Attachment A FSSSpecs.pdf
PDF 538 KB Posted
- Solicitation number
- AG-82B1-S-10-0340
About this file
Attachment A Specifications
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 000001 SF 30.pdf | ||
| Attachment B Plans and Drawings.pdf | ||
| Schedule Terms Conditions Requiements.pdf | ||
| Attachment C Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLACKTAIL RESTORATION
Watershed Rehabilitation
Forest Service Supplemental Specifications
FP-03 U.S. Customary Units, FHWA 2003
March, 2006
Preface 101 - Terms, Format, and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.03 SI Symbols
101.04 Definitions
102 - Bid, Award, and Execution of Contract Deletions
103 - Scope of Work Deletions
104 - Control of Work Deletions
104.06 Use of Roads by Contractor
105 - Control of Material
105.02 Material Sources
105.02(a) Government Provided Sources
105.05 Use of Material Found in the Work
106 - Acceptance of Work
106.01 Conformity with Contract Requirements
106.07 Partial and Final Acceptance
107 - Legal Relations and Responsibility to the Public
107.05 Responsibility for Damage Claims
107.09 Legal Relationship of the Parties
107.06 Contractor’s Responsibility for Work
107.10 Environmental Protection
108 - Prosecution and Progress Deletions
109 - Measurement and Payment
109.02 Measurement Terms and Definitions
109.02 Measurement Terms and Definitions
109.03 Weighing Procedures and Devices
109.10 Methods of Measurement
151 - Mobilization 156 - Public Traffic 157 - Soil Erosion Control
157.01
157.03 General
157.04 Controls and Limitations on Work
157.16 General
203 - Removal of Structures and Obstructions Description
203.05 Disposing of Material
211 - Roadway Obliteration Description Construction Requirements
211.03 Water Bars and Barriers
622 - Rental Equipment
622.02 Rental Equipment
622.04 & 622.05 Measurement and Payment
625 - Turf Establishment
625.03 General
625.07 Seeding. (a) Dry method
713 – Roadside Improvement Materials
713.05 Mulch
Preface
Preface_wo_03_15_2004_m
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-03 for construction of
National Forest System Roads.
101 - Terms, Format, and Definitions
101.00_nat_08_12_2004
101.01_nat_05_11_2004
101.01 Meaning of Terms.
Add the following:
Delete all references in FP-03 to Transportation Acquisition Regulations (TAR). For
Timber Sales, delete all references in FP-03 to Federal Acquisition Regulations (FAR).
101.03_nat_05_17_2004
101.03_0117_01_05_2005
101.03 Abbreviations.
Add the following to (a) Acronyms:
AFPA
FSSS
MSHA
NIST
NESC
WCLIB
American Forest and Paper Association
Forest Service Supplemental Specification
Mine Safety and Health Administration
National Institute of Standards and Technology
National Electrical Safety Code
West Coast Lumber Inspection Bureau
101.04_nat_07_16_2004
101.03 SI Symbols.
Add the following to (b) SI Symbols:
mp Milepost ppm Part Per Million
101.04_0117_1_5_2005 http://www.nist.gov/
Add the following:
(e) Abbreviations
& And
Avail Available
Coat Coating
Const Construction
Dwgs Drawings
Gov't Government
Incl Culv Exc Includes Culvert Excavation
Ind Removal /Trees Individual Removal of Trees
Lg Large
Log Logs
Med Medium
M.Gals.Mi. or MGM One Thousand Gallon Miles
Opt Options
P.M. Placement Method
S.T. Slash Treatment
Sm Small
Stl Steel
Str Structure
TH or Thick Thickness
Tbr Timber
Treat Treatment
101.04_nat_07_16_2004
101.04_0117_01_15_2005
101.04 Definitions.
Delete the following definitions and substitute the following:
Bid Schedule--The Schedule of Items.
Contractor--The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the
“purchaser”.
Right-of-Way--A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Adjustment in Contract Price--“Equitable adjustment,” as used in the Federal
Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale
Contract, as applicable.
Change--“Change” means “change order” as used in the Federal Acquisition
Regulations, or “design change” as used in the Timber Sale Contract.
Forest Service--The United States of America, acting through the Forest Service, U.S.
Department of Agriculture.
Neat Line--A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road--Temporary construction access built along the route of the project.
Purchaser--The individual, partnership, joint venture, or corporation contracting with the
Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse--A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order--An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Schedule of Items--A schedule in the contract that contains a listing and description of construction items, quantities, units of measure, methods of measurement, unit price, and amount.
Utilization Standards--The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
101.03_17_1_5_2005
Noxious Weeds or Weeds--Any exotic plant species established or that may be introduced in the State which may render land unfit for agriculture, forestry, livestock, wildlife, or other beneficial uses and which is designated by the State's Department of
Agriculture, or by the County's weed management district, or by other appropriate agencies having jurisdiction, or as listed on the current "All States Noxious Weed List".
Shop Drawings--Incidental design sheets and/or drawings which the Contractor is required to submit to the Forest Service. Shop drawings shall conform to the contract requirements, but they are not part of the contract drawings. They may be drawings, diagrams, schedules, performance charts, brochures, and similar data prepared by the
Contractor, subcontractor, manufacturer, suppliers, or distributors that illustrate how specific portions of the work are to be fabricated or installed.
Weed Management District--A weed management district is any area of land identified for the purpose of weed management or control. Such an identified land area may be, but is not limited to one of the following: a project or job site, a County, two or more
Counties, or a National Forest."
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
R ig h t o f
W a y
R o a d s id e R o a d s id e
C le a ri n g W id th
R o a d w a y
C le a ri n g
L im it X
Y
G ro u n d
L in e
T ra v e le d
W a y
C L B e rm
S u rf a c e
C o u rs e
B a s e
C o u rs e
F ill
S lo p e
B a c k S lo p e
D ra in a g e D itc h
G ro u n d
L in e
S u b g ra d e
R o a d B e d
S h a p e s a n d d im e n s io n s w ill v a ry t o f it l o c a l c o n d iti o n s
S e e d ra w in g s f o r ty p ic a l s e c tio n s
X a n d Y d e n o te c le a ri n g o u ts id e o f ro a d w a y
N o te
Right - of - Way Line
Right - of - Way Line
Clearing Limit
Shoulder
Shoulder
102 - Bid, Award, and Execution of Contract
102.00_nat_05_17_2004
Deletions
Delete Section 102 in its entirety.
103 - Scope of Work
103.00_nat_05_17_2004
Delete all but subsection 103.01 Intent of Contract.
104 - Control of Work
104.00_nat_us_02_17_2005
Delete sections 104.01, 104.02, and 104.04.
104.06_nat_us_02_17_2005
Add the following subsection:
104.06 Use of Roads by Contractor
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
105 - Control of Material
105.02_nat_05_11_2004
105.02 Material Sources.
105.02(a) Government Provided Sources.
Comply with the requirements of 30 CFR 56, subparts B and H. Use all suitable material for aggregate regardless of size unless otherwise designated. When required, re-establish vegetation in disturbed areas according to section 625.
105.05_nat_05_12_2004
105.05 Use of Material Found in the Work.
Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:
Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. The
Government is not obligated to make reimbursement for the cost of producing these materials.
106 - Acceptance of Work
106.01_nat_08_12_2004
106.01 Conformity with Contract Requirements.
Delete Subsection 106.01 and substitute the following:
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project. When the Government tests work, copies of test reports are furnished to the
Contractor upon request. Government tests may or may not be performed at the work site.
If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price.
Four methods of determining conformity and accepting work are described in Subsections
106.02 to 106.05 inclusive. The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove and replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted, at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
(1) Sampling method;
(2) Number of samples;
(3) Sample transport;
(4) Test procedures;
(5) Testing laboratories;
(6) Reporting;
(7) Estimated time and costs; and
(8) Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed
Government test results or that produced the test results used as a basis for the dispute.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the
Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
(1) Have the work accepted at a reduced price; or
(2) Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.07_nat_05_11_2004
106.07 Partial and Final Acceptance.
Delete subsection 106.07.
107 - Legal Relations and Responsibility to the Public
107.05_nat_05_11_2004
107.05 Responsibility for Damage Claims.
Delete the entire subsection.
107.09_nat_05_11_2004
107.09 Legal Relationship of the Parties.
Delete the entire subsection: 107.10_nat_us_02_23_2005
107.06 Contractor’s Responsibility for Work.
Delete the following:
“except as provided in Subsection 106.07”.
107.10 Environmental Protection.
Add the following:
Design and locate equipment repair shops, stationary refueling sites, or other facilities to minimize the potential and impacts of hazardous material spills on Government land.
Before beginning any work, submit a Hazardous Spill Plan. List actions to be taken in the event of a spill. Incorporate preventive measures to be taken, such as the location of mobile refueling facilities, storage and handling of hazardous materials, and similar information. Immediately notify the CO of all hazardous material spills. Provide a written narrative report form no later than 24 hours after the initial report and include the following:
Description of the item spilled (including identity, quantity, manifest number, and other identifying information).
Whether amount spilled is EPA or state reportable, and if so whether it was reported, and to whom.
Exact time and location of spill including a description of the area involved.
Containment procedures.
Summary of any communications contractor had with news media, Federal, state and local regulatory agencies and officials, or Forest Service officials.
Description of clean-up procedures employed or to be employed at the site including final disposition and disposal location of spill residue.
When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.
The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. Clean up spills or leaks to the satisfaction of the CO and in a manner that complies with Federal, state, and local laws and regulations.
108 - Prosecution and Progress
108.00_nat_05_11_2004
Delete Section 108 in its entirety.
109 - Measurement and Payment
109.02_nat_05_11_2004
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Add the following:
Contract quantities will be adjusted only when there are errors in the original design of
15% or more.
109.02_0117_11_15_2004
Delete the second paragraph and substitute the following:
For aggregates weighed for payment, the tonnage will not be adjusted for moisture content of 5 percent or less. Payment for aggregates having moisture content exceeding 5 percent will be adjusted by the percentage in excess of 5 percent. Moisture content will be determined in accordance with AASHTO T 255.
109.02 Measurement Terms and Definitions.
Add the following definition:
(p) Thousand Board Feet (Mbf). 1,000 board feet based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job. For glued laminated timber, 1,000 board feet based on actual width, thickness, and length of each piece actually incorporated in the job.
109.02_0117_11_15_2004
109.03 Weighing Procedures and Devices.
(c) Project weighing system.
Add the following after the fifth paragraph.
Under observation of the Engineer or a designated Government Representative, the contractor shall perform the following tests:
Daily Zero Load Tests.
Initial Materials Tests the first day pay item materials are available.
Subsequent Materials Tests as required by the Engineer when Daily Zero Load
Tests or Simulated Load Tests indicate a doubt exists in the original calibration.
A minimum of one subsequent materials test shall be conducted for each 7500 ton quantity of material weighed.
Simulated Load Tests or other procedures recommended by the manufacturer shall be performed, even though they may not be covered in this specification.
Tests shall be conducted in accordance with the following:
Conditions of Test. A belt conveyor scale shall be tested after it is installed according to manufacturer’s instructions, or NIST Handbook No. 44. All tests shall be conducted at the same belt speed that will exist during actual weighing of aggregate for payment.
Materials tests shall be conducted at the same loading that will exist during actual weighing of aggregate for payment. All tests shall be run after the belt-conveyor scale system has run at normal loading for a minimum of 15 minutes to equalize belt temperature.
Zero Load Tests. Zero load tests shall be run every day the scale is used, after the conveyor framework is disturbed, and after any adjustment for belt tension or alignment.
The variation between the beginning and ending indication of the master weight totalizer shall not be more than 1 scale division when the belt-conveyor scale is operated at no load for a period of time equivalent to that required to deliver the minimum totalized load of 1000 scale divisions.
The zero-load test shall be conducted over a whole number of belt revolutions, but not less than three revolutions or 10 minutes' operation, whichever is greater.
During any point of time while conducting the zero-load test, the totalizer shall not change more than three scale divisions from its initial indication.
Material Tests. The actual aggregate to be purchased by the Government shall be used for this test. Aggregate must be loaded into the hauling vehicles that are to be used on the project, each load must be weighed on certified platform scales, and the weights from both scales compared for each load to see if they meet the accuracy and variation requirements.
An initial materials test done at the start of the project shall consist of three individual loads of aggregate. Subsequent materials tests at 7500 ton intervals shall consist of two individual loads of aggregate. The performance of the belt scale is not to be determined by averaging the results of the individual tests. The results of all of these tests shall be within the accuracy and variation requirements.
The belt scale accuracy requirement is plus or minus 5 percent from the weights from certified platform scales. The determination of final quantities for payment shall be based on the percentage correction that results in the smallest quantity; all materials test results will be considered.
The maximum variation between the individual tests conducted during initial Materials
Test verifications and the maximum variation between the individual tests conducted during subsequent Materials Test verifications shall not be greater than 1.0 percent
To assure that the test load is accurately weighed and determined, the following precautions shall be observed:
The truck boxes must not leak, and shall not be overloaded to the point that aggregate will be lost.
The actual empty or tare weight of the hauling vehicle shall be determined at the time of the test. Stenciled tare weight of hauling vehicles shall not be used.
Gross and tare weights shall be determined on the same scale.
The elapsed time between the test on the belt-conveyor scale and the determination of the weight of the aggregate on certified platform scales shall not be more than eight hours.
The test shall not be valid if the weight of the aggregate has been affected by environmental conditions.
Simulated Load Tests. Simulated load tests shall be conducted in accordance with the belt-conveyor scale manufacturer instructions. These tests shall not be used for official certification.
Security. All adjustable components and recording equipment shall be secured and locked. Access to recording equipment shall be restricted to the Engineer."
Bin Scales (Hopper): Bin Scale (Hopper) weighing will be accepted in lieu of platform scales, provided the method or device meets the requirements specified below and is compatible with the provisions of measurement and payment in the applicable construction specifications. Scales shall be of beam type, electronic type, or springless dial type. The scales shall be accurate within 0.5 percent throughout the range of use.
When beam type scales are used, provisions, such as a "Tell-tale" dial, shall be made for indicating to the operator that the required load in the weighing hopper is being approached. A device on weighing beams shall indicate critical position clearly. Poises shall be designed to be locked in any position and to prevent unauthorized change. The weigh beam and "tell-tale" device shall be in full view of the operator while charging the hopper, and the operator shall have convenient access to all controls.
Before use on the project, (after installing for use on the project) the Contractor shall have scales and weighing devices checked, adjusted, and certified by a representative of the State agency responsible for weights and measures or by a qualified manufacturer's representative.
The Engineer may permit use of scales and weighing devices for three calendar days prior to certification, provided field testing indicates consistent compliance within the limits of accuracy specified herein.
In the event that checking and certification reveals: (a) the scales and weighing devices have been underweighing (indicating less than true weight) they shall be adjusted and no additional payment to the contractor will be allowed for materials previously weighed and recorded; or (b) the scales and weighing devices have been overweighing (indicating more than true weight), they shall be adjusted and all materials received subsequent to the last previously correct weighing accuracy test will be reduced by the percentage of error in excess of 0.5 percent.
109.06_0117_03_02_2009
Delete the following entire subsections:
109.06 Pricing of Adjustments.
109.07 Eliminated Work.
109.08 Progress Payments.
109.09 Final Payment.
Add the following Subsection:
109.10 Methods of Measurement
One of the following methods of measurement for determining final payment is
DESIGNATED IN THE SCHEDULE OF ITEMS for each PAY ITEM:
(a) Designed Quantities (DQ). These quantities are synonymous with “Contract
Quantities” in section 109.02B. They denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units DESIGNATED IN THE SCHEDULE OF
ITEMS may be authorized under any of the following conditions:
(1) Changes in the work authorized by the CO.
(2) A determination by the CO that errors exist in the original design that cause a PAY ITEM quantity to change by 15 percent or more.
(3) A written request submitted to the CO showing evidence of errors in the original design that cause the quantity of a PAY ITEM to change by 15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is in error.
(b) Stake Quantities (SQ). These quantities are determined from staked measurements prior to construction.
(c) Actual Quantities (AQ). These quantities are determined from measurements of completed work.
(d) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles.
(e) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job.
151 - Mobilization
151.00_0117_01_15_2005
Description
151.01
All temporary or portable construction signs shall be included as a subsidary item to Section 151. Signs and sign placement shall meet the requirements of the
"MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD),
published by the U.S. Department of Transportation, Federal Highway
Administration. Work on the project shall not be started until all required signs are in place and approved by the CO.
Removal and replacement of road closure devices such as concrete barriers or earth barriers to gain access to the project shall be included as incidental to
Section 151 Mobilization.
Work also includes cleaning of all equipment used at the project site. Clean all construction equipment prior to entry on the project site. Remove all dirt, plant parts and material that may carry noxious weed seeds into the area. Only construction equipment inspected by the Forest Service will be allowed to operate within the project area. Treat subsequent move-ins of equipment the same as the initial move-in. Clean truck beds and dump boxes hauling to the project site prior to entering the work area. Contractor shall give the Forest Service at least 24 hours advance notification when equipment is ready for inspection. Location for inspection shall be as agreed.
155 - Schedules for Construction Contracts
155.00_nat_us_05_11_2004
Delete Section 155 in its entirety and replace with the following:
Contractor is required to submit a preliminary construction schedule 7 days prior to preconstruction conference for CO approval. This preliminary schedule shall include a written narrative with a detailed breakdown of all contract activities. Do not begin work, except mobilization and traffic control, without an accepted preliminary construction schedule.
156 - Public Traffic
156.00_0117_03_02_2009
Delete Section 156 in its entirety and replace with the following:
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Construction sign panels 633
Retroreflective sheeting 718.01
Temporary concrete barrier 618
Temporary plastic fence 710.11
Temporary traffic control devices 718.22
156.03 General. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic.
Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved. Post construction signs and traffic control devices in conformance with MUTCD. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
The Contractor shall submit a traffic control plan to the Contracting Officer for review and approval 7-days prior to the start of construction.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the
Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services
Association, the National Safety Council, the International Municipal Signal
Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Temporary Closures. Road segments may be closed upon written approval by the C.O. Submit a written request to the Contracting Officer at least 15 days in advance of the requested closure date. Maintain traffic control devices during closure period(s).
Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Table 156-1
Temporary Road Closures
Road
Number
From
Terminus
To
Terminus
Maximum
Consecutive
Days of
Closure
Minimum
Consecutive
Days Open
None
A temporary road closure device shall be constructed or placed when a closed Forest
Service System road has been opened for work on this project.
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Work under this section is incidental to Item 15101 – Mobilization.
157 - Soil Erosion Control
157.03_0117_03_02_2009
157.01
The work includes submitting a written plan outlining the erosion control measures to be taken during work under this contract. Submit the erosion control plan at least 7 days before work begins. No work will begin until CO has approved written plan.
Construction Requirements
157.03 General
Delete the second paragraph and add the following:
The erosion control plan reflects special concerns and measures necessary to protect resources. The Erosion Control Plan shall, at a minimum:
1. Describe the construction activities and sequence of implementation relating to specific erosion control measures.
2. Describe the location and type of permanent controls to be implemented during construction.
3. Describe the location and type of temporary controls to be implemented during construction.
4. For work in stream channels with flowing water, include a detailed dewatering plan.
5. Describe what monitoring will take place for the duration of the contract.
Add to the third paragraph:
Upon completion of construction at the site, all temporary dewatering materials and equipment are to be removed from Government property.
157.04 Controls and Limitations on Work.
Delete the second paragraph and replace with the following:
Temporary erosion control measures shall be in place at the end of each day’s operation.
All permanent erosion control measures shall be in place within 5 days following completion of earthwork at the location.
For projects, including road obliteration, no more than one feature shall be cleared of established vegetation, with disturbed soil exposed, at a time for each excavator, except for the situation described at the end of this paragraph. One feature is defined as one road. The exception to the limitation of one feature exposed at a time would occur when a series of features are linked together, and all preceding features would need to be cleared to access the feature at the end of the linked features.
Work during wet conditions shall cease if rutting and erosion cannot be controlled. Prior to leaving the site, any rutted areas and other damaged areas shall be smoothed, sloped and graded to drain, and all erosion control features required under this contract shall be constructed and functional.
Payment
157.16 General
Delete this section and replace with the following:
Erosion control work required under this specification and not shown on the Schedule of
Items is considered incidental to and included in the payment of the pay items in the
Schedule of Items (Reference Section 109, Measurement and Payment).
203 - Removal of Structures and Obstructions
203.01_nat_05_12_2004
Description
Delete and replace with the following:
203.01 This work consists of disposing of clearing slash, salvaging, removing, and disposing of buildings, fences, structures, pavements, culverts, utilities, curbs, sidewalks, and other obstructions.
203.03_0117_11_10_2004
203.05 Disposing of Material.
(a) Remove from project.
All culverts, cattleguards, and gates, to be removed shall become the property of the contractor and shall be removed from National Forest land.
Payment
Delete and replace with the following:
203.08 The accepted quantities will be paid at the contract price per unit of measurement for the Section 203 pay items listed in the bid schedule. Payment is based upon the removal and disposal of all structures designated in the contract, and DOES include the excavation necessary to access these structures. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05.
211 - Roadway Obliteration
211.01_0117_03_02_2009
211.01
(a) Method 1.
Delete the section and replace with the following:
Obliterate the roadway by restoring to approximate original ground contours.
Decompact all surfaces that have become hardened. Remove all pipes, bridges, and other structures and all fill material associated with them down to “natural ground” or as shown on the drawings. Keep excavated material within the original construction limits. Finish slopes to provide gradual transitions in slope adjustments without noticeable breaks.
(b) Method 2.
Delete the section and replace with the following:
Close roads by constructing a barrier to vehicle passage, decompacting the roadbed, filling and removing ditches and outsloping to drain. Remove designated pipes, bridges, and other structures and all fill material associated with them down to
“natural ground”. Eliminate all ruts and low spots that could hold water.
211.02
(b) Nonrigid Material.
(1) Nonasphalt Material.
Delete the section and add the following:
Decompaction. Any specified road segment or surface area where embankment is to be placed shall be decompacted prior to placement to promote water infiltration and establish vegetation. This work shall consist of loosening 100 % of the soil in the existing roadbed or landing surface to a depth of 18 inches or AS
SHOWN ON THE DRAWINGS. A sufficient number of passes shall be made to attain complete decompaction. Equipment shall not be operated on decompacted areas. If this occurs, the area shall be decompacted again at the Contractor's expense.
Outsloping. Roads and landings shall be outsloped by pulling the fill shoulder towards the cut bank as shown on the drawings. Excavated material shall be spread over the roadbed or landing. The finished grade shall be a free draining, straight-line surface across the existing roadway. Any existing ditches at the toe of the cutslope shall be ripped and filled with the material excavated during outsloping. Any berms remaining along the upper or lower edges of this work shall be blended with the surrounding terrain, and all other berms, tracks, and other surface irregularities shall be smoothed to allow a free draining surface.
Drainage excavation. Drainage excavation shall include the removal of fill material over culverts and bedding material underneath, reconstruction of the natural channel course and blending of sideslopes. All designated drainage structures and appurtenances (culverts, downpipe, anchors, drop inlets, and trash racks, etc.) shall be removed as described in Section 203 - Removal of Structures and Obstructions. Removal and disposal of log drainage structures shall be considered incidental to this section, and no additional payment will be made.
Stream channel width after drainage structures have been removed shall be the same as the undisturbed width above or below the crossing. The depth and alignment of excavation will be to the depth and position of the existing culvert, plus removal of any material between the natural channel and the culvert
(bedding), unless specified otherwise on the drawings. A uniform grade shall be constructed from the inlet to the outlet to facilitate a free draining channel for the entire length. Excavated material shall be incorporated in the adjacent areas while maintaining the “natural slopes”. Culvert removal shall be AS SHOWN ON THE
DRAWINGS. Materials excavated during culvert removal shall be deposited evenly on the roadbed as shown on the drawings or work list. When removing culverts in wet draws or streams, water diversions, pumping or other approved means will be utilized to reduce water siltation and erosion. Low stage check dams shall be installed to reduce erosion of newly created stream beds WHEN
SHOWN ON THE DRAWINGS OR WORK LISTS.
