SF-30 Amenment 01
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Revised Bid Sch. 1-27-2010.pdf | ||
| CONSTRUCTION_RFQ.doc | DOC document | |
| Combined Dwgs.pdf | ||
| Fire Plan.doc | DOC document | |
| Summary of Work.pdf | ||
| NM2_dvb.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE
PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
| 1 |
| 3 |
| 2. AMENDMENT/MODIFICATION NO. |
| 3. EFFECTIVE DATE |
| 4. REQUISITION/PURCHASE REQ. NO. |
| 5. PROJECT NO. (If applicable) |
| 01 |
| 1/27/2010 |
| 6. ISSUED BY |
| CODE |
7. ADMINISTERED BY (If other than Item 6)
USDA FOREST SERVICE
3463 LAS PALOMAS DRIVE
ALAMOGORDO, NEW MEXICO 88310
Same
| () |
| 9A. AMENDMENT OF SOLICITATION NO. |
| x |
| AG-7512-S-10-0006 |
9B. DATED (SEE ITEM 11)
ALL OFFERORS
January 22, 2010
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
|_| The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers |_| is extended, |X| is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning one (1) copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATA SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and data specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
Job Code: Budget Object Code:
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS; IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| () | |
| A. | THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. |
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER Specify type of modification and authority)
E. IMPORTANT: Contractor is (x) is not, ( ) required to sign this AMENDMENT and return 1 copy with his proposal.
) is required to sign this document and return __1__ copies to the issuing office.
THE PURPOSE OF THIS AMENDMENT IS TO ADD A CORRECTED BID SCHEDULE AND QUESTIONS AND ANSWERE FROM THE
SITE VISIT HELD ON 1/27/2010.
A. ALSO ATTACHED IS A COPY OF THE QUESTIONS ASKED AND ANSWERS FROM THE SITE VISIT HELD TODAY, 1/27/2010, ATTACHMENT #1.
B. SF-18, REPLACE PAGE 3 WITH THE ATTACHED PAGE 3 AND 3A, ATTACHMENT #2.
C. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED.
| 15A. NAME AND TITLE OF SIGNER (Type or print) |
| 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print) |
| 15B. CONTRACTOR/OFFEROR |
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
| 16C. DATE SIGNED |
(Signature of person authorized to sign)
BY _____________________________________________
(Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
PREVIOUS EDITION UNUSABLE Computer Generated Prescribed by GSA Prescribed by GSA FAR (48 CFR) 53.236-1(e)
Clarifications to questions asked during the Dry Canyon ARRA Project site visit on 27 Jan, 2010
1. Correction to the Summary of Work: Part 1, 1.1- B - 2a: Provide and install one 36” x 16’ culvert. Drawings and specifications refer to a 36” culvert.
2. All boulders for this project are Government Furnished and are located at the rock pile as shown on Sheet #3. Boulders within the project area, that were originally intended as barriers and fill the requirements of the specifications, may be relocated and placed per the drawings. Contractor will not leave the immediate project area. There is a 10 foot limit, from either side of the roadbeds and parking areas, that the contractor will be able to retrieve boulders, unless approved by the COR. All boulders, required for Option #2, will be from the rock pile, as shown on Sheet 3.
3. A section of roadway, approximately 100 ft long, will need additional base course to bring the roadbed up out of a wash. Estimated 88 cubic yards of compacted base will be required. Incorporate this cost to Line Item #5 in the Schedule of Items, Road Reconditioning.
4. Change to the Summary of Work: Camping will be permitted for security reasons.
5. Bollards will be constructed from ‘sound’, 4” schedule 40 steel pipe. Pipe may be previously used but will have to be approved prior to installation. The contractor will submit a sample, 2’ section of pipe, to the COR.
6. Where Mesquite Bush is encountered during the widening of the parking areas, the contractor will follow the Road Reconditioning specification. Scarify 6” in depth, brush that is removed can be scattered on site. Contractor will not be responsible for re-growth of brush.
7. A 30 foot section of road, near the corrals, has water running across from a leaking hydrant. This section shall receive a ‘dip’ and be treated as a low water crossing.
8. Option #2: Contractor may incorporate the cost, for minimal repairs to Forest Service Road 9334, to Option Items 14-16. These repairs are only what the contractor feels necessary to make safe passage for the equipment required to accomplish the work in Option Items 14-16. Any additional material needed will be brought in from an approved outside source. The work will be restricted to the existing road prism and the contractor may be required to return the road to its original condition, at no additional cost to the government.
9. Option #2 – Line 16: General debris in the area consists of items such as: old computers, televisions, broken glass, cans, bottles, and house hold items. There are no known hazards, such as asbestos. If the contractor does encounter any hazardous material, they shall cease work in that area immediately and notify the CO.