitation includes the obtaining of permits, insurance,and bonds.
Progress payment will be made as follows:
A. When five percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization (less bonding costs), or five percent of the original contract amount, whichever is less, will be paid in addition to the bonding costs.
B. When ten percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization or ten percent of the original contract amount, whichever is less, will be paid.
C. Upon completion of all work on the project, any unpaid amount for mobilization will be paid.
D. The total of all payments shall not exceed the original contract amount for this item.
PART 4 MEASUREMENT AND PAYMENT
4.01
MEASUREMENT AND PAYMENT:
The accepted quantities will be paid at the contract unit price for this pay item as shown in the Schedule of Items. The Government will pay to the CONTRACTOR the total premiums paid by the CONTRACTOR to obtain bonds in the first progress payment. This payment for bonding shall not be in addition to the contract price but will be included in the bid price for Mobilization.
PAY ITEM
PAY UNIT
01900 Mobilization
LS
END OF SECTION 01900
SPECIAL SPECIFICATIONS
SECTION 02100
CLEARING
PART 1 GENERAL
SCOPE: This work of this Section consists of clearing and grubbing within the project site. The work shall include but not be limited to clearing the work areas of trees, bushes, vegetation, organic matter and other objectionable materials within the building site and shall include removing rootwads and disposing of all spoils and debris resulting from the clearing and grubbing.
MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for the work of this section.
PART 2 PRODUCTS
TREE WOUND DRESSINGS: Dressing for tree wounds or cuts shall be:
A. An approved black asphaltum base antiseptic paint.
B. An approved black paint consisting of Bordeaux mixture, raw linseed oil, and lampblack.
C. An approved black paint consisting of zinc oxide, raw linseed oil, and lampblack.
CLEARING: The CONTRACTOR shall remove all vegetation, debris, organic matter, and otherwise objectionable material which is not suitable for use as fill or for support of structural loads or slabs. Any tree greater than 12 inches in diameter shall need to be reviewed and approved by CONTRACTING OFFICER prior to removal.
GRUBBING: Grubbing shall consist of the removal of stumps, root wads and roots larger than two (2) inches in diameter. Extent of grubbing shall not be less than six (6) inches below the original ground level and shall extend at least two (5) feet beyond the limits of the proposed structure, under walkways and parking areas. Unless further excavation is required, depressions made by grubbing shall be filled and compacted to the density of the surrounding soil or to the density required for structures, such that the surface conforms to the contour of adjacent ground.
DISPOSAL OF CLEARING AND GRUBBING DEBRIS: All clearing and grubbing materials shall be disposed of off Government property in accordance with all State and Local regulations.
PROTECTION AND TRIMMING OF EXISTING TREES:
A. All trees not designated for removal shall be protected from injury. The natural topsoil around the root systems shall also be maintained.
B. Where trees are damaged, or where limbs are required to be trimmed or removed because of operations under this contract, the cutting or removal of limbs or branches shall be performed in accordance with good tree surgery practices. No trees shall be removed, damaged, or pruned unless shown on the drawings or staked on the ground.
C. Trees damaged by the CONTRACTOR outside the cleared area shall have the scars painted with a nontoxic bituminous paint or shall be cut flush with the ground and disposed of.
END OF SECTION 02100
SPECIAL SPECIFICATIONS
SECTION 02111
REMOVAL OF STRUCTURES AND OBSTRUCTIONS
PART 1 GENERAL
1.01 SCOPE: The work of this Section is to completely remove old steel water pipe, miscellaneous concrete foundations, and unused appurtenances exposed during work on water system. All items removed shall become the property of the CONTRACTOR. The work shall include but not be limited to removing and disposing of the resulting debris and the like off Government property in accordance with all applicable Federal, State, County and Local regulations.
1.03 MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for the work of this Section.
PART 2 PRODUCTS
2.01 Not Applicable
PART 3 EXECUTION:
3.01 GENERAL: It is not known if hazardous materials were used in the construction of the water system. If hazardous materials are found, the CONTRACTOR shall remove any such materials in accordance with all applicable Federal, State, County and Local regulations.
3.02 All areas shall be backfilled with waste excavation from the project to match existing grade of surrounding topography. The disturbed areas shall be treated with erosion control prevention measures.
END SECTION 02111
SPECIAL SPECIFICATIONS
SECTION 02322
EXCAVATING, BACKFILLING, AND COMPACTING FOR UTILITIES
SCOPE: This work consists of trench excavation, backfilling, and compaction for utilities.
MEASUREMENT AND PAYMENT: No separate measurement or payment will be made for work specified in this section.
