Attachment_J-2.pdf
PDF 1 MB Posted
- Solicitation number
- AG-82X9-S-17-0003
About this file
Attachment J-2.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_J-2.pdf | ||
| Amendment_000002.pdf | ||
| Amendment_000001.pdf | ||
| Attachment_J-3.pdf | ||
| Attachment_J-1.pdf | ||
| Attachment_J-4.pdf | ||
| Attachment_J-2.pdf | ||
| Attachment_J-5.pdf | ||
| AG-82X9-S-17-0003.pdf | ||
| FBO_Synopsis_-_Bessey_Nursery.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST SERVICE
U.S. DEPARTMENT OF AGRICULTURE
ROCKY MOUNTAIN REGION PACKING SHED REFRIGERATION SYSTEM REPLACEMENT
NEBRASKA & SAMUEL R. MckELVIE NFs BUFFALO GAP, FT. PIERRE, & OGLALA NGs
BESSEY NURSERY 4
TITLE SHEET
A t t a c h m e n t
J
A G X S
P a g e o f
ROCKY MOUNTAIN REGION PACKING SHED REFRIGERATION SYSTEM REPLACEMENT
NEBRASKA & SAMUEL R. MckELVIE NFs BUFFALO GAP, FT. PIERRE, & OGLALA NGs
BESSEY NURSERY 4
LEGENDS, GENERAL NOTES, & SCHEDULES
A t t a c h m e n t
J
A G X S
P a
ROCKY MOUNTAIN REGION PACKING SHED REFRIGERATION SYSTEM REPLACEMENT
NEBRASKA & SAMUEL R. MckELVIE NFs BUFFALO GAP, FT. PIERRE, & OGLALA NGs
BESSEY NURSERY 4
MECHANICAL/ELECTRICAL PLANS
A t t a c h m e n t
J
A G X S
P a lcarroll Text Box
3. Base Item: Install 60 amp fused disconnect with 40 amp fuses and 3-#10 and 1-#10 ground for condensers C-1 and C-2.
lcarroll Text Box
4. Optional Item: Install 60 amp fused disconnect with 40 amp fuses and 3-#1- and 1-#10 ground for condenser C-3.
lcarroll Text Box
16. Existing transformer to remain.
lcarroll Text Box
18. Base Item: Install 30 amp fused disconnect with 15 amp fuses on existing evaporator.
lcarroll Line lcarroll Line lcarroll Line lcarroll Line lcarroll Line lcarroll Line lcarroll Line lcarroll Text Box
10. Base Item: Install 60 amp fused disconnect with 40 amp fuses on existing condenser with 3-#10 and 1-#10 ground.
lcarroll Line lcarroll Line lcarroll Text Box
13. Base Item: Install 30 amp fused disconnect with 15 amp fuses for evaporators E-1A, E-2A, and E-2B.
lcarroll Line lcarroll Line lcarroll Text Box
14. Optional Items: Install 30 amp fused disconnect with 15 amp fuses for evaporators E-3A and E-3B.
lcarroll Line lcarroll Line lcarroll Text Box 22Feb2017 Revision
ROCKY MOUNTAIN REGION PACKING SHED REFRIGERATION SYSTEM REPLACEMENT
NEBRASKA & SAMUEL R. MckELVIE NFs BUFFALO GAP, FT. PIERRE, & OGLALA NGs
BESSEY NURSERY 4
PHOTOS - EXISTING CONDITIONS
A t t a c h m e n t
J
A G X S
P a lcarroll Text Box 22Feb2017 Revision lcarroll Line lcarroll Text Box
5. Existing transformer to remain.
| 1 |
| 2 |
| 3 |
| 4 |
| PackingShed_Dwgs_RevFeb2017.pdf |
| 1 |
| 2 |
| 3 |
| 4 |
File details come from the government source that posted it. Updated .