SF_30_Mod 1.docx

DOCX document 48 KB Posted

Attached to
RECOVERY Hayden Flat Campground Rehab
Solicitation number
AG-9702-S-10-0212
Issued by

About this file

Correction to Amendment 2. Modification Documents

View the file

Other files

File Type Posted
38_Solicitation.docx DOCX document
35_Attachments 1-4.pdf PDF
35_Attachment 5 Fire Plan.pdf PDF
38_Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE
PAGE OF PAGES
1
1
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
00001
3/9/2010
6. ISSUED BY
CODE
9702
7. ADMINISTERED BY (If other than Item 6)
CODE
9702

USDA Forest Service Pacific Southwest Region, EROC 1323 Club Drive Vallejo, CA 94592

USDA Forest Service Pacific Southwest Region, EROC 1323 Club Drive Vallejo, CA 94592

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code)
(X)
9A. AMENDMENT OF SOLICITATION NO.
|_|
AG-9702-S-10-0212

9B. DATED (SEE ITEM 11)

3/9/2010

|_|
10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

|_| The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers |_| is extended, |X| is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X)
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN

THE CONTRACT ORDER NO. IN ITEM 10A.

|_|
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
|_|
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
|_|
D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor|_|is not |_|is required to sign this document and return 1 copies submitted w/Bid to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.

The purpose of this modification is to revise the section B Schedule of Items and the section C Statement of Work. All revisions supercede section B and section C in the original solicitation.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
YOLANDA MITCHELL

Contracting Officer

15B. CONTRACTOR/OFFEROR
15C. DATE SIGNED
16B. UNITED STATES OF AMERICA
16C. DATE SIGNED

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

30-105
STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

SECTION B: SCHEDULE OF ITEMS

SHASTA-TRINITY N.F.

HAYDEN FLAT CAMPGROUND REHABILITATION - WELL DRILLING

WITH OPTIONS TO ACQUIRE MINIMUM WELL YIELD

THE BIDDER MUST BID ALL ITEMS AND PROVIDE UNIT PRICES FOR OPTIONAL ITEMS

SCHEDULE OF ITEMS

Item Number

Description of Pay Item
Method of

Measure

EST.

Quantity Pay Unit Unit Price Amount

1001
Mobilization
L.S.Q.
1
Lump

Sum

1002-1
Drilling well #1
A.Q.
250
L.F.
1003-1
Steel Well Casing 6”
A.Q.
202
L.F.
1003-2
Slotted Steel Well Casing 6”
A.Q.
50
L.F.
1003-3
4” PVC class 200 Well Casing
A.Q.
200
L.F.
1003-4
4” PVC class 200 Slotted 0.032” Well Casing
A.Q.
50
L.F.
1004
Sanitary Seal 50 ft.
L.S.Q.
1
Lump Sum
1005
Well Development
L.S.Q.
1
Lump Sum
1006
Well Performance Pumping Test
L.S.Q.
1
Lump Sum
1007
Water sampling and testing
L.S.Q.
1
Lump Sum
1008-1
Destruction -

existing abandoned vertical well

A.Q.
50
L.F.
1008-2
Destruction - new vertical well #1
A.Q.
250
L.F.
1009
Erosion Control
L.S.Q.
1
Lump Sum

TOTAL BASE BID =

Option 1

Option 1 1002-2

Drilling well #2
A.Q.
250
L.F.

Option 1 1008-3

Destruction - new vertical well #2
A.Q.
250
L.F.

Option 1 Total =

Option 2

Option 2 1002-3

Drilling well #3
A.Q.
250
L.F.

Option 2 1008-4

Destruction - new vertical well #3
A.Q.
250
L.F.

Option 2 Total =

TOTAL WITH ALL OPTIONS =

SECTION C - DESCRIPTIONS/SPECIFICATIONS/WORK STATEMENT

C.1 DESCRIPTION OF WORK

Work is to construct a new vertical potable water well and destroy existing abandoned vertical well at Hayden Flat Campground, Del Loma, California.

C.1A SPECIFIC DESCRIPTION OF WORK

· Vertically drill, case, seal, develop, performance pumping, disinfect, sample and test, and abandon is necessary, a new potable public water source.

· Properly destroy existing 50-ft deep, 6-inch steel cased 2-ft above ground surface, abandoned vertical well.

· All resulting debris will be disposed of according to State, County and local regulations.

ADDITIONAL OPTION ITEMS

· If desired minimum yield is not obtained, Contracting Officer may approve drilling in one or two additional locations in the campground.

C.2 PROJECT LOCATION

SITE - HAYDEN FLAT CAMPGROUND

Hayden Flat Campground well drilling site(s) is located just north of the Trinity River off of CA Highway 299-West within the Shasta-Trinity National Forest, in Trinity County. From the town of Weaverville, CA - travel approximately 30 miles west on CA Hwy 299-West to the town of Del Loma, CA. Travel approximately another 0.8miles west of Del Loma, CA to Hayden Flat Campground.

C.3 PRE-BID CONFERENCE

A pre-bid meeting has not been scheduled. Contact the project COR, Leslie Ross at 530-226-2316, for further information.

C.4 CONTRACT TIME AND ESTIMATED START DATE

Estimated starting date is May 1, 2009 or later. Contract time will be 60 calendar days.

The time stated for completion shall include obtaining water test results.

C.5 PROJECT ACCESS

Hayden Flat Campground area may be closed during construction. The Forest Service shall be given 15 days advanced notice prior to drilling, for public notification.

C.6 CLEAN EQUIPMENT

Cleaning of Equipment- Pre-Operation Cleaning of Equipment. To prevent the spread of the root disease and/or noxious weeds, the Contractor shall clean equipment before entering Government property, unless otherwise agreed to in writing by the Contracting Officer. Clean any vehicle or equipment that may transport infected soil and weed seed. Cleaning shall consist of the removal of foreign material by steam cleaning or high pressure hose. Cleaning shall be inspected prior to use by the Contractring Officers Representative (COR).

C.7 TECHNICAL SPECIFICATIONS

C 7.1 PLANS

The contractor shall furnish a Safety Work Plan, detailed Operation Plan/Schedule, Erosion Control Plan, and product manufactures literature/MSDSs for approval by the Contracting Officer prior to the start of work.

Technical information concerning this project can be obtained from Leslie Ross, Shasta-Trinity National Forest Supervisors Office, Redding, CA, telephone (530) 226-2316.

C.7.2 SAFETY PLAN CRITERIA, MINIMUM REQUIREMENTS

1. General Statements of Policy

0. Company Policy

0. Health and Safety

0. Safety Inspections

0. Accident Prevention

0. Emergency Procedures

1. Fire Prevention

1. General Statement

1. Fire Restrictions

1. Communications

1. Smoking

1. Cleaning and Decreasing

1. Welding or Torch Work

1. Medical

2. On Site First Aid

2. Medical Facilities

2. Training and Certification

2. Personnel Qualifications

2. Record Keeping

1. Communications (radio-phone)

3. Personnel Training

3. Available Equipment

3. Communications Plan

1. Occupational Health and Safety

4. Job Hazard Analysis

4. Drinking Water

4. Noise Exposure

4. Atmospheric Contaminants

4. Hazardous Chemicals

4. Personal Protective Equipment

4. Excavation and Trenching

4. Working Surfaces

4. Trips and Falls

1. Heavy Equipment and Motor Vehicles

5. Job Hazard Analysis

5. Inspection and Maintenance Procedures

5. Personnel Qualifications

5. Operation of Heavy Equipment

5. Operation of Motor Vehicles

1. Small Equipment and Tools

6. Job Hazard Analysis

6. Slings and Hoists

6. Hand and Power Tools

6. Grinding Tools

6. Power Saws

6. Pneumatic Tools

6. Air Compressors

6. Compressed Gas Cylinders

6. Man and Scissor Lifts

6. Generators and Welders

6. Whackers and Vibratory Plate

1. Public Protection

7. Traffic Control

7. Signs

7. Barricades

d. Sign Plan

C 7.3 FIRE PLAN – SEE ATTACHMENT 5

C 7.4 PROJECT SPECIFICATIONS

There are only special project specifications for this project (see below).

C.7.5 SPECIAL PROJECT SPECIFICATIONS

The following special project specifications are a part of this solicitation and any resultant contract.

DIVISION 1 – GENERAL REQUIREMENTS

SECTION 01110 – SUMMARY OF WORK

SECTION 01330 - SUBMITTAL PROCEDURES

SECTION 01600 – USE OF GOVERNMENT FACILITIES

SECTION 01640 – PRODUCT HANDLING

SECTION 01700 – CLEANING OF EQUIPMENT

SECTION 01900 – MEASUREMENT AND PAYMENT

DIVISION 2 – SITE CONSTRUCTION

SECTION 02525 – WATER SUPPLY WELLS

SPECIAL PROJECT SPECIFICATIONS

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01100 - SUMMARY OF WORK

Description of Work: The work shall include all labor, equipment, materials, and incidentals necessary to construct new vertical potable water well and destroy existing abandoned vertical well.

The Contracting Officers Representative (COR) will stake the exact well(s) location on the ground. The drilling CONTRACTOR does not represent, warrant, or guarantee the quality, quantity, or kind of water, if any, encountered.

No separate measurement or payment will be made for work specified in this section.

SECTION 01330 – SUBMITTAL PROCEDURES

The CONTRACTOR will submit, for approval by the CONTRACTING OFFICER, all information necessary to ensure compliance with standards and specifications contained herein. The CONTRACTOR will provide the required submittals at least ten business days prior to the start of work and will include:

a. Written safety work plan and plan of operation/schedule

b. Written site specific erosion control plan (refer to Appendix B- Non-Site Specific Erosion Control Plan for Well Drilling Projects)

c. Manufacture’s literature, MSDS, and shop drawings of all construction products and materials required for the planned work including casing, drilling foam, mudding agents, grout, etc.

Work will not begin until all submittals have been reviewed and approved by the CONTRACTING OFFICER.

No separate measurement or payment will be made for work specified in this section.

SECTION 01600 - USE OF GOVERNMENT FACILITIES, UTILITIES, ETC.

If approved by the CONTRACTING OFFICER the CONTRACTOR may store materials and equipment at the project site. However, any materials or equipment stored on government property by the CONTRACTOR is the responsibility of the CONTRACTOR.

The CONTRACTOR may use existing sanitation facilities at the worksite.

The CONTRACTOR is responsible for furnishing all utilities necessary to complete the required work. The CONTRACTOR may use existing GOVERNMENT utilities with written approval from the CONTRACTING OFFICER.

No separate measurement or payment will be made for work specified in this section.

SECTION 01640 – PRODUCT HANDLING

Work includes protecting products scheduled for work use by means including, but not necessarily limited to, those described in this section.

Quality Assurance: Include within the CONTRACTOR's quality assurance program such procedures as are required to assure full protection of work and materials.

Testing Laboratory Recommendations: Except as otherwise approved by the CONTRACTING OFFICER, determine and comply with testing Laboratory's recommendations on product handling, storage, and protection.

Packaging: Maintain packaged materials with seal(s) unbroken and label(s) intact until time of use. At no cost to the Government, promptly remove any damaged material not meeting the specified requirements. The CONTRACTING OFFICER will reject as non-complying such material and products that do not satisfactorily indicate grade, quality, and other pertinent information.

Protection: Protect finished surfaces over which equipment and materials are handled. Maintain and protect finished surfaces until accepted by the CONTRACTING OFFICER.

Repairs and Replacements:

a. In event of damage, promptly replace and/or repair the item as directed and approved by the CONTRACTING OFFICER at no additional cost to the Government.

b. Additional time required to secure replacements and/or make repairs will not be considered by the CONTRACTING OFFICER as justification for an extension in the Contract Time of Completion.

No separate measurement or payment will be made for work specified in this section.

END OF SECTION 01640

SECTION 1700 - CLEANING OF EQUIPMENT (04/03)

This work consists of removing all soil and vegetative matter from equipment prior to moving to the project area.

Cleaning Equipment Requirements:

a. Noxious weeds To prevent the spread of noxious weeds on National Forest Land, CONTRACTOR shall ensure that all equipment is free of soil, seeds, vegetative matter, or other debris that could hold seeds. CONTRACTOR shall employ whatever cleaning methods necessary to ensure compliance with the terms of this specification and shall notify the Contracting Officer prior to moving each piece of equipment onto National Forest land. Notification will include identifying the location of the equipment’s most recent operations. Upon request of the CONTRACTING OFFICER, arrangements shall be made to inspect each piece of equipment prior to it being placed into service. If it is determined by the Contracting Officer that noxious weeds are present in a project, cleaning may also be required before moving between work areas within the same project. The Contracting Officer will approve locations for this additional equipment cleaning.

The CONTRACTOR shall certify in writing compliance with the terms of this specification prior to each start up of operations. Measures taken to ensure compliance for equipment used at the start of operations or mobilized later will be identified in the certification. For the purposes of this specification, “equipment” includes all machinery except for lowboys, pickup trucks, cars or other vehicles used to transport personnel on a daily basis.

b. Port Orford Cedar root rot and Sudden Oak Death Syndrome To prevent the spread of Phytophora lateralis (Port Orford Cedar root) and/or Phytophthora ramorum (Sudden Oak Death Syndrome) the CONTRACTOR shall clean any vehicles or equipment moved from infected areas before use in the project area.

Cleaning shall consist of the removal of soil by steam cleaning or use of a high-pressure hose. The CONTRACTING OFFICER will inspect cleaned equipment and vehicles prior to mobilization into the project area.

