AG-82B1-S-10-0165.rtf
RTF text file 354 KB Posted
- Solicitation number
- AG-82B1-S-10-0165
About this file
Solicitation Package
Text of this file
SOLICITATION NUMBER AG-82B1-S-10-0165
| HYPERLINK \l "_Toc253556058" SECTION B - Supplies or Services/Prices | 2 |
| HYPERLINK \l "_Toc253556059" SECTION C - Description/Specifications | 5 |
| HYPERLINK \l "_Toc253556060" 452.211-72 Statement of Work/Specifications. (FEB 1988) | 8 |
| HYPERLINK \l "_Toc253556061" 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988) | 8 |
| HYPERLINK \l "_Toc253556062" SECTION D - Packaging and Marking | 9 |
| HYPERLINK \l "_Toc253556063" SECTION E - Inspection and Acceptance | 10 |
| HYPERLINK \l "_Toc253556064" 52.246-12 Inspection of Construction. (APR 1996) | 10 |
| HYPERLINK \l "_Toc253556065" SECTION F - Deliveries or Performance | 12 |
| HYPERLINK \l "_Toc253556066" 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) | 12 |
| HYPERLINK \l "_Toc253556067" 452.236-75 Maximum Workweek - Construction Schedule. (NOV 1996) | 12 |
| HYPERLINK \l "_Toc253556068" SECTION G - Contract Administration Data | 14 |
| HYPERLINK \l "_Toc253556069" 452.215-73 Postaward Conference. (NOV 1996) | 14 |
| HYPERLINK \l "_Toc253556070" SECTION H - Special Contract Requirements | 15 |
| HYPERLINK \l "_Toc253556071" 52.204-11 American Recovery and Reinvestment Act--Reporting Requirements. (MAR 2009) | 15 |
| HYPERLINK \l "_Toc253556072" 52.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials. (MAR 2009) | 19 |
| HYPERLINK \l "_Toc253556073" 52.225-23 Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials under Trade Agreements. (MAR 2009) | 22 |
| HYPERLINK \l "_Toc253556074" 452.236-77 Emergency Response. (NOV 1996) | 27 |
| HYPERLINK \l "_Toc253556075" SECTION I - Contract Clauses | 28 |
| HYPERLINK \l "_Toc253556076" 52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009. (MAR 2009) | 28 |
| HYPERLINK \l "_Toc253556077" 52.204-7 Central Contractor Registration. (APR 2008) | 28 |
| HYPERLINK \l "_Toc253556078" 52.219-3 Notice of Total HUBZone Set-Aside. (JAN 1999) | 31 |
| HYPERLINK \l "_Toc253556079" 52.222-54 Employment Eligibility Verification. (JAN 2009) | 34 |
| HYPERLINK \l "_Toc253556080" 52.228-13 Alternative Payment Protections. (JUL 2000) | 38 |
| HYPERLINK \l "_Toc253556081" 52.236-1 Performance of Work by the Contractor. (SEP 2006) | 38 |
| HYPERLINK \l "_Toc253556082" 52.244-6 Subcontracts for Commercial Items. (AUG 2009) | 39 |
| HYPERLINK \l "_Toc253556083" 452.228-70 Alternative Forms of Security. (NOV 1996) | 41 |
| HYPERLINK \l "_Toc253556084" SECTION J - List of Documents, Exhibits, and Other Attachments | 42 |
| HYPERLINK \l "_Toc253556085" SECITON K - Representations, Certifications, and Other Statements of Offerors or Respondents | 43 |
| HYPERLINK \l "_Toc253556086" 52.204-8 Annual Representations and Certifications. (FEB 2009) | 43 |
| HYPERLINK \l "_Toc253556087" 52.209-5 Certification Regarding Responsibility Matters. (DEC 2008) | 47 |
| HYPERLINK \l "_Toc253556088" 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns. (JUL 2005) | 50 |
| HYPERLINK \l "_Toc253556089" 52.219-28 Post-Award Small Business Program Rerepresentation. (APR 2009) | 51 |
| HYPERLINK \l "_Toc253556090" 52.223-1 Biobased Product Certification. (DEC 2007) | 54 |
| HYPERLINK \l "_Toc253556091" 52.223-13 Certification of Toxic Chemical Release Reporting. (AUG 2003) | 54 |
| HYPERLINK \l "_Toc253556092" 452.219-70 Size Standard and NAICS Code Information. (SEP 2001) | 55 |
| HYPERLINK \l "_Toc253556093" SECTION L - Instructions, Conditions, and Notices to Offerors or Respondents | 56 |
| HYPERLINK \l "_Toc253556094" 52.216-1 Type of Contract. (APR 1984) | 56 |
| HYPERLINK \l "_Toc253556095" 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction. (FEB 1999) | 56 |
| HYPERLINK \l "_Toc253556096" 52.233-2 Service of Protest. (SEP 2006) | 57 |
| HYPERLINK \l "_Toc253556097" 52.236-27 Site Visit (Construction). (FEB 1995) - Alternate I (FEB 1995) | 57 |
| HYPERLINK \l "_Toc253556098" SECTION M - Evaluation Factors for Award | 59 |
SECTION B - Supplies or Services/Prices
WILDERNESS BRIDGE MAINTENANCE
BLACK BEAR
SALMON FORKS
BIG PRAIRIE
Flathead National Forest Spotted Bear Ranger District Flathead County, Montana
B- 1 - SCHEDULE OF ITEMS
| METHOD * | PAY | EST. UNIT AMOUNT | ||
| ITEM NO. | DESCRIPTION | OF MEAS. | UNIT | QTY. PRICE BID |
557(03)A Untreated structural timber LSQ LS 1 $_______ $ ________ and lumber
| 557(03)B Untreated structural timber | LSQ | LS 1 | $_______ $ ________ |
| and lumber |
| 557(04) Treated structural timber | LSQ | LS 1 | $_______ $ ________ |
| and lumber |
601(01) Mobilization LSQ LS 1 XXXX $ ________
TOTAL PRICE (ALL ITEMS) $_______________________
*See Clause C- 3 - SPECIFICATIONS, Section 106 - Measurement and Payment.
| Designated Method of Measurement: | DQ - Designed Quantities | |
| AQ - Actual Quantities | ||
| LSQ - Lump Sum Quantities |
WORK TO BE DONE AT EACH BRIDGE SITE:
Item 557(03)A Untreated structural timber and lumber. This work item is for the Black Bear Bridge. This work shall consist of removal and replacement of the bridge running planks. It also includes adjusting the bridge camber to the elevations as SHOWN ON THE DRAWINGS.
Item 557(03)B Untreated structural timber and lumber. This work item is for the Salmon Forks Bridge. This work shall consist of removal and replacement of the bridge running planks as SHOWN ON THE DRAWINGS.
Item 557(04) Treated structural timber and lumber. This work item is for the Big Prairie Pack Bridge This work shall consist of removing and replacement of the bridge deck and running planks including the approach spans. It also includes removal and replacement of the bridge railing which consists of the top and bottom chords as well as the lattice truss. The bridge shall have (5) five needle beams and truss braces removed and replaced as designated by the Engineer. The bridge camber shall be adjusted to the elevations SHOWN ON THE DRAWINGS.
B- 2 – BASIS OF AWARD
ONE AWARD WILL BE MADE. Offer of award will be made to the Quoter whose quote, as determined by the Contracting Officer, provides the best value to the Government, considering but not limited to factors such as past performance, price, Contractor’s capacity to do the work, and experience with this type of work.
DUNS# ___________________
TIN# _____________________
Email Address:_____________________
SECTION C - Description/Specifications
C- 1 - PROJECT DESCRIPTION AND LOCATION
| (a) | Description of Work. The project consists of repairs to (3) three cable suspension bridges in the Bob Marshall Wilderness Complex. Work includes removal and replacement of decks, approach span decks, running planks, needle beams, top and bottom chords as well as the truss-lattice. The work also includes the adjustment of the bridge camber using the cable hangers as the adjusting feature. | |
| (1) Black Bear bridge will have the running planks removed, replaced and the camber adjusted. | ||
| (2) | Salmon Forks Trail Bridge shall have only the running planks removed and replaced. | |
| (3) | Big Prairie Trail Bridge shall have the deck on the main span as well as the (2) two approach spans removed and replaced. The running planks shall also be removed and replaced. The top and bottom chords along with the truss-lattice will be removed and replaced. Five of the needle beams shall be removed, replaced and have the camber adjusted. | |
| This project is located in grizzly bear habitat. |
(b) Project Location. The project is located on the Spotted Bear Ranger District within the Bob Marshall Wilderness area and ranges in elevation from 4,200 feet to 4,700 feet. The following is the most direct route to the project:
From Martin City, Montana, follow the East Side Reservoir Road No. 38 approximately 53 miles southeast to the junction the West Side Reservoir Road # 895 Road. Travel west on Road # 895 approximately 1 ½ miles to the junction with Road # 2826 the Meadow Creek Road. Travel south on the Meadow Creek Road approximately 15 miles to the Meadow Creek Gorge Trailhead.
From this point you will be entering the Bob Marshall Wilderness Complex and motorized/mechanized equipment is prohibited. Hiking or stock use is the only available travel method in this complex.
Travel south on Trail # 80 to the junction with Trail # 263. Travel west on Trail # 263 approximately 1-1/2 miles to the Black Bear Bridge.
Continue to travel south on Trail # 263 approximately 7 miles to the Salmon Forks Trail Bridge.
At this point you can travel south on Trail # 263 approximately 11 miles to the Big Prairie Trail Bridge. An alternative is to cross the South Fork of the Flathead River using Trail # 263 and access Trail # 80 to travel to the Big Prairie Bridge.
The lower end of the project is normally free of snow by mid May, although high water will be encountered through late June. Travelers will encounter downed trees across some trails until yearly maintenance is accomplished by late June. No motorized equipment, including mountain bikes, are allowed within designated Wilderness.
(c) Price Range. The price range is between $25,000 and $100,000.
(d) Prebid Tour. None scheduled. Interested parties may contact Jack David (406)758-5217 at the Flathead National Forest Supervisor’s Office, 650 Wolfpack Way, Kalispell, Montana, for additional information.
(e) Prebid Conference. None.
(f) Start Work. It is estimated that the Notice to Proceed for project work will be issued about August 1, 2011 (see Clause F-3).
(g) Period of Performance. Contract shall be completed by October 15, 2011. (Reference Clause F- 3).
(h) Use of Livestock Riding and pack stock may be used to transport personnel, supplies, materials, and equipment to and from, and within the project area. Commonly accepted (“Leave No Trace”), low impact stock-handling techniques shall be used to minimize the impact from stock on National Forest Lands. Stock use is restricted as follows:
(1) Stock shall not be tied directly to trees except for brief (less than 1 hour) periods for loading and unloading. For longer periods, low impact high-line methods shall be used.
(2) The number of stock allowed shall not be more than the number needed to accomplish contract work, with a limit of six head, except during move-in and move-out or re-supply operations when additional stock may be kept over one night. Any excess animals shall be removed from National Forest Lands.
(3) No grazing will be allowed. Stock shall be contained with 100% feed provided by the contractor. All hay (cubes or bales) used on National Forest lands shall be certified as weed seed free. Containment areas (hitch lines, electric fence corrals, supplemental feeding areas, etc) shall be moved every 10 days or as otherwise directed by the Contracting Officer (CO). Containment areas shall not be within 200 feet of any permanent water source.
(i) Use of Premise and Camping. Camping will be allowed in close proximity to the project site in an area approved by the CO. Camping is restricted to the low impact (“Leave No Trace”) method in adherence with the wilderness ethic. Furthermore, all food and refuse shall be handled according to food storage requirements of Special Order No. LC00-18 to eliminate grizzly bear/human contact (see Section J).
(j) Tools and Equipment. All tools and equipment shall be furnished by the Contractor. Since this is a designated Wilderness Area, no wheeled or motorized equipment shall be allowed except for single-wheeled, non-motorized wheelbarrows.
C- 2 - GOVERNMENT-FURNISHED PROPERTY. All bridge materials necessary to accomplish the designated work which includes lumber and hardware. All transportation to the work sites, personnel, tools food and camping equipment will be the responsibility of the contractor.
Material furnished at the site for Item 557(03)A 1). 48 Ea- 2” X 10” X some or all may be 8’ untreated running planks.
2). 100# of 4” ring shank nails
Materials furnished at the site for Item 557(03)B 1). 40 Ea.- 2” X 12” X some or all may be 8’ untreated running planks.
