Amend_0003_S-17-0033.pdf

PDF 128 KB Posted

Attached to
REPLACE BIG LAKE WATER TANK Federal contract opportunity
Solicitation number
AG-8173-S-17-0033
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

About this file

AMENDMENT 0003

View the file

Other files for this federal contract opportunity

Other files attached to REPLACE BIG LAKE WATER TANK, newest first.
File Type Posted
Exhibit10_LeadPaintReport.pdf PDF
REVISED_RETURN_PACKAGE_S-17-0033.pdf PDF
Exhibit9_GeotechReport.pdf PDF
Amend_0002_S-17-0033.pdf PDF
Amend_0001_S-17-0033.pdf PDF
Exhibit4_Specifications.pdf PDF
Exhibit7_Pictures_BigLakeWaterTank.pdf PDF
Exhibit5_AsBuiltDrawings_ExistingTank.pdf PDF
Exhibit8_Pictures_TempWaterOpportunity.pdf PDF
Exhibit6_Map_BigLakeTank.pdf PDF
RETURN_PACKET_S-17-0033.pdf PDF
Exhibit3_Drawings.pdf PDF
S-17-0033_Replace_Big_Lake_Water_Tank.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NSN 7540-01-152-8070 Automated STANDARD FORM 30 (REV 10-83)

FAR (48 CFR) 52.243

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) Amendment 0003 8/25/17

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE USDA FS Apache-Sitgreaves National Forests SAME Acquisition Management 30 S. Chiricahua Drive PO Box 640 Springerville, AZ 85938 ,

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) () 9A. AMENDMENT OF SOLICITATION NO.

X AG-8173-S-17-0033

9B. DATE (SEE ITEM 11)

X 6/22/17

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not ex-tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACT/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(4) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MDE IN THE CON-

TRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying offices, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section heading, including solicitation/contract subject matter where feasible.)

AG-8173-S-17-0033

.The purpose of Amendment 0003:

. I. Closing Date for Offers REMAINS -- SEPTEMBER 14, 2017, 4:00 P.M. (MST).

. II. Exhibits 9 and 10 added for Geotech Soils and Lead Based Paint Testing incorporated into specifications.

(Continued on following page)

Except as provided herein, all terms and conditions of this document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

, WARREN ABBOTT, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C DATE SIGNED

BY 8/25/17

(Signature of person authorized to sign) (Signature of Contracting Officer)

In lieu of STANDARD FORM 30 BACK

AG-8173-S-17-0033

Replace Big Lake Water Tank Amendment 0002

III. Incorporate additional specifications and language:

1. For Geotechnical Analysis, see attached Exhibit 9, dated August 15, 2017, from Western Technologies Inc. The report includes recommendations for foundation preparation and construction, as well as material requirements.

2. For Lead-Paint testing, see attached Exhibit 10, dated July 14, 2017, from Western Technologies Inc.

The exterior of the tank contains lead-based paint. In additional to the demolition requirements in Base Line Item 2.1, follow all Arizona Department of Environmental Quality (ADEQ) guidelines and National Emission Standards for Hazardous Air Pollutants (NESHAP) reporting procedures. This shall include obtaining all applicable permits for demolition and disposal.

3. SECTION 33 16 13 Aboveground Water Utility Storage Tanks, Section 2.1.D reads “Submit warranty certificates from the manufacturer validating a 20-year warranty for the superstructure and 10 years for the interior coating system.”

It shall be revised to read “Submit warranty certificates validating a 20-year warranty for the superstructure (structural) and a 10-year warranty for the interior coating systems. Submit all required terms and conditions, such as required tank inspections, for warranties to be valid.”

4. The USFS is currently clearing hazard trees along the tank access road and around the tank location to allow for better access for equipment. The USFS is responsible for road maintenance and will do some road improvements upon completion of tree-clearing activities and prior to the start of the work.

5. Contractor may temporarily remove/unhinge gates and other fence sections to better access the tank.

Re-install upon completion of the work.

6. Use the Revised RETURN PACKAGE TO SUBMIT PRICING – Add Option Line Item O4.1 for hazard tree removal. Remove 6-inch to 18-inch DBH hazard trees at tank location, and haul offsite. This can include already downed trees. Species vary, but contain pine, aspen, and fir. Obtain commercial permit through the Springerville Ranger District. Minimum award of ten (10) tree removals up to two hundred (200). Sample of line item to look for:

Option Item #

Description of Project Items

Unit of Measure Est. Qty Unit Price Extended

Amount

O4.1 Remove hazard trees TREE 1 $___________ N/A

IV. All other terms and conditions remain the same.

File details come from the government source that posted it. Updated .