Exhibit3_Drawings.pdf
PDF 473 KB Posted
- Attached to
- REPLACE BIG LAKE WATER TANK Federal contract opportunity
- Solicitation number
- AG-8173-S-17-0033
About this file
DRAWINGS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Exhibit10_LeadPaintReport.pdf | ||
| REVISED_RETURN_PACKAGE_S-17-0033.pdf | ||
| Exhibit9_GeotechReport.pdf | ||
| Amend_0003_S-17-0033.pdf | ||
| Amend_0002_S-17-0033.pdf | ||
| Amend_0001_S-17-0033.pdf | ||
| Exhibit4_Specifications.pdf | ||
| Exhibit7_Pictures_BigLakeWaterTank.pdf | ||
| Exhibit5_AsBuiltDrawings_ExistingTank.pdf | ||
| Exhibit8_Pictures_TempWaterOpportunity.pdf | ||
| Exhibit6_Map_BigLakeTank.pdf | ||
| RETURN_PACKET_S-17-0033.pdf | ||
| S-17-0033_Replace_Big_Lake_Water_Tank.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APACHE-SITGREAVES
1 TITLE SHEET
PROJECT LOCATION
BLYTHE
YUMA
KINGMAN
ROOSEVELT
NOGALES
TUCSON
GRANDE
CASA
PHOENIX
MESA
ALPINE
SAFFORD
GLOBE
TUBA CITY
PAYSON
FLAGSTAFF
CANYON
GRAND
SPRINGERVILLE
SHOWLOW
HEBER
CHINLE
PAGE
BIG LAKE WATER
TANK REPLACEMENT
CLIFTON
STATE VICINITY MAP DRAWING SHEET INDEX
2 EXISTING SITE PLAN & DEMO
3 NEW TANKS SITE PLAN
4 CONSTRUCTION DETAILS
TITLE SHEET
OF
SHEET
U.S. DEPARTMENT OF AGRICULTURE
FOREST SERVICE
SOUTHWEST REGION 3
APACHE-SITGREAVES NATIONAL FORESTS
SPRINGERVILLE RANGER DISTRICT
SUBMITTED BY:
CIVIL ENGINEER DATE
REVIEWED BY:
INFRASTRUCTRE & OPS DATE
REVIEWED BY:
DISTRICT RANGER DATE
APPROVED BY:
FOREST ENGINEER DATE
APPROVED BY:
FOREST SUPERVISOR DATE
Project Vicinity Map
N
E
S
W
PROJECT DESCRIPTIONESTIMATED QUANTITIES
POTABLE WATER TANK - 2 EACH
DRAIN LINES, 6" HDPE - 60 LF
DRAIN LINES, 6" VALVE - 2 EACH
TANK SUPPLY LINES, 8" HDPE - 40 LF
TANK SUPPLY LINES, 8" VALVE - 2 EACH
SHOW LOW
AZ260
BIG LAKE
SPRINGERVILLE
A Z
A Z
EAGAR
ALPINE
A Z
10 MI
US60
PROJECT LOCATION
REMOVE AND REPLACE THE EXISTING
400,000 GALLON BIG LAKE WATER
TANK WITH TWO 72,000 GALLON
TANKS, AND ASSOCIATED
CONNECTIONS TO EXISTING WATER
LINES, NEW VALVES. OPTIONAL ITEMS
INCLUDE TEMPORARY WATER SERVICE
TO THE CAMPGROUNDS, WELDED
EPOXY COATED TANKS, OR BOLTED
GLASS-FUSED TO STEEL TANKS.
06/06/2017
6" CAST IRON DRAIN LINE
TO HEADWALL TO REMAIN
STARTING AT TEE
45-DEGREE
BEND
6' C.I. GATE VALVE
EXISTING 6" CAST IRON
TEE; REMOVE ALL EXISTING
TANK OVERFLOW AND DRAIN
PIPING TO TEE LOCATION
INCLUDING VALVE CHAMBERS
AND BOXES
REMOVE EXISTING 400,000
GALLON STEEL TANK
REMOVE 8' C.I. SUPPLY
LINE FROM EXISTING TANK
TO AND INCLUDING
THE VALVE LOCATION.
REMOVE VALVE CHAMBER
AND BOX IN ITS ENTIRETY.
ENTRANCE ROAD
EXISTING FENCE
EXISTING DOUBLE
SWING GATE
8" C.I. WATER SUPPLY/DISCHARGE
C .I
D
R A
IN
L
IN
E
EXISTING
E X
IS
T
IN
G
EXISTING FOUNDATION
FOOTPRINT
R E V
IS
IO
N D
E
SC
R
IP
T
IO
N D
A T
E
So u th w es t
R eg io n
A p a ch e- Si tg re a v es
N a ti o n a l
Fo re st s
E n g in ee ri n g D iv is io n
IN
IT
IA
L S
OF
SHEET
B
IG
L A
K E W
A T
E R
T A
N K
R E P L A
C E M
E N
T E X
IS
T
IN
G
S
IT
E P
L A
N A
N D
D E M
O L
IT
IO
N
SCALE (1" = 10')
1. EXISTING TANK CONTAINS
THE LIQUID LEVEL
CONTROLS CONSISTING OF
TELEMETRY TRANSMITTER
AND TANK FLOATS. EXISTING
TRANSMITTER AND NEW
TANK FLOATS TO BE
INSTALLED ON NEW TANK.
COORDINATE WITH
GOVERNMENT FOR FINAL
LOCATION. GOVERNMENT
WILL BE RESPONSIBLE FOR
TREE REMOVAL IF LINE OF
SIGHT IS COMPROMISED
WITH NEW TANKS.
2. THE EXISTING
FOUNDATION AS IDENTIFIED
IN THE 400,000 GAL TANK
DRAWINGS MAY BE RE-USED
FOR THE NEW TANKS, TO
THE MOST PRACTICAL
EXTENT. IF IT IS USED,
IDENTIFY REPAIRS, IF
REQUIRED, IN THE
FOUNDATION DESIGN
DRAWINGS AND CONSTRUCT
PER THE APPROVED
SUBMITTAL.
3. OPTION O1.1: PROVIDE
TEMPORARY WATER TO THE
RECREATION AREA. REFER TO
DESCRIPTION IN
SOLICITATION.
N
E
S
W
20'5'0' 10'
SHEET NOTES
LEGEND
C.I. - Cast Iron
22' DIAMETER BOLTED STEEL
WATER STORAGE TANK;
72,000 GAL CAPACITY; INTERIOR
EPOXY COATED
6" CAST IRON DRAIN LINE
TO HEADWALL TO REMAIN
STARTING AT TEE
CONNECT NEW HDPE
PIPE WITH EXISTING 6"
C.I. DRAIN PIPE WITH
PROPER TRANSITION
FITTINGS AND COUPLINGS
NEW 6"
GATE VALVE
IN VALVE BOX
NEW 6" HDPE
GATE VALVE
IN VALVE BOX
OVERFLOW LINE;
TIE IN TO 6" HDPE
LINE AFTER VALVE
OVERFLOW LINE;
TIE IN TO 6" HDPE
LINE AFTER VALVE
NEW 8" GATE
VALVE WITH SDR 9 ENDS
LOCATED ABOVE GROUND
AND WITH PROPER SUPPORTS
SD
R
H
D P E P
IP
E
CONNECT NEW HDPE
PIPE WITH EXISTING 8"
C.I. PIPE WITH PROPER
TRANSITION FITTINGS
AND COUPLINGS
ENTRANCE ROAD
EXISTING FENCE
EXISTING DOUBLE
SWING GATE
8" C.I. WATER SUPPLY/DISCHARGE
C .I
D
R A
IN
L
IN
E
8" SDR 9 HDPE PIPE
USE EXISTING
TRENCH WHERE 8" C.I.
PIPE WAS REMOVED
EXISTING FOUNDATION
FOOTPRINT; USE TO THE
MOST PRACTICAL EXTENT.
SUBMIT STAMPED FOUNDATION
DESIGN PER SPECIFICATIONS.
EXISTING
E X
IS
T
IN
G
R E V
IS
IO
N D
E
SC
R
IP
T
IO
N D
A T
E
So u th w es t
R eg io n
A p a ch e- Si tg re a v es
N a ti o n a l
Fo re st s
E n g in ee ri n g D iv is io n
IN
IT
IA
L S
OF
SHEET
B
IG
L A
K E W
A T
E R
T A
N K
R E P L A
C E M
E N
T N
E W
T A
N K
S
SI
T E P
L A
N
SCALE (1" = 10')
1. PROVIDE NEW TANKS,
VALVES, LINES, AND
INCIDENTALS TO ENSURE
FULLY OPERATIONAL
SYSTEM.
2. 6" DRAIN VALVES
INSTALLED AND BURIED PER
SPECIFICATIONS AND
DETAILS ON SHEET 4 OF 4.
3. INSTALL ALL WATERLINES
PER SPECIFICATIONS AND
DETAIL 3A, SHEET 4 OF 4.
4. PROVIDE ALL REQUIRED
COUPLINGS, FITTINGS, PIPE
BENDS, TEES, 90-DEGREE
ENDS, AND INCIDENTALS
FOR PROPER WATER LINE
INSTALLATION.
5. OPTION O2.1: WELDED
STEEL TANKS, INTERIOR
EPOXY COATED.
6. OPTION O3.1: BOLTED
STEEL TANKS, INTERIOR
GLASS-FUSED TO STEEL
(PORCELAIN ENAMEL).
N
E
S
W
20'5'0' 10'
SHEET NOTES
LEGEND
C.I. - Cast Iron
R E V
IS
IO
N D
E
SC
R
IP
T
IO
N D
A T
E
So u th w es t
R eg io n
A p a ch e- Si tg re a v es
N a ti o n a l
Fo re st s
E n g in ee ri n g
D iv is io n
IN
IT
IA
L S
OF
SHEET
C O
N
ST
R U
C T
IO
N
D E T
A
IL
S
SIZED TO HOUSE REQUIRED
UTILITY DEVICES + 6" ON ALL
SIDES
2" MIN.
PIPE
COVER
A
B
PULL SLOT
A B
BOX
COVER
LOCKING BOLTS (2)
IRON LID
PUNCHOUTS (2);
OPENING AS REQUIRED
WITH 4" X 4" KNOCKOUT
ABOVE OPENING
DIMENSIONS INCHES
DETAIL 1A
NO SCALE
PRE-CAST UTILITY BOX
PLAN
SELECT MATERIAL
MARKING TAPE
6" TO 10"
24" MAX
MOUND BACKFILL 3"
ABOVE GROUND LINE
SELECT EXCAVATED
MATERIAL
REMOVABLE CAST IRON
COVER MARKED "WATER"
WATERLINE WITH
TRACER WIRE
BEDDING COURSE
MATERIAL
6" 6" 6" 6"
HDPE SDR 9 PIPE
VALVE BOX
WATER VALVE
3" 3"
UNION
DRAINAGE
COURSE
PIPE DIA.
36" MINIMUM PIPE COVER
STACKABLE BOXES
AS NEEDED TO
ACHIEVE PIPE COVER
DEPTH AND 4"- 6"
ABOVE GROUND SURFACE
DETAIL 3A ELEVATION VIEW
WATERLINE TRENCH
NO SCALE
DETAIL 2A
PRE-CAST UTILITY BOX
NO SCALE
DETAIL 4A PLAN VIEW
INLINE VALVE
NO SCALE
CONCRETE
STACKABLES
B
IG
L A
K E W
A T
E R
T A
N K
R E P L A
C E M
E N
T
ELEVATION VIEW
3-D VIEW
File details come from the government source that posted it. Updated .