Revised Bid Sch. 1-27-2010.pdf

PDF 20 KB Posted

Attached to
RECOVERY/ DRY CANYON TRAIL MAINTENANCE
Solicitation number
AG-7512-S-10-0006
Issued by

About this file

revised bid schedule

View the file

Other files

File Type Posted
SF-30 Amd 01 Dry Canyon.docx DOCX document
CONSTRUCTION_RFQ.doc DOC document
Combined Dwgs.pdf PDF
Fire Plan.doc DOC document
Summary of Work.pdf PDF
NM2_dvb.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dry Canyon SOI 1/2 10/8/2009

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

DRY CANYON REHABILITATION

Sacramento Ranger District Lincoln National Forest

Otero County, New Mexico

B- 1 - SCHEDULE OF ITEMS

ITEM DESCRIPTION PAY EST. UNIT TOTAL

NO. UNIT QTY. PRICE PRICE

Mobilization

Lump Sum

Construction survey and staking, method I, tolerance B

Water

Removal gate

Each

Road reconditioning, w/ grade ditches

Square Yard

Roadway excavation, Parking Areas

Gate, type steel, size single lane

Provide and Install Landscape boulders

36” Culvert, 16’long

4” Concrete-Filled Bollards

OPTION #1 – Aggregate

Aggregate base, 4-inch depth (Road)

Aggregate base, 4-inch depth (Parking)

Sign system, including posts

OPTION #2 – Sheet S6

Provide and Install Landscape boulders

Dry Canyon SOI 2/2 10/8/2009

Removal and Disposal of Steel Water Tank

Clean-up and Dispose of trash and debrie

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.

PART I - SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES DRY CANYON REHABILITATION