No separate measurement or payment will be made for work specified in this section.

END OF SECTION 01700

SECTION 01900 – MEASUREMENT AND PAYMENT

The accepted quantities of work will be measured as shown below and paid for at the contract bid price as shown on the Schedule of Items.

Materials and work items not specifically included as specified pay items shall be considered incidental to the following pay items and shall be included in their payment.

ITEM NO.

1001 Mobilization – Lump sum payment includes travel, per diem, and all costs incurred in assembling all needed equipment at well site and its return (demobilization). Bonding costs and local permit(s) application fees shall also be included in pay item.

1002 Drilling - Linear foot payment of drilled vertical hole, measured from the natural ground surface or from start of hole diameter to the final depth. Payment shall include materials, labor, and equipment for drilling; well completion report; drilling fluid, well plumbness and alignment; and well disinfection.

1003 Casing - Linear foot payment of casing installed, measured vertically end-to-end for each type and size. Slotted well casing shall be measured from the bottom of the slotted casing to its connection with the continuous well casing. Payment shall include materials and labor for installation, joining casing sections, installation/removal of temporary (outer) casing if used, casing backfill, site grading around the casing, and secured with lockable cap.

1004 Sanitary seal - Lump sum payment for a 50 foot sanitary seal, measured from the starting lowest level at which the seal is placed to within the ground surface. Seal includes furnishing materials, labor and equipment to mix and place sanitary seal.

1005 Well Development - Lump sum payment includes all materials, equipment, labor, and sampling to complete the development.

1006 Well Performance Testing - Lump sum payment shall include all materials, equipment, and labor necessary to complete performance testing and measurement of static/pumping water levels and drawdown/recovery data.

1007 Water sampling and testing – Lump sum payment shall include all materials, equipment, labor, and laboratory testing analyses from representative well water samples.

1008 Well Destruction – Linear foot payment of hole abandoned. Payment shall be made only when the CONTRACTING OFFICER authorizes the CONTRACTOR - in writing - to abandon the well. Payment when authorized shall include all materials, equipment, and labor required to abandon the well.

1009 Erosion Control – Lump sum payment shall include all materials, equipment, and labor to complete required erosion control measures.

END OF SECTION 01900

SPECIAL PROJECT SPECIFICATIONS

DIVISION 2 – SITE CONSTRUCTION

SECTION 02525 - WATER SUPPLY WELLS

GENERAL

1.01 SCOPE: This work shall consist of furnishing all labor, equipment, materials, and supervision necessary to do the following: drill vertically, case, seal, develop, performance pumping, disinfect, sample & test, and abandon if necessary, a new potable public water source and; properly destroy existing 50-ft deep, 6-inch steel cased 2-ft above ground surface, abandoned vertical well. No well logs exist for the existing abandoned well. If the desired minimum yield is not found, than the CONTRACTING OFFICER may direct the CONTRACTOR to drill in another location within the Campground and modify the base contract with optional well #2 and/or well #3 award items.

1.02 LICENSED CONTRACTOR: Licensed C-57 water well CONTRACTOR shall perform all work under this section.

1.03 CODES AND STANDARDS: All work shall be in accordance with all applicable requirements specified in the following:

· California Well Standards Bulletin 74-81 and 74-90; and any subsequent bulletins published by the California Department of Water Resources (DWR) establishing standards for domestic water well drilling in the state of California

· California Drinking Water Standards – Title 17 and Title 22

· American Water Works Association Standard A100-97 for Water Wells

· Environmental Protection Agency Manual of Water Well Construction Practices

· National Sanitation Foundation (NSF)

· State, County and local regulations and code requirements

1.04 SITE LOCATION: Hayden Flat Campground is located just north of the Trinity River, off of Highway 299-West (T5N, R7E, SW ¼ of Section 24; Lat 40°47’05”N, 123°20’33”W; APN# 008-230-08-00) approximately 30 miles west of the town of Weaverville and 30 miles east of the town of Willow Creek, CA (Appendix A). Meta-sediment bedrock is mapped at Hayden Flat Campground (Appendix D).

1.05 PERMITS: The CONTRACTOR shall obtain all required local permits such as Trinity County water well permit.

1.06 NOTIFICATION: The CONTRACTOR shall notify the Contracting Officer’s Representative Seventy-two (72) hours in advance when starting work on site.

1.07 REPORTS: The CONTRACTOR shall submit a “Well Completion Report, DWR 188” (Appendix C) to the CONTRACTING OFFICER and to the Department of Water Resources Northern District office upon completion of work. Report form available at http://www.dpla2.water.ca.gov/publications/groundwater/dwr188_prd.pdf

1.08 YIELD: The desired minimum yield is 10 gallons per minute.

SECTION 02525 - WATER SUPPLY WELLS (Continued)

PRODUCTS

2.01 All products shall be new, undamaged, and approved for the intended use. CONTRACTING OFFICER shall review and approve of all products prior to use and/or installation (refer to Section 01330 and schedule of items).

2.02 The CONTRACTOR will furnish potable water. The CONTRACTOR will identify the potable water source in the submitted work plan. The CONTRACTOR will obtain water from a source that complies with public water system standards.

2.03 Impervious material: Any material with a coefficient of permeability less than 10 feet per year which includes, but is not limited to: Neat cement, sand-cement grout, concrete, and bentonite clay; and well-proportioned mixes of silts, sands, and clays or cement. All impervious materials require the approval of the CONTRACTING OFFICER.

Filler material: Mixtures containing varying proportions of clay, silt, sand, gravel, and crushed stone. All fillers require the approval of the CONTRACTING OFFICER.

Organic matter shall not be used.

EXECUTION

3.01 All soil erosion controls shall be in place prior to start of work if drilling outside of Normal Operating Season (NOS) defined as May 15 to October 15.

3.02 The target depth to achieve sufficient water yield is estimated to be within 250 feet of the surface. The CONTRACTING OFFICER must approve drilling past the target depth. If the well yield is below the minimum desired, the CONTRACTING OFFICER shall consider approving further drilling beyond 250-ft or moving to a different drill site. If a sufficient amount of water quantity is obtained the CONTRACTING OFFICER may direct the CONTRACTOR to stop drilling prior to the 250-ft depth.

3.03 Final disinfection shall be sufficient to produce a minimum of 50 mg/l (parts per million) of available chlorine solution when mixed with the total volume of water in well.

3.04 Steel casing shall be used for the sanitary seal and extend 2-feet above ground surface. The finished well shall be secured with a lockable well cap.

Placement of slotted well casing shall be determined in the field.

PVC well liner casing shall not be extended above ground surface.

If a consolidated geologic formation exists below the sanitary seal, the CONTRACTING OFFICER shall consider not extending the steel casing to the bottom of the drilled hole.

3.05 Well development will be performed in manner that does not threaten or damage the well structure. The pump and prime mover shall have a capacity in excess of the anticipated lift and final production capacity of the well. The development and test pump shall be set to a depth in excess of the anticipated pumping level. Development equipment and method used shall permit variable pumping discharge rates.

SECTION 02525 - WATER SUPPLY WELLS (Continued)

3.06 Performance Pumping Test – After recovery from well development is complete, (return of well to static water level), a step-drawdown test and a constant rate test shall be conducted. Pumping the well at the design rate or at maximum yield for a period of not less than 24 hours, unless otherwise specified, and until the pumping level remains constant for at least 8 hours, or until the CONTRACTING OFFICER terminates testing.

3.07 Once well development, disinfection, and performance testing are complete, and all traces of disinfection have been removed the CONTRACTOR shall collect representative water samples. The CONTRACTOR will have a California certified lab conduct the following test analyses: General Mineral; General Physical; Inorganic Chemical; EPA method 200.8 for Arsenic, Boron, Vanadium; and bacteriological colilert analysis. Submit all results to the CONTRACTING OFFICER.

3.08 Well Destruction

Locate all existing underground utilities at or near existing abandoned well. All water utilities shall be capped and all electrical utilities shall be disconnected. Remove exposed unused utilities at least down to 2-feet below ground surface. Remove and dispose of casing down to 3-feet below ground surface.

Contractor shall remove and properly dispose off government land any existing surface grade concrete aprons or foundations surrounding well casing and any existing obstructions and contaminants from within the well casing. No disposal will occur on Government land.

Fill well from the bottom up. The maximum permissible vertical drop for concrete or other cementitious materials is limited to 2 feet. Cementitious material shall not be exposed to the action of water before setting, or deposited in water, except upon written permission. If placing cementitious material in water, prevent segregation by placing from the bottom of the hole using a slick line or equivalent allowing the cementitious material to displace water as the hole is filled.

Provide a continuous seal from the bottom of well to within 3-feet of ground surface. Sealing material placed in the well shall flow over to form a cap.

The CONTRACTOR must verify that the volume of the material placed in the well is at least equal to the volume of the hole. The CONTRACTOR will report results to the COR.

After well seal has been approved by the CONTRACTING OFFICER, existing native soil fill material shall be mounded 1-foot higher than the existing ground surface to allow for settlement. Grade fill material back to existing ground surface with a 1/2:1 slope

END OF SECTION 02525