Attach9_General Decision Number.doc

DOC document 49 KB Posted

Attached to
Dakota Prairie Grasslands - Petrified Forest Road Project
Solicitation number
AG-87BJ-S-09-0005
Issued by

About this file

Attachment 9 - Wage Determination

View the file

Other files

File Type Posted
sf_30_Amend 1.doc DOC document
Attach2_Amend_Petrified_forest_access_haul_route_contract.pdf PDF
Attach4_SPS.doc DOC document
Attach6_Typical_Sections.pdf PDF
Attach1_Title_Sheet.pdf PDF
Attach3_Project_Area_Map.pdf PDF
Attach7_PP1-Model.pdf PDF
Attach5_CONSTRUCTION NOTES.doc DOC document
COVER_SHEET_SAMPLE.doc DOC document
AG_87BJ_S_09_0005_CONST_RFQ.doc DOC document
Attach2_Map_StockPile_Project_Location.pdf PDF
Attach8_PP2-Model.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 9 Page 1

AG-87BJ-S-09-0005

General Decision Number: ND080019 09/05/2008 ND19

Superseded General Decision Number: ND20070019

State: North Dakota

Construction Type: Heavy

Counties: Adams, Barnes, Benson, Billings, Bottineau, Bowman, Burke, Cavalier, Dickey, Divide, Dunn, Eddy, Emmons, Foster, Golden Valley, Grant, Griggs, Hettinger, Kidder, La Moure, Logan, McHenry, McIntosh, McKenzie, McLean, Mercer, Mountrail, Nelson, Oliver, Pembina, Pierce, Ramsey, Ransom, Renville, Richland, Rolette, Sargent, Sheridan, Sioux, Slope, Stark, Steele, Stutsman, Towner, Traill, Walsh, Ward, Wells and

Williams Counties in North Dakota.

HEAVY INDUSTRIAL/PROCESSING PLANTS AND REFINERIES.

Modification Number Publication Date

0 02/08/2008

1 05/02/2008

2 05/16/2008

3 05/23/2008

4 07/11/2008

5 08/15/2008

6 09/05/2008

BOIL0647-005 07/01/2008

Rates Fringes

BOILERMAKER......................$ 32.59 17.83

CARP1091-001 05/05/2008

ADAMS,BILLINGS,BOTTINEAU,BOWMAN,BURKE,BURLEIGH,DIVIDE,DUNN,

EMMONS,GOLDEN VALLEY,GRANT,HETTINGER,KIDDER,LOGAN,MCHENRY,

MCINTOSH,MCKENZIE,MCLEAN,MERCER,MORTON,MOUNTRAIL,OLIVER,

PIERCE,RENVILLE,ROLETTE,SHERIDAN,SIOUX,SLOPE,STARK,WARD, WELLS,

AND WILLIAMS COUNTIES:

Rates Fringes

CARPENTER

CARPENTER(Including

Formbuilding)...............$ 24.55 12.25

MILLWRIGHTS.................$ 28.25 16.46

CARP1176-004 05/01/2008

BARNES, BENSON, CAVALIER, DICKEY, EDDY, FOSTER, GRIGGS, LA

MOURE, NELSON, PEMBINA, RAMSEY, RANSOM, RICHLAND, SARGENT,

STEELE, STUTSMAN, TOWNER, TRAIL AND WALSH COUNTIES

Rates Fringes

CARPENTER

CARPENTERS(Including form building)...................$ 20.52 12.73

* ELEC0714-010 07/01/2007

ADAMS, BILLINGS, BOTTINEAU, BOWMAN, BURKE, DIVIDE, DUNN,

EMMONS, GOLDEN VALLEY, GRANT, HETTINGER, MCHENRY, MCKENZIE,

MCLEAN, MERCER, MOUNTRIAL, OLIVER, PIERCE, RENVILLE, ROLLETTE,

SHERIDAN, SOIUX, SLOPE, STARK, WARD, & WILLIAMS COUNTIES:

Rates Fringes

ELECTRICIAN

CABLE SPLICER...............$ 30.01 7.62+11%

ELECTRICIAN (Including low voltage wiring).............$ 31.66 7.62+11%

ELEC1426-013 06/01/2007

REMAINING COUNTIES

Rates Fringes

ELECTRICIAN

CABLE SPLICER...............$ 23.90 7.46+12%

ELECTRICIAN (Including low voltage wiring).............$ 22.76 7.46+12%

ENGI0049-038 04/28/2008

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 27.60 13.85

GROUP 2.....................$ 24.95 13.85

GROUP 3.....................$ 24.35 13.85

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Crane Operator 180' boom or jib and over any combination, all types.

GROUP 2: Backhoe operator 3 1/2 Cu. Yd. and over, Crane operator 135' not to exceed 180' boom or jib, any combination, all types. Gentry Crane operator.

GROUP 3: Backhoe (Track or rubber),Crane operator up to and including 135' of boom or jib, any combinatoin, all types, Dozer (Track or rubber), Forklift Operator, Hoist Operator

(covers all tuggers), Mechanic, OilerTrack & Truck Crane &

Scraper Operator.

LABO0580-003 05/01/2000

Rates Fringes

Laborers:

Common......................$ 14.33 4.81

PLUM0300-002 05/01/2008

BARNES, BENSON, CAVALIER, DICKEY, EDDY, FOSTER, GRIGGS, LA

MOURE, MOGAN, MCINTOSH, NELSON, PEMBINA, RAMSEY, RANSOM,

RICHLAND, SARGENT, STEELE, STUTSMAN, TRAILL, AND WALSH COUNTIES:

Rates Fringes

PLUMBER/PIPEFITTER...............$ 32.14 9.70

PLUM0300-003 05/01/2008

ADAMS, BILLINGS, BOTTINEAU, BURKE, DIVIDE, DUNN, EMMONS, GOLDEN

VALLEY, GRANT, HETTINGER, KIDDER, MCHENRY, MCKENZIE, MCLEAN,

MERCER, MOUNTRAIL, OLIVER, PIERCE, RENVILLE, ROLETTE, SHERIDAN,

SOIUX, SLOPE, STARK, TOWNER, WARD, WELLS AND WILLIAMS COUNTIES:

Rates Fringes

PLUMBER/PIPEFITTER...............$ 32.14 9.70

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .