STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS (FP-03 U.S. CUSTOMARY UNITS) (2003)
The Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03 U.S. Customary Units), 2003 are included by reference. The requirements contained in these specifications are hereby made a part of this solicitation and any resultant contract.
The 700-page book entitled “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-03 U.S. Customary Units), is available from:
Headquarters Washington DC David K. Green Construction Standards Engineer Internet: David.Green@fhwa.dot.gov Mail: Federal Highway Administration
HFPD-3
400 Seventh Street, SW Washington D.C. 20590 http://www.wfl.fha.dot.gov/design/specs/fp03.htm Applicable sections include (1) Sections designated in the following list and (2) Sections referenced therein.
| Section No. |
| Title |
| 101 |
| Terms, Format, and Definitions |
| 102 |
| Bid, Award, and Execution of Contract |
| 103 |
| Scope of Work |
| 104 |
| Control of Work |
| 105 |
| Control of Material |
| 106 |
| Acceptance of Work |
| 107 |
| Legal Relations and Responsibility to the Public |
| 108 |
| Prosecution and Progress |
| 109 |
| Measurement and Payment |
| 152 |
| Construction Survey and Staking |
| 153 |
| Contractor Quality Control |
| 154 |
| Contractor Sampling and Testing |
| 155 |
| Schedules for Construction Contracts |
| 156 |
| Public Traffic |
| 157 |
| Soil Erosion Control |
| 171 |
| Weed and Disease Prevention |
| 201 |
| Clearing and Grubbing |
| 203 |
| Removal of Structures and Obstructions |
| 204 |
| Excavation and Embankment |
| 205 |
| Rock Blasting |
| 251 |
| Riprap |
| 301 |
| Untreated Aggregate Courses |
| 303 |
| Road Reconditioning |
| 404 |
| Minor Hot Asphalt Concrete |
| 607 |
| Culverts and Drains |
| 651 |
| Development of Pits & Quarries |
| 703 |
| Aggregate |
| 705 |
| Rock |
| 718 |
| Traffic Signing and Marking Material |
FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS TO THE STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS
Forest service supplemental specifications (FSSS) may add to, delete from, or modify the Forest Service Standard Specifications (FP-03). FSSS are applicable to this project and are included in full text as an attachment listed in Section J.
CSI SPECIFICATION
CSI Specifications are applicable to all construction, included within this solicitation and any resultant contract, and are included in full text as an attachment listed in Section J.
CSI SPECIFICATION INDEX
FOR
OAK CREEK COMPLEX
DIVISION 1 - GENERAL REQUIREMENTS
01000 - Project Coordination
01010 - Summary of Work
01020 – Temporary Soil Erosion and Water Pollution Controls
01030 – Noxious Weed Control
01101 - Abbreviations
01102 - Definitions
01103 – Measurement and Payment
01300 - Submittals
01410 - Quality Control and Quantity Measurement
01620 – Storage and Protection
01710 - Cleaning
01730 – Operations and Maintenance Data
DIVISION 2 - SITE WORK
02071 - Removal of Structures and Obstructions
02072 – Obliteration of Abandoned Roadways/Spurs
02110 - Clearing and Grubbing
02217 – Treated Timber Post Pads/Trails
02220 - Excavation and Backfill for Buildings/Structures
02223 - Excavation and Backfill for Utilities
02224 – Excavation, Embankment and Backfill
02270 - Riprap
02304 – Select Material
02447 – Metal Gates
02470 – Trash Containers
02512 - Concrete Sidewalks/Slabs 02526 – Wheel Stops
02610 - Pipe, Fittings, and Specialties
02641 - Valves
02642 - Valve Enclosures
02645 – Hydrants/Water Fixtures
02665 - Waterlines and Appurtenances
02715 - Sanitary Sewer – Gravity
02731 – Septic Holding Tanks
02820 – Wood Fence
02841 - Signs
02870 – Concrete Picnic Tables
02901 – Barrier Rocks 02951 – Seeding and Mulching
DIVISION 3 - CONCRETE
03100 - Concrete Formwork
03201 - Concrete Reinforcement
03251 - Expansion and Contraction Joints
03301 - Cast-in-Place Concrete
03345 – Concrete Finishing
DIVISION 4 – MASONRY
04100 - Masonry Mortar
04150 – Masonry Accessories
04220 – Reinforced Concrete Masonry Units
04225 – Masonry Toilet Buildings
04850 – Rock Assemblies
DIVISION 5 - METALS
05100 - Structural Metal
05130 – Fire Rings
05500 - Metal Fabrications
DIVISION 6 – WOOD & PLASTIC
06100 – Carpentry
DIVISION 7 – THERMAL & MOSITURE PROTECTION
07150 – Masonry Damp Proofing
07200 - Building Insulation
07410 – Preformed Metal Roofing
07820 – Skylights
07900 – Caulking and Sealants
DIVISION 8 – DOORS & WINDOWS
08110 – Hollow Metal Doors & Frames
08710 - Finish Hardware
DIVISION 9 – FINISHING
09230 – Flexible Stucco 09900 - Painting and Graffiti Protection
DIVISION 10 – SPECIALTIES
10800 – Building Accessories
DIVISION 13 – SPECIAL CONSTRUCTION
13100 – Precast Concrete Toilets
DIVISION 16 – ELECTRICAL
16000 – Power Distribution and Service
16020 – Electrical Distribution & Building Electrical System
16060 – Grounding and Bonding
16070 – Hangers and Supports
16075 – Electrical Identification
16095 – Minor Electrical Demolition
16123 – Building Wire and Cable
16131 – Conduit
16138 – Boxes
16140 – Wiring Devices
16443 – Panelboards
16500 – Lighting
16520 – Exterior Luminaires
END OF SPECIFICATION INDEX
DIVISION 1 GENERAL
PROJECT COORDINATION - 01000
PART 1 - GENERAL
1.1 - Description This work shall consist of coordination with government agencies and the general public.
1.2 - Related Sections 01010 - Summary of Work
01030 – Noxious Weed Control
PART 2 - PRODUCTS
None
PART 3 - EXECUTION
3.1 - Government Agencies All permits necessary for construction and occupancy of the project shall be obtained by the Contractor.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement Work under this section will not be measured for payment, but is included in all other items in the contract.
4.2 - Payment Separate payment will not be made.
END OF SPECIFICATION 01000
DIVISION 1 GENERAL
SUMMARY OF WORK - 01010
PART 1 - GENERAL
1.1 - Location The project is located at the Oak Creek Complex, on the Red Rock Ranger District of the Coconino National Forest, Sections 22 and 5, Township 18 and 19 North, Range 6 East, Gila and Salt River Meridian, approximately 20 miles south of Flagstaff, Arizona. Driving time from Flagstaff, Arizona is approximately 30 minutes.
1.2 - Site Work and Utilities General:
1. All work shall be completed in accordance with project specifications and construction drawings. The work includes all labor, material, and equipment necessary to perform all the operations for the work specified.
Site work:
The project consists of pulverizing existing asphalt spurs, blading and reshaping roads and spurs, asphalt paving of spurs, reconditioning of gravel roads and spurs, construction of six vault toilet buildings, concrete sidewalks, grid power system, water and sewer systems, construction of new host site, installation of tent and picnic pads and amenities, removal and obliteration and removal of six existing vault toilet buildings and specified campsite amenities.
1.3 - Timing of Work The site shall be closed to the public during construction. No restrictions are placed on weekend work.
1.4 - Government-Furnished Facilities
1. The site is available to the Contractor for staging and storage during construction. Any damage resulting from the Contractor's use of the site will be repaired or replaced at the Contractor’s expense at the direction of the Engineer.
2. Sanitary facilities for construction workers shall be furnished and maintained by the Contractor during the life of the contract.
3. All temporary services and use areas shall be completely removed and the areas restored upon completion of use.
4. Electricity is available on site at the existing meter panel and toilets located through out the project site. Other sites can become available through completed construction. The Contractor shall pay for electrical service used.
5. Water for construction purposes is available for this contract only, Oak Creek Complex, at no cost to the Contractor at the site. If the Contractor elects to use the water source, the Contractor will be responsible for coming up with a filling apparatus that is removable after completion of the contract. The contractor will also be responsible for maintaining the existing systems running to other entities during and after construction. Otherwise, pumping, hauling and the placement of the water shall be the Contractor's responsibility. The Contractor shall submit a water source for the Engineer’s approval if an alternate source is to be used. Water supply and placement shall be incidental to other payments.
6. Transportation to and from the work site for the Contractor's personnel and materials will be provided at the Contractor's expense.
1.5 - Material Sources All materials shall be obtained from a commercial source unless noted otherwise.
The source of hauled fill material shall be approved by the COR prior to the delivery to the project site.
There are two sources of fill material available for the construction of Oak Creek Complex. The sources are located approximately 17 and 23 miles (one way) from the project on the south end of Sedona headed toward Cottonwood. The first source is Girdner Pit located on the south end of Sedona at the city limits. Take Highway 89A through Sedona heading towards Cottonwood and turn west at Cultural Park Place and travel approximately 0.7 miles going through a forest service gate to get to the site. The second source is a pit off FSR 761B. Take Highway 89A through Sedona heading towards Cottonwood and turn west at FSR 525 and travel approximately 0.4 miles to FSR 761B. Turn south on FSR 761B and travel approximately 0.3 miles to the pit location. Please note that both sites will require the material to be processed before it can be used as suitable fill material on the project. The contractor may also obtain commercial sources approved by the Engineer
1.7 - Subsurface Soils and Investigations
No auger boring tests were made in the area. The Contractor shall undertake any site investigations necessary to ascertain subsurface conditions, under supervision of the Engineer.
The contractor shall expect to encounter rock during excavation for the toilet vaults, septic holding tanks and utility trenching.
1.8 - Precautionary Measures
Environmental Protection:
All vehicles and equipment entering the project area must be clean of noxious weeds and will be subject to inspection. Wash all construction equipment to thoroughly remove all dirt, plant, and other foreign material prior to entering the project. Particular attention must be given to the under carriage and any surface where soil containing exotic seeds may exist.
Protection of Work:
The Contractor shall take precautions to protect all work during the construction period and shall provide and maintain adequate protection during severe weather conditions to prevent damage to the work, materials and equipment.
Safety:
The Contractor is responsible for safeguarding employees, public, existing facilities, and forest resources from his operations. All operations shall be in compliance with the requirements and restrictions of OSHA, the Arizona Occupational Safety and Health Code, and the Workman’s Compensation Board. The Contractor shall erect signs and chain-link fencing barricades as necessary to make unguarded operations safe. Signs and barricades shall be maintained at night and on weekends. Precautions such as lowering tractor blades and safely storing materials shall be practiced to prevent injury to others in the area.
Security:
No security shall be provided by the Government. The Contractor shall take all precautions deemed necessary to secure the worksite, improvements and equipment. This may include security fencing and/or a night watchman with mobile communication.
Traffic Control:
All necessary traffic control is the responsibility of the contractor and shall adhere the current edition of MUTCD. This is an incidental cost and will not be paid for a separate basis.
END OF SPECIFICATION 01010
DIVISION 1 GENERAL
TEMPORARY SOIL EROSION AND WATER POLLUTION CONTROL - 01020
PART 1 - GENERAL
1.1 - Description This work consists of temporary measures as specified herein or directed by the Engineer to control soil erosion and water pollution, through the use of berms, dikes, dams, sediment basins, silt fences, brush barriers, fiber mats, netting, mulches, grasses, slope drains, and other devices or methods.
The control provisions shall be coordinated with the permanent erosion control features in the contract to ensure economical, effective, and continuous protection throughout the construction period.
1.2 - Related Work Specified Elsewhere
157 – Soil Erosion Control
204 – Excavation and Embankment
303 - Pulverizing Old Asphalt
02220 - Excavation and Backfill for Buildings/Structures 02223 - Excavation and Backfill for Utilities
02224 – Excavation, Embankment, and Backfill
1.3 – Submittals
Erosion Control Plan
PART 2 - PRODUCTS
NONE
PART 3 - EXECUTION
3.1 - Plan and Construction The Contractor shall submit an Erosion Control Plan to the Engineer for approval prior to the beginning of any ground disturbing activities. The plan shall specify both temporary and permanent measures for erosion control, at specific locations, during specified stages of work. All permanent erosion control features shall be incorporated into the project at the earliest practicable time to minimize the need for temporary erosion control. Permanent erosion control features are SHOWN ON THE DRAWINGS. Clearing and grubbing shall be scheduled and performed so that grading operations and permanent erosion control measures can follow without interference.
The plan shall include drawings identifying the locations of erosion control measures as well as a narrative discussion. The plan should also identify the individual responsible for insuring the erosion control measures are implemented.
Elements that shall be considered in an Erosion Control Plan are:
1. Minimize the amount of clearing and grubbing and limit exposure of erodible area. The Arizona Water Quality Control Council for Construction and Related Activities in Water recommends limiting exposure of erodable surface to 750,000 square feet at any one time.
2. Measures to minimize off-site runoff onto cleared areas. These could include berms, diversions or drains to convey off-site runoff around or through cleared areas.
3. Measures to prevent sediments from disturbed areas from reaching stream channels or water bodies. These could include hay or straw bale checks to act as erosion filters and barriers at the toe of fills and as erosion checks in ditches, pipe outlets, and drainage channels. Rock check dams may be used to trap sediments in ditches or drainages. Sediment basins may be constructed to capture on-site runoff to settle sediments before water is discharged to natural channels or water bodies.
4. Wash water from aggregate washing or other operations containing mud or silt shall be treated by filtration or retention in a settling pond, or ponds, adequate to prevent muddy water from entering stream channels or water bodies. The location of aggregate washing operations and filtration or retention facilities shall be identified on drawings submitted with the Erosion Control Plan.
5. A lined and bermed facility shall be maintained for fuel storage if the contractor elects to store fuel within the limits of the Coconino National Forest. This facility shall be located above the limits of the 100 year floodplain of any drainage channel.
6. Oily or greasy substances originating from the contractors operations shall be removed from the National Forest lands and disposed in an approved site. Portland cement, fresh portland cement concrete, and wash water from concreting operations shall not be disposed of except at sites approved by the Engineer.
7. Excavation and/or fill material shall not be placed in drainage channels at any time. Existing channel flows shall not be restricted at any time during construction except by structures specifically intended to trap or filter sediments or other pollutants. Material derived from roadway work shall not be deposited in stream channels. The Contractor shall not operate equipment in live streams except as approved by the Engineer. Construction equipment shall cross drainage channels only at crossings designated by the Engineer.
8. The Contractor shall operate and maintain all temporary pollution and erosion control features in a functional condition during the life of the contract. When depth of materials retained in these facilities reaches three-fourths capacity, the facilities shall be cleaned and restored to their original condition. Material cleaned from these facilities shall be disposed of at a site approved by the Engineer or incorporated into the work where feasible.
9. Removal and disposal of all temporary erosion control devices shall be specified in the Erosion Control Plan.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement There will be no separate measurement of this item.
4.2 - Payment This work is incidental to other items in the contract and direct separate payment will not be made.
END OF SPECIFICATION 01020
DIVISION 1 – GENERAL
NOXIOUS WEED CONTROL – 01030
PART 1 - GENERAL
1.1 - Description This work consists of incorporating weed prevention and control within the project site. The Contractor shall prevent new weed infestations and the spread of existing weed infestations within the project site as specified herein.
1.2 - Related Work Specified Elsewhere 171 – Weed and Disease Prevention
201 – Clearing and Grubbing
203 – Removal of Obstructions
204 – Excavation and Embankment
02071 – Removal of Obstructions
02072 – Obliteration of Abandoned Roadways/Spurs
02110 – Clearing and Grubbing
02220 - Excavation and Backfill for Structures
02223 - Excavation and Backfill for Utilities
02224 – Excavation, Embankment and Backfill
1.3- Submittals Fill and surfacing material source.
PART 2 - PRODUCTS
None.
PART 3 - EXECUTION
3.1 - Equipment The Contractor shall ensure all equipment brought onto the forest is thoroughly washed/cleaned in order to remove all soil, vegetative matter, and other debris prior to entering the forest. Particular attention shall be given to the under carriage and any other surface where soil containing weed seed and propagules may exist. All equipment shall be available for inspection by the Forest Service prior to entering the construction site. Only construction and maintenance equipment, and the equipment necessary to transport said equipment shall be allowed to operate within the project area. All subsequent move-ins of equipment to the project area shall be treated in the same manner as the initial move-in. This requirement does not apply to service vehicles, water trucks, pickups, cars, and/or similar vehicles, if these vehicles are kept on routes designated weed free by the Forest Service.
The Contractor shall employ cleaning methods, approved by the Forest Service, to ensure that construction and maintenance equipment is free of noxious weeds. Equipment shall be considered free of soil, seed, and other such debris when a visual inspection does not disclose such material. Equipment or component disassembly, or the need for specialized tools, are not required.
Unless otherwise agreed, the Contractor shall give the Forest Service at least 24 hours notice when equipment is ready for inspection. Notification will include an agreed upon location where the equipment will be available for inspection by the Forest Service. Recleaning and inspection will be required each time a piece of equipment leaves the construction site and returns.
3.2 – General Project Work
The Contractor shall minimize soil surface disturbance wherever possible.
All fill and surfacing material sources shall be approved by the Engineer prior to being transported to the project site. All sources shall be free of noxious weed contamination.
New infestations of noxious weeds of concern to Forest Service and identified by either Contractor or Forest Service, on the project site or on haul routes the Contractor plans to use, shall be promptly reported to the other party. Contractor and Forest Service shall agree on treatment methods to reduce or prevent the spread of noxious weeds when new infestations are found. A current list of noxious weeds of concern to Forest Service is available at each Forest Service office. A copy of this list as well as the Forest Service’s Best Management Practices will be submitted to the prime contractor.
A Noxious Weed Summary will be submitted to the Contractor by the Government providing information about noxious weeds that may be encountered at the project sites or haul roads.
PART 4 - MEASUREMENT AND PAYMENT
4.1 – Measurement There will be no separate measurement of this item.
4.2 - Payment This work is incidental to other items in the contract and direct separate payment will not be made.
DIVISION 1 GENERAL
ABBREVIATIONS - 01101
Organizations & Standards Whenever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows. Reference to a specific standard of specification shall mean the latest edition or amendment in effect on date of invitation to bid.
AASHTO--American Association of State Highway and Transportation Officials
ACI--American Concrete Institute
AISC--American Institute of Steel Construction
AISI--American Iron and Steel Institute
AITC--American Institute of Timber Construction
ANSI--American National Standards Institute
APA--American Plywood Association
API--American Petroleum Institute
ASME--American Society of Mechanical Engineers
ASTM--American Society for Testing and Material
ATCC--American Type Culture Collection
AWPA--American Wood Preservers Association
AWPB--American Wood Preservers Bureau
AWS--American Welding Society
AWWA--American Water Works Association
CFR--Code of Federal Regulations
CRSI--Concrete Reinforcing Steel Institute
CS--Commercial Standard issued by U.S. Department of Commerce
DEMA--Diesel Engine Manufacturers Association
EPA--Environmental Protection Agency
FAR--Federal Acquisition Regulation
FED SPEC. or FS-- Federal Specifications
FSS--Federal Specifications and Standards
GSA--General Services Administration
MIL--Military Specifications
MSHA--Mine Safety and Health Administration
MUTCD--Manual on Uniform Traffic Control Devices
NBFU--National Board of Fire Underwriters
NBS--National Bureau of Standards
NEMA--National Electrical Manufacturers Association
NESC--National Electrical Safety Code
NFPA--(Fire)--National Fire Protection Association
NFPA--(Forest)--National Forest Products Association
NSF--National Sanitation Foundation
NWMA--National Woodwork Manufacturers Association
OSHA--Occupational Safety and Health Administration
PCA--Portland Cement Association
PCI--Prestressed Concrete Institute
PS--Product Standard issued by the U.S. Department of Commerce
PTI--Post-Tensioning Institute
RIS-Redwood Inspection Service
SAE--Society of Automotive Engineers
SF--Standard Form
SSPC--Steel Structures Painting Council
UL--Underwriter's Laboratories, Inc.
USASI--United States of America Standards Institute
WCLIB--West Coast Lumber Inspection Bureau
WWPA--Western Wood Products Association
ABBREVIATIONS
Aluminum
AL.
Asphalt
ASP.
Barbed Wire
B.W.
Bituminous Coated Corrugated Steel Pipe . . . . B.C.C.S.P. OR B.C.C.S. PIPE
Bituminous Surface Treatment
BST
Cement
CEMT.
Cement Treated
CEMT.-T.
Cement Treated Base
CTB
Clearing & Grubbing
CLEAR & GRUB
Compaction
CMPCT.
Concrete
CONC.
Corrugated Metal Pipe
CMP
Corrugated Steel Pipe
C.S.P.
Corrugated Steel Pipe Arch
C.S.P. ARCH
Cubic Yard
C.Y.
Cubic Yard Mile
C.Y.MI.
Diameter
DIA.
Each
EA.
Emulsified
EMLSFD.
Erosion and Pollution Control
E&P CONTROL
Fabricated
FABR.
Finish Floor Elevation
F.F.E.
Foundation
FOUND.
Furnished
FURN.
Gallon
GAL.
Grade
GR.
Height
HT.
High Strength
H. STRENGTH
Horizontal
HOR.
Hour
HR.
Linear Foot
L.F.
Liquid
LIQ.
Loading
LD.
Lump Sum
L.S.
Material
MAT'L
Maximum
MAX.
Method
M.
Mile
MI.
Minimum
MIN.
One Thousand Feet Board Measure . . . . . . . . MFBM
One Thousand Gallons
M.GALS.
One Thousand Gallons Mile
M.GALS.MI.
One Thousand Square Feet M.S.F.
Polyvinylchloride
PVC
Pounds
LBS.
Reflectorized
REFLECT.
Section
SEC.
Square Foot
S.F.
Square Yard
S.Y.
Station
STA.
Station Yard
STA. YD.
Strand
S.
Structural
STRUCT.
Structural Steel
S. STEEL
Stump
STMP
Target Value
TV
Thickness
TH.
Ton Mile
T.M.
Tops and Limbs
T&L
Utilization of Timber
UOT
Vertical
VERT.
Welded Wire Fabric W.W.F.
White
WH.
Width
W.
With
W/
Without
W/O
Woven wire
W.W.
Yellow
YE.
END OF SPECIFICATION 01101
DIVISION 1 - GENERAL
DEFINITIONS - 01102
Wherever in these specifications, or in other contract documents, the following terms, or pronouns in place of them, are used, the intent and meaning shall be interpreted as follows:
Adjustment in Contract Price. "Adjustment in contract price" shall mean "equitable adjustment" as used in the Federal Acquisition Regulations.
Arch Pipe. A culvert section, usually formed of bolted structural plates, that is an arc of a circle (usually one-half or less); that is, a bottomless culvert.
Base Course. The layer or layers of specified or selected material of designed thickness placed on a subbase or subgrade to support a surface course.
Bearings. The portion of a beam, girder, or truss that transmits the bridge superstructure load to the substructure.
Berm. Curb or dike constructed to control runoff water or traffic flow.
Change. "Change" means "Change Order" as used in the Federal Acquisition Regulations.
Clearing Limits. The limits of clearing as designated on the ground or on the drawings.
Conduit. A man made channel for carrying/housing electrical wiring and products as described in Section 16131.
Construction Slash. All vegetative material not meeting utilization standards, such as tops and limbs, timber, brush, and grubbed stumps associated with construction or reconstruction of a facility.
Contractor. The individual, partnership, joint venture, or corporation undertaking the execution of the work under the terms of the contract and acting directly or through their agent, employees, or subcontractors.
Contracting Officer (CO). The person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
Contractor Officer Representative (COR). The person designated by the CO in writing as the on site contract administrator whose duties and responsibilities are defined in a letter of designation (form FS-6300-6, or equivalent).
Controlled Felling. Directing the placement of trees in felling by wedges, jacks, cable tension, or distribution of holding wood or any combinations of these which will ensure that trees are dropped into previously cleared areas, or clear of any objects that are to remain.
Culvert. A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually constructed entirely below the elevation of the traveled way.
Cushion Material. Native or imported material generally placed over rocky sections of unsurfaced roads to provide a usable and maintainable traveled way.
Defect. A failure to meet a requirement with respect to a single quality characteristic.
Drawings. The documents, including plan and profile sheets, cross sections, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials showing details for construction of a facility.
Embankment. A structure of soil, aggregate, or rock material placed on the prepared ground surface and constructed to subgrade.
Engineer. The Contracting Officer's Representative (COR) responsible for onsite administration of the contract.
Equipment. All machinery and equipment, together with the necessary supplies for upkeep and maintenance, as well as tools and apparatus necessary for the proper construction and acceptable completion of the work.
Excess Excavation. Material from the excavation in excess of that needed for construction of designed roadways and facilities.
Forest Service. The United States of America, acting through the Forest Service, U.S. Department of Agriculture.
Gauge. The term "gauge" when used in connection with the measurement of plates will mean the U.S. Standard Gauge, except when reference is made to the measurement of metal sheets used in the manufacture of corrugated metal, pipe, metal plate culverts and arches, and metal cribbing, then the term means the "gauge" or "thickness" specified in AASHTO M 36, M 167, M 196, and M 219, as applicable. When the term "gauge" refers to the measurement of wire, it will mean the wire gauge specified in AASHTO M 32.
Government Land. National Forest System lands, and other lands controlled or administered by the Forest Service or by other Federal agencies.
Inspector. The Government-authorized representative designated in writing by the CO or COR responsible for detailed inspection.
Job-Mix Formula. The percentage of each material in a mixture intended for a particular use.
Laboratory. A testing laboratory of the Government or any other testing laboratory approved by the Contracting Officer.
Materials. Any substance specified for use in the construction of the project and its appurtenances.
Maximum Density. The highest density that can be obtained under stated conditions.
Measurement. Determining and expressing the quantities of work or materials.
Multi-Beam Girder. A precast, prestressed concrete member where the concrete deck is precast as an integral part of the member.
Neat Line. A line defining the proposed or specified limits of an excavation or structure.
Nominal Dimensions or Weights. The numerical values shown on the drawings or in the specifications as measurements of material to be used in the construction.
Nominal Maximum Particle Size. The largest sieve size listed in the applicable specification upon which any material is permitted to be retained.
Overbreak. Material beyond the neat line of an excavation that is removed in the process of excavation, usually by blasting.
Pavement Structure. Subbase, base, or surface course, or combination thereof, placed on a subgrade to support the traffic load and distribute it to the roadbed.
Pipe. A culvert that is circular (round) in cross-section.
Pipe-Arch. A pipe that has been factory-deformed from a circular shape such that the width (or span) is larger than the vertical dimension (or rise).
Profile Grade. The trace of a vertical plane, as shown on the drawings, intersecting the top surface at the centerline of the proposed facility construction.
Random Sampling. Sampling at times or locations determined in advance by the use of a table of random numbers.
Reasonably Close Conformity. Unless working tolerances are specified, all work performed and materials furnished shall be in reasonably close conformity with lines, grades, cross sections, dimensions, and material requirements shown on the drawings, indicated in the specifications, or designated on the ground. "Reasonably close conformity" is compliance with reasonable and customary manufacturing and construction tolerances.
Roadway. The portion of the road within the limits of excavation and embankment, including slope rounding.
Schedule of Items. A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.
Second Samples. A sample taken when the initial sample indicates that the material is defective.
Sidewalk. The portion of the roadway constructed primarily for pedestrian use.
Specifications. A description of the technical requirements for a material, product, or service that includes criteria for determination whether these requirements are met.
Standard Specifications. Specifications approved for general application and repetitive use.
Subbase. The layers of specified or selected material of designed thickness placed on a subgrade to support a base course.
Subgrade. The layers of roadbed that bring it up to the top surface, upon which subbase, base, or surface course is constructed. For roads without base course or surface course, that portion of roadbed prepared as the finished wearing surface.
Tackifier. Binder for vegetative mulch.
Target Value. The percentage of each material in a mixture intended for a particular use from which allowable variations are measured.
Unit of Measurement. The unit and fractions of units shown in the Schedule of Items.
Unsuitable Material. The material excavated during roadway construction that is not usable in embankment and must be disposed of or that can be used only in certain locations or for limited purposes.
END OF SPECIFICATION 01102
DIVISION 1 - GENERAL
MEASUREMENT AND PAYMENT - 01103
PART 1 - GENERAL
1.1 – Requirements:
Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered incidental to and included in the payment of the pay items in the SCHEDULE OF ITEMS.
1.2 – Measurement Terms and Definitions:
Unless otherwise specified, the following terms are defined as follows:
Each. One entire unit. The quantity is the actual number of units completed and accepted.
Linear foot. As applicable, measure the work along its length from end-to-end; parallel to the base or foundation; along the top; along the front face; or along the invert. Do not measure overlaps.
Lump sum. Do not measure directly. The bid amount is complete payment for all work described in the contract and necessary to complete the work for that item. The quantity is designated as "1." Estimated quantities of lump sum work shown in the contract are approximate.
Square yard. 9 square feet. Longitudinal and transverse measurements for area computations will be made horizontally. No deductions from the area computation will be made for individual fixtures having area of 9 square feet or less.
1.3 - Units of Measurement:
Payment will be by units defined and determined according to U.S. Standard measure.
END OF SPECIFICATION 01103
DIVISION 1 GENERAL
SUBMITTALS - 01300
PART 1 - GENERAL
1.1 - Requirements It will be the Contractor's responsibility to submit all items with such promptness as to cause no delay in the work. Approvals must be obtained before starting work which involves the item. The Contractor shall allow ten (10) days for processing of submittals by the Government.
Submittals may also be referred to as SHOP DRAWINGS.
1.2 - Manufacturer's Literature and Shop Drawings Submit three (3) copies to the Engineer for approval on the items required herein.
Submittal specifications are to be submitted in the following format:
A. The specifications and salient qualities of the item specified in the contract.
B. The specifications and salient qualities of the submittal item.
C. A listing of the differences and a comparison between the two, including but not limited to the structural qualities, operational qualities, any modifications necessary to accomplish installation of unit, and guarantee and warranty.
D. A cost comparison between the specified and submitted item(s) with the cost reduction benefit to the government or adequate justification for a cost increase to the government.
E. Shop drawings of submitted item(s) including wiring or layout diagrams.
If there are any modifications necessary to facilitate installation, a set of drawings showing installation of specified item and a set showing how the submittal item will be installed.
If the specified item is to be handicapped accessible the submittal item needs to show handicapped access on submitted drawings, not just state it is available as handicapped accessible.
Submittals will be waived if Contractor furnishes exact item used for design when manufacturer's model, size, etc. are shown in the contract.
Submittals are required per the following sections:
1. 01020 – Temporary Soil Erosion and Water Pollution Control
Erosion Control Plan.
2. 01030 – Noxious Weed Control
Fill material and surfacing source.
3. 01410 – Quality Control and Quantity Measurement
Contractor's Representative Designation
Project Schedule
Quality Control Plan
As-Built Drawings
Certificates-of-Compliance
Quantity Measurements
Test Results
Bill-of-Ladings
4. 01730 – Operations and Maintenance Data
Operations and Maintenance Manual
5. 02217 – Treated Timber Post Pads/Trails
Product Data for Timbers
Approved fill material source.
6. 02270 – Riprap Certificate-of-Compliance of riprap material
7. 02304 – Select Material
Certificates-of-Compliance of Select Material
8. 02447 – Metal Gates
Paint/color chip.
