Revised Bid Sch. 1-27-2010.pdf
PDF 20 KB Posted
- Attached to
- RECOVERY/ DRY CANYON TRAIL MAINTENANCE
- Solicitation number
- AG-7512-S-10-0006
About this file
revised bid schedule
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-30 Amd 01 Dry Canyon.docx | DOCX document | |
| CONSTRUCTION_RFQ.doc | DOC document | |
| Combined Dwgs.pdf | ||
| Fire Plan.doc | DOC document | |
| Summary of Work.pdf | ||
| NM2_dvb.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dry Canyon SOI 1/2 10/8/2009
PART I - SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES
DRY CANYON REHABILITATION
Sacramento Ranger District Lincoln National Forest
Otero County, New Mexico
B- 1 - SCHEDULE OF ITEMS
ITEM DESCRIPTION PAY EST. UNIT TOTAL
NO. UNIT QTY. PRICE PRICE
Mobilization
Lump Sum
Construction survey and staking, method I, tolerance B
Water
Removal gate
Each
Road reconditioning, w/ grade ditches
Square Yard
Roadway excavation, Parking Areas
Gate, type steel, size single lane
Provide and Install Landscape boulders
36” Culvert, 16’long
4” Concrete-Filled Bollards
OPTION #1 – Aggregate
Aggregate base, 4-inch depth (Road)
Aggregate base, 4-inch depth (Parking)
Sign system, including posts
OPTION #2 – Sheet S6
Provide and Install Landscape boulders
Dry Canyon SOI 2/2 10/8/2009
Removal and Disposal of Steel Water Tank
Clean-up and Dispose of trash and debrie
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-03 109.01 unless otherwise noted.
| PART I - SCHEDULE OF ITEMS |
| SECTION B – SERVICES AND PRICES DRY CANYON REHABILITATION |