Schedule Terms and Conditions Requirements

View the file

Other files

File Type Posted
Amendment 000001 SF 30.pdf PDF
Attachment B Plans and Drawings.pdf PDF
Attachment C Wage Determination.pdf PDF
Attachment A FSSSpecs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Blacktail Restoration

Nez Perce National Forest

Idaho County, Idaho

B-1 Schedule of Items

Pay Item

Number Description

Method of

Measure* Pay Unit

Pay Item

Number Unit Price Amount

15101 Mobilization LSQ LS 1

15714 Soil Erosion Control LSQ LS 1

21103 Roadway Obliteration, Method 1 DQ Mile 10.08

62201 Equipment Rental, Hydraulic

Excavator (with thumb) AQ Hour 60

62501 Seeding, Dry Method DQ Acre 55

Total (all items)

* Designated Method of Mesurement: DQ=Design Quantity; AQ= Actual Quantity

LSQ=Lump Sum Quantity

PROJECT DESCRIPTION AND LOCATION

(a) Description of Work Blacktail Restoration – The project consists of road obliteration by recontouring and decompacting, as well as soil restoration on the Clearwater Ranger District. Work includes surface decompaction and restoring natural slopes on features such as roads, skid trails, excavated skid roads and log landings. Work also includes seeding, fertilizing and applying straw mulch or available slash on disturbed soil, and spot-construction of drainage ditch to drain wet areas.

(b) Project Location From Grangeville, Idaho: The project area is located approximately 11 miles north on

State Hwy 13, then approximately 7 miles south-southeast on Forest Road 244 (Lightning Creek). The main roads accessing the features to be treated are Forest Roads 244, 337 (Green Cr Point) 337A (Wall Point), 1104

(Green Creek) and 1106 (Sears Creek).

(c) Pre-Bid Tour None

(d) Pre-Bid Conference None

(e) Start Work Work on the project shall commence no earlier than August 01, 2010, and proceed in accordance with the contractor’s approved work schedule and run continuosly till the end of the project no later than October 31, 2010. For purpose of this project, the winter season is usually November to April of each year.

(f) Government-Furnished Property None

(g) STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL

HIGHWAY PROJECTS FP-03 U.S. Customary Units (U.S. DEPARTMENT OF TRANSPORTATION, Federal Highway Administration) (2003)

Standard Specifications for Construction of Roads & Bridges on Federal Highway Projects (FP- 03) are included by reference only. The requirements contained in these Standard Specifications are hereby made a part of this solicitation and any resultant contract.

Copies of the Standard Specifications for Construction of Roads & Bridges on Federal Highway Projects (FP-

03) are available in PDF format on the Western Federal Lands Highway Division website at www.wfl.fha.dot.gov/design/specs/fp03.htm.

The Supplemental Project Specifications listed in the Supplemental Specification List are applicable to this contract.

NOTE THAT THE SPECIFICATION LIST INCLUDES THE MAJOR SPECIFICATIONS

APPLICABLE TO THIS PROJECT. OTHER SPECIFICATIONS REFERRED TO WITHIN THESE

SPECIFICATIONS (EVEN THOUGH NOT SPECIFICALLY LISTED HEREIN) ARE ALSO FULLY

APPLICABLE TO THIS REQUEST FOR PROPOSALS AND ANY RESULTANT CONTRACT.

SUPPLEMENTAL SPECIFICATION LIST

BLACKTAIL RESTORATION NEZ PERCE NATIONAL FOREST

SPEC. No. SPECIFICATION TITLE LATEST REVISION

DATE

FSSS101 Terms, Format, and

Definitions

1/2005

FSSS102 Bid, Award, and Execution of Contract

5/2004

FSSS103 Scope of Work 5/2004

FSSS104 Control of Work 2/2005

FSSS105 Control of Materials 5/2004

FSSS106 Acceptance of Work 8/2004

FSSS107 Legal Relations and

Responsibility to the Public

5/2004

FSSS108 Prosecution and Progress 5/2004

FSSS109 Measurement & Payment 3/2009

FSSS151 Mobilization 1/2005

FSSS155 Schedules for Construction

Contracts

5/2004

FSSS156 Public Traffic 3/2009

FSSS157 Soil Erosion Control 3/2009

FSSS 203 Removal of Structures and

Obstructions

11/2004

FSSS 211 Roadway Obliteration 3/2009

FSSS622 Rental Equipment 1/2005

FSSS625 Turf Establishment 1/2005

FSSS713 Roadside Improvement

Materials

1/2005

INSPECTION AND ACCEPTANCE

(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not--

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the

Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer.

The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the

Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the

Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee

Required Submittal/Notification

SUBMITTAL/NOTIFICATION

TIMELINES

Deadline for Receipt by the

Government

Applicable Specification

1) Equipment Mobilization

Notification

24 hours prior to moving equipment onto Nez Perce N.F

151 - Mobilization

2) Preliminary Construction

Schedule

7-days prior to preconstruction conference.

155- Schedules for Construction

Contracts

3) Traffic Control Plan 7-days prior to start of construction

156 – Public Traffic

4) Erosion Control Plan 7-days before intended use 157 – Soil Erosion Control

SPECIAL CONTRACT REQUIREMENTS

CONDITIONS ON USE OF PREMISES (Camping)

(a) Camping will be allowed only at the sites designated on the project maps or approved in advance by the

Contracting Officer.

(b) No improvements of a permanent nature shall be constructed without prior written approval of the Contracting officer.

Temporary structures such as tent frames, hitch racks, tents and tent pegs shall be removed at the end of the period of use, all evidence of the camp eliminated, and the site restored to its original condition. Final payment will not be authorized until the campsite has been cleaned up and the site is approved by the Contracting Officer or his designated representative. Reusable native material may be neatly stacked for future use.

(c) Livestock will not be permitted without written approval from the Contracting Officer.

(d) Vegetation shall be undisturbed to the maximum extent possible. The Contractor will be permitted to cut only those trees designated by the COR.

(e) Storage of petroleum products in excess of 50 gallons at the campsite will require the approval of the COR. All petroleum spills shall be immediately cleaned up. All spills shall be reported immediatly to the CO or COR. Spills over 25 gallons or that cause a sheen on surface water shall be reported to the Idaho State Department of

Enviromental Quality. No waste disposal of petroleum product will be permitted on National Forest land.

(f) Chemical toilets are preferred for all campsites, however, the Contractor may be permitted to construct a slit trench when conditions warrant. Any slit trench constructed shall not be located closer than 400 feet to any live stream and is subject to approval of the COR. The trench shall be covered and the area restored to as natural a condition as possible when the camp is closed.

(g) Refuse including waste materials, garbage, and rubbish of all kinds, shall be disposed of in the following manner, and shall guard the purity of streams and living waters:

Garbage, trash, sewage waste, and other litter shall be kept in closed fly-proof containers and periodically hauled to an approved disposal facility located outside of the National Forest.

(h) Waste water shall be disposed of in a leach pit located at least 300 feet from springs, streams, and lakes. The pit shall be a minimum of 2 x 2 x 2 feet and shall be filled with rock two to eight inches in diameter. The leach pit shall be covered with at least two feet of compacted soil when the camp is closed.

(i) No waste or by-products shall be discharged if it contains any substances in concentrations which will result in substantial harm to fish and wildlife, or to human water supplies.

Storage facilities for materials capable of causing water pollution, if accidentally discharged, shall be located so as to prevent any spillage into waters, or channels leading into water, that would result in substantial harm to fish and wildlife or to human water supplies.

(j) The camp area shall be maintained to present a clean, neat, and orderly appearance. Disposal of trash and debris, unusable machinery, Forest Service authorized improvements, etc., shall be kept current. Building materials, firewood, etc., shall be neatly stacked. The campsite shall be left in a clean condition. Any clean-up work not accomplished by the Contractor at time of camp closure will be done by the Forest Service, and the actual cost of such clean-up will be deducted from payment otherwise due the Contractor.

PHYSICAL DATA

Data and information furnished or referred to below is for the contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by the U.S. Department of Agriculture, Forest Service. Features shown on the plan & profile sheets were identified by visual observation during the preliminary location and survey and during a "plans in hand" review.

(b) Weather Conditions - The project is subject to seasonal limitations from November thru June. Wet weather commonly limits construction operations in October and June.

BARRICADES, WARNING SIGNS, AND OTHER DEVICES

The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic. See FSSS 156 Public Traffic.

The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on

Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes. Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.