9. 02470 – Trash Containers
Product Data
10. 02478 – Grills
11. 02526 – Wheel Stops
12. 02610 - Pipe, Fittings and Specialties
Product Data for:
Pressure Pipe and fittings
Gravity sewer pipe and fittings
Drainage systems
Specialties
13. 02641 - Valves
Product Data
14. 02642 - Valve Enclosures
15. 02645 – Hydrants/Water Fixtures
16. 02665 – Waterlines and Appurtenances
Disinfection Procedures
Bacterial Test Results
17. 02731 – Septic Holding Tanks
Shop Drawings
Product Data
Installation Instructions
ADEQ Certification
18. 02820 – Wood Fence/Screening
Product Data
19. 02870 – Concrete Picnic Tables
Product Data
Manufacturer’s Warranty
20. 02951 – Seeding and Mulching
Seed mix data
Weed free certification
21. 03301 - Cast-in-Place Concrete
Mix Design
Admixtures
Delivery Tickets
22. 04100 - Masonry Mortar
Manufacturer’s Prepare Dry Color Sample
23. 04220 – Reinforced Concrete Masonry Units
Samples of Proposed Concrete Masonry Units
Certificate-of-Compliance of Masonry Units
24. 05130 - Fire Rings
Product Data
25. 05500 - Metal Fabrications
Shop Drawings
26. 07410 - Preformed Metal Roofing
Manufacturer’s Specifications and Installation Recommendations
Product Samples
Shop drawings
Warranties
27. 07820 - Skylights
Shop Drawings
Product Data
28. 08110 - Hollow Metal Doors and Frames
Shop Drawings
Product Data
29. 08710 - Finish Hardware
Product Data
30. 09900 - Painting and Graffiti Protection
8” X 8” Top Coat Finish Samples
Product Data
31. 10800 – Building Accessories
Product Data
32. 16000 - Electrical Power and Distribution
Product Data
Material List
Electrical Plan
33. 16500 - Lighting
Shop Drawings
Product Data
Certification of Plastic Materials
Operation, Maintenance, and Testing Instructions
Other required submittals include all those as specified in the referenced Forest Service Specifications for this project.
END OF SPECIFICATION 01300
DIVISION 1 - GENERAL
QUALITY CONTROL AND QUANTITY MEASUREMENT - 01410
PART 1 - GENERAL
1.1 - Description This work shall consist of providing quality control in conformance with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specification. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.
1.2 - Related Work Specified Elsewhere General Provisions FAR 52.236-5, Material and Workmanship
General Provisions FAR 52.236-6, Superintendence by the Contractor
General Provisions FAR 52.246-12, Inspection of Construction
1.3 - Submittals Submittals under this section shall be furnished to the Engineer. Submittals include, but are not limited to the following:
Contractor's Representative Designation
Project Schedule
Quality Control Plan
As-Built Drawings
Certificates-of-Compliance
Quantity Measurements
Test Results
Bill-of-Ladings
PART 2 - PRODUCTS
None
PART 3 - EXECUTION
3.1 - Contractor's Representative Submit a letter to the Contracting Officer stating the name of the on-the-job superintendent or representative for the Contractor and the duties and authorities of the representative during work under this contract.
3.2 - Project Schedule Submit a project schedule stating information such as proposed dates of completion of various elements of construction.
3.3 - Quality Control Plan The Quality Control Plan shall consist of the following:
(1) Authorities and responsibilities of inspection and testing personnel.
(2) Experience and qualifications of inspection and testing personnel to be assigned and name and location of any (for hire) testing facility to be used.
The Contractor's proposed quality control plan for all items requiring quality control shall be submitted to the Engineer for review prior to the Contractor commencing work. Within 10 days of receipt of the plan, the Engineer shall notify the Contractor whether the plan adequately covers quality control requirements. Construction work shall not be performed prior to Contractor's receipt of written approval of the proposed plan. The Contractor shall submit to the Engineer, in writing, any proposed changes in the approved quality control plan. Proposed changes shall not be put into effect until approved in writing by the Engineer.
All work shall comply with local applicable codes and codes referenced in individual sections of the technical specifications.
3.4 - Sampling, Testing, Inspection, and Measurement of Quantities The Contractor shall provide and maintain appropriate measuring and testing devices, equipment, and supplies to accomplish the required measurement, testing, and inspection in a timely manner. Tests, measurements, and certifications shall be made as required by the drawings and specifications. The Contractor shall take samples and perform inspections and tests necessary to achieve the quality of construction required by the contract and make required measurements of work under this contract performed onsite or offsite. Sampling and testing frequency for specific items shall be specified in the related section.
The Contractor shall maintain current records of all inspections and tests performed. The following information will be acceptable to the Government:
PROJECT NAME:________________________CONTRACT No._____________________
Pay Item No.
Test Date Location Standard Results Test By
(Initials)
The Contractor shall engage inspection and testing agencies which are prequalified as complying with the recommendations of "Independent Laboratory Qualification" by the American Council of Independent Laboratories, and which specialize in the types of inspections and tests to be preformed.
The Contractor shall protect construction exposed by or for quality control service activities and protect repaired construction. Upon completion of inspection and testing repair damaged construction and restore substrates and finishes to eliminate deficiencies. The Contractor is responsible for repair and protection of inspected work, whether inspection is performed by the Contractor or by the Government.
The Contractor shall certify in writing that all inspections and tests were performed in accordance with specifications.
3.5 - As-Built Drawings The Contractor shall maintain a set of the contract drawings depicting as-built conditions. These drawings shall be maintained in a current condition and shall be available for review. All variations from contract drawings shall be indicated in red on the drawings. Upon completion of the contract work, as built drawings shall be submitted to the Contracting Officer (CO) or Contracting Officer Representative (COR).
3.6 - Certificates and Measurements Certification:
The Contractor shall furnish certificates executed by the manufacturer, supplier, or vendor, stipulating that all offsite produced materials incorporated into the work meet the applicable requirements SHOWN ON THE DRAWINGS or stated in the specifications. Incidental purchases needed to remedy minor shortages of material shall be certified by the Contractor. Earth, aggregate, and concrete material shall be certified and accurately completed indicating weights, volumes, and batch times where appropriate.
Measurements:
The Contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Contract Quantity. The Contractor shall compute the quantities for periodic progress payments; the Engineer will compute the quantities for the final payment based on measurements taken by the Contractor. All Contractor measurements are subject to verification. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities. The Contractor shall certify in writing as to the accuracy of the measurements and computations submitted.
The following format or one containing the following information will be acceptable to the Government:
PROJECT NAME:_______________________CONTRACT No.__________________
Quantity or
Pay Item
Date
Measurement
Test By
(Initials)
3.7 - Aggregate Materials When the material sources are not designated as Government-furnished or the Contractor elects not to use designated sources, the Contractor shall be responsible for furnishing materials that produce an end product equivalent in performance to that originally designated and that meets contract specifications.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement There will be no separate measurement for this section.
4.2 - Payment This work is incidental to other items in the contract and direct separate item payment will not be made.
END OF SPECIFICATION 01410
DIVISION 1 – GENERAL
STORAGE AND PROTECTION – 01620
PART 1 - GENERAL
1.1 - Description This section of work covers storage and protection procedures for the products scheduled for use.
1.2 - Related Work Specified Elsewhere 01300 - Submittals
PART 2 - PRODUCTS
None
PART 3 - EXECUTION
3.1 – Manufacturer’s Recommendations Except as otherwise approved by the Engineer, determine and comply with manufacturer’s instructions on product handling, storage and protection.
3.2 - Packing Deliver products to the job site in the manufacturer’s original container, with the labels intact and legible.
1. Maintain packaged materials with seals unbroken and labels intact until time of use.
2. Promptly remove damaged material and unsuitable items from the job site, and promptly replace with material meeting the specified requirements at no additional cost to the Forest Service.
The Engineer may reject as non-complying such material and products that do not bear identification satisfactory to the Forest Service as to the manufacturer, grade, quality and other pertinent information.
All product literature, warranties and operating instructions must be intact and placed in a binder and transmitted to the Forest Service.
3.3 – Protection Protect finished surfaces, including jambs and soffits of openings used as passageways, through which equipment and materials are handled.
Provide protection for finished floor surfaces in traffic areas prior to allowing equipment and materials to be moved over such surfaces.
Maintain finished surfaces clean, unmarred and suitably protected until accepted by the Forest Service.
3.4 – Repairs and Replacements
In event of damage, promptly make replacements and repairs to the approval of the Forest Service and at no additional cost to the Forest Service.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement There will be no separate measurement for this section.
4.2 - Payment This work is incidental to other items in the contract and direct separate item payment will not be made.
END OF SPECIFICATION 01620
DIVISION 1 – GENERAL
CLEANING – 01710
PART 1 - GENERAL
1.1 - Description Throughout the construction period, maintain the construction site and facilities in a standard of cleanly and orderliness as described in this Section.
PART 2 - PRODUCTS
2.1 – Cleaning Materials and Equipment Provide required personnel, equipment and materials as needed to maintain the specified standard of cleanly and orderliness.
2.2 – Compatibility Use only the cleaning materials and equipment, which are compatible with the surface being cleaned, as recommended by the manufacturer of the cleaning material.
PART 3 - EXECUTION
3.1 – Progress Cleaning Retain stored items in an orderly arrangement allowing maximum access, not impeding traffic or drainage, and providing required protection of materials.
Do not allow accumulation of scrap, debris, waste material and other items not required for construction of this work.
At least twice each month, and more often if necessary, completely remove all scrap, debris and waste material from the job site.
Provide adequate storage for all items awaiting removal from the job site, observing requirements for fire protection and protection of the ecology.
3.2 – Site
Daily, and more often if necessary, inspect the site and pick up all scrap, debris and waste material. Remove such items to the place designated for their storage.
Maintain the site in a neat and orderly condition at all times.
Clean mud and debris from roadways or highways adjacent to the project site daily.
3.3 – Final Cleaning
"Clean" for the purpose of this Article shall be interpreted as meaning the level of cleanliness generally provided by skilled cleaners using commercial quality building maintenance equipment and materials.
Prior to completion of the work, remove from the job site all tools, surplus materials, equipment, scrap, debris and waste.
Structures:
1.
Exterior:
a.
Visually inspect exterior surfaces and remove all traces of soil, waste materials, smudges and other foreign matter.
b.
Remove all traces of splashed materials from adjacent surfaces.
c.
In the event of stubborn stains not removable with water, the Forest Service may require light sandblasting or other cleaning at no additional cost to the Forest Service.
2.
Interior:
a.
Visually inspect interior surfaces and remove all traces of soil, waste materials, smudges and other foreign matter.
b.
Remove all traces of splashed material from adjacent surfaces.
c.
Remove paint drippings, spots, stains and dirt from finished surfaces.
3.
Skylights: Clean inside and outside.
4.
Polished surfaces: To surfaces requiring routine application of buffed polish, apply the polish recommended by the manufacturer of the material being polished.
Schedule final cleaning as approved by the Forest Service to enable Forest Service to accept a completely clean Work.
PART 4 - MEASUREMENT AND PAYMENT
4.1 - Measurement There will be no separate measurement for this section.
4.2 - Payment This work is incidental to other items in the contract and direct separate item payment will not be made.
END OF SECTION 01710
DIVISION 1 - GENERAL REQUIREMENTS
OPERATING AND MAINTENANCE DATA - 01730
PART 1 - GENERAL
1.1 - Requirements Included Compile product data and related information appropriate for Government's maintenance and operation of…