Attach3 DB Wage Rates.docx
DOCX document 28 KB Posted
- Attached to
- Berthoud Pass Trailhead Project
- Solicitation number
- AG-82X9-S-11-0107
- Issued by
-
Department of Agriculture Forest Service
About this file
Attachment Three- Daveis Bacon Wage Rates
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach2 Drawings.pdf | ||
| SF 1442.pdf | ||
| Attach1 Specifications.doc | DOC document | |
| AG-82X9-S-11-0107.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Decision Number: CO100013 06/24/2011 CO13
Superseded General Decision Number: CO20080013
State: Colorado
Construction Type: Heavy
Counties: Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley, Custer, Delta, Dolores, Eagle, Elbert, Fremont, Garfield, Gilpin, Grand, Gunnison, Hinsdale, Huerfano, Jackson, Kiowa, Kit Carson, La Plata, Lake, Las Animas, Lincoln, Logan, Mineral, Moffat, Montezuma, Montrose, Morgan, Otero, Ouray, Park, Phillips, Pitkin, Prowers, Rio Blanco, Rio Grande, Routt, Saguache, San Juan, San Miguel, Sedgwick, Summit, Teller, Washington and Yuma Counties in Colorado.
HEAVY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 03/12/2010 1 06/04/2010 2 07/16/2010 3 08/06/2010 4 08/20/2010 5 09/03/2010 6 09/24/2010 7 10/08/2010 8 12/03/2010 9 01/21/2011 10 06/24/2011
ELEC0012-002 06/01/2009
ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CONEJOS, COSTILLA,
CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, LAS ANIMAS, MINERAL,
OTERO, PROWERS, RIO GRANDE AND SAGUACHE COUNTIES
Rates Fringes Electricians:
Electrical work $150,000 or less.....................$ 22.85 10.79 Electrical work over $150,000....................$ 27.00 10.91
ELEC0068-011 06/01/2010
CLEAR CREEK, EAGLE, GILPIN, GRAND, JACKSON, LAKE, LOGAN,
MORGAN, PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON AND YUMA COUNTIES
Rates Fringes
ELECTRICIAN......................$ 31.60 12.32
ELEC0111-002 09/01/2010
Rates Fringes Line Construction:
Cable Splicer...............$ 28.65 13.75%+4.75 Equipment Operator- Underground.................$ 25.06 12.75%+4.75 Groundmen...................$ 20.48 17.75%+4.75 Line Equipment Operator.....$ 25.74 17.75%+4.75 Lineman and Welder..........$ 35.81 20.75%+4.75
ELEC0113-004 06/01/2009
CHEYENNE, ELBERT, KIT CARSON, LINCOLN, PARL AND TELLER COUNTIES
Rates Fringes
ELECTRICIAN......................$ 28.80 3%+13.10
ELEC0969-003 06/01/2009
DOLORES, GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT,
MONTEZUMA, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN AND SAN
MIGUEL COUNTIES
Rates Fringes
ELECTRICIAN......................$ 28.00 9.24
ELEC0969-010 06/01/2009
DELTA AND MONTROSE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 21.31 8.92
ENGI0009-004 05/01/2009
Rates Fringes Power equipment operators:
Mechanic....................$ 23.82 9.22 Motor Grader: Blade-finish..$ 23.97 9.22 Motor Grader: Blade-rough...$ 23.67 9.22 Roller: self-propelled, all types over 5 tons.......$ 23.67 9.22 Roller: self-propelled, rubber tires under 5 tons...$ 23.32 9.22 Trackhoe....................$ 23.82 9.22
PLUM0003-003 06/01/2010
CLEAR CREEK, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN,
PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON, AND YUMA. PARTS OF
ELBERT, EAGLE, KIT CARSON, LINCOLN, AND PARK COUNTIES
Rates Fringes
PLUMBER..........................$ 33.37 10.35
PLUM0058-010 01/01/2011
ALAMOSA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS, COSTILLA,
CROWLEY, CUSTER, ELBERT (Southern portion including towns of Elbert, Matherson and Simla), FREMONT, HUERFANO, KIOWA, KIT CARSON (Including towns of Dfalgler, Siebert, Vona, Stratton and Bethune), LAS ANIMAS, LINCOLN (Including towns of Geona and Arriba in the southern portion of the county), MINERAL, OTERO, PARK (Including towns of Fauplay, Hartsel and Lake George), PROWERS, PUEBLO, RIO GRANDE, AND SAGUACHE COUNTIES
Rates Fringes
PLUMBER..........................$ 31.55 12.45
PLUM0058-012 01/01/2011
TELLER COUNTY
Rates Fringes
PLUMBER/PIPEFITTER
Plumbers Include HVAC Work
Pipefitters Exclude HVAC Work........................$ 28.05 12.45
* PLUM0145-004 01/01/2011
ARCHULETA, DELTA, DOLORES, EAGLE (Eagle County is divided from where Pitkin and Lake Counties join on the north, and in a straight line to and including the town of Edwards and northerly to the south east corner of Routt County), GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, MONTROSE, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN AND SAN MIGUEL
COUNTIES
Rates Fringes
PLUMBER..........................$ 24.58 10.47
SUCO2001-005 12/20/2001
Rates Fringes Carpenters:
Form Building and Setting...$ 16.16 .82 All Other Work..............$ 15.72
Cement Mason/Concrete Finisher...$ 14.76 2.28
Laborer, common..................$ 11.11 3.80
PIPEFITTER.......................$ 18.13 1.84
Power equipment operators:
Backhoe.....................$ 15.93 3.58 Bobcat/Skid Loader..........$ 20.22 4.41 Bulldozer...................$ 15.08 4.44 Excavator...................$ 15.39 Front End Loader............$ 15.86 3.59 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: CO100011 07/08/2011 CO11
Superseded General Decision Number: CO20080011
State: Colorado
Construction Type: Building
Counties: Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley, Custer, Delta, Dolores, Eagle, Elbert, Fremont, Garfield, Gilpin, Grand, Gunnison, Hinsdale, Huerfano, Jackson, Kiowa, Kit Carson, La Plata, Lake, Las Animas, Lincoln, Logan, Mineral, Moffat, Montezuma, Montrose, Morgan, Otero, Ouray, Park, Phillips, Pitkin, Prowers, Rio Blanco, Rio Grande, Routt, Saguache, San Juan, San Miguel, Sedgwick, Summit, Teller, Washington and Yuma Counties in Colorado.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)
Modification Number Publication Date 0 03/12/2010 1 05/21/2010 2 06/04/2010 3 07/02/2010 4 07/09/2010 5 07/16/2010 6 08/06/2010 7 08/13/2010 8 08/20/2010 9 09/03/2010 10 09/24/2010 11 10/08/2010 12 01/21/2011 13 01/28/2011 14 02/11/2011 15 05/06/2011 16 06/24/2011 17 07/08/2011
ASBE0028-004 07/01/2010
ALL COUNTIES EXCEPT ARCHULETA, CONEJOS, COSTILLA, LA PLATA AND
MONTEZUMA
Rates Fringes Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems.....................$ 30.23 11.53
ASBE0076-002 01/01/2009
ARCHULETA, CONEJOS, COSTILLA, LA PLATA AND MONTEZUMA
Rates Fringes Asbestos Workers/Insulator (Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems)....................$ 27.35 10.43
BRCO0007-003 01/01/2011
ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS,
COSTILLA, CROWLEY, CUSTER, DOLORES, ELBERT, FREMONT, HINSDALE,
HUERFANO, KIOWA, KIT CARSON, LA PLATA, LAS ANIMAS, LINCOLN,
MINERAL, MONTEZUMA, PARK, PROWERS, SAGUACHE, SAN JUAN & TELLER
COUNTIES
Rates Fringes
BRICKLAYER.......................$ 22.13 9.89
BRCO0007-009 01/01/2011
DELTA, GARFIELD, GRAND, GUNNISON, JACKSON, LAKE, LOGAN, MOFFAT,
MONTROSE, MORGAN, OTERO, OURAY, PHILLIPS, RIO BLANCO, RIO
GRANDE, SAN MIGUEL, SEDGWICK, WASHINGTON & YUMA COUNTIES
Rates Fringes
BRICKLAYER.......................$ 22.13 9.89
BRCO0007-010 01/01/2011
CLEAR CREEK, EAGLE, GILPIN, PITKIN, ROUTT & SUMMIT COUNTIES
Rates Fringes
BRICKLAYER.......................$ 22.13 9.89
CARP9901-006 05/01/2009
Baca, Bent, Chaffee, Cheyenne, Clear Creek, Crowley, Custer, Delta, Eagle, Elbert, Fremont, Garfield, Gilpin, Grand, Gunnison, Huerfano, Jackson, Kiowa, Kit Carson, Lake, Las Animas, Lincoln, Logan, Moffat, Montrose, Morgan, Otero, Ouray, Park, Phillips, Pitkin, Prowers, Rio Blanco, Routt, Saguache, Sedgwick, Summit, Teller, Washington and Yuma Counties, Colorado Rates Fringes Carpenters:
Formbuilding/Formsetting, Drywall Hanging/Framing and Metal Stud Work.........$ 26.60 8.89
CARP9901-007 05/01/2009
Alamosa, Archuleta, Conejos, Costilla, Dolores, Hinsdale, La Plata, Mineral, Montezuma, Rio Grande, San Juan and San Miguel Counties, Colorado Rates Fringes
CARPENTER
Formbuilding/Formsetting, Drywall Hanging/Framing and Metal Stud Work.........$ 23.05 7.60
ELEC0012-001 06/01/2009
ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CONEJOS, COSTILLA,
CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, LAS ANIMAS, MINERAL,
OTERO, PROWERS, RIO GRANDE AND SAGUACHE COUNTIES
Rates Fringes Electricians:
Electrical work $150,000 or less.....................$ 22.85 10.79 Electrical work over $150,000....................$ 27.00 10.91 (Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)
ELEC0068-007 06/01/2010
CLEAR CREEK, EAGLE, GILPIN, GRAND, JACKSON, LAKE, LOGAN,
MORGAN, PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON AND YUMA COUNTIES
Rates Fringes
ELECTRICIAN......................$ 31.60 12.32
(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls
ELEC0113-003 06/01/2009
CHEYENNE, ELBERT, KIT CARSON, LINCOLN, PARK AND TELLER COUNTIES
Rates Fringes
ELECTRICIAN......................$ 28.80 3%+13.10
(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)
ELEC0969-001 06/01/2009
DELORES, GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT,
MONTEZUMA, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN AND SAN
MIGUEL COUNTIES
Rates Fringes
ELECTRICIAN......................$ 28.00 9.24
(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)
ELEC0969-009 06/01/2009
DELTA AND MONTROSE COUNTIES
Rates Fringes
ELECTRICIAN......................$ 21.31 8.92
(Including low voltage wiring and installation of fire alarms, telephones, computers and temperature controls)
* ELEV0025-002 01/01/2011
Rates Fringes Elevator Constructor.............$ 38.19 21.79
FOOTNOTE:
a. Employer contributes 8% of basic hourly rate for over 5 years' service and 6% basic hourly rate for 6 months' to 5 years' service as Vacation Pay Credit.
PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans Day; Thanksgiving Day; Friday after Thanksgiving Day; and Christmas Day.
IRON0024-002 11/01/2009
Rates Fringes Ironworker, reinforcing and structural.......................$ 24.80 9.91
LABO0720-003 05/01/2009
Rates Fringes Laborers:
Concrete/Mason Tenders......$ 16.52 6.84
PAIN0930-001 07/01/2009
Rates Fringes
GLAZIER..........................$ 27.95 7.10
PLAS0577-001 05/01/2010
Rates Fringes Cement Mason/Concrete Finisher...$ 24.60 10.10
PLUM0003-006 06/01/2011
CLEAR CREEK, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN,
PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON, AND YUMA. PARTS OF
ELBERT, EAGLE, KIT CARSON, LINCOLN, AND PARK COUNTIES
Rates Fringes
PLUMBER..........................$ 32.69 11.18
(Including HVAC work)
PLUM0058-009 01/01/2011
ALAMOSA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS, COSTILLA,
CROWLEY, CUSTER, ELBERT (Southern portion including the towns of Elbert, Matherson and Silma), FREMONT, HUERFANO, KIOWA, KIT CARSON (Including towns of Dfalgler, Seibert, Vona, Stratton and Bethune), LAS ANIMAS, LINCOLN (Including towns of Geona and Arriba in the southern portion of the county), MINERAL, OTERO, PARK (Including towns of Fauplay, Hartsel and Lake George), PROWERS, RIO GRANDE, AND SAGUACHE COUNTIES
Rates Fringes
PLUMBER/PIPEFITTER
(Plumbers include HVAC work)
(Pipefitters exclude HVAC work).......................$ 28.05 12.45
PLUM0058-012 01/01/2011
TELLER COUNTY
Rates Fringes
PLUMBER/PIPEFITTER
Plumbers Include HVAC Work
Pipefitters Exclude HVAC Work........................$ 28.05 12.45
PLUM0145-001 01/01/2011
ARCHULETA, DELTA, DOLORES, EAGLE (Eagle County is divided from where Pitkin and Lake Counties join on the north, and in a straight line to and including the town of Edwards and northerly to the south east corner of Routt County), GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, MONTROSE, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN AND SAN MIGUEL
COUNTIES
Rates Fringes
PLUMBER/PIPEFITTER...............$ 24.58 10.47
PLUMBERS (Including HVAC work) AND PIPEFITTERS (Excluding HVAC work)
PLUM0208-005 06/01/2011
CLEAR CREEK, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN,
PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON, YUMA. PARTS OF ELBERT,
EAGLE, KIT CARSON, LINCOLN, AND PARK COUNTIES
Rates Fringes
PIPEFITTER.......................$ 32.61 11.26
(Excluding HVAC work)
ROOF0058-001 05/01/2010
Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 20.83 5.43
SHEE0009-001 01/01/2011
Rates Fringes Sheet metal worker (Includes HVAC duct and installation of HVAC systems)....................$ 31.66 10.98
SUCO2001-008 12/20/2001
Rates Fringes Carpenters:
Acoustical..................$ 15.69 3.15 All other Work..............$ 15.94 3.41
Drywall Finisher/Taper...........$ 14.44 2.19
Laborer, common..................$ 9.75
PAINTER..........................$ 15.19
(Excluding drywall finishing/taping) Brush, Roller, Spray
Power equipment operators:.......$ 13.41 Backhoe WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .