table404-1.doc

DOC document 25 KB Posted

Attached to
Recovery Upper Niagara Creek Bridge Federal contract opportunity
Solicitation number
AG-9702-S-09-0024
Issued by
Department of Agriculture Forest Service Washington Office Economic Recovery Operations Center Southwest

About this file

404-1

View the file

Other files for this federal contract opportunity

Other files attached to Recovery Upper Niagara Creek Bridge, newest first.
File Type Posted
UNCB Revision 1 - Sheet 7 of 12.pdf PDF
Table 301.doc DOC document
ARRA_UPPER NIAGRA CRK BRDGE_Contractor_EST-10-05-09.pdf PDF
Amendment_0002.pdf PDF
404.doc DOC document
Sheet_1_of_6_revised.pdf PDF
Amendment 0001 Final.pdf PDF
SF 1442 page 1 - 3.pdf PDF
ARRA_UPPER NIAGRA CRK BRDGE_California Fire Laws.rtf RTF text file
ARRA_UPPER NIAGRA CRK BRDGE_PLANS.pdf PDF
Wage Determination.doc DOC document
ARRA_UPPER NIAGRA CRK BRDGE_ PAL Fire Plan_June 2006.doc DOC document
SF24 Bid Bond.pdf PDF
09 2009 Upper Niagara Bridge Approach Spec_Revised 07-09-09.doc DOC document
SF 1442 page 4 - 44.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

404.09 Acceptance.

Add the following to the second paragraph:

See Table 404-1 for sampling and testing requirements.

Table 404-1. Delete and replace with the following:

Table 404-1. Sampling and Testing Requirements.

Material or Product
Type of Acceptance (Subsection)
Characteristic
Category
Sampling Methods Specifications
Sampling Frequency
Point of Sampling
Split Sample
Reporting Time
Asphalt Mixture (404.09)
-
-
-
AASHTO T 168
Three minimum per project and at least one per 500 Cubic yards
Roadway prior to compaction
yes
As soon as sampled

File details come from the government source that posted it. Updated .