Vegetation removal. This work shall consist of clearing, grubbing, trimming, removing and disposing of debris and vegetation. Vegetation includes dead woody debris, trees, stumps, roots and other vegetation within the limits of the project area necessary to be cleared for access to project sites, covering areas designated for excavation or embankment, and woody material generated from excavations. Vegetation shall be preserved and later placed on top of finished road segments and completed channel side slopes in stable positions. Trimmed or removed vegetation shall not be left "hung-up" in remaining live vegetation.
Standing trees of greater than 10 inches in diameter at breast height shall not be disturbed without prior approval of the engineer.
Seeding. Seed and fertilize disturbed areas in accordance with Section 625.
211.03 Water Bars and Barriers
Delete and replace with the following:
Construct waterbars where indicated on worklists or where located by the CO. Construct waterbars as shown on drawings.
622 - Rental Equipment
622.02_0117_01_05_2005
Construction Requirements
622.02 Rental Equipment.
Delete the first two sentences of the first paragraph and add the following:
Hydraulic Excavator. Provide a track mounted hydraulic excavator, In acceptable operating condition. Bucket must be equipped with a hydraulic "thumb". It is anticipated that an excavator of a size capable of performing the excavation and embankment needs for the project, will be of an adequate size to be acceptable for any work that the
Contractor may be directed to perform under this section. Contractor is required to get approval of the size of the Hydraulic Excavator from the Contracting Officer prior to any work taking place.
622.04 & 622.05 Measurement and Payment.
The contractor shall be aware of the following statement within section F of the Contract under FAR 52.211-18 Variation in Estimated Quantities: “Adjustment of contract prices as described in this section shall not apply to section 622…. The government reserves the right to reduce or eliminate entirely the work under this item with no adjustment in the contract unit price.”
625 - Turf Establishment
625.03_0117_01_05_2005
625.03 General.
Delete the first subsection and add the following:
Apply seed within 14 days after completion of construction to each portion of work, between May 1 and October 30. Do not seed during windy weather or when the ground is excessively wet, frozen, snow covered, extremely dry, cloddy, hard pan, or is otherwise unsuitable.
Application Methods for Seed, Fertilizer, & Limestone
"Furnish the kinds of seed and the amounts to be applied in terms of pure live seed as follows:
Quantity of Pure
Kind of Seed Live Seed (Lbs/Acre)
1. ___Annual Rye_____________ _______30______________
2. __________________________ _______________________
3. __________________________ _______________________
4. __________________________ _______________________
5. __________________________ ______________________
6. __________________________ _______________________
7. __________________________ _______________________
Total _______30______________
Determine the pounds of seed to be furnished per acre by dividing the pounds of pure live seed required per acre by the product of the percent purity and percent germination.
Example 5 lbs. pure live seed/acre = 6.55 lbs
0.90 x 0.85 seed per acre; purity = 90% and germination = 85%
Apply seed by the ________Dry_____________method. Fertilizer shall be applied at a rate of ______0____ _____ pounds per acre in _______1__________ application by the
_________Dry___________ method and have a chemical analysis as listed below:
Nutrient Percent
Nitrogen, N . . . . . . . . . . . . . ___0 ____
Phosphorus, P205 . . . . . . . . . ___0 ____
Potassium, K . . . . . . . . . . . . . ___0 ____ 625.07_nat_05_13_2004
625.07 Seeding. (a) Dry method.
Remove the last sentence. “Lightly compact the seedbed within 24 hours after seeding.”
713 – Roadside Improvement Materials
635.03_0117_01_05_2005
713.05 Mulch
Straw bales shall be certified as “Weed Free”. The source field shall be inspected and certified by the county extension agent from the county that the straw/hay was grown.
Each shipment onto the forest shall be accompanied by a certification tag stating that it is weed free. The contractor shall furnish the CO with a statement of certification.