| SECTION | C. | | PERFORMANCE | WORK | STATEMENT | | | | |
| Rocky | Mountain | Research | Station | – | Flagstaff | Science | Laboratory | and | Greenhouse |
| 2500 | South | Pine | Knoll | Drive |
| Southwest | Forest | Science | Complex | |
and
| 1800 | South | Lone | Tree | Road |
| Flagstaff, | Arizona | 86001 | | |
C.1. GENERAL REQUIREMENTS
| C.1.1 | Scope | of | Work | | | | | | | | | | | | | | | |
| The | Contractor | shall | provide | all | necessary | management, | supervision, | personnel, | transportation, | general | and | | | | | | | |
| specialized | tools | equipment, | and | supplies | (except | as | specified | herein | as | Government | furnished) | required | to | | | | | |
| accomplish | all | services | identified | herein | at | the | Rocky | Mountain | Research | Station | side | of | the | Southwest | | | | |
| Forest | Sciences | Complex | (BLDG | 82B) | as | specified | herein. | All | work | shall | be | performed | at | the | RMRS | Flagstaff | | |
| Laboratory, | 2500 | S. | Pine | Knoll | Drive; | and | at | the | RMRS | Greenhouse/Shop | Facility | located | at | 1800 | S. | Lone | | |
| Tree | Road. | All | work | shall | be | completed | between | the | hours | of | 5:00 | p.m. | and | 6:00 | a.m. | local | time. | Contractor |
| shall | have | unobstructed | access | to | the | buildings | between | those | hours. | Training | and | performance | of | this | | | | |
| contract | shall | include | and | comply | with | all | applicable | OSHA, | EPA, | local, | State | and | Federal | codes, | mandates, | | | |
| and | standards. | The | Contractor | shall | at | all | times | | provide | adequate | supervision | of | employees | ensuring | all | | | |
| work | is | accomplished | in | accordance | with | the | terms | and | conditions | of | the | contract, | in | a | manner | that | will | |
| maintain | | satisfactory | facility | conditions | and | present | a | clean, | neat | and | professional | appearance. | Attachment | | | | | |
| # | 1 | details | the | frequency | at | which | the | services | are | to | be | performed. | | | | | | |
| C.1.2 | Personnel | | | | | | | | | | | | |
| C.1.2.1. | Project | Manager. | The | Contractor shall | designate, | in | writing | to | the | Contracting | Officer | (CO) | a |
| Contract | Manager | which | will | be | responsible | for | the | performance | of | the | work. | | The | Contract | | | |
| Manager | will | have | full | authority | to | act | for | the | Contractor | on | all | contract | matters | relating | to | the | |
| daily | operation | of | this | contract. | | The | contract | manager | will | be | available | by | means | of | a | | |
| communication | system | so | the | Contractor | may | respond | in | person | or | by | phone | within | 15 | minutes | | | |
| during | normal | duty | hours | or | within | one | (1) | hour | after | normal | duty | hours. | | The | name | of | this |
| person | shall | be | submitted | to | the | Contracting | Officer | at | pre‐ | performance | meeting | and | within | 1 | | | |
| workday | of | any | change(s). | | The | contract | manager | shall | have | two | full | years | of | housekeeping | | | |
| experience | within | the | last | six | years | and | demonstrate | an | active | knowledge | of | aseptic | | | | | |
| requirements | and | cleaning | techniques. | | | | | | | | | | | | | | |
| C.1.2.2. | Other | Personnel. | | The | Contractor shall | furnish | supervisory, | administrative, | and | direct | labor | | | | |
| personnel | to | accomplish | all | work | required. | | The | Contractor | shall | not | hire | off‐duty | COR's | or | any |
| other | person | whose | employment | would | result | in | a | conflict | with | the | USDA | Standards | of | Ethical | |
| Conduct | located | in | 5 | CFR | Part | 2635. | | Personnel | employed | to | provide | the | services | described | |
| herein | shall | be | competent | in | the | performance | of | such | services. | | | | | | |
| C.1.2.3. | Personnel | List. | | In | accordance | with | Homeland | Security | Presidential | Directive‐12 | (HSPD‐12), | | | | | |
| Office | of | Management | and | Budget | (OMB) | guidance | M‐05‐24 | and | Federal | Information | | Processing | | | | |
| Standards | Publication | (FIPS | PUB) | Number | 201. | The | Contractor | shall, | within | five | work | days | after | | | |
| the | start | of | the | contract, | furnish | the | CO | a | complete | list | of | the | name, | address, | social | security |
| number, | and | date | of | birth | of | each | employee | engaged | in | the | performance | of | this | contract. | The | |
| Government | may | require | additional | information | to | establish | the | identity | and | legal | employment | | | | | |
| status | of | each | employee | having | access | to | Government | buildings | or | facilities. | In | the | event | of | a | |
| change | in | employees, | the | Contractor | shall | inform | the | CO | promptly | of | the | change, | normally | | | |
| within | one | calendar | day | after | new | employee | hire | or | employee | dismissal. | | | | | | |
1 RMRS Flagstaff Science Lab & Greenhouse/Shop Facility Custodial Contract March 2015
| C.1.2.4. | Employee | Identification. | | The | Contractor shall | issue | picture | identification | badges, | containing | the | | |
| Contractor's | company | name | and | employee's | name | and | picture | at | the | Contractor's | expense. | The | |
| identification | badges | shall | be | worn | in | a | conspicuous | place | on | the | exterior | clothing | whenever |
| work | is | being | performed | under | this | contract. | | | | | | | |
| C.1.3 | Contractor | Quality | Control | | | | | | | | |
| C.1.3.1. | General | Requirement. | | The | Contractor is responsible for | quality | control | and | shall | establish | and |
| maintain | an | effective | quality | control | system. | | The | quality | control | system | shall | consist | of | plans, | | |
| procedures, | and | organization | necessary | to | produce | services | that | comply | with | the | contract | | | | | |
| requirements | and | shall | not | just | restate | the | PWS. | The | system | shall | cover | all | janitorial | operations. | | |
| The | Contractor | shall | be | responsible | for | the | quality | of | work | on | the | job | and | is | subject | to |
| termination | for | non‐compliance | with | quality | requirements | specified | in | the | contract. | | | | | | | |
| C.1.3.2. | Quality | Control | System. | | The | Contractor shall | implement | and | maintain | a | documented | quality | | | | | | |
| control | system, | including | a | Quality | Control | Plan | (QCP), | that | identifies | and | results | in | correction | of | | | | |
| potential | and | actual | problem | areas | throughout | the | entire | scope | of | the | contract. | An | electronic | | | | | |
| copy | of | the | QCP | shall | be | provided | to | the | CO/COR | at | pre‐performance | meeting. | The | Government | | | | |
| will | consider | an | interim | plan | for | the | first | 30 | days | of | operation. | The | QCP | or | interim | plan | shall | be |
| implemented | on | the | first | day | of | contract | performance. | When | the | plan | is | acceptable | to | all | parties, | | | |
| it | shall | be | signed | by | the | Contractor, | CO, | and | COR. | The | Contractor's | Quality | Control | system | shall | | | |
| include, | as | a | minimum, | the | following | to | cover | all | Janitorial | operations, | including | work | by | | | | | |
subcontractors.
| C.1.3.2.1. | Be | structured | to | assure | the | individual(s) | responsible | for | Quality | Control | is | independent | from |
| any | other | parts | of | the | Contractor's | organization. | | | | | | | |
C.1.3.2.2. Assure the Quality Control Manager has direct accountability to the Contractor's top management.
| C.1.3.2.3. | Contain | procedures | for | written | and | verbal | communication | with | the | Government | regarding |
| performance | of | the | contract. | | | | | | | | |
C.1.3.2.4. Contain procedures for handling corrective action without dependence upon Government direction.
| C.1.3.2.5. | Contain, | at | a | minimum, | specific | surveillance | procedures | for | each | contract | service | identified | in |
| the | Performance | Requirements | Summary. | These | surveillance | procedures | shall | identify | who | shall | | | |
| perform | the | surveillance, | the | frequency, | the | method, | listing | of | items | under | surveillance, | and | |
| corrective | action | that | will | be | taken | to | correct | Contractor | identified | deficiencies. | | | |
| C.1.3.2.6. | Include | a | customer | service/complaint | system. | At | a | minimum, | the | customer | service/complaint | | | | | |
| system | shall | contain | procedures | for | the | customer | to | file | service/complaints | with | the | COR/CO, | | | | |
| form | to | be | used | by | customers, | procedures | for | investigation | of | complaint, | and | feedback | to | the | | |
| customer | and | the | Government | on | the | results | and | actions, | if | any, | taken | on | the | complaint. | Form | to |
| be | provided | to | and | approved | by | the | CO/COR | at | pre‐performance | meeting. | | | | | | |
| C.1.3.2.7. | Maintain | records | of | all | Contractor quality | control | checks | and | corrective | action. | | The | Quality | | | |
| Control | Plan | will | include | a | sign‐in | and | sign‐out | process | that | documents | the | arrival | and | exit | time | |
| of | each | employee | on | a | daily | basis. | | These | files | shall | be | maintained | by | the | Contractor | throughout |
| the | term | of | this | contract | and | shall | be | made | available | to | the | Contracting | Officer | or | designated | |
| representative | during | the | term | of | this | contract. | | The | Contractor | shall | retain | its | quality | control | | |
| files | for | not | less | than | one | year | after | the | completion | or | termination | of | the | contract. | | |
2 RMRS Flagstaff Science Lab & Greenhouse/Shop Facility Custodial Contract
C.1.3.3. Acceptance of Plan. Government acceptance of the QCP is conditional and will be predicated on
| satisfactory | performance | during | the | Janitorial | services. | The | Government | reserves | the | right | to | | | |
| require | the | Contractor | to | make | changes | in | its | QCP | and | operations | including | removal | of | |
| personnel, | as | necessary, | to | obtain | the | quality | specified. | After | acceptance | of | the | QCP, | the | |
| Contractor | shall | notify | the | CO | in | writing | of | any | proposed | change. | Proposed | changes | are | subject |
| to | acceptance | by | the | CO/COR. | | | | | | | | | | |
| C.1.4. | Safety | | | | | | | | | | | | |
| The | Contractor | shall | conduct | its | operations | in | strict | conformance | with | all | United | States |
| Department | of | Agriculture, | United | States | Forest | Service, | and | all | applicable | provisions | of | 29 | CFR | | | | |
| 19IO | and | 1926 | of | the | Occupational | Safety | and | Health | Act. | The | Contractor | shall | implement | a | | | |
| suitable | safety | program | for | employees | performing | work | under | this | contract. | The | safety | program | | | | | |
| shall | be | in | writing | and | a | copy | shall | be | furnished | to | the | CO/COR | within | thirty | calendar | days | after |
| commencement | of | work | under | the | contract. | | Immediately | after | a | job‐connected | injury, | the | | | | | |
| Contractor | shall | prepare | a | report | of | the | injury | using | its | own | accident | report | form | or | other | | |
| documentation | and | within | five | days | send | the | report | to | the | CO | who | will | forward | it | to | the | Rocky |
| Mountain | Research | Station | Safety | Officer | and | COR. | | Any | technical | advice | and | assistance | | | | | |
| necessary | for | reporting | and | investigating | accidents | may | be | requested | from | the | Safety | Officer | | | | | |
| through | the | CO. | | | | | | | | | | | | | | | |
| C.1.5. | Security | | | | | | | | | | | |
| All | outside | doors | shall | remain | locked | while | Contractor performs | work | and | the | Contractor shall |
| assure | that | all | interior | and | exterior | doors | in | the | main | building | and | outlying | buildings | are | locked | | | |
| prior | to | departure. | | Unnecessary | lights/faucets | shall | be | turned | off | and, | windows | closed | upon | | | | | |
| completion | of | duties. | Do | not | adjust | mechanical | equipment | controls. | | Contractor | shall | | | | | | | |
| immediately | report | fires | and | hazardous | conditions | to | the | COR, | tum | in | lost | and | found | articles | to | | | |
| the | COR, | and | notify | the | COR | when | an | unauthorized | or | suspicious | person | is | seen | on | the | premises. | | |
| Report | any | items | in | need | of | repair | to | the | COR. | | Contractor | shall | immediately | notify | the | COR | if | |
| any | problems | are | encountered | either | with | the | alarm | or | if | any | keys | are | lost. | Additionally, | the | | | |
| Contractor | will | maintain | a | sign‐in | and | sign‐out | process | that | documents | the | arrival | and | exit | time | | | | |
| of | each | employee | on | a | daily | basis. | These | files | shall | be | maintained | by | the | Contractor | throughout | | | |
| the | term | of | this | contract | and | shall | be | made | available | to | the | CO | and/or | COR | during | the | term | of |
| this | contract. | | The | Contractor | shall | retain | security | files | for | not | less | than | one | year | after | the | | |
| completion | or | termination | of | the | contract. | | | | | | | | | | | | | |
| C.1.6. | Meetings | | | | | | | | | | | | | | | | |
| The | Contractor | and | COR | shall | meet | weekly | during | the | first | four | (4) | weeks | of | the | base | year. |
| Meetings | shall | be | conducted | quarterly | thereafter. | Mutual | effort | will | be | made | by | both | parties | to | | | |
| resolve | any | problems | identified | during | the | performance | of | the | contract | requirements. | Written | | | | | | |
| minutes | of | the | meetings | will | be | prepared | by | the | COR | within | 10 | work | days | and | signed | or | rejected |
| by | the | Contractor | within | 5 | work | days | of | receiving | the | notes. | Should | the | Contractor | not | concur | | |
| with | the | minutes, | the | Contractor | shall | notify | the | CO, | in | writing, | of | any | areas | of | disagreement | | |
| within | five | (5) | days | following | issuance | of | the | minutes. | | | | | | | | | |
C.2. GOVERNMENT FURNISHED PROPERTY, FACILITIES AND SERVICES
| C.2.1. | Facilities | | | | | | | | | | | | | | |
| The | Government | will | furnish | the | Contractor with | an | area | to | use | for | storage | of | equipment | and |
| supplies. | | Access | key | cards | will | be | issued | for | the | entrance | to | the | office. | | A | master | key | will | be |
| issued | for | access | to | internal | areas. | | The | Contractor | shall | reimburse | the | Government | for | repairs | | | | | |
| not | attributable | to | fair | wear | and | tear | for | the | facilities | provided. | | | The | area | must | be | kept | neat, | |
| clean | and | odor | free | and | returned | to | the | Government | at | the | expiration | of | the | contract | in | | | | |
3 RMRS Flagstaff Science Lab & Greenhouse/Shop Facility Custodial Contract
| reasonably | the | same | condition | as | at | the | time | of | entering | into | the | contract. | Shelving | will | be |
| supplied | for | cleaning | supplies. | | | | | | | | | | | | |
| The | Government | will | provide | janitorial | closets. | | These | closets | are | located | on | the | first | and | second | | |
| floors | of | the | main | office/lab | building | and | on | the | main | floor | of | the | greenhouse/shop. | | The | | |
| Contractor | shall | not | change | the | locks | at | any | time | and | shall | notify | the | CO | immediately | if | items | are |
| missing | from | the | closet | or | if | it | appears | that | someone | other | than | the | Contractor | and | his/her | | |
| employees | is | gaining | access | to | the | space. | | | | | | | | | | | |
C.2.1.1. Contractor shall not change the locks or make copies of any Government furnished keys.
| C.2.1.2. | Within | five | (5) | working | days | after | contract | start | date, | the | Contractor | and | COR | will | conduct | a |
| joint | building | condition | and | installed | equipment | condition/repair | inventory | inspection | to | | | | | | | |
| include | photographs | as | needed. | | Building | and | installed | equipment | condition, | damage, | and | repair | | | | |
| requirements | will | be | recorded | and | the | record | signed | by | the | Contractor | and | the | COR | at | the | time |
| of | inspection. | | | | | | | | | | | | | | | |
| C.2.1.3. | Within | fifteen | (15) | working | days | prior | to | the | end | of | a | contract | period, | the | Contractor and | the | |
| COR | shall | conduct | a | joint | building | and | condition | inventory | of | all | building | facilities | and | installed | | | |
| equipment | furnished | to | the | Contractor. | | All | damage | (other | than | fair | wear | and | tear) | which | was | | |
| nonexistent | at | the | time | of | contract | start | date | will | be | documented | and | signed | by | the | Contractor | | |
| and | the | COR. | | Any | damage | noted | at | this | time, | which | resulted | through | other | than | fair | wear | and |
| tear, | shall | be | collected | or | repaired | at | the | Contractor's | expense. | | | | | | | | |
| C.2.2. | Utilities | | | | | | | | | | | | | | |
| The | Government | will | furnish | electrical | power, | sewer | service, | and | water | at | no | cost | to | the |
| Contractor | during | performance | of | this | contract. | The | Contractor | shall | conserve | all | furnished | | | | | |
| utilities. | Hot | and | cold | water | as | necessary, | limited | to | the | normal | supply | will | be | provided | in | the |
| building. | No | special | heating | or | cooling | of | the | water | will | be | provided. | The | Government | will | not | |
| furnish | telephone | service. | | | | | | | | | | | | | | |
| C.2.3. | Trash | Disposal | | | | | | | | | | | | | | |
| The | Government | will | furnish | pick | up | and | disposal | of | trash | generated | in | or | associated | with | the |
| performance | of | this | contract. | The | Contractor | shall | be | responsible | for | the | placement | of | trash | in | | |
| the | designated | dumpster. | Trash | shall | not | be | placed | in | dumpsters/roll‐a‐ways | belonging | to | other | | | | |
| buildings | or | Contractors. | | If | such | an | event | occurs | and | results | in | a | claim | against | the | Government |
| for | disposal | of | the | trash, | the | Contractor | will | be | charged | for | the | amount | of | the | negotiated | claim. |
| C.2.4. | Key | and | Access | Card | Control | | | | | | | | | | |
| Keys | and | LincPass | or | Security | Access | Cards | will | be | provided | by | the | Forest | Service. | No |
| Contractor | employee | shall | enter | any | FS | building | without | first | obtaining | a | card | allowing | access | to | | | | |
| Government | property. | | Contract | employees | are | prohibited | from | sharing | their | electronic | | | | | | | | |
| access | key | or | other | keys | with | other | contracted | employees. | | Random | point | of | entry | checks | | | | |
| via | video | camera | will | occur. | | The | Contractor | shall | be | liable | for | all | loss | or | damage | of | such | |
| delivered | Government‐furnished | property | until | completion | of | and | final | acceptance | of | work | | | | | | | | |
| required | under | this | contract. | The | Government, | at | the | Contractor's | expense, | shall | replace | any | | | | | | |
| access | cards | and/or | keys | lost | by | the | Contractor's | employees. | | In | the | event | a | master | key | is | lost, | |
| the | Government, | at | the | Contractor's | expense, | shall | replace | keys | on | that | master | system. | If | a | | | | |
| standard | (non‐master) | key | is | lost, | the | lock | for | that | key | will | be | replaced | by | the | Government | and | | |
| the | cost | deducted | from | the | monthly | payment | due | the | Contractor. | Lost | keys | shall | be | reported | to | | | |
| the | COR | immediately. | If | the | COR | is | not | available, | the | loss | shall | be | reported | to | the | CO. | Keys | and |
| LincPass | or | Security | Access | Cards | are | accountable | Government | property | and | will | be | turned | in | to | | | | |
| the | COR | by | close | of | business | on | the | last | day | of | the | contract. | Any | temporary | employees | shall | tum | |
4 RMRS Flagstaff Science Lab & Greenhouse/Shop Facility Custodial Contract
| in | their | keys | and | LincPass | or | Security | Access | Cards | to | the | Contractor | who | will | then | give | them | to |
| the | COR | on | the | last | day | of | their | temporary | duty. | | | | | | | | |
C.3. CONTRACTOR FURNISHED ITEMS
| C.3.1. | Supplies | | | | | | |
| The | Contractor | shall | furnish | soap, recycled paper hand towels, 2‐ply | toilet | paper,and other |
| necessary | cleaning | supplies. | The | Contractor | shall | provide | all | bio‐based | nontoxic | cleaning | | | | | | |
| products, | vacuums, | bio‐based | carpet | cleaner, | bio‐based | shampoo, | rags, | and | any | other | | | | | | |
| cleaning | supplies | and | equipment | necessary | to | adequately | meet | the | cleaning | specifications. | | | | | | |
| No | flammable | or | explosive | liquids | such | as | gasoline | will | be | stored. | The | Contractor | shall | | | |
| submit | a | list | of | cleaning | products | to | be | used | to | the | CO/COR | for | approval | during | the | pre‐ |
| performance | meeting. | Materials | and | equipment | shall | be | of | suitable | size | and | type | for | the | | | |
| work | or | service | being | performed. | | See | paragraph | C.5.IO | for | additional | information. | | | | | |
| C.3.1.1. | The | Contractor | is | responsible | for | ensuring | all | containers | of | cleaning | chemicals, | hazardous | |
| materials, | and | similar | products | shall | be | conspicuously | marked | with | a | factory | label | to | identify |
| contents. | Hazardous | materials | shall | be | labeled | with | appropriate | Department | of | Transportation | | | |
| (DOT) | or | Interstate | Commerce | Commission | (ICC) | hazard | labels | (flammable, | corrosive, | acid, | etc.), | | |
| as | specified | on | the | Material | Safety | Data | Sheet | (MSDS)/Safety | Data | Sheet | (SDS). | | |
| C.3.1.2. | The | Government | reserves | the | right | to | require | samples of | supplies | to | be | used | by | the | Contractor |
| to | determine | suitability | and | standards | compliance. | | The | Contractor, | at | the | Contractor’s | expense, | | | |
| shall | replace | items | failing | to | meet | required | standards. | | | | | | | | |
| C.3.1.3. | Contractor | shall | use | products | made | with | recycled | materials | to | the | greatest | extent | possible. |
| Preference | shall | be | given | to | concentrated | cleaning | chemicals | which | use | ecologically | sound | | |
| packaging | and | are | phosphate‐free, | non‐corrosive, | non‐flammable | and | fully | biodegradable. | | | | | |
| C.3.1.4. | The | use | of | caustics | (acid‐based | cleansers) | may | not | be | approved | and | must | be | preapproved | by | the | |
| COR. | | Materials | or | supplies | shall | not | be | used | in | performance | under | this | contract | – | or | placed | or |
| stored | on | Government | property | – | until | the | applicable | MSDS/SDS | for | all | chemicals | and | | | | | |
| hazardous | materials | (products | containing | “caution” | and/or | “warning” | labels), | have | been | | | | | | | | |
| furnished | to | the | COR | and | approval | has | been | received | from | the | COR. | | | | | | |
| C.3.2. | Material | Safety | Data | Sheets/Safety | Data | Sheets | | | | | | |
| The | Contractor | shall | submit | MSDS/SDS | sheets | obtained | from | the | manufacturer | or | dealer |
| concerning | all | hazardous | materials | (i.e., | chemicals | and | cleaning | solutions) | to | be | used | under | this | | | |
| contract | through | the | COR | to | the | Rocky | Mountain | Research | Station | Safety | Office | at | the | pre‐ | | |
| performance | meeting. | | Reference: | | 29 | CFR | 1910‐1200. | | MSDS/SDS | will | be | submitted | and | | | |
| products | approved | prior | to | the | use | of | any | products. | | Safety | Data | Sheets | will | be | the | required |
| format | beginning | June | 1, | 2016. | | Reference: | | Hazard | Communication | Standard | Final | Rule | | | | |
(https://www.osha.gov/dsg/hazcom/HCSFactsheet.html)
| C.3.3. | Contractor’s | Equipment. | | | | | | | | | | | | |
| The | Government | will | not | provide | equipment | for | this | contract. | The | Government | may | inspect | the |
| Contractor’s | equipment | at | any | time. | | If | a | piece | of | equipment | needs | repair | or | is | determined |
| unsafe | by | the | COR, | the | Contractor | shall | immediately | stop | using | the | equipment. | Defective | | | |
| equipment | shall | be | repaired | or | replaced | within | 72 | hours | of | identification. | | Contractor’s | | | |
| equipment | shall | be | subject | to | approval | by | the | COR/CO. | | The | Contractor | shall | service | or | replace, |
| at | no | cost | to | the | Government, | any | equipment | found | to | be | defective, | unsafe | or | unsuitable. | |
C.3.3.1. For protection of walls and doors, all wheeled and movable equipment shall be equipped with
5 RMRS Flagstaff Science Lab & Greenhouse/Shop Facility Custodial Contract
| protective | non‐marking | wheels | and | rubber | bumpers | or | guards | around | the | entire | perimeter. | No |
| part | of | the | equipment | (except | fixed | handles) | shall | protrude | beyond | the | rubber | bumpers. |
| C.3.4. | Trash | Receptacle | Liners. | | | | | | | | | | |
| The | Contractor | shall | provide, | at | a | minimum, | 1mm | thick | liners | in | trash | receptacles. |
C.4. SPECIFIC TASKS
| C.4.1. | General | | | | | | | | | | | | |
| The | Contractor | shall | provide | all | management | and | labor | necessary | to | ensure | that | custodial |
| services | are | performed | at | the | RMRS | Flagstaff | Laboratory | and | Greenhouse/Shop | Facility. | | The | | | | |
| Contractor | shall | ensure | that | tools | and | equipment | necessary | to | clean | the | restrooms | and | shower | | | |
| facilities | are | clearly | identified | and | utilized | only | for | cleaning | those | areas | (i.e. | mop | used | to | clean | |
| bathroom | floor | shall | not | be | used | to | clean | kitchen | floor). | | The | Government | will | ensure | that | |
| adequate | tools | and | equipment | are | available | to | prevent | cross | contamination. | The | Contractor | | | | | |
| shall | perform | the | required | custodial | services | of | this | contract | between | the | hours | of | Monday | ‐ | | |
| Friday | 5:00 | p.m. | to | 6:00 | a.m. | and | between | Saturday | morning | at | 6:00 | a.m. | and | Sunday | night | at |
| midnight | in | accordance | with | the | terms | of | this | Performance | Work | Statement | (PWS). | | The | tasks | | |
| and | frequencies | of | the | work | are | listed | in | the | Task | and | Frequency | list. | | | | |
| C.4.1.1. | Areas | Under | Repair/Remodeling. | The | Contractor is | not | required | to | perform | custodial | duties | in | | | | |
| an | area | that | is | under | repair | or | being | remodeled. | These | areas | will | be | clearly | marked | by | the |
| Government | as | not | requiring | services. | | | | | | | | | | | | |
| C.4.1.2. | Areas | Marked | with | “No | Custodial | Services | Required”. | | The | Contractor | is | not | required | to | perform |
| custodial | duties | in | any | lab | or | other | area | marked | “No | Custodial | Services | Required”. | | | |
| C.4.1.3. | Frequency | of | Custodial | Services. | All | regular | services | shall | occur | in | accordance | with | the | cleaning | | | |
| schedule | proposed | by | the | Contractor | for | all | janitorial | services. | | At | a | minimum, | the | tasks | outlined | | |
| in | the | | daily | Task | and | Frequency | Chart | (attached) | shall | be | performed | daily, | in | a | manner | that | |
| ensures | trash | is | not | left | over | the | weekend | . | | These | days | shall | remain | unchanged | through | the | life |
| of | the | contract | except | as | the | Government | and | Contractor | shall | otherwise | agree. | | The | Contractor | | | |
| is | not | required | to | perform | custodial | services | on | Federal | holidays. | | A | list | of | Federal | holidays | is | |
| provided | under | the | Contract | Administration | Data | segment | of | this | contract. | | If | the | Contractor | | | | |
| chooses | not | to | perform | the | scheduled | service | on | the | Federal | holiday, | the | scheduled | service | must | | | |
| be | performed | on | the | next | calendar | day. | | | | | | | | | | | |
| C.4.1.4. | Management. | | The | Contractor will | provide | the | service | of | work | scheduling. | | The | Task | and |
| Frequency | Chart | will | be | the | basis | for | scheduling | cleaning | tasks | in | the | specified | buildings | and |
| areas. | | The | Contractor | shall | provide | adequate | supervision | of | their | employees | to | ensure | complete | |
| and | satisfactory | performance | of | all | work | in | accordance | with | the | terms | and | conditions | of | the |
| contract. | | Adequate | supervision | includes | the | Contractor | requiring | employees | to | physically | sign | | | |
| in | and | out | each | work | day. | | | | | | | | | |
| C.4.1.5. | Cleaning | Schedules. | | The | Contractor shall | submit | a | written, | annual | schedule | for | services | | | |
| described | in | this | PWS | for | acceptance | at | the | pre‐performance | meeting, | identifying | facilities | by | | | |
| title, | cleaning | duties | by | date | and | approximate | time | cleaning | will | occur. | | The | Contractor | shall | be |
| allowed | thirty | (30) | days | to | adjust | work | schedules | based | on | inspections. | | If | necessary, | a | second |
| work | schedule | shall | be | submitted | to | the | CO/COR | for | acceptance | within | ten | (10) | days | after | the |
| first | contract | month | period. | | The | Contractor | shall | not | deviate | from | the | accepted | schedule | | |
| without | prior | written | approval | from | the | CO/COR. | | Any | permanent | changes | must | be | submitted | | |
| ten | (10) | days | before | implementation | and | receive | CO/COR | written | acceptance | before | the | | | | |
| Government | will | allow | the | proposed | changes. | | | | | | | | | | |
6 RMRS Flagstaff Science Lab & Greenhouse/Shop Facility Custodial Contract
| C.4.2. | Cleaning | Tasks | | | | | | | | | | | | | |
| All | cleaning | tasks | shall | be | accomplished | as | stated | below | and | coincide | with | the | Task | and |
Frequency Chart (attached).
| C.4.2.1. | Sweep/Dust | Mop | Floors. | | All | accessible resilient | and | hard floor | areas | shall | be | swept | or | dust | |
| mopped. | | After | the | floor | has | been | swept | or | dust | mopped, | the | entire | floor | surface, | including |
| corners | and | abutments | shall | be | free | of | litter, | dust, | and | debris. | | Chairs, | trash | receptacles, | and |
| easily | movable | items | shall | be | moved | to | maintain | floors | underneath | these | items. | | All | moved | items |
| shall | be | returned | to | their | proper | position | when | all | operations | have | been | completed. | | | |
| C.4.2.1.1. | Damp/Wet | Mop | Floors. | | All | accessible | resilient | and | hard | floor | areas | shall | be | damp | and/or | wet | | |
| mopped. | | Chairs, | trash | receptacles, | and | easily | movable | items | shall | be | moved | to | maintain | floors | | | | |
| underneath | these | items. | | All | moved | items | shall | be | returned | to | their | proper | position | when | all | | | |
| operations | have | been | completed. | After | being | mopped, | the | floor | shall | have | a | uniform | appearance | | | | | |
| with | no | streaks, | swirl | marks, | detergent | residue, | or | any | evidence | of | soil, | stains, | film | debris, | or | | | |
| standing | water. | | There | shall | be | no | splash | marks | or | mop | streaks | on | furniture, | equipment, | walls, | | | |
| baseboards, | etc., | or | mop | stands | remaining | in | the | area. | | Do | not | wet | mop | wood | or | carpeted | floors. | |
| All | floors | shall | be | free | of | all | grime, | soils, | perspiration | marks, | water | spots, | scuffmarks, | and | lotion | | | |
| residue | and | free | of | odor. | | Floors | will | be | disinfected. | | Mop | bucket | shall | be | emptied | and | rinsed | at |
| the | end | of | each | day. | | | | | | | | | | | | | | |
| C.4.2.1.2. | Floors | and | Thresholds | Maintenance. | | All | floors | accessible | to | floor | machines, | unless | otherwise | | | |
| shown | in | Task | and | Frequency | Chart | as | having | carpet, | shall | receive | floor | maintenance. | | After | | |
| receiving | floor | maintenance, | the | entire | floor | shall | have | a | uniform, | glossy | appearance, | and | be | free | | |
| of | scuffmarks, | heel | marks, | and | other | stains | and | discolorations. | | All | floor | maintenance | solutions | | | |
| shall | be | removed | from | baseboards, | furniture, | trash | receptacles, | comers, | wall | abutments, | doors, | | | | | |
| and | areas | behind | radiators | and | pipes, | etc. | | Chairs, | trash | receptacles, | and | easily | removable | items | | |
| shall | be | moved | to | maintain | floors | underneath | these | items. | | All | moved | items | shall | be | returned | to |
| their | proper | position | when | all | operations | have | been | completed. | Floor | maintenance | includes | | | | | |
| sweeping, | dust | mopping, | damp | mopping, | wet | mopping, | stripping, | buffing | and | polishing | as | | | | | |
| required | to | achieve | the | above | stated | results. | | | | | | | | | | |
| C.4.2.1.3. | Wooden | Floors. | | Wooden | floors | shall | be | swept | and | dust | mopped | and | free | of | debris, | litter | and | |
| marks. | | Only | cleaning | supplies | for | specific | use | with | wooden | floors | are | to | be | used. | | Damp | | |
| mopping | will | occur | as | directed | by | instructions | found | on | cleaning | solutions | and/or | not | more | | | | | |
| than | one | (1) | time | weekly | and | not | less | than | four | (2) | times | monthly | or | as | needed | based | on | the |
| condition | of | the | wood | floor. | | | | | | | | | | | | | | |
| C.4.2.1.4. | Carpeted | Surfaces. | | All | carpeted | surfaces | shall | be | vacuumed | and | free | of | all | visible | lint, | litter, | soil, | |
| and | imbedded | grit. | | Area | and | throw | rugs | are | to | receive | service | also. | | Rugs, | mats, | and | runners | in |
| excess | of | 20 | pounds | shall | be | moved | by | more | than | one | person | and | cleaned | underneath. | | | | |
| C.4.2.1.5. | Semi‐Annual | Carpet | Extraction/Cleaning. | The | Contractor shall | extract/clean | all | carpeted | areas | | | | | | | | |
| including | offices, | cubicles, | hallways, | common | areas | and | conference | rooms. | | Each | | | | | | | |
| cleaning/extraction | shall | be | spaced | in | equal | proportion | apart | from | the | last | and | the | next. | | Carpet | | |
| cleaning/extraction | shall | be | done | to | present | a | clean | walking | surface | with | no | stains, | streaks, | dirt, | | | |
| skids, | nor | marks | of | any | kind. | | After | cleaning, | any | wastebaskets | that | have | been | placed | on | a | desk |
| or | table | must | be | removed | and | the | area | where | the | wastebasket | was | sitting | shall | be | sanitized. | | At |
| pre‐performance | meeting, | Contractor | shall | provide | a | carpet | extraction/cleaning | schedule | to | the | | | | | | | |
| CO/COR | for | the | base | year | and | on | the | anniversary | date | for | each | option | year. | | For | any | deviations |
| from | the | established | schedule, | the | Contractor | must | schedule, | in | advance, | changes | with | the | COR | | | | |
| or | CO. | | All | carpet | cleaning/extraction | shall | be | complete | within | 48 | hours | of | beginning | and | be | | |
| accomplished | on | the | weekends. | | | | | | | | | | | | | | |
7 RMRS Flagstaff Science Lab & Greenhouse/Shop Facility Custodial Contract
C.4.2.1.6. Semi‐Annual Stripping and Re‐waxing of Durable/Resilient (non‐wood) Flooring. Resilient
| flooring | shall | be | swept/dust | mopped | and | stripped | to | remove | all | built | up | wax | and | imbedded |
| dirt | prior | to | re‐waxing. | | After | application | of | wax, | areas | shall | be | buffed | (if | required) |
| sufficiently | for | maximum | gloss | and | uniform | sheen | from | wall | to | wall, | including | corners. | | The |
| re‐waxed | floor | shall | present | a | clean | appearance | free | from | scuff | marks | and | dirt | smears. | |
| Furniture | and | other | equipment | moved | during | floor | stripping | and | re‐waxing | shall | be | returned | | |
| to | their | original | positions. | | Buffing | shall | occur | at | least | monthly | on | all | resilient | (non‐wood) |
floors.
| C.4.2.2. | Trash, | Refuse | Garbage | and | Solid | Waste. | | All | trash | receptacles | shall | be | emptied | and | returned | to | | |
| their | original | location. | | Any | obviously | soiled | or | torn | plastic | trash | receptacle | liners | in | such | | | | |
| receptacles | shall | be | replaced. | | A | spare | liner | shall | be | kept | in | the | bottom | of | each | receptacle. | | Boxes |
| no | larger | than | two | (2) | cubic | feet, | cans, | and | papers | placed | near | trash | receptacle | shall | be | removed | | |
| if | clearly | marked | "trash". | | All | debris | or | liquids | remaining | in | trash | receptacle | due | to | a | leaky | | |
| plastic | bag | shall | be | cleaned | and | removed. | | Trash | shall | be | disposed | of | in | a | secured | plastic | bag | of |
| not | less | than | 1mm | thickness. | | The | Contractor | shall | pick | up | any | trash | that | may | fall | onto | the | |
| facility | or | grounds | during | the | removal | of | such | trash | collection. | | All | refuse | collected | shall | be | | | |
| disposed | of | in | the | designated | trash | dumpster | outside | the | buildings. | | Trash | shall | be | emptied | from | | | |
| all | wastebaskets. | | Dirty | trash | receptacles | shall | be | wiped | inside | and | out | and | shall | be | odor | free. | | |
| Waste | receptacles | shall | be | free | of | residue. | | Liners | shall | be | changed | daily | if | there | is | food | or | |
| moisture | residue. | | Waste | receptacles | shall | be | cleaned | as | required | to | maintain | sanitary | | | | | | |
| conditions. | | All | waste | generated | in | the | building | shall | be | collected, | removed, | and | placed | in | | | | |
| Government | provided | dumpsters. | | | | | | | | | | | | | | | | |
| C.4.2.3. | Lunch | Room | Area. | | The | floor | in | the | break/lunch | room | will | be | swept, | damp | mopped | and |
| sanitized | as | indicated | in | the | Task | and | Frequency | Chart. | | Floors | shall | have | a | uniform | appearance | |
| free | of | streaks, | swirls, | marks, | detergent | residue | and | any | evidence | of | soil, | stain, | film | or | standing | |
| water. | | Easily | removable | items | shall | be | moved | aside | to | sweep | and | damp | mop | under | the | item. |
| Sinks, | counters, | table | tops | and | all | horizontal | surfaces | (microwave | and | refrigerator | tops, | | | | | |
| dispensers, | etc.) | shall | be | clean | of | debris, | streaks | and | stains. | | Dispensers | will | be | kept | full | of |
| supplies. | | Microwaves | will | be | wiped | and | disinfected | internally; | the | outside | surfaces | of | | | | |
| microwaves, | toaster | ovens | and | refrigerators | will | be | clean | and | free | of | prints, | smudges, | etc. | | | |
| C.4.2.4. | Landings, | Stairways, | Risers, | Loading | Areas, | Garage, | and | Ramps. | | Surfaces | (horizontal | and | | | | |
| vertical) | shall | be | swept, | mopped, | scrubbed | and | disinfected. | | Surfaces | shall | be | free | of | dirt, | dust, | |
| debris, | and | other | foreign | substances. | | Surfaces | shall | present | an | overall | appearance | of | | | | |
| cleanliness. | | Limited | exterior | areas | are | covered | under | this | contract. | | The | exterior | area | includes | | |
| the | area | from | the | doorways | to | the | bottom | or | ending | of | any | and | all | building | stairways, | ramps, |
| loading | areas, | and | landings; | the | balconies; | and, | the | patio | areas. | | | | | | | |
| C.4.2.5. | Building | Entrance/Exit | Areas. | Clean | all | building | entrances, | to | include | floors, | mats | and | glass | |
| entry | and | side | doors, | both | internally | and | externally. | Building | entrances | include | the | main | | |
| entrance | (south | side), | side | entrance | (west | side), | employee | entrance | (north | side) | and | the | | |
| shipping/receiving | area | entrance. | | At | the | greenhouse | only | the | main | entry | will | be | cleaned | |
| including | wiping | doors | inside | and | out | to | remove | smudges, | marks | and | debris; | and, | cleaning | of |
| the | glass | panels | located | in | the | entry/lobby | area | to | ensure | marks, | smudges | and | debris | are |
| removed | inside | and | outside. | | | | | | | | | | | |
| C.4.2.6. | Elevator. | | Interior | shall | be | free | of | dust, | dirt, | and | any | other | foreign | matter. | All | bright | metal |
| surfaces | shall | be | polished | to | a | uniform | appearance. | | Elevator | floors | shall | be | cleaned | in | the | same | |
| manner | and | on | the | same | schedule | as | other | durable | and | resilient | flooring. | | | | | | |
8 RMRS Flagstaff Science Lab & Greenhouse/Shop Facility Custodial Contract
| C.4.2.7. | Drinking | Fountains. | | Clean | and | disinfect | all | porcelain | and | polished | metal | surfaces, | including | the | |
| cabinet, | percolator | orifices | and | drains. | | Wipe | wall | areas | around | fountains | as | needed | to | ensure | a |
| clean | and | smudge | free | appearance. | | After | cleaning, | the | entire | drinking | fountain | shall | be | free | |
| from | streaks, | stains, | spots, | smudges, | scale, | and | other | obvious | soil. | | | | | | |
| C.4.2.8. | Restrooms | and | Shower | Rooms. | | All | restrooms | and | shower | rooms, | in | all | buildings, | shall | be | |
| thoroughly | scrubbed | and | disinfected | as | required | in | the | Task | and | Frequency | Chart. | | Completely | | | |
| damp | clean | and | disinfect | all | surfaces | of | sinks; | wash | bowls; | toilet | bowls | and | seats; | urinals; | | |
| lavatories; | showers; | shower | mats; | dispensers; | plumbing | fixtures; | kick | plates; | lavatory | | | | | | | |
| partitions; | doors; | walls; | grates; | entry | doors; | mirrors; | and, | all | wall | areas | adjacent | to | wall | | | |
| mounted | lavatories, | urinals | and | toilets. | | A | disinfecting | and/or | germicidal | cleaning | agent | will | be | | | |
| used | to | clean | the | aforementioned | surfaces. | | After | cleaning, | all | surfaces | shall | be | free | of | deposits; | |
| dirt; | spots; | smudges | and | streaks; | soap | film; | dust; | soils; | graffiti; | scum; | and, | odors. | | All | bright | |
| metal | finishes | such | as | faucets, | pipes, | fittings | and | hardware | shall | be | kept | in | a | bright | and | clean |
| condition. | | All | dispensers | shall | be | monitored | and | restocked | as | needed | to | ensure | they | have | | |
| adequate | supplies. | | After | cleaning | restrooms | and | shower | rooms, | all | lavatory/toilet | seats | will | be | | | |
| left | in | an | upright | position | and | the | entry | door | shall | be | left | open. | | | | |
| C.4.2.8.1. | Restroom | and | Shower | Room | Floors. | | Sweep, | mop and | disinfect restroom | and | shower | room | | | | | |
| floors | ensuring | the | entire | surface | is | free | from | litter, | dust, | debris, | spots | and | areas | appearing | | | |
| unclean. | | Grout | on | wall | and | floor | tiles | shall | be | free | from | dirt, | scum, | mildew, | residue, | etc. | Floors |
| shall | have | a | uniform | appearance | free | of | streaks, | swirls, | marks, | detergent | residue | and | any | | | | |
| evidence | of | soil, | stain, | film | or | standing | water. | | Easily | removable | items | shall | be | moved | aside | to | |
| sweep | and | damp | mop | under | the | item. | | Restroom | floors | shall, | according | to | the | Task | and | | |
| Frequency | Chart, | be | stripped, | scrubbed | and | waxed | to | maintain | sanitary | conditions | and | a | clean, | | | | |
| uniform | appearance. | | Every | time | the | restrooms | and | showers | are | cleaned | the | floors | will | be | | | |
| swept, | damp | mopped | and | disinfected. | | | | | | | | | | | | | |
| C.4.2.9. | Laboratory | Cleaning. | | In | most | cases | laboratories | will | not | be | cleaned. | | Rarely, | the | CO/COR | may | |
| request | that | specific | lab | floors | be | swept, | damp | mopped, | disinfected | and/or | stripped | and | waxed. | | | | |
| Requests | to | enter | labs | and | sweep, | damp | mop | and | disinfect | floors | will | not | exceed | more | than | 2 | |
| times | monthly. | | Floor | maintenance | will | follow | the | semi‐annual | schedule | and | not | more | often. | | | | |
| Lab | table | tops | and | sinks | SHALL | NOT | be | cleaned | or | disturbed | in | any | manner. | | Damp | mopping | and |
| disinfection | will | be | done | only | with | pre‐approved | cleaners. | | | | | | | | | | |
| C.4.2.10. | General | Dusting/Cleaning. | There | shall | be | no | obvious | signs | of | dust | on | any | surface | (i.e. | walls, | tops |
| of | partitions, | tissue | and | towel | dispensers, | etc.). | All | horizontal, | vertical, | and | under | surface | areas | | | |
| shall | be | free | of | dust, | smudges, | and | spots. | These | areas | include | desk | knee | wells, | chair | rungs, | table |
| legs, | and | the | like. | Corners, | crevices, | moldings, | and | ledges | shall | be | free | of | dust. | When | dusting | |
| horizontal | surfaces, | particularly | desk | tops, | desk | items | (i.e. | telephones, | pencil | sharpeners, | | | | | | |
| calendars, | staplers, | etc.) | may | be | moved | to | dust | under. | In | no | case | shall | papers | be | disturbed | or |
viewed.
| C.4.2.11. | High | Dusting/Cleaning. | | High | cleaning | shall | be | done | quarterly | and | includes | cleaning | horizontal | | | | |
| and | vertical | surfaces | over | 7 | feet | above | floor | level | including | all | overhead | piping, | lights | and | ceiling | | |
| areas. | All | dust | litter | and | soil | shall | be | removed | from | all | surfaces. | Walls | shall | be | free | of | dirt, |
| smudges, | and | markings. | Ceilings | are | to | be | free | of | cobwebs | and | loose | dirt. | | | | | |
C.4.2.12. Window Blinds. Blinds, tapes, cords, and valances shall be free of dust and maintained in a clean manner.
| C.4.2.13. | Walls, | Partitions, | Dividers. | Wall | surfaces | shall | be | free | of | smudges, | marks, | dirt, | dust, | and | spots. |
| This | shall | be | completed | without | obvious | discoloration | to | the | wall | finish. | If | stains | cannot | be | |
9 RMRS Flagstaff Science Lab & Greenhouse/Shop Facility Custodial Contract
| removed | from | wall | without | harming | the | finish, | immediately | notify | the | COR/CO. | In | restrooms | all | |
| signs | of | water | stains, | streaks, | film, | and | smudges | shall | be | removed | from | all | surfaces | including |
| partitions, | walls, | window | frames, | sills, | etc. | This | shall | be | completed | by | using | a | disinfectant | |
| cleaner | to | ensure | sanitary | conditions. | | | | | | | | | | |
| C.4.2.14. | Wood | Surfaces. | Vertical | and | horizontal | wood | surfaces | shall | be | cleaned | with | a | treated | dust | cloth. | | |
| Wood | shall | be | free | of | soil, | dirt, | dust, | streaks, | spots, | and | film. | Wood | paneling | must | be | treated | in |
| accordance | with | industry | standards | and | best | practices | to | maintain | a | uniform | appearance. | | | | | | |
| C.4.2.15. | Fixtures | and | Bright | Metal | Surfaces. Fixtures, | including | overhead | light | units, | shall | be | clean | and | | |
| bright. | Fixtures | and | bright | metal | surfaces | shall | be | free | of | streaks | and | matter. | In | addition, | they |
| shall | be | disinfected | and | dried. | There | shall | be | no | obvious | dust, | trash, | dirt, | stains, | nor | encrustation |
| on | fixtures | and | bright | metal | surfaces. | Water | fountains | and | exterior | ashtrays | shall | be | kept | free | of |
| trash, | ink, | encrustation, | etc. | Metal | surfaces | shall | have | a | polished | lustrous | appearance. | | | | |
| C.4.2.16. | Glass | and | Mirrors. | | Glass | and | mirror | surfaces | shall | be | clean | and | free | of | dust, | smudges, | soil |
| substances, | and | spots. | | This | includes, | but | is | not | limited | to, | transoms, | partitions, | entrance | glass, | | | |
| desktop | glass, | full | height | glass | walls, | and | bookcases. | | Glass | windows | and | surfaces | around | | | | |
| entrances, | lobbies, | and | vestibules | shall | be | free | of | smudges, | spots, | streaks | and | other | dirt. | | There | | |
| shall | be | no | water | spots | or | streaks | on | glass | or | adjacent | fixtures | or | furniture | when | job | is | done. |
| Glass | shall | be | cleaned | on | hanging | pictures | and | mirrors. | | | | | | | | | |
| C.4.2.17. | Patio | and | Balcony | Areas. | | Patio | and | balcony | areas | {two(2) | patios | and | three | (3) | balconies} | will | be |
| addressed | by | wiping | clean | table | tops | and | seats | with | a | damp | towel, | and | sweeping | and | disposing | | |
| of | any | debris | littering | the | cement | areas. | | | | | | | | | | | |
| C.4.2.18. | Supply | Dispensers. | | All | supply | dispensers | (i.e. | towel | dispensers, | soap | dispensers, | toilet | paper | | | |
| dispensers, | toilet | seat | covers, | garbage | bags, | sanitary | product | dispensers, | etc.) | shall | be | fully | | | | |
| stocked | and | maintained | to | meet | the | needs | of | the | buildings' | normal | occupancy. | All | supply | | | |
| dispensers | shall | be | clean | and | dry. | In | addition, | all | dispensers | shall | be | free | of | spots, | dirt, | streaks, |
| rust, | mildew, | and | excess | moisture. | Vanity | shelves | shall | be | clean | and | dry. | | All | dispensers | shall | be |
disinfected.
| C.4.2.19. | Spot | Cleaning. | | Contractor | personnel | shall | perform | spot cleaning | on | a | continual | basis. | | Spot |
| cleaning | includes, | but | is | not | limited | to | the | removing | of, | or | cleaning | of | smudges, | fingerprints, |
| marks, | streaks, | spills, | etc., | from | washable | surfaces | of | all | walls, | partitions, | vents, | grillwork, | doors, | |
| door | guards, | door | handles, | push | bars, | kick | plates, | and | fixtures. | Germicidal | detergent | shall | be | |
| used | in | restrooms, | locker | rooms, | break | areas, | and | drinking | fountains. | | After | spot | cleaning, | the |
| surface | shall | have | a | clean, | uniform | appearance, | free | of | streaks, | spots, | and | other | evidence | of |
| removed | soil. | | | | | | | | | | | | | |
| C.4.2.20. | Supplies. | | | All | supply | dispensers | (i.e. | towel | dispensers, | soap | dispensers, | toilet | paper | dispensers, | | | |
| toilet | seat | covers, | garbage | bags, | sanitary | product | dispensers, | etc.) | shall | be | fully | stocked | and | | | | |
| maintained | to | meet | the | needs | of | the | buildings' | normal | occupancy. | All | supply | dispensers | shall | be | | | |
| clean | and | dry. | | In | addition, | all | dispensers | shall | be | free | of | spots, | dirt, | streaks, | rust, | mildew, | and |
| excess | moisture. | Vanity | shelves | shall | be | clean | and | dry. | | | | | | | | | |
C.5. INSPECTIONS
In accordance with the Performance Requirements Summary, random inspections shall be
10 RMRS Flagstaff Science Lab & Greenhouse/Shop Facility Custodial Contract carried out by the COR. Inspection items include all items listed in the Task and Frequency Chart.
| C.5.1. | Defects. | | When | the | number | of defects in the Contractor's performance | discovered by the COR | | | | | | |
| exceeds | the | acceptable | level, | the | Contracting | Officer | will | issue | a | non‐compliance | report . | | The |
| non‐compliance | report | requires | the | Contractor | to | explain | in | writing | why | performance | was | | |
| unacceptable, | how | performance | will | be | returned | to | acceptable | levels, | and | how | recurrence | of | |
| the | problem | will | be | prevented | in | the | future. | | | | | | |
| C.5.1.1. | Upon | receipt | of | a | non‐compliance report, the Contractor shall immediately | inspect the area in | | | | | | | | | |
| question. | | Under | FAR | 52.212‐4 | the | Contractor | will | not | be | paid | for | services | not | rendered | in |
| accordance | with | the | standards | set | forth | in | this | contract | (i.e., | unsatisfactory | performance) | | | | |
| unless | satisfactory | re‐performance | is | accomplished. | | | | | | | | | | | |
| C.5.1.2. | At | the | sole | election | of | the | Government and upon notification to the Contractor | by the | | | | | | | |
| Contracting | Officer, | the | Contractor | may | be | required | to | re‐perform | or | perform | late | any | or | all | |
| defective | work | disclosed | by | the | Government | inspection | including | defective | and | incomplete | | | | | |
| work | performance | except | where | timeliness | is | an | element. | | This | re‐ | performance | shall | be | at | no |
| additional | cost | to | the | Government. | | Where | the | Government | so | elects, | the | Contractor | shall | be | |
| notified | promptly | after | inspection | that | specified | defective | services | will | be | re‐ | | | | | |
| performed/performed | late | and | completed | within | a | reasonable | time | specified | by | the | | | | | |
| Government. | | In | such | cases, | the | Government | shall | re‐inspect | work | designated | for | re‐ | | | |
| performance, | and | the | Contractor | may | be | held | liable | for | any | damages | sustained | by | the | | |
| Government | including, | for | example, | the | costs | associated | with | re‐ | inspection. | | | | | | |
C.6. GENERAL INFORMATION
| C.6.1. | Definitions | | | | | | | | | | | | |
| The | following | special | terms | and/or | phrases | are | used | in | this | Performance | Work | Statement. |
C.6.1.1. Common Areas. This term includes all areas that are shared by tenants of the building and are
| not | of | an | infrastructure | type. | | Areas | include: | hallways; | reception | and | lobby | areas; | waiting | areas; |
| stairs | and | stairwells; | entrances/exits; | mail/copy | room; | supply | rooms; | first | aid | room; | | | | |
| copier/printer | areas; | break | and | lunch | rooms; | conference | rooms; | library; | elevator; | and | the | | | |
| computer | lab | Room | 242. | | | | | | | | | | | |
| C.6.1.2. | Restrooms | and | Shower | Rooms/Showers. | | This | includes | all | lavatories, | pre‐rooms | with | or | without |
| wash | basins, | and | showers | in | both | buildings | covered | under | this | contract. | | | |
C.6.1.3. Special Requirements Cleaning Tasks. Tasks completed on an irregular basis.
| C.6.2. | Government | Responsibilities | | | | | | | | | | | | |
| The | Government | will | not | be | responsible | for | damage | occasioned | by | fire, | theft, | accident, | or |
| otherwise | to | the | Contractor's | supplies, | materials, | or | equipment | in | storage, | or | the | Contractor's |
| and | their | employee's | personal | belongings | brought | into | the | building. | | | | |
| C.6.3. | Contractor | Responsibilities | | | | | | | | | | | | |
| The | Contractor | is | responsible | for | loss, | theft, | damage, | or | destruction | of | any | Government | or |
| personal | items | belonging | or | assigned | to | the | occupant | or | user | in | any | office | or | other | rooms | of | the |
| facility | when | such | acts | can | be | proven, | beyond | a | reasonable | doubt, | to | be | the | fault | of | the | |
11 RMRS Flagstaff Science Lab & Greenhouse/Shop Facility Custodial Contract
| Contractor | or | one | of | their | employees. | No | one | under | the | age | of | 16 | shall | be | permitted | in | the |
| building | or | on | the | premises | during | the | period | of | 5:00 | p.m. | to | 11:00 | p.m. | The | Contractor | shall | |
| ensure | that | no | one | but | their | authorized | employees | have | knowledge | of | the | fire | alarm | security | | | |
| code | to | the | main | building | alarm | system. | The | Contractor | shall | be | responsible | for | ensuring | their | | | |
| employees | do | not | disturb | papers | on | desks, | open | desk | drawers | or | cabinets, | or | use | Government | | | |
| telephones | or | equipment. | Contractor | must | establish | and | implement | methods | of | ensuring | that | all | | | | | |
| keys | and | access | cards | issued | by | the | Government | are | not | lost, | misplaced, | or | used | by | | | |
| unauthorized | persons. | | | | | | | | | | | | | | | | |
| C.6.4. | Energy | Conservation | | | | | | | | | | | | | | |
| Contractor | shall | tum | on | lights | in | rooms | only | during | the | time | needed | to | perform | the | required |
| work | and | ensure | that | all | lights | are | turned | off | in | each | room | as | work | in | that | room | is | completed, |
| except | those | required | to | remain | on. | | | | | | | | | | | | | |
| C.6.5. | Federal, | State | and | Local | Codes | and | Laws. | | | | | | | |
| All | chemicals | used | will | be | those | commercially | available | which | meet | Federal, | State, | and | local |
| codes | and | which | have | been | approved | by | the | COR/CO. | Information | can | be | obtained | from | Federal, | |
| State, | and | local | agencies | concerning | safe | chemical | cleaning | materials. | The | Contractor | shall | use | | | |
| products | made | with | recycled | materials | to | the | greatest | extent | possible. | Preference | should | be | | | |
| given | to | concentrated | cleaning | chemicals | which | use | ecologically | sound | packaging | and | are | | | | |
| phosphate‐free, | non‐corrosive, | non‐flammable, | and | fully | biodegradable. | The | use | of | caustics | | | | | | |
| (acid‐based | cleansers) | may | not | be | approved. | | Materials | or | supplies | shall | not | be | used | in | |
| performance | under | this | contract | (or | placed | or | stored | on | Government | property) | until | the | | | |
| applicable | Material | Safety | Data | Sheets | have | been | furnished | to | the | COR/CO. | | No | item | containing | a |
| CAUTION | or | WARNING | label | will | be | added | to | the | Contractor's | products | list | until | the | COR/CO | has |
| given | verbal | approval | for | its | addition. | The | Contractor | shall | not | use | any | material | which | the | |
| COR/CO | determines | would | be | unsuitable | for | the | purpose | or | harmful | to | the | surfaces | to | which | |
| applied. | Costs | for | correcting | damage | caused | by | misused | materials | will | be | borne | by | the | | |
| Contractor. | The | COR/CO | reserves | the | right | for | final | approval | on | all | materials | and | supplies | | |
| utilized | by | the | Contractor. | | | | | | | | | | | | |
| C.6.6. | Occupational | Safety | and | Health | Act | (OSHA) | | | | | |
| Full | compliance | with | environmental | and | hazardous | waste | management | laws, | rules, | and |
regulations is required.
| C.6.7. | Environmental | Protection | Agency | (EPA) | | | | | | | |
| Full | compliance | with | environmental | and | hazardous | waste | management | laws, | rules, | and |
regulations is required.
| C.6.8. | Fire | Prevention | | | | | | | | | | | |
| Fire | prevention | shall | be | exercised at | all | times | by | the | Contractor and | employees. | All | combustible |
| material | shall | be | used | and | stored | in | a | safe | manner. | Contractor | shall | report | to | the | COR/CO | any |
| fire | hazards. | | | | | | | | | | | | | | | |
| C.6.9. | Tobacco | Control | | | | | | | | | | | |
| The | Contractor | and | its | employees | shall | observe | the | Tobacco | Control | requirements | contained | in |
| DR4400‐006, | 5 | U.S.C. | 301; | 5 | U.S.C. | 7901; | 29 | U.S.C. | 666; | 41 | CFR | 101‐ | 20.105‐3; | and | 41 | CFR | 101‐ |
| 39.300(d) | whenever | performing | services | in | or | visiting | Government | facilities/buildings. | | | | | | | | | |
| C.6.10. | Compliance | | | | | | | | | | | | | | | |
| The | Contractor | must | comply | with | Section | 9002 | of | the | Farm | Security | and | Rural | Investment | Act | of |
2002 (FSRIA), Executive Order (EO) 13423, “Strengthening Federal Environmental, Energy, and
12 RMRS Flagstaff Science Lab & Greenhouse/Shop Facility Custodial Contract
| Transportation | Management” | and | the | Federal | Acquisition | Regulation | to | provide | bio‐based | | | | | | | | | |
| products. | The | Contractor | shall | utilize | products | and | material | made | from | bio‐based | materials | | | | | | | |
| (e.g., | bio‐based | greases, | bio‐based | hydraulic | fluids, | bio‐based | absorbents) | to | the | maximum | | | | | | | | |
| extent | possible | without | jeopardizing | the | intended | end | use | or | detracting | from | the | overall | quality | | | | | |
| delivered | to | the | end | user. | All | supplies | and | materials | shall | be | of | a | type | and | quality | that | conform | |
| to | applicable | Federal | specifications | and | standards. | | All | supplies | and | materials | to | be | used | in | the | | | |
| performance | of | work | described | herein | are | subject | to | the | approval | of | the | COR. | | The | following | is | | |
| an | example | list | of | products | that | may | be | used | in | this | contract | for | Janitorial | services | for | which | bio‐ | |
| based | products | are | available. | The | list | is | not | all | inclusive. | | It | is | desirable | that | vendors | be | able | to |
| supply | the | greatest | number | of | bio‐based | products | listed | meeting | the | health | and | environmental | | | | | | |
specifications.
| * | Air | freshener | (including | dispenser) * Furniture | polish | | | | |
| * | All | purpose | cleaner | * Glass | cleaner | | | | |
| * | Bathroom | cleaner | * Grout | cleaner | | | | | |
| * | Brass | polish/cleaner * Gum | remover | | | | | | |
| * | Carpet | shampoo | * Heavy | duty | cleaner | | | | |
| * | Chrome | polish/cleaner * Laundry | detergent | | | | | | |
| * | Cream | cleanser | * Lime | and | scale | remover | (tub | and | tile) |
| * | Degreaser/cleaner | * Liquid | hand | soap | (including | dispenser) | | | |
| * | Deodorizer | * Neutral | cleaner | (liquid) | | | | | |
| * | Disinfectant | sanitizer * Solvent | | | | | | | |
| * | Extraction | fluid | * Stain | Remover | | | | | |
| * | Floor | finish | * Stainless | steel | polish/cleaner | | | | |
| * | Floor | finish | restorer * Toilet | bowl | cleaner | | | | |
| * | Floor | sealer | * White | board | cleaner | | | | |
| * | Floor | stripper | * Wood | floor | cleaner | | | | |
| Bio‐based | products | that | are | designated | for | preferred | procurement | under | USDA | 's | Bio‐Preferred | | | | | | |
| program | must | meet | the | required | minimum | bio‐based | content | as | stated | in | the | USDA | Final | Rule | | | | |
| available | at | www | .biopreferred | .gov. | The | Contractor | should | provide | data | for | their | bio‐based | | | | | | |
| products | such | as | bio‐based | content. | | In | addition | to | the | bio‐based | products | designated | by | the | U.S. | | | |
| Department | of | Agriculture | in | the | Bio‐Preferred | Program, | the | Contractor | is | encouraged | to | use | | | | | | |
| other | bio‐based | products. | The | Contractor | shall | submit | with | the | initial | proposal | a | complete | list | of | | | | |
| bio‐based | products, | indicating | the | name | of | the | manufacturer, | cost | of | each | material, | and | the | | | | | |
| intended | use | of | each | of | the | materials | that | are | to | be | used | in | carrying | out | the | requirements | of | the |
| contract. | | Additionally, | the | winning | Contractor | on | each | anniversary | date | of | the | contract | shall | | | | | |
| compile | a | complete | list | of | bio‐based | products, | including | the | information | above, | purchased | to | | | | | | |
| carry | out | the | contract | requirements. | The | Contractor | shall | list | volume | to | be | used | and | total | cost | | | |
| for | each | individual | product. | This | information | will | be | used | for | reporting | purposes. | | | | | | | |
C.7. CONTRACT AUTHORITY
| Except | as | specified | herein, | no | order, | statement, | or | conduct | of | Government | personnel | who | visit | | |
| the | Contractor's | facilities | or | in | any | other | manner | communicate | with | Contractor | personnel | | | | | |
| during | the | performance | of | this | contract | shall | constitute | a | change | under | the | "Changes" | clause | of | | |
| this | contract. | The | Contractor | shall | not | comply | with | any | order, | direction | or | request | of | | | |
This is the start of the file's text. The full file is on GovTribe.