Am2_Attachment1.doc

DOC document 37 KB Posted

Attached to
Boulder Office Remodel Project
Solicitation number
AG-82X9-S-09-0020
Issued by

About this file

Amendment2_Attachment1

View the file

Other files

File Type Posted
Am2_sf30.rtf RTF text file
Am1_sf30.rtf RTF text file
Attach4_Location_Map.doc DOC document
Attach3_Drawing2.pdf PDF
Attach3_Drawing1.pdf PDF
Attach3_Drawing4.pdf PDF
Attach2_Davis_Bacon_Wage_Rates.doc DOC document
Attach1_Specifications.doc DOC document
Attach3_Drawing7.pdf PDF
Attach3_Drawing6.pdf PDF
Attach3_Drawing3.pdf PDF
Attach3_Drawing5.pdf PDF
Keep_This_Copy.doc DOC document
Return_This_Copy.doc DOC document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AG-82X9-S-09-0020

AMENDMENT TWO (02)

BOULDER REMODEL PROJECT

ATTACHMENT ONE (01)

Boulder Remodel Pre-Quote Meeting:

Location: 2140 Yarmouth Ave, Boulder, Colorado Date: Monday, January 5, 2009

Time: 2:30 Mountain Time Zone

Attendants:

1. Tammy Seader, Growling Bear CO

2330 4th Ave, Greeley, CO 80631

(970)-353-6964

2. Jeremy Beaudoin/Shawn Squire, SCS Inc.

4955 Miller St, Suite 202, Wir, CO 80033

(303)-431-2443

3. Bryon Barba, Barba & Sons Construction 15269 Navajo Street, Broomfield, CO 80023

(303)-252-9299

4. Jeff Haynes, Ebuilding Service LLC

5650 North Washington, Suite C-9, Denver, CO 80216

(303)-592-1055

5. Jerry Burton, Burton Building Ent. Inc

12205 Perry St, #249, Broomfield, CO 80020

(541)-589-2798

6. David Bacon, Beaudoin & Papagno Construction

6428 S. Quebec Street, Centennial, CO 80111

(720)-488-7932

7. Leslie Stilson, IBEC Construction Company

3107 W. Hapden Ave, Englewood, CO 80110 (303)-304-6351

8. Jeremy Paddock, Paddock Construction

11349 Dover St., Firestone, CO 80504

(303)-349-4996

9. Steve Mager, St. Andrews Construction

12520 First St., Eastlake, CO 80614

(303)-439-7999

10. Chris Tolar, Stonebridge Builders

P.O. Box 741105, Arvada, CO 80006

(303)-425-9999

11. Keith Fleming/Justin Collins, Wildwood Services 2011 Alpine Dr, Erie, CO 80516

(720)-203-0213

12.

Jason Ruybal, USDA Forest Service

Items of Discussion:

· Contract time is 90 calendar days.

· Davis-Bacon Wage rates for Boulder County apply to the project.

· Successful Contractor is responsible for providing sanitation facilities for their employees.

· Electricity is available at the project site, but water is not.

· Structural Fill material is needed to bring porch up to desired finished elevation.

· All debris generated from the site is the Contractors responsibility and shall be removed from project site.

· Siding, shingle, baseboard, wall color, and wall texturing shall be of the type, size, and color of existing structure.

· Successful Contractor is responsible for obtaining a permit for electrical work and associated electrical inspection.

· Roofing shingles and materials shall comply with Boulder County wind and design loads.

· Successful Contractor is responsible for restoring access trail to porch and fine grading area around porch when work is completed.

· Flooring material is office #103 shall be resilient flooring material. Material of resilient flooring shall be marble, granite, terrazzo, durable vinyl composite tile, or approved equal, color as selected by the Government.

· Stone for porch columns shall be cultured stone veneer on metal lathe on self adhered rubber membrane over 5/8” OSB. Stone style, size, and color shall match existing exterior masonry.

· An approved staging area for Contractor’s materials and equipment will be designated for the successful contractor in the immediate vicinity of the construction area.

· The office will remain open to the public. The successful Contractor is responsible for maintaining site safety and access to the building for employees and the public. Contractor shall take all reasonable measures to minimize disturbances to employees.

· Porch door hardware shall comply with ADAG and ADA regulations to provide for handicap access.

· Given timing of the contract, the successful contractor will be responsible for taking all measures necessary to comply with cold weather placement of all grout and concrete and maintaining quality and curing of these materials.

· The porch slab and footer may be poured as a monolithic pour or as two separate pours as SHOWN ON THE CONTRACT DRAWINGS.

· Gutter type, color, and dimensions shall match existing entities.

Other Questions Submitted:

1. Submittal of proposal, Solicitation sheet says sealed bids in original and two copies, page 9 of the Instructions says we can fax this proposal over. Can we indeed fax this over? If so to the attention of whom. If not where do we deliver the proposal to?

If the proposals are submitted hardcopy, two original copies must be submitted to this office in accordance with the instructions on the SF1442 form.

If proposals are submitted via facsimile, the instructions on page nine of the Return this Copy package, FAR 52.215-5, Facsimile of Proposals, must be followed.

2. Is this job tax exempt?

The proposed price for this project shall include all Federal, State, and local taxes.

File details come from the government source that posted it. Updated .