BEDDING MATERIAL:
A. Sand shall be clean free flowing granular material, free of vegetative matter with 100 percent finer than the No. 4 sieve, and with no more than six percent passing the No. 200 sieve.
B. Clean naturally rounded aggregate with a mix of particle sizes not less than 1/8 inch or greater than 1/2 inches. This material is commonly called pea gravel.
PART 3 EXECUTION
GENERAL: Trenching shall be performed to the lines, grades, and dimensions AS SHOWN ON THE DRAWINGS to provide the minimum required cover and separation between lines. Excavation shall be considered unclassified regardless of material encountered.
EXISTING UTILITIES: Prior to beginning trenching, the CONTRACTOR shall locate all existing underground utilities intersecting or parallel to the trench. Existing utilities shall be located by means of a pipe or cable locator and the location identified by spray painting the ground surface.
RESPONSIBILITY FOR UTILITIES: If existing underground utilities, SHOWN ON THE DRAWINGS or made known to the CONTRACTOR are damaged, utilities shall be repaired or replaced at no additional cost to the Government.
SAW CUTTING: Before trenching through concrete, asphalt concrete, chip sealed or oiled areas, the edges of all trenches shall be neatly saw cut to sharp clean vertical edges.
EXCAVATED MATERIAL: Trench excavation shall be placed in a neat pile adjacent to the trench a sufficient distance to prevent cave‑ins. Spoils pile shall not obstruct traffic. Excess excavation or excavation not suitable for backfill shall be disposed of off Government property. No side casting of excavated materials allowed.
3.06 BEDDING: All pipes shall be bedded in select bedding AS SHOWN ON THE DRAWINGS.
3.07
BACKFILL:
COMMON BACKFILL or native material may be used as backfill AS SHOWN ON THE DRAWINGS provided it contains no rocks larger than 3 inches in the greatest dimension. Native material shall be compacted in 12-inch loose measure lifts to match the density of the surrounding native soil. Backfill over pipe shall have a minimum of 24 inches of cover with 3 rounded inches left above ground grade on top of trench.
On native surface roadway areas, backfill shall be compacted in 12-inch loose measure lifts to 95 percent of AASHTO T‑99 Method C or D.
SELECT BACKFILL: Pipes/pipe zone shall be backfilled with select backfill material. Pipe zone shall be considered as 3 inches in any direction of the pipe. Select backfill shall be placed and compacted in 6-inch maximum lifts. Wheeled or track type hydro-hammers shall not be used for a compacting method.
Chipseal areas shall have 6” aggregate base compacted to a density of 95 percent of AASHTO T‑99 Method C or D unless approved otherwise.
3.08
SAFETY:
A. Trenches four feet in depth or greater shall be sloped or shored as required by the California State Division of Safety and Health.
B.
CONTRACTOR shall erect barriers around trench excavations to prevent accidents. Post warning lights on property adjacent to or with public access. Lights shall be placed from sunset to sunrise of the next day until excavation is entirely backfilled.
C. The Contractor is solely responsible for the safety of the workers and all others that may be affected by the work.
END OF SECTION 02322
SPECIAL SPECIFICATIONS
SECTION 02510
WATER DISTRIBUTION SYSTEM
PART 1 GENERAL
1.01 SCOPE: This work consists of furnishing and installing new potable water lines and related multiple utilities as specified in this contract.
1.02 SUBMITTALS: Submittals shall conform to these specifications and in accordance with Section 01340.
PART 2 PRODUCTS
PIPE AND FITTINGS:
All materials shall be new, of size, material, and type called for in these specifications.
1.
Galvanized Steel Pipe (GSP): Galvanized steel pipe and fittings shall be standard weight Schedule 40, with 150 pound class fittings, approved for use with potable water.
2.
Polyvinyl Chloride (PVC) Solvent weld Pressure Pipe: PVC pipe with a nominal pipe size of 3 inches and smaller shall be solvent weld pressure pipe, Schedule 40. Pipe shall be NSF approved and meet the requirements of ASTM D-1784 and D-1785.
3.
Polyvinyl Chloride (PVC) Pressure Pipe: PVC pipe with a nominal pipe size of 4 inches and larger shall meet the requirements of AWWA C900. All pipe shall be Class 150 and meet the requirements of SDR18. Pipe shall be bell end containing a lock-in ring and spigot joint.
4.
PVC Solvent Cements and Primer: Solvent cements and primer for use with PVC pipe shall comply with the Uniform Plumbing Code Installation Standard and recommended for use by the pipe manufacturer.
5.
Pipe Fittings: All change-in-direction fittings for PVC pipe 3 inches and smaller shall be of the same size and material as the pipe it serves. All pipe 4 inches and larger installed below ground shall make changes in direction with Ductile Iron Flanged fittings of the same size and class as to the pipe it serves. All PVC and Ductile Iron fitting shall be joined together using a Mechanical Joint (MJ). All pipe joints 4 inches and larger installed above ground shall be a Grove Lok type fitting.
6.
Pipe Thread Sealing Paste: Pipe sealant compound shall be a non-hardening, non-seizing, and non-toxic sealing paste containing TFE-Fluorocarbon approved for use with potable water.
2.02 VALVES, METERS AND ENCLOSURES: Valves and valve boxes shall be new, of size, material, and type as specified herein. All valves shall be equipped with hand wheel or other operating devices. Extensions shall be supplied for valves whose standard handle would exceed 12 inches below the top of valve enclosure. C900 PVC pipe, sized to fit inside valve box at least a couple inches below box lid, shall be notched to fit over pipe to act as a sleeve protector.
A. SHUT-OFF VALVES:
All waterlines less than 2 INCHES IN DIAMETER shall use full port brass body Ball Valves with wing handle.
For waterlines, 2 to 3 INCHES IN DIAMETER shall use Bronze Body Gate Valves. Bronze Gate Valves, Class 150, shall be union bonnet with solid wedge disk and non-rising stem. Valves shall conform to Federal Specification WW-V-54d, Class B, Type 2.
For waterlines LARGER THAN 3 INCHES in diameter, valve shall be iron body-bronze mounted, flanged ends, double disc parallel seat with four point wedging mechanism with hand wheel, rated for minimum operating pressure of 150 psi unless specified otherwise.
B. DRAIN VALVES:
All drain valves shall be 1 Inch Brass Swing Check Valves. Insect screening shall be installed at pipe end. The last ten linear feet of drain pipe with end exposed to daylight shall be GSP.
C. AIR RELEASE VALVES shall have a cast iron body and cover, stainless steel float and brass seat.
D. WATER METER shall be a 1 Inch positive displacement meter approved equal, installed in utility box outside of the wellhead vault cover.
E. VALVE AND METER UTILITY BOXES and extensions shall be pre-cast concrete, covers shall be marked “water”, and size and type shall be AS SHOWN ON DRAWINGS. PVC pipe sized to slip into the concrete box shall be notched to fit around the pipe.
2.04
FAUCETS
A. THREADED BIB FAUCET: Woodford model #46-VB faucet in rough brass exterior finish, with anti-siphon vacuum breaker and removable tee key handle manufactured by the Woodford Manufacturing Company, 2121 Waynoka Road, Colorado Springs, CO 80915 [(800) 621-6032] http://www.woodfordmfg.com, or approved equal.
B. SUMP: Gray water chamber for hydrants shall be the “Equalizer 24” as manufactured by Infiltrator Systems Inc., 6 Business Park Road, Old Saybrook, CT 06475 [(800) 221-4436] http://www.infiltratorsystems.com, or approved equal.
2.04 THRUST BLOCKS: Concrete for thrust blocking shall be a dry mix, less than 1” slump and a minimum of 2000 lbs break in 28 days.
2.05
MARKING TAPE
Marking tape shall be 2 inches wide with imprint "Caution - Buried Waterline Below"; color shall be blue. Tape shall be as manufactured by Calpico Inc. (located in South San Francisco, CA) or an approved equal.
Where more than one utility is located in a common trench, marking type shall be 6 inches wide with imprint "Caution - Buried Utility Lines Below".
2.06
BEDDING AND BACKFILL MATERIALS
A.
DRAIN ROCK: Drain rock material shall be uniformly graded, hard, durable, screened material 3-inch maximum size. It shall contain no lumps of soil or clay and free of organic material.
B. SELECT BACKFILL: Select backfill for bedding and backfilling shall consist of fine soil or sand, without stones or dirt clods larger than 3/8 inch.
C.
COMMON BACKFILL: Common backfill shall consist of inorganic material containing no rocks larger than 4 inches.
2.07 DISINFECTING AGENT: See Section 02675.
PART 3 EXECUTION
3.01 GENERAL: All piping shall be installed per manufacture’s recommendations and in accordance with the Uniform Plumbing Code Installation Standards.
3.02 PROTECTION OF PIPE: All pipe and fittings shall be protected during storage and installation to prevent contamination. All pipe interiors shall be clean prior to installation. Pipe that is not clean shall be flushed and swabbed out with water. Care shall be taken during laying and joining to prevent dirt and other objectionable material from entering pipe. Cap or plug lines when work is not in progress. Storage and stockpiles of PVC pipe shall be protected from exposure to sunlight. No PVC pipe will be left exposed to sunlight for more than 5 days.
3.03 PIPE INSTALLATION: No pipe shall be installed in the trench until the trench and bedding have been inspected and approved by the Government. PVC pipe shall be cut square to ensure proper assembly. PVC gasketed pipe shall be beveled with a plastic pipe pilot beveling tool and hand beveling will not be allowed. Pipe 2 ½”in diameter and smaller shall be assembled out of the trench and laid in the trench. Dropping pipe into trench after assembly will not be allowed. PVC spigot end pipe shall be assembled with its spigot ends pointing in the direction of flow. Solvent welded pipe shall be snaked in the trench. Valves and other control devices shall be installed in the line where called for AS SHOWN ON THE DRAWINGS. All devices shall be installed with unions to allow for ease of removal.
3.04 GRADE AND ALIGNMENT: Changes to grade and alignment shall be made with appropriate fittings. All PVC pipe may be deflected or bent to the minimum curve radii recommended by the manufacturer. Mechanically joined pipe shall not exceed 5º deflection at the joint. Changes in alignment to PVC solvent welded pipe, which cannot be made with standard fittings may be accomplished with swing joints installed so the lines drain. All pipe shall be laid with no sags or crests in gradient.
3.05 VALVE INSTALLATION:
A. Valves shall be installed AS SHOWN ON THE DRAWINGS and in accordance with the manufacturer's recommendations. Valves shall be installed in such positions that they are readily accessible, plumb, well-spaced from other valves, and fully opened and closed without binding. All valves shall be installed with stems pointing up. Contractor shall provide an operating extension handle to match handle on valve.
B. All valves shall be supported and braced as necessary to provide full support and prevent movement during normal operation. It shall be the responsibility of the Contractor to design, fabricate, and install the necessary supports and bracing.
C. All valves shall be placed upon a bed of drain rock material (washed pea gravel), 6 inch maximum thickness with a 4-mil plastic placed over rock to prevent freeze/thaw soil movement.
D. Each valve, its fittings and appurtenances, shall be kept free of dirt or other foreign materials. Each valve shall be tested for leakage and operation during the system tests and disinfected in accordance with Section 02675.
3.06 VALVE BOX ENCLOSURES: All valves and meter shall be installed in boxes or enclosures AS SHOWN ON THE DRAWINGS and specified herein.
A. The enclosures shall be installed in such a manner to prevent settlement or other movement after installation. The area on which the box sets shall be compacted to 90% of maximum density as determined by AASHTO T 180.
B. The box shall be set over the pipes and centered around valves and related appurtenances. Adequate clearance shall be provided between the enclosure and pipelines, valves and appurtenances. Sectional or stacked units shall be permanently assembled.
C. After the box is in final position, the area around the box shall be backfilled and compacted the same as the adjacent utility trench. The box, when in final position, shall be 1/2 inch minimum above surrounding finish grade and there shall be a minimum of 1/2 inch clearance between the box and the pipeline at any point.
3.07 THRUST BLOCKS: All piping and control devices shall have concrete thrust blocks installed per IAPMO Installation Standard. Concrete shall be hand placed so concrete does not interfere with operation of flange bolts. Thrust blocks shall be installed around all fitting and valves 3 inches or larger. Thrust blocks shall be sized in accordance with the pipe manufacturer’s recommendations and soil conditions.
3.08 MARKING TAPE: Marking tape shall be buried in all trenches AS SHOWN ON THE DRAWINGS and as specified herein. Tape shall be continuous in the trench and if tape needs to be broken, tape shall be overlapped 6 inches. Marking tape shall be placed above all buried water lines at 6 to 12 vertical inches below finished ground grade.
3.09 CARRIER CONDUIT: All water lines crossing the campground roads or spurs shall be placed within carrier conduit of PVC, CMP, steel or ABS and shall be sized to allow the water line to slide freely within. Road surface shall have a six inch depth of aggregate base rock with a 95% AASHTO T-99 density compaction AS SHOWN ON THE DRAWINGS.
3.010 DRAINS: As shown on water typical, include valve in valve box, GSP, check valve, and drain rock at all downhill elevation hydrants, locations shown on drawings.
3.011 BACKFILLING
A. SELECT BACKFILL: Pipes/pipe zone shall be backfilled with select backfill material. Pipe zone shall be considered as 3 inches in any direction of the pipe. Select backfill shall be placed and compacted in 6-inch maximum lifts. Wheeled or track type hydro-hammers shall not be used for a compacting method.
B. COMMON BACKFILL: Common backfill shall be placed and compacted in 12-inch maximum lifts. Total backfill over pipe shall be a minimum of 24 inches of cover and with 3 rounded inches left above ground grade on top of trench,…
This is the start of the file's text. The full file is on GovTribe.