Attach1_Specifications.doc

DOC document 301 KB Posted

Attached to
Boulder Office Remodel Project
Solicitation number
AG-82X9-S-09-0020
Issued by

About this file

Attach1_Specifications

View the file

Other files

File Type Posted
Am2_Attachment1.doc DOC document
Am2_sf30.rtf RTF text file
Am1_sf30.rtf RTF text file
Attach4_Location_Map.doc DOC document
Attach3_Drawing2.pdf PDF
Attach3_Drawing1.pdf PDF
Attach3_Drawing4.pdf PDF
Attach2_Davis_Bacon_Wage_Rates.doc DOC document
Attach3_Drawing7.pdf PDF
Attach3_Drawing6.pdf PDF
Attach3_Drawing3.pdf PDF
Attach3_Drawing5.pdf PDF
Keep_This_Copy.doc DOC document
Return_This_Copy.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CSI SPECIFICATIONS FOR

BOULDER OFFICE REMODEL

ARAPAHO-ROOSEVELT NATIONAL FORESTS

1. ARAPAHO-ROOSEVELT NATIONAL FORESTS

2. ARAPAHO-ROOSEVELT NATIONAL FORESTS

No. of Pages

DIVISION 1 – GENERAL REQUIREMENTS

Section 01010 - Summary of Work

Section 01025 - Definition of Bid Items and Measurement and Payment Section 01140 - Work Restrictions

Section 01330 - Submittal Procedures Section 01400 - Quality Requirements

Section 01660 - Product Handling and Storage

Section 01770 - Closeout Procedures Section 01950 - Mobilization

DIVISION 3 – CONCRETE

Section 03300 - Cast-In-Place Concrete Section 03305 - Concrete for Minor Structures

DIVISION 4 – MASONRY

Section 04080 - Masonry Anchorage

Section 04100 - Mortar Section 04853 - Mortar-Placed Stone Assemblies

DIVISION 6 – WOODS AND PLASTICS

Section 06100 - Rough Carpentry

DIVISION 8 – DOORS AND WINDOWS

Section 08110 - Steel Doors and Frames Section 08211 - Flush Wood Doors Section 08711 - Door Hardware

DIVISION 16 – ELECTRICAL

Section 16050- Basic Electrical Materials and Methods

SECTION 01010

SUMMARY of work

PART 1 - GENERAL

1.1 summary

A. Work for this project includes but is not limited to the framing and relocation of an existing interior door, framing and remodeling existing walls to accommodate walkway, minor electrical and mechanical renovations, constructing gyp board sound proofing in an existing office, construction an exterior door and associated porch and lighting for exterior door, and constructing new flooring in existing office, and all associated work to complete the project as SHOWN ON THE DRAWINGS.

1.2 location

A. This project is located at the Boulder Ranger District Office in Boulder, Colorado at the intersection of 28th Street and Yarmouth Avenue. The site address is as follows:

2140 Yarmouth Avenue

Boulder, CO 80301

1.3 GENERAL SITE CONDITIONS AND WEATHER

Spec. Writer: EDIT paragraph below specific to the site.

A. The elevation of the site is approximately 5,400 feet above mean sea level. The construction site experiences snowfall and cold temperatures, with snow on the ground intermittently from mid-November through April.

Spec. Writer: edit paragraph below specific to the site. Coordinate blasting permission with section 02300.

B. In-depth soil surveys have not been performed; however, rocks at the ground surface are evident throughout the area. The Contractor should expect to encounter such rock during excavation and grubbing operations. Blasting of rocks will not be permitted without special permission.

C. In-depth water table surveys have not been performed; however, if water is encountered during excavation, the Contractor shall perform adequate dewatering to keep the excavation free from water and dispose of the water without damage to property.

1.4 USE OF PREMISES

spec writer: Delete this Article if Owner places strict limitations on Contractor's use of premises, and use Division 1 Section "Work Restrictions" instead. Expand Article if Owner's restrictions are minor. See the Evaluations in Division 1 Section "Work Restrictions.”

spec writer: Retain paragraph below if Project is on a vacant site or in an unoccupied building being renovated and there are no Owner-occupancy requirements. Revise to suit Project.

A. General: Contractor shall have full use of premises for construction operations, including use of Project site, during construction period. Contractor's use of premises is limited only by the Government's right to perform work or to retain other Contractors on portions of Project.

B. Contractor shall at all times conduct his operations to ensure the least inconvenience to the public and employees. No closures will be permitted.

C. Confine storage of materials to areas as approved by the Contracting Officer (CO).

D. Contractor shall provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Contractor shall minimize disturbance of all undisturbed areas.

E. Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

F. Existing Utilities: Notify CO and utility companies of proposed locations and times for excavation.

1. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

2. Interruption of Existing Utility Service: Existing utilities may only be interrupted with prior written approval from the CO. Notify CO 48 hours in advance of any interruption.

spec writer Insert additional paragraphs to specify minor restrictions on Contractor's use of premises or to specify minor limitations because of Owner occupancy.

1.5 MEALS AND LODGING

A. Meals and lodging are commercially available in the City of Boulder within tem miles of the construction site. Meals and/or lodging will not be available at Forest Service facilities.

1.6 camping

A. No camping will be permitted at the site.

1.7 construction sequence

A. There is no specified construction sequence or season for this project.

1.8 Field verification

A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.

1.9 permits

A. Special permits for electrical work or any other permits required by County, State, or Federal laws or regulations shall be obtained by the Contractor.

PART 2 – PRODUCTS

Not applicable

PART 3 – EXECUTION

Not applicable

END OF SECTION 01100

SECTION 01025

Definition of bid items and

MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1 summary

A. The intent of this section is to explain, in general, what is and what is not included in a line item; the limits or cut-off points where one line item ends and another begins; and the method of measurements and the basis of payment for work items listed in the Schedule of Items.

B. Work:

1. Work includes furnishing all labor, materials, equipment, and other incidentals necessary to successfully complete the project or any portion of it, and carrying out all duties and obligations imposed by the contract on the Contractor.

C. Payment:

1. For each individual item listed here and in the Schedule of Items, payment shall be full compensation for all work related to the particular item in accordance with these specifications, as shown on the drawings, and as staked in the field.

2. Measurement and payment for contract work shall be made only for and under those pay items included in the Schedule of Items. All other work and materials shall be considered incidental or as included in the payment for items shown.

1.2 DETERMINATION OF QUANTITIES

A. The Contractor shall perform, or cause to be performed, all measurement of quantities of materials incorporated into the work processes that are to be measured under the provisions of the contract.

B. Quantity Measurements:

1. The Contractor shall make all measurements for computation of quantities for all work items except those specified for payment by Designed Quantity (DQ) or Lump Sum Quantity (LSQ).

2. The Contractor shall compute the quantities for periodic progress payments; the Contracting Officer shall compute the quantities for the final payment based on measurements taken by the Contractor.

3. All Contractor measurements are subject to verification.

4. The Contractor shall submit all field notes, calculation sheets, and other data used to determine quantities.

5. The Contractor shall certify in writing as to the accuracy of the measurements and computations submitted.

C. The following measurements and calculations are used to determine contract quantities.

1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting, and erosion control blankets shall be along slope lines.

2. The average end area method shall be used to compute volumes of excavation or embankment. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three dimensional methods.

3. Structures shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed. Pipes shall be measured along center of invert.

5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

6. For standard manufactured items--such as fence, wire, plates, rolled shapes, pipe conduits--identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

1.3 UNITS OF MEASUREMENT

A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:

B. Cubic Yard: A measurement computed by one of the following methods:

1. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

2. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.

3. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

C. Each: One complete unit, which may consist of one or more parts.

D. Linear Foot: Linear feet measured horizontally.

PART 2 - products

1.4 METHOD OF MEASUREMENT

A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:

B. ACTUAL QUANTITIES (AQ)

1. These estimated quantities which are determined from actual measurements of completed work.

C. LUMP SUM QUANTITIES (LSQ)

1. These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.

PART 3 - EXECUTION

1.5 EARTHWORK TOLERANCES

A. Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the Contractor as necessary to produce the designed trail sections and to balance earthwork. Such adjustments shall not be considered as "Changes."

END OF SECTION 01025

SECTION 01140

WORK RESTRICTIONS

Part 1-GENERAL

1.1 USE OF PREMISES

SPEC WRITER: RETAIN PARAGRAPH AND SUBPARAGRAPHS BELOW IF SITE WILL BE ACCESSIBLE TO OTHER PARTIES OR IF PARTS OF A BUILDING BEING RENOVATED WILL BE OCCUPIED DURING CONSTRUCTION. REVISE TO SUIT PROJECT.

A. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the work is indicated.

1. Limits: Confine constructions operations to immediate areas where remodel work is being performed. Specific areas for equipment storage and staging will be located by the CO.

2. Government Occupancy: Allow for Government occupancy of site and use by the public of areas not directly related to the work.

3. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to occupants, Government employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.

SPEC WRITER: RETAIN PARAGRAPH BELOW IF THE WORK INVOLVES EXISTING OCCUPIED BUILDING.

B. Use of Existing Building: Maintain existing building in a weather tight condition throughout construction period. Repair damage caused by construction operations. Protect building and its occupants during construction period.

1.2 OCCUPANCY REQUIREMENTS

SPEC WRITER: RETAIN PARAGRAPH BELOW IF OWNER WILL OCCUPY ALL OR PART OF PREMISES DURING CONSTRUCTION. REVISE TO SUIT PROJECT. SEE EVALUATIONS.

A. Full Government Occupancy: Government will occupy site and existing building during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the work so as not to interfere with Government operations.

PART 2- PRODUCTS

PART 3- EXECUTION

END OF SECTION 01140

SECTION 01330

SUBMITTAL PROCEDURES

part 1- GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals.

B. See Division 1 Section "Quality Requirements" for submitting test and inspection reports and Delegated-Design Submittals.

C. See Division 1 Section "Closeout Procedures" for submitting warranties Project Record Documents, operation and maintenance manuals and “as built” drawings.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information that requires CO responsive action.

B. Informational Submittals: Written information that does not require CO approval. Submittals may be rejected for not complying with requirements.

1.3 SUBMITTAL PROCEDURES

A. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. CO reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

B. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Allow ten days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Allow ten days for processing each resubmittal.

4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the work to permit processing.

C. Identification: Place a permanent label or title block on each submittal for identification.

1. Indicate name of firm or entity that prepared each submittal on label or title block.

2. Provide a space approximately 2 by 3 inches on label or beside title block to record Contractor's review and approval markings and action taken by CO.

3. Include the following information on label for processing and recording action taken:

a. Project name.

b. Date.

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. Other necessary identification.

D. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

E. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

F. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.

part 2 – PRODUCTS

1.4 ACTION SUBMITTALS

A. General: Prepare and submit Action Submittals required by individual Specification Sections.

1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated. CO will return two copies. Mark up and retain one returned copy as a Project Record Document.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard printed data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data.

1. Preparation: Include the following information, as applicable:

a. Dimensions.

b. Identification of products.

c. Fabrication and installation drawings.

d. Roughing-in and setting diagrams.

e. Wiring diagrams showing field-installed wiring, including power, signal, and control wiring.

f. Notation of dimensions established by field measurement.

2. Wiring Diagrams: Differentiate between manufacturer-installed and field-installed wiring.

D. Samples: Prepare physical units of materials or products, including the following:

1. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

1.5 INFORMATIONAL SUBMITTALS

A. General: Prepare and submit Informational Submittals required by other Specification Sections.

1. Number of Copies: Submit two copies of each submittal, unless otherwise indicated. CO will not return copies.

2. Certificates and Certifications: Provide a notarized statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

3. Test and Inspection Reports: Comply with requirements in Division 1 Section "Quality Requirements."

B. Contractor's Construction Schedule:

1. The following submittal is required following award of contract for review and/or approval pursuant to contract provisions:

Item Description
Copies Required
References
Cost breakdown schedule listing main types of work and totaling amount of contract
1
FAR 52.232-05

C. Material Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements.

D. Field Test Reports: Prepare reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements.

E. Maintenance Data: Prepare written and graphic instructions and procedures for operation and normal maintenance of products and equipment. Comply with requirements in Division 1 Section "Closeout Procedures."

F. Manufacturer's Instructions: Prepare written or published information that documents manufacturer's recommendations, guidelines, and procedures for installing or operating a product or equipment. Include name of product and name, address, and telephone number of manufacturer.

part 3 – EXECUTION

1.6 general

A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.

B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

C. CO will not review submittals that do not bear Contractor's approval stamp and will return them without action.

D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

END OF SECTION 01330

SECTION 01400

QUALITY REQUIREMENTS

part 1 - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for quality assurance and quality control.

B. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

1. Specified tests, inspections, and related actions do not limit Contractor's quality-control procedures that facilitate compliance with the Contract Document requirements.

2. Requirements for Contractor to provide quality-control services required by CO or authorities having jurisdiction are not limited by provisions of this Section.

C. See Divisions 2 through 16 Sections for specific test and inspection requirements.

1.2 DEFINITIONS

A. Quality-Assurance Services: Activities, actions, and procedures performed before and during execution of the work to guard against defects and deficiencies and ensure that proposed construction complies with requirements.

B. Quality-Control Services: Tests, inspections, procedures, and related actions during and after execution of the work to evaluate that completed construction complies with requirements. Services do not include contract enforcement activities performed by CO.

C. Testing Agency: An entity engaged to perform specific tests, inspections, or both. Testing laboratory shall mean the same as testing agency.

1.3 SUBMITTALS

A. Qualification Data: For testing agencies specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include proof of qualifications in the form of a recent report on the inspection of the testing agency by a recognized authority.

B. Reports: Prepare and submit certified written reports that include the following:

SPEC WRITER: REVISE LIST BELOW TO SUIT PROJECT.

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples and tests or inspections.

5. Names of individuals making tests and inspections.

6. Description of the work and test and inspection method.

7. Identification of product and Specification Section.

8. Complete test or inspection data.

9. Test and inspection results and an interpretation of test results.

10. Ambient conditions at time of sample taking and testing and inspecting.

11. Comments or professional opinion on whether tested or inspected work complies with the Contract Document requirements.

12. Name and signature of laboratory inspector.

13. Recommendations on retesting and reinspecting.

C. Permits, Licenses, and Certificates: For CO’s records, submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the work.

1.4 QUALITY ASSURANCE

A. Fabricator Qualifications: A firm experienced in producing products similar to those indicated for this Project and with a record of successful in-service performance, as well as sufficient production capacity to produce required units.

B. Factory-Authorized Service Representative Qualifications: An authorized representative of manufacturer who is trained and approved by manufacturer to inspect installation of manufacturer's products that are similar in material, design, and extent to those indicated for this Project.

C. Installer Qualifications: A firm or individual experienced in installing, erecting, or assembling work similar in material, design, and extent to that indicated for this Project, whose work has resulted in construction with a record of successful in-service performance.

D. Professional Engineer Qualifications: A professional engineer who is legally qualified to practice in jurisdiction where Project is located and who is experienced in providing engineering services of the kind indicated. Engineering services are defined as those performed for installations of the system, assembly, or products that are similar to those indicated for this Project in material, design, and extent.

E. Testing Agency Qualifications: An agency with the experience and capability to conduct testing and inspecting indicated, as documented by ASTM E 548, and that specializes in types of tests and inspections to be performed.

1.5 QUALITY CONTROL

A. Contractor Responsibilities: Unless otherwise indicated, provide quality-control services specified and required by authorities having jurisdiction.

1. Where services are indicated as Contractor's responsibility, engage a qualified testing agency to perform these quality-control services.

a. Contractor shall not employ the same entity engaged by the Government, unless agreed to in writing by CO.

2. Notify testing agencies at least 48 hours in advance of time when work that requires testing or inspecting will be performed.

3. Where quality-control services are indicated as Contractor's responsibility, submit a certified written report, in duplicate, of each quality-control service.

4. Testing and inspecting requested by Contractor and not required by the Contract Documents are Contractor's responsibility.

5. Submit additional copies of each written report directly to authorities having jurisdiction, when they so direct.

B. Special Tests and Inspections: Contractor will engage a testing agency to conduct special tests and inspections required by authorities having jurisdiction as the responsibility of Contractor.

1. Testing agency will notify CO and Contractor promptly of irregularities and deficiencies observed in the work during performance of its services.

2. Testing agency will submit a certified written report of each test, inspection, and similar quality-control service to CO with copy to Contractor and to authorities having jurisdiction.

3. Testing agency will submit a final report of special tests and inspections at Substantial Completion, which includes a list of unresolved deficiencies.

4. Testing agency will interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from the Contract Documents.

5. Testing agency will retest and reinspect corrected work.

C. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections. Report results in writing.

D. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that revised or replaced work that failed to comply with requirements established by the Contract Documents.

E. Testing Agency Responsibilities: Cooperate with CO and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.

1. Notify CO and Contractor promptly of irregularities or deficiencies observed in the work during performance of its services.

2. Interpret tests and inspections and state in each report whether tested and inspected work complies with or deviates from requirements.

3. Submit a certified written report, in duplicate, of each test, inspection, and similar quality-control service through Contractor.

4. Do not release, revoke, alter, or increase requirements of the Contract Documents or approve or accept any portion of the work.

5. Do not perform any duties of Contractor.

F. Associated Services: Cooperate with agencies performing required tests, inspections, and similar quality-control services, and provide reasonable auxiliary services as requested. Notify agency sufficiently in advance of operations to permit assignment of personnel. Provide the following:

1. Access to the work.

2. Incidental labor and facilities necessary to facilitate tests and inspections.

3. Adequate quantities of representative samples of materials that require testing and inspecting. Assist agency in obtaining samples.

4. Facilities for storage and field-curing of test samples.

5. Preliminary design mix proposed for use for material mixes that require control by testing agency.

6. Security and protection for samples and for testing and inspecting equipment at Project site.

G. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and quality-control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

part 2 – PRODUCTS not applicable part 3 – EXECUTION

1.6 REPAIR AND PROTECTION

A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.

1. Provide materials and comply with installation requirements specified in other Sections of these Specifications. Restore patched areas and extend restoration into adjoining areas in a manner that eliminates evidence of patching.

2. Comply with the Contract Document requirements for Division 1 Section "Cutting and Patching."

B. Protect construction exposed by or for quality-control service activities.

C. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.

END OF SECTION 01400

SECTIOn 01660

Product handling and storage requirements

Edit Section number above and the title of the section. Remove text enclosed in angle brackets <> and insert text appropriate for the Project. Revise as necessary to describe the Project accurately. Insert additional paragraphs as appropriate, detailing fully miscellaneous provisions. For better control on numbered paragraphs, click the Protect Form button on the Format toolbar and change to the Outline View. To insert additional paragraphs, place the cursor at the end of the line after which you want to add text. Press the Enter key to create a new paragraph. Press the TAB key to indent one level. (To move from a 1.1 level to a level A, press TAB twice). Press SHIFT+TAB to back out a level. Develop paragraphs to satisfy specific Project requirements. To hide these instructions, click the Show/Hide ¶ button on the Standard Toolbar.

PART 1 - GENERAL

1. List Level 1

1.1 summary

A. Work includes protecting products scheduled for use in the work by means including, but not necessarily limited to, those described in this section. Include within the Contractor's quality assurance program such procedures as are required to assure full protection of work and materials.

B. Equipment and supplies, approved by the CO and in storage, shall be installed in the same physical and mechanical condition as when approved by the CO.

1.2 testinglaboratory recomendations

A. Except as otherwise approved by the CO, determine and comply with testing Laboratory's recommendations on product handling, storage and protection.

1.3 packaging

A. Delivery of products to the job site:

1. Maintain packaged materials with seal unbroken and labels Intact until time of use.

2. Promptly remove damaged material and unsuitable Items from the job site, and promptly replace with material meeting the specified requirements, at no additional cost to the Government.

B. The CO will reject as non‑complying such material and products that do not bear Identification satisfactory to the CO as to grade, quality, and other pertinent information.

1.4 protection

A. Protect finished surfaces over which equipment and materials are handled.

B. Maintain finished surfaces suitably protected until accepted by the Government.

1.5 repairs and replacements

A. In event of damage, promptly make replacements and repairs to the item as directed and approved by the Contracting Officer and at no additional cost to the Government.

B. Additional time required to secure replacements and to make repairs will not be considered by the Contracting Officer to justify an extension in the Contract Time of Completion.

PART 2 – PRODUCTS

2. List Level 2

PART 3 – EXECUTION

3. List Level 3

END OF SECTION

01660

SECTION 01770

CLOSEOUT PROCEDURES

part - GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:

SPEC WRITER: ADJUST LIST BELOW TO SUIT PROJECT.

1. Inspection procedures.

2. Project Record Documents.

3. Operation and maintenance manuals.

4. Warranties.

5. Instruction of Government personnel.

6. Final cleaning.

B. See Divisions 2 through 16 Sections for specific closeout and special cleaning requirements for products of those Sections.

1.2 SUBSTANTIAL COMPLETION

A. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.

SPEC WRITER: DELETE ITEMS BELOW NOT APPLICABLE OR REVISE TO SUIT PROJECT.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the work is not complete.

2. Advise CO of pending insurance changeover requirements.

3. Submit specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.

4. Obtain and submit releases permitting Government unrestricted use of the work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.

5. Prepare and submit Project Record Documents, operation and maintenance manuals, Final Completion construction photographs and photographic negatives, damage or settlement surveys, property surveys, and similar final record information.

6. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.

7. Make final changeover of permanent locks and deliver keys to CO. Advise Government personnel of changeover in security provisions.

8. Complete startup testing of systems.

9. Submit test/adjust/balance records.

10. Terminate and remove temporary facilities from Project site, along with mockups, construction tools, and similar elements.

11. Advise CO of changeover in heat and other utilities.

12. Submit changeover information related to Government occupancy, use, operation, and maintenance.

13. Complete final cleaning requirements, including touchup painting.

14. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for Final Completion.

1.3 FINAL COMPLETION

A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:

1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the work identified in previous inspections as incomplete is completed or corrected.

1.4 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Preparation: Submit three copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

1. Organize list of spaces in sequential order, starting with exterior areas first and proceeding from lowest floor to highest floor.

2. Organize items applying to each space by major element, including categories for ceiling, individual walls, floors, equipment, and building systems.

1.5 PROJECT RECORD DOCUMENTS

A. General: Do not use Project Record Documents for construction purposes. Protect Project Record Documents from deterioration and loss. Provide access to Project Record Documents for CO's reference during normal working hours.

B. Record Drawings: Maintain and submit one set of blue- or black-line white prints of Contract Drawings and Shop Drawings.

1. Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints.

a. Give particular attention to information on concealed elements that cannot be readily identified and recorded later.

b. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations.

2. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the work at the same location.

3. Note Construction Change Directive numbers, Change Order numbers, alternate numbers, and similar identification where applicable.

4. Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. Organize into manageable sets and bind each set with durable paper cover sheets. Include identification on cover sheets.

C. Record Specifications: Submit one copy of Project's Specifications, including addenda and contract modifications. Mark copy to indicate the actual product installation where installation varies from that indicated in Specifications, addenda, and contract modifications.

1. Give particular attention to information on concealed products and installations that cannot be readily identified and recorded later.

2. Mark copy with the proprietary name and model number of products, materials, and equipment furnished, including substitutions and product options selected.

3. Note related Change Orders and Record Drawings, where applicable.

1.6 OPERATION AND MAINTENANCE MANUALS

A. Assemble a complete set of operation and maintenance data indicating the operation and maintenance of each system, subsystem, and piece of equipment not part of a system. Include operation and maintenance data required in individual Specification Sections and as follows:

1. Operation Data: Include emergency instructions and procedures, system and equipment descriptions, operating procedures, and sequence of operations.

2. Maintenance Data: Include manufacturer's information, list of spare parts, maintenance procedures, maintenance and service schedules for preventive and routine maintenance, and copies of warranties and bonds.

B. Organize operation and maintenance manuals into suitable sets of manageable size. Bind and index data in heavy-duty, three-ring, vinyl-covered, loose-leaf binders, in thickness necessary to accommodate contents, with pocket inside the covers to receive folded oversized sheets. Identify each binder on front and spine with the printed title "OPERATION AND MAINTENANCE MANUAL," Project name, and subject matter of contents.

1.7 WARRANTIES

A. Submittal Time: Submit written warranties on request of CO for designated portions of the work where commencement of warranties other than date of Substantial Completion is indicated.

B. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.

1. Bind warranties and bonds in heavy-duty, 3-ring, vinyl-covered, loose-leaf binders, thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-11-inch (115-by-280-mm) paper.

2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.

3. Identify each binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor.

C. Provide additional copies of each warranty to include in operation and maintenance manuals.

part 2 – PRODUCTS

1.8 MATERIALS

A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

part 3 – EXECUTION

1.9 DEMONSTRATION AND TRAINING

A. Instruction: Instruct Government personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system.

1. Provide instructors experienced in operation and maintenance procedures.

2. Provide instruction at mutually agreed-on times. For equipment that requires seasonal operation, provide similar instruction at the start of each season.

3. Schedule training with Government, through CO, with at least seven day’s advance notice.

4. Coordinate instructors, including providing notification of dates, times, length of instruction, and course content.

B. Program Structure: Develop an instruction program that includes individual training modules for each system and equipment not part of a system, as required by individual Specification Sections. For each training module, develop a learning objective and teaching outline.

1. Include instruction for system design and operational philosophy, review of documentation, operations, adjustments, troubleshooting, maintenance, and repair.

1.10 FINAL CLEANING

A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.

1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:

a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

b. Remove tools, construction equipment, machinery, and surplus material from Project site.

c. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.

d. Remove debris and surface dust from limited access spaces, including roofs, plenums, shafts, trenches, equipment vaults, manholes, attics, and similar spaces.

e. Sweep concrete floors broom-clean in unoccupied spaces.

f. Vacuum carpet and similar soft surfaces to remove debris and excess nap. Shampoo if visible soil or stains remain.

g. Clean transparent materials, including mirrors and glass in doors and windows. Remove glazing compounds and other noticeable, vision-obscuring materials. Replace chipped or broken glass and other damaged transparent materials. Polish mirrors and glass, taking care not to scratch surfaces.

h. Remove labels that are not permanent.

i. Touch up and otherwise repair and restore marred, exposed finishes and surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

1) Do not paint over "UL" and similar labels, including mechanical and electrical nameplates.

j. Wipe surfaces of mechanical and electrical equipment, and similar equipment. Remove excess lubrication, paint and mortar droppings, and other foreign substances.

k. Replace parts subject to unusual operating conditions.

l. Clean light fixtures, lamps, globes, and reflectors to function with full efficiency. Replace burned-out bulbs, and those noticeably dimmed by hours of use, and defective and noisy starters in fluorescent and mercury vapor fixtures to comply with requirements for new fixtures.

m. Leave Project clean and ready for occupancy.

C. Pest Control: Engage an experienced, licensed exterminator to make a final inspection and rid Project of rodents, insects, and other pests. Prepare a report.

D. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.

END OF SECTION 01770

SECTIOn 01950 mobilization

Edit Section number above and the title of the section. Remove text enclosed in angle brackets <> and insert text appropriate for the Project. Revise as necessary to describe the Project accurately. Insert additional paragraphs as appropriate, detailing fully miscellaneous provisions. For better control on numbered paragraphs, click the Protect Form button on the Format toolbar and change to the Outline View. To insert additional paragraphs, place the cursor at the end of the line after which you want to add text. Press the Enter key to create a new paragraph. Press the TAB key to indent one level. (To move from a 1.1 level to a level A, press TAB twice). Press SHIFT+TAB to back out a level. Develop paragraphs to satisfy specific Project requirements. To hide these instructions, click the Show/Hide ¶ button on the Standard Toolbar.

PART 1 - GENERAL

1. List Level 1

1.1 SUMMARY

A. This work of this section shall consist of preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.

1.2 Measurement and payment

A. The accepted quantities will be paid at the contract unit price for this pay item as shown in the Schedule of Items. The Government will pay to the Contractor the total premiums paid by the Contractor to obtain bonds in the first progress payment. This payment for bonding shall not be in addition to the contract price but will be included in the line item price for Mobilization.

PART 2 – PRODUCTS

NOT APPLICABLE

2. List Level 2

PART 3 - EXECUTION

3. List Level 3

3.1 progress payments

A. When five percent or more of the original contract amount is earned from other pay items, 50 percent of the amount for mobilization (less bonding costs), or five percent of the original contract amount, whichever is less, will be paid in addition to the bonding costs.

B. When ten percent or more of the original contract amount is earned from other pay items, 100 percent of the amount for mobilization or ten percent of the original contract amount, whichever is less, will be paid.

C. Upon completion of all work on the project, any unpaid amount for mobilization will be paid.

D. The total of all payments shall not exceed the original contract amount for this item.

END OF SECTION

01950

SECTION 03300

CAST-IN-PLACE CONCRETE

part 1 - GENERAL

1.1 SUMMARY

A. This Section includes cast-in-place concrete for the new door pad and porch, including reinforcement, concrete materials, mix design, placement procedures, and finishes.

B. See Division 2 Section "Earthwork" for drainage fill under slabs-on-grade.

1.2 SUBMITTALS

A. Product Data: Submit manufacturer/supplier name and mix design and type of concrete used.

B. Shop Drawings: Include details of steel reinforcement placement including material, grade, bar schedules, stirrup spacing, bent bar diagrams, arrangement, and supports.

1.3 QUALITY ASSURANCE

A. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products complying with ASTM C 94 requirements for production facilities and equipment.

B. Comply with ACI 301, "Specification for Structural Concrete," including the following, unless modified by the requirements of the Contract Documents.

1. General requirements, including submittals, quality assurance, acceptance of structure, and protection of in-place concrete.

2. Formwork and form accessories.

3. Steel reinforcement and supports.

4. Concrete mixtures.

5. Handling, placing, and constructing concrete.

6. Lightweight concrete.

part 2 - PRODUCTS

1.4 MATERIALS

A. Formwork: Furnish formwork and form accessories according to ACI 301.

B. Steel Reinforcement:

1. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed.

2. Plain-Steel Wire: ASTM A 82, as drawn.

3. Plain-Steel Welded Wire Fabric: ASTM A…