2). 100# of 4” ring shank nails
Materials furnished at the site for Item 557(04)A
| 1). 5 Ea. Glue laminated beams | Bolts W/nuts | ¾” X 18” | 28 ea | ||||||
| 6-3/4” X 9” X16’-0” | Bolts self locking nuts ¾” X 18” | 60 Ea | |||||||
| Bolts W nuts ¾” X 20” | 12 Ea. | ||||||||
| 2). 252 Ea. Treated, Rough Sawn | Bolts w/nuts ¾” X 12” | 8 Ea. | |||||||
| 2” X 12” X 9’-0” U-Bolts / nuts ¾” X 18” | 10 Ea. | ||||||||
| Bolts w/nuts 5/8” X 17” | 27 Ea | ||||||||
| 3). 7 Ea. Treated Rough Sawn | Bolts w/nuts 5/8” X 11” | 60 Ea. | |||||||
| 2” X 12” X 14’-0” | Bolts w/nuts | 5/8” X 10” | 248 Ea | ||||||
| Bolts w/nuts | 5/8” X 6” | 176 Ea. | |||||||
| 4). 14 Ea. S4S Treated | Bolts w/nuts | ½” X 6” | 550 Ea. | ||||||
| 2” X 6” X 4’-4 ¾” | Bolts w/nuts | ½” X 7 ½” | 32 Ea. | ||||||
| Cut washers | ¾” | 210 Ea. | |||||||
| 5). 84 Ea. S4S Treated | Cut washers | 5/8” | 760 Ea. | ||||||
| 2” X 6” X 15’-3 ¾” | Cut washers | ½” | 1100 Ea | ||||||
| Nails- Ring Shank 4” | 150# | ||||||||
| 6). 8 Ea. S4S Treated | Nails- 16d galvanized | 20 # | |||||||
| 2” X 6” X 12’-0” | Plate washer ½” X 6” X 10” | 12 Ea. | |||||||
| Plate Washer ½” X 6” X 16” | 12 Ea. |
7). 160 Ea. S4S Treated 1” X 6” X 7’-1 7/8”
8). 88 Ea. S4S Treated 2” X 6” X 2’-0”
9). 10 Ea. Treated, Rough Sawn 3” X 6” X 7’-8 3/8”
10). 50 Ea. Untreated Rough Sawn 2” X 12” X some or all may be 8’ untreated running planks.
C- 3 - SPECIFICATIONS
The requirements contained in the following Specifications are hereby made a part of this solicitation and any resultant contract and are physically included in this section:
| Section 106 | Measurement & payment | 1/20/2010 | 1 page | |
| Section 202 | Removal of Structures & Obstructions | 1/20/2010 | 1 pages | |
| Section 557 | Timber Structures | 1/20/2010 | 1 page | |
| Section 601 | Mobilization | 3/23/2000 | 1 page |
C- 4 - DRAWINGS
The following drawings are a part of this solicitation and any resulting contract:
| Title Sheet | Sheet 1 |
| Area Map | Sheet 2 |
| Project Map | Sheet 3-4 |
| Bridge Plans-Black Bear Pack Bridge | Sheets 5-6 |
| Bridge Plans- Salmon Forks Pack Bridge | Sheets 7-8 |
| Bridge Plans-Big Prairie Pack Bridge | Sheets 9-11 |
452.211-72 Statement of Work/Specifications. (FEB 1988)
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
(End of Clause)
452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.
(End of Clause)
SECTION D - Packaging and Marking
(For this Solicitation Package there are NO clauses in this section)
SECTION E - Inspection and Acceptance
Periodic field inspections will be made by the Contracting Officer’s Representative (COR) or the COR’s designated Inspector. Work not completed to contract standards shall be rejected and reworked without additional compensation to the Contractor.
52.246-12 Inspection of Construction. (APR 1996)
(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not -
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may -
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor's right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
(End of clause)
SECTION F - Deliveries or Performance
52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10-calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 15, 2011. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by August 1, 2011. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
(End of clause)
452.236-75 Maximum Workweek - Construction Schedule. (NOV 1996)
Within 7 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following in writing for approval:
(a) A schedule as required by FAR clause 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposes to carry out the work.
The maximum workweek that will be approved is to be coordinated with the COR and approved by the Contracting Officer.
(End of clause)
52.242-14 SUSPENSION OF WORK (APR 1984)
(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.
(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted (1) by an act of the Contracting Officer in the administration of this contract, or (2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.
(c) A claim under this clause shall not be allowed (1) for any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order), and (2) unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.
SECTION G - Contract Administration Data
452.215-73 Postaward Conference. (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within 14 days after the date of contract award. The conference will be held at a mutually agreed upon time and place.
(End of Clause)
SECTION H - Special Contract Requirements
52.204-11 American Recovery and Reinvestment Act--Reporting Requirements. (MAR 2009)
(a) Definitions. As used in this clause--
"Contract," as defined in FAR 2.101, means a mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing. In addition to bilateral instruments, contracts include (but are not limited to) awards and notices of awards; job orders or task letters issued under basic ordering agreements; letter contracts; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications. Contracts do not include grants and cooperative agreements covered by 31 U.S.C. 6301, et seq. For discussion of various types of contracts, see FAR Part 16.
"First-tier subcontract" means a subcontract awarded directly by a Federal Government prime contractor whose contract is funded by the Recovery Act.
"Jobs created" means an estimate of those new positions created and filled, or previously existing unfilled positions that are filled, as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.
"Jobs retained" means an estimate of those previously existing filled positions that are retained as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.
"Total compensation" means the cash and noncash dollar value earned by the executive during the contractor's past fiscal year of the following (for more information see 17 CFR 229.402(c)(2)):
(1) Salary and bonus.
(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123 (Revised 2004) (FAS 123R), Shared Based Payments.
(3) Earnings for services under non-equity incentive plans. Does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.
(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.
(5) Above-market earnings on deferred compensation which is not tax-qualified.
(6). Other compensation. For example, severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property if the value for the executive exceeds $10,000.
(b) This contract requires the contractor to provide products and/or services that are funded under the American Recovery and Reinvestment Act of 2009 (Recovery Act). Section 1512(c) of the Recovery Act requires each contractor to report on its use of Recovery Act funds under this contract. These reports will be made available to the public.
(c) Reports from contractors for all work funded, in whole or in part, by the Recovery Act, and for which an invoice is submitted prior to June 30, 2009, are due no later than July 10, 2009. Thereafter, reports shall be submitted no later than the 10th day after the end of each calendar quarter.
(d) The Contractor shall report the following information, using the online reporting tool available at http://www.FederalReporting.gov.
(1) The Government contract and order number, as applicable.
(2) The amount of Recovery Act funds invoiced by the contractor for the reporting period. A cumulative amount from all the reports submitted for this action will be maintained by the government's on-line reporting tool.
(3) A list of all significant services performed or supplies delivered, including construction, for which the contractor invoiced in this calendar quarter.
(4) Program or project title, if any.
(5) A description of the overall purpose and expected outcomes or results of the contract, including significant deliverables and, if appropriate, associated units of measure.
(6) An assessment of the contractor's progress towards the completion of the overall purpose and expected outcomes or results of the contract (i.e., not started, less than 50 percent completed, completed 50 percent or more, or fully completed). This covers the contract (or portion thereof) funded by the Recovery Act.
(7) A narrative description of the employment impact of work funded by the Recovery Act. This narrative should be cumulative for each calendar quarter and only address the impact on the contractor's workforce. At a minimum, the contractor shall provide--
(i) A brief description of the types of jobs created and jobs retained in the United States and outlying areas (see definition in FAR 2.101). This description may rely on job titles, broader labor categories, or the contractor's existing practice for describing jobs as long as the terms used are widely understood and describe the general nature of the work; and
(ii) An estimate of the number of jobs created and jobs retained by the prime contractor, in the United States and outlying areas. A job cannot be reported as both created and retained.
(8) Names and total compensation of each of the five most highly compensated officers of the Contractor for the calendar year in which the contract is awarded if--
(i) In the Contractor's preceding fiscal year, the Contractor received--
(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and
(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and
(ii) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986.
(9) For subcontracts valued at less than $25,000 or any subcontracts awarded to an individual, or subcontracts awarded to a subcontractor that in the previous tax year had gross income under $300,000, the Contractor shall only report the aggregate number of such first tier subcontracts awarded in the quarter and their aggregate total dollar amount.
(10) For any first-tier subcontract funded in whole or in part under the Recovery Act, that is over $25,000 and not subject to reporting under paragraph 9, the contractor shall require the subcontractor to provide the information described in (i), (ix), (x), and (xi) below to the contractor for the purposes of the quarterly report. The contractor shall advise the subcontractor that the information will be made available to the public as required by section 1512 of the Recovery Act. The contractor shall provide detailed information on these first-tier subcontracts as follows:
(i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor's parent company, if the subcontractor has a parent company.
(ii) Name of the subcontractor.
(iii) Amount of the subcontract award.
(iv) Date of the subcontract award.
(v) The applicable North American Industry Classification System (NAICS) code.
(vi) Funding agency.
(vii) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.
(viii) Subcontract number (the contract number assigned by the prime contractor).
(ix) Subcontractor's physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable.
(x) Subcontract primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district if applicable.
(xi) Names and total compensation of each of the subcontractor's five most highly compensated officers, for the calendar year in which the subcontract is awarded if--
(A) In the subcontractor's preceding fiscal year, the subcontractor received--
(l) 80 percent or more of its annual gross revenues in Federal contracts (and subcontracts), loans, grants (and subgrants), and cooperative agreements; and
(2) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants), and cooperative agreements; and
(B) The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986.
(End of clause)
52.225-21 Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials. (MAR 2009)
(a) Definitions. As used in this clause--
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
"Domestic construction material" means--
(1) An unmanufactured construction material mined or produced in the United States; or
(2) A construction material manufactured in the United States.
"Foreign construction material" means a construction material other than a domestic construction material.
"Manufactured construction material" means any construction material that is not unmanufactured construction material.
"Steel" means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
"Unmanufactured construction material" means raw material brought to the construction site for incorporation into the building or work that has not been--
(1) Processed into a specific form and shape; or
(2) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials.
(b) Domestic preference. (1) This clause implements--
(i) Section 1605 of the American Recovery and Reinvestment Act of 2009 (Recovery Act) (Pub. L. 111-5), by requiring, unless an exception applies, that all iron, steel, and other manufactured goods used as construction material in the project are produced in the United States; and
(ii) The Buy American Act (41 U.S.C. 10a-10d) by providing a preference for unmanufactured domestic construction material.
(2) The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraph (b)(3) and (b)(4) of this clause.
(3) This requirement does not apply to the construction material or components listed by the Government as follows:
NONE
(4) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(3) of this clause if the Government determines that--
(i) The cost of domestic construction material would be unreasonable.
(A) The cost of domestic iron, steel, or other manufactured goods used as construction material is unreasonable when the cumulative cost of such material will increase the cost of the contract by more than 25 percent;
(B) The cost of unmanufactured construction material is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available quantities and of a satisfactory quality; or
(iii) The application of the restriction of section 1605 of the Recovery Act or the Buy American Act to a particular construction material would be inconsistent with the public interest.
(c) Request for determination of inapplicability of Section 1605 of the Recovery Act or the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Cost;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(4) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed cost comparison table in the format in paragraph (d) of this clause.
(iii) The cost of construction material shall include all delivery costs to the construction site and any applicable duty.
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to section 1605 of the Recovery Act or the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable cost of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to section 1605 of the Recovery Act or the Buy American Act applies, use of foreign construction material is noncompliant with section 1605 of the American Recovery and Reinvestment Act or the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Cost Comparison
Construction material description Quantity Unit of measure Cost (dollars)*
Item 1:
Foreign construction material [ ] Domestic construction material [ ]
Item 2:
Foreign construction material [ ] Domestic construction material [ ]
(List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.)
(Include other applicable supporting information.)
(* Include all delivery costs to the construction site.)
(End of clause)
52.225-23 Required Use of American Iron, Steel, and Other Manufactured Goods--Buy American Act--Construction Materials under Trade Agreements. (MAR 2009)
(a) Definitions. As used in this clause--
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
"Domestic construction material" means-- (1) An unmanufactured construction material mined or produced in the United States; or
(2) A construction material manufactured in the United States.
"Foreign construction material' means a construction material other than a domestic construction material.
"Free trade agreement (FTA) country construction material" means a construction material that--
(1) Is wholly the growth, product, or manufacture of an FTA country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in an FTA country into a new and different construction material distinct from the materials from which it was transformed.
"Least developed country construction material" means a construction material that--
(1) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
"Manufactured construction material' means any construction material that is not unmanufactured construction material.
'Recovery Act designated country" means any of the following countries:
(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Aruba, Austria, Belgium, Bulgaria, Canada, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, or United Kingdom);
(2) A Free Trade Agreement country (FTA)(Australia, Bahrain, Canada, Chile, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Israel, Mexico, Morocco, Nicaragua, Oman, Peru, or Singapore); or
(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, East Timor, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Maldives, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, Tanzania, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia).
"Recovery Act designated country construction material" means a construction material that is a WTO GPA country construction material, an FTA country construction material, or a least developed country construction material.
'Steel" means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.
"United States' means the 50 States, the District of Columbia, and outlying areas.
"Unmanufactured construction material' means raw material brought to the construction site for incorporation into the building or work that has not been--
(1) Processed into a specific form and shape; or
(2) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials.
"WTO GPA country construction material" means a construction material that--
(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.
(b) Construction materials. (1) The restrictions of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) and the Buy American Act (41 U.S.C. 10a-10d) do not apply to Recovery Act designated country construction material. Consistent with U.S. obligations under international agreements, this clause implements--
(i) Section 1605 of the Recovery Act by requiring, unless an exception applies, that all iron, steel, and other manufactured goods used as construction material in the project are produced in the United States; and
(ii) The Buy American Act by providing a preference for unmanufactured domestic construction material.
(2) The Contractor shall use only domestic or Recovery Act designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.
(3) The requirement in paragraph (b)(2) of this clause does not apply to the construction materials or components listed by the Government as follows:
NONE
(4) The Contracting Officer may add other construction material to the list in paragraph (b)(3) of this clause if the Government determines that--
(i) The cost of domestic construction material would be unreasonable.
(A) The cost of domestic iron, steel, or other manufactured goods used as construction material is unreasonable when the cumulative cost of such material will increase the overall cost of the contract by more than 25 percent;
(B) The cost of unmanufactured construction material is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality; or
(iii) The application of the restriction of section 1605 of the Recovery Act or the Buy American Act to a particular construction material would be inconsistent with the public interest.
(c) Request for determination of inapplicability of section 1605 of the Recovery Act or the Buy American Act.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Cost;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(4) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed cost comparison table in the format in paragraph (d) of this clause.
(iii) The cost of construction material shall include all delivery costs to the construction site and any applicable duty.
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to section 1605 of the Recovery Act or the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable cost of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to the section 1605 of the Recovery Act or the Buy American Act applies, use of foreign construction material other than that covered by trade agreements is noncompliant with the applicable Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Cost Comparison
Construction material description Quantity Unit of measure Cost (dollars)*
Item 1:
Foreign construction material [ ] Domestic construction material [ ]
Item 2:
Foreign construction material [ ] Domestic construction material [ ]
(List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.)
(Include other applicable supporting information.)
(* Include all delivery costs to the construction site.)
(End of clause)
452.236-77 Emergency Response. (NOV 1996)
(a) Contractor's Responsibility for Fire Fighting. (1) The Contractor, under the provisions of FAR clause 52.236-9, PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS, shall immediately extinguish all fires on the work site other than those fires in use as a part of the work. (2) The Contractor may be held liable for all damages and for all costs incurred by the Government for labor, subsistence, equipment, supplies, and transportation deemed necessary to control or suppress a fire set or caused by the Contractor or the Contractor's agents or employees.
(b) Contractor's Responsibility for Notification in Case of Fire. The Contractor shall immediately notify the Government of any fires sighted on or in the vicinity of the work site.
(c) Contractor's Responsibility for Responding to Emergencies. When directed by the Contracting Officer, the Contractor shall allow the Government to temporarily use employees and equipment from the work site for emergency work (anticipated to be restricted to fire fighting). An equitableadjustment for the temporary use of employees and equipment will be made under the CHANGES clause, FAR 52.243-4.
SECTION I - Contract Clauses
52.202-1 Definitions. (JUL 2004)
52.203-3 Gratuities. (APR 1984)
52.203-5 Covenant Against Contingent Fees. (APR 1984)
52.203-6 Restrictions on Subcontractor Sales to the Government. (SEP 2006)
52.203-7 Anti-Kickback Procedures. (JUL 1995)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (JAN 1997)
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (JAN 1997)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (SEP 2007)
52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009. (MAR 2009)
(a) The Contractor shall post notice of employees rights and remedies for whistleblower protections provided under section 1553 of the…
This is the start of the file's text. The full file is on GovTribe.
Other files
| File | Type | Posted |
|---|---|---|
| Experience Questionnaire.doc | DOC document | |
| Exp. Qstnr.doc | DOC document | |
| SF-18.Wilderness Bridge..pdf | ||
| Exp. Qstnr.docm | DOCM document | |
| 96sps_106.doc | DOC document | |
| 96sps_557.doc | DOC document | |
| food_order.doc | DOC document | |
| wage determination MT2.txt | TXT text file | |
| SKMBT_60010012112361.pdf | ||
| SKMBT_60010012112360.pdf | ||
| 96sps_202.doc | DOC document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .