Text version

409 - Asphalt Surface Treatment

409.02_nat_us_05_12_2004

409.02 Material.

Add the following:

When designated, conform to applicable State department of transportation asphalt cement or emulsified asphalt requirements.

409.06_nat_us_05_12_2004

409.06 Weather.

Delete the first paragraph and replace with the following:

Apply surface treatments with aggregate only when ambient air and surface temperatures are above 60 °F and rising in the shade, when the weather is not foggy or rainy, and when rain is not forecast for at least 24 hours after application.

409.06 Date & Time.

Add the following.

Construct fog seal and single-course surface treatments between _____ (dates) and ______ and multiple-course surface treatments between ______ and ______.

409.08_nat_us_06_21_2005

409.08 Asphalt Application.

Add the following to the 3rd paragraph:

Ensure the length of spread is no more than what can be covered with aggregate within 1 minute of the asphalt application.

409.10 Fog Seal.

Add the following to the first paragraph:

Dilute by adding an equal amount of water to the emulsified asphalt. Do not cut the emulsified asphalt more than once.

409.11 Single Course Surface Treatments.

Add the following:

Do not permit traffic to travel over any Asphalt Surface Treatment until completion of rolling.

409.10_nat_us_08_12_2004

Delete Table 409-1 and substitute the following:

Table 409-1 Approximate Quantities of Material-Single Course Surface Treatment

Table 409-1

Approximate Quantities of Material for

Single-Course Surface Treatment

Designation
ADVANCE \d 3Nominal Maximum Size of Aggregate
Aggregate Gradation (1)
Estimated Quantity of Aggregate (2) pounds/yd2
Estimated Quantity of Emulsified Asphalt (3) gallons/yd2
Estimated Quantity of Asphalt Binder (3) gallons/yd2
1A
3/4 inch
B
40 – 49
0.40 – 0.55
0.27 – 0.38
1B
1/2 inch
C
26 – 29
0.31 – 0.44
0.20 – 0.31
1C
3/8 inch
D
20 – 26
0.20 – 0.35
0.13 – 0.24
1D
No. 4
E
15 – 20
0.15 – 0.22
0.11 – 0.18
1E
Sand
F
9 – 15
0.11 – 0.18
0.09 – 0.15

(1) See Table 703-7 for aggregate gradations.

(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65, as determined by AASHTO T 84 and

T 85. Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below 2.55.

(3) Adjust the asphalt content for the condition of the road.

409.11_nat_us_12_18_2004

Table 409-2 Approximate Quantities of Material – Double Course Surface Treatments

Delete Tables 409-2 and substitute the following:

Table 409-2

Approximate Quantities of Material for

Double Course Surface Treatments

Designation (Thickness)
Nominal Maximum Size of Aggregate
Aggregate Gradation(1)
Estimated Quantity of Aggregate(2)

pounds/yd2

Estimated Quantity of Emulsified Asphalt (3) gallons/yd2
Estimated Quantity of Asphalt

Binder (3) gallons/yd2

2A (1/2 inch)

1st Application
3/8 inch
D
26 – 35
0.20 – 0.31
0.11 – 0.22
2nd Application
No. 4
E
9 – 15
0.31 – 0.40
0.18 – 0.29

2B (5/8 inch)

1st Application
1/2 inch
C
29 – 40
0.31 – 0.40
0.18 – 0.29
2nd Application
No. 4
E
14 – 20
0.40 – 0.51
0.24 – 0.33

2C (3/4 inch)

1st Application
3/4 inch
B
40 – 49
0.35 – 0.51
0.22 – 0.33
2nd Application
3/8 inch
D
20 – 26
0.51 – 0.60
0.33 – 0.42

(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65, as determined by AASHTO T 84 and

T 85. Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below 2.55.

(3) Adjust the asphalt content of the first application for the condition of the road.

409.12_nat_us_08_12_2004

Delete Tables 409-2 and substitute the following:

Table 409-3 Approximate Quantities of Material – Triple Course Surface Treatments

Table 409-3

Approximate Quantities of Material for

Triple Course Surface Treatments

Designation (Thickness)
Nominal Maximum Size of Aggregate
Aggregate Gradation(1)
Estimated Quantity of Aggregate(2)

pounds/yd2 Estimated Quantity of Emulsified Asphalt (3) gallons/yd2 Estimated Quantity of Asphalt Binder(3) gallons/yd2

3A (1/2 inch)

1st Application
3/8 inch
D
26 – 35
0.20 – 0.31
0.11 – 0.22
2nd Application
No. 4
E
9 – 15
0.24 – 0.35
0.15 – 0.27
3rd Application
Sand
F
9 – 15
0.20 – 0.31
0.11 – 0.22

3B (5/8 inch)

1st Application
1/2 inch
C
29 – 40
0.20 – 0.31
0.11 – 0.22
2nd Application
3/8 inch
D
15 – 20
0.31 – 0.40
0.18 – 0.29
3rd Application
No. 4
E
9 – 15
0.20 – 0.31
0.11 – 0.22

3C (3/4 inch)

1st Application
3/4 inch
B
35 – 46
0.24 – 0.35
0.15 – 0.27
2nd Application
3/8 inch
D
20 – 26
0.31 – 0.40
0.18 – 0.29
3rd Application
No. 4
E
9 – 15
0.24 – 0.35
0.15 – 0.27

(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65 as determined by AASHTO T 84 and

T 85. Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below 2.55.

(3) Adjust the asphalt content of the first application for the condition of the road.

409.13_nat_us_05_13_2004

409.13 Acceptance.

Delete the 2nd paragraph and replace with the following:

Aggregate gradation for asphalt surface treatment will be evaluated under Subsection 106.04.

Table 409-4 Sampling and Testing Requirements.

Delete the last cell (4th) under Sampling Frequency and replace with the following:

1 per tanker truck and 1 per trailer

Delete the 2nd and 3rd cell under Type of Acceptance and replace with the following:

Measured and tested for conformance (106.04)

File details come from the government source that posted it. Updated .