96sps_202.doc
DOC document 25 KB Posted
- Solicitation number
- AG-82B1-S-10-0165
About this file
96 SPS 202
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Experience Questionnaire.doc | DOC document | |
| Exp. Qstnr.doc | DOC document | |
| SF-18.Wilderness Bridge..pdf | ||
| Exp. Qstnr.docm | DOCM document | |
| 96sps_106.doc | DOC document | |
| 96sps_557.doc | DOC document | |
| food_order.doc | DOC document | |
| AG-82B1-S-10-0165.rtf | RTF text file | |
| wage determination MT2.txt | TXT text file | |
| SKMBT_60010012112361.pdf | ||
| SKMBT_60010012112360.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIAL PROJECT SPECIFICATION
WILDERNESS BRIDGE MAINTENANCE
Section 202 – Removal of Structures & Obstructions Description
202.01 Work
Removal of old bridge materials
This work shall consist of the removal of the existing bridge materials listed in the general notes for each bridge. All dimension lumber removed will have all nails pulled, bent, or cut off. The old bridge material shall be stacked at a location designated by the Engineer, for future removal from the wilderness complex by the Forest Service. The designated area to stack the dimension lumber shall be within 100’ of the bridge site.
96 SPS 202 -1 (1/20/10)
File details come from the government source that posted it. Updated .