Amendment_0002.pdf
PDF 30 KB Posted
- Attached to
- Recovery Upper Niagara Creek Bridge Federal contract opportunity
- Solicitation number
- AG-9702-S-09-0024
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| UNCB Revision 1 - Sheet 7 of 12.pdf | ||
| table404-1.doc | DOC document | |
| Table 301.doc | DOC document | |
| ARRA_UPPER NIAGRA CRK BRDGE_Contractor_EST-10-05-09.pdf | ||
| 404.doc | DOC document | |
| Sheet_1_of_6_revised.pdf | ||
| Amendment 0001 Final.pdf | ||
| SF 1442 page 1 - 3.pdf | ||
| ARRA_UPPER NIAGRA CRK BRDGE_California Fire Laws.rtf | RTF text file | |
| ARRA_UPPER NIAGRA CRK BRDGE_PLANS.pdf | ||
| Wage Determination.doc | DOC document | |
| ARRA_UPPER NIAGRA CRK BRDGE_ PAL Fire Plan_June 2006.doc | DOC document | |
| SF24 Bid Bond.pdf | ||
| 09 2009 Upper Niagara Bridge Approach Spec_Revised 07-09-09.doc | DOC document | |
| SF 1442 page 4 - 44.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0002 10/08/09
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
USDA Forest Service EROC-SW Contracting 1323 Club Drive Vallejo, CA 94592
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State, and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.
AG-9702-S-09-0024
9B. DATED (SEE ITEM 11)
09/16/09
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(X) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN
THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.
See Summary of Changes, page 2 of 2.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT - Attachment to SF 30 2 2
ISSUANCE DATE 10/08/09 PROJECT NAME – Upper Niagara Creek Bridge
AMENDMENT NUMBER - 0002
List below (or on attached sheet, if necessary) each proposed modification identified by Item Number, location of station, etc., giving the reasons for the modifications.
Summary of Changes
1. Replace the schedule of items with the attached revised schedule
2. Refer to supplemental specifications for Construction of Bridges on Federal Highway Projects FP-03 and remove sections 403 and 409.
3. Add the Attached Supplemental Specification 404 – Minor Hot Asphalt Concrete with table 404-1
Sampling and testing requirements
4. Replace Table 301-1 of the Supplemental Specifications with the attached Table 301-1
5. Replace the Plan and Elevation drawing sheet 7 of 12 with the attached Plan and Elevation drawing which deletes the aggregate finish sentence from the prestress members General note.
6. Add the following wording to Section 300 of the Supplemental Specifications:
“Aggregate base provided under this contract shall be certified by the producer or other person selling or supplying the aggregate base, to contain an asbestos content less than 0.25%. The certification shall contain: (a) the amount of aggregate base sold or supplied for this contract; (b) the date sold; (c) the dates the aggregate base was sampled and tested; and (d) a statement that the asbestos content of the aggregate base is less than 0.25% as tested and measured by a State approved bulk test method.”
End of Amendment