Attach J.1 DOL Wage Determination.doc

DOC document 60 KB Posted

Attached to
Turquoise Water System Rehab
Solicitation number
AG-82X9-S-08-0211
Issued by

About this file

Attachment J.1 DOL Wage Determination

View the file

Other files

File Type Posted
Amendment 02.doc DOC document
amend_01.doc DOC document
Turquoise Lake Water Rehab DRAWINGS.pdf PDF
Solicitation.doc DOC document
Attach J.3 Project Specs.doc DOC document
Attach_J.2_Fire_Prevention_and_Control_Plan.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attach J.1 DOL Wage Determination No. CO 20080013

GENERAL DECISION: CO20080013 06/06/2008 CO13

Date: June 6, 2008

General Decision Number: CO20080013 06/06/2008

Superseded General Decision Number: CO20070013

State: Colorado

Construction Type: Heavy

Counties: Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley, Custer, Delta, Dolores, Eagle, Elbert, Fremont, Garfield, Gilpin, Grand, Gunnison, Hinsdale, Huerfano, Jackson, Kiowa, Kit Carson, La

Plata, Lake, Las Animas, Lincoln, Logan, Mineral, Moffat, Montezuma, Montrose, Morgan, Otero, Ouray, Park, Phillips, Pitkin, Prowers, Rio Blanco, Rio Grande, Routt, Saguache, San

Juan, San Miguel, Sedgwick, Summit, Teller, Washington and Yuma

Counties in Colorado.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date

0 02/08/2008

1 02/15/2008

2 05/02/2008

3 06/06/2008

ELEC0012-002 09/01/2007

ALAMOSA, ARCHULETA, BACA, BENT, CHAFFEE, CONEJOS, COSTILLA,

CROWLEY, CUSTER, FREMONT, HUERFANO, KIOWA, LAS ANIMAS, MINERAL,

OTERO, PROWERS, RIO GRANDE AND SAGUACHE COUNTIES

Rates Fringes

Electricians:

Electrical work $150,000 or less.....................$ 22.44 10.77

Electrical work over

$150,000....................$ 26.59 10.90

ELEC0068-011 06/01/2005

CLEAR CREEK, EAGLE, GILPIN, GRAND, JACKSON, LAKE, LOGAN,

MORGAN, PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON AND YUMA COUNTIES

Rates Fringes

ELECTRICIAN......................$ 28.91 10.33

ELEC0111-002 09/01/2007

Attach J.1 DOL Wage Determination No. CO 20080013

Rates Fringes

Line Construction:

Groundman...................$ 15.05 20.75%+4.75

Line Equipment Operator.....$ 23.56 20.75%+4.75

Lineman and Welder..........$ 33.28 22.75%+4.75

* ELEC0113-004 06/01/2008

CHEYENNE, ELBERT, KIT CARSON, LINCOLN, PARL AND TELLER COUNTIES

Rates Fringes

ELECTRICIAN......................$ 27.80 3%+12.55

ELEC0969-003 06/01/2007

DOLORES, GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT,

MONTEZUMA, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN AND SAN

MIGUEL COUNTIES

Rates Fringes

ELECTRICIAN......................$ 28.06 8.76

ELEC0969-010 06/01/2007

DELTA AND MONTROSE COUNTIES

Rates Fringes

ELECTRICIAN......................$ 20.31 8.56

ENGI0009-004 05/01/2008

Rates Fringes

Power equipment operators:

Mechanic....................$ 22.82 8.72

Motor Grader: Blade-finish..$ 22.97 8.72

Motor Grader: Blade-rough...$ 22.67 8.72

Roller: self-propelled, all types over 5 tons.......$ 22.67 8.72

Roller: self-propelled, rubber tires under 5 tons...$ 22.32 8.72

Trackhoe....................$ 22.82 8.72

PLUM0003-003 06/01/2007

CLEAR CREEK, GILPIN, GRAND, JACKSON, LAKE, LOGAN, MORGAN,

PHILLIPS, SEDGWICK, SUMMIT, WASHINGTON, AND YUMA. PARTS OF

ELBERT, EAGLE, KIT CARSON, LINCOLN, AND PARK COUNTIES

Rates Fringes

Attach J.1 DOL Wage Determination No. CO 20080013

PLUMBER..........................$ 31.62 9.90

PLUM0058-010 07/01/2007

ALAMOSA, BACA, BENT, CHAFFEE, CHEYENNE, CONEJOS, COSTILLA,

CROWLEY, CUSTER, ELBERT (Southern portion including towns of

Elbert, Matherson and Simla), FREMONT, HUERFANO, KIOWA, KIT

CARSON (Including towns of Dfalgler, Siebert, Vona, Stratton and Bethune), LAS ANIMAS, LINCOLN (Including towns of Geona and

Arriba in the southern portion of the county), MINERAL, OTERO, PARK (Including towns of Fauplay, Hartsel and Lake George), PROWERS, PUEBLO, RIO GRANDE, AND SAGUACHE COUNTIES

Rates Fringes

PLUMBER

Free Zone - 0 to 40 miles...$ 23.15 10.55

Zone 1 - 40 miles and over: $19.85 per hour + $32.00 per day per diem will be paid on projects over 40 miles (Zone 1) measured in practical driving miles by the shortest route, beginning at 5th and Main Streets in Pueblo, Colorado, when the employee stays overnight or drives their own vehicle.

Hazardous pay: Add $2.20 per hour to base rate. Hazardous pay applies to projects at chemical plants, steel mills, cement plants, power generator plants, process piping at manufacturing plants, food processing plants, and all projects which may present a health hazard or serious personal injury.

PLUM0058-012 07/01/2007

TELLER COUNTY

Rates Fringes

PLUMBER/PIPEFITTER

Plumbers Include HVAC Work

Pipefitters Exclude HVAC

Work........................$ 27.55 10.55

PLUM0145-004 05/01/2008

ARCHULETA, DELTA, DOLORES, EAGLE (Eagle County is divided from where Pitkin and Lake Counties join on the north, and in a straight line to and including the town of Edwards and northerly to the south east corner of Routt County), GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT, MONTEZUMA, MONTROSE, OURAY, PITKIN, RIO BLANCO, ROUTT, SAN JUAN AND SAN MIGUEL

COUNTIES

Rates Fringes

Attach J.1 DOL Wage Determination No. CO 20080013

PLUMBER..........................$ 23.90 9.10

SUCO2001-005 12/20/2001

Rates Fringes

Carpenters:

Form Building and Setting...$ 16.16 .82

All Other Work..............$ 15.72

Cement Mason/Concrete Finisher...$ 14.76 2.28

Laborer, common..................$ 11.11 3.80

PIPEFITTER.......................$ 18.13 1.84

Power equipment operators:

Backhoe.....................$ 15.93 3.58

Bobcat/Skid Loader..........$ 20.22 4.41

Bulldozer...................$ 15.08 4.44

Excavator...................$ 15.39

Front End Loader............$ 15.86 3.59

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

Attach J.1 DOL Wage Determination No. CO 20080013

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .