AG-7442-S-09-0055 Calvit WRP – Rock Ford Stream Crossing - Bowie County SF 1442 Page 2
Solicitation/Contract Form
SF 1442 Page 3
Solicitation/Contract Form
BOWIE COUNTY WRP
Rock Ford Stream Crossing – Wetland Easement
PART I – THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES/PRICES
BID SCHEDULE
| Item | Description | No. | Estimated | Unit | ||
| No. | Quantity Unit | Price | Amount |
Hugh Dawson – Wetland Restoration Line Items
001 Mobilization/DeMoblization 1 Job Lump Sum $_________ $_____________
002 Site Preparation Class E 1 Job Lump Sum $_________ $_____________
003 Stream Crossing (Rock Ford) 1 Job Lump Sum $_________ $_____________
004 Fence 1 600 FT. $_________ $_____________
SUBTOTAL: $_____________
TOTAL BID PRICE: $_____________
Signature:___________________________________ Date: _______________
SECTION C- DESCRIPTION/SPECIFICATION
AGAR 452.211-72 Statement of Work/Specifications. (FEB 1988)
The works consist of removal and disposal of the steel bridge from the WRP easement, construction of rock ford stream crossing and relocation and construction of a Watergate.
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J, List of Documents, Exhibits, and Other Attachments.
AGAR 452.211-73 Attachments to Statements of Work/Specifications. (FEB 1988)
The attachments to the Statement of Work/Specifications listed in Section J are hereby made party of this solicitation and any resultant contract.
SECTION D – PACKING AND MARKING
THERE ARE NO CLAUSES INCLUDED IN THIS SECTION
SECTION E – INSPECTION AND ACCEPTANCE
52.252.2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:
http://acquisition.gov/com/far/index.html
52.246-12 Inspection of Construction. (APR 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not—
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may—
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor; or
(2) Terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
(End of clause)
SECTION F – DELIVERIES OR PERFORMANCE
452.211-74 Period of Performance. (FEB 1988)
The period of performance of this contract is estimated from: September 14 – October 14, 2009 except for Federal holidays.
(End of Clause)
52.211-10 Commencement, prosecution, and Completion of Work (APR 1984) – Alternate I
The Contractor shall be required to (a) commence work under this contract within five (5) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 14, 2009. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by September 11, 2009. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
Actual Damages (NRCS, FEB 1993) If the Contractor fails to complete the work within the time specified in the contract, or any extension thereof, the Contractor shall pay to the Government actual damages for each calendar day of the delay. Actual damages will be based upon the costs incurred by the Government including but not limited to personnel costs, travel, etc. The amount of such costs will be deducted from monies due or to become due to the Contractor.
52.211-18 Variation in Estimated Quantity (Apr 1984) If the quantity of a unit-priced item in this contract is an estimated quantity and the actual quantity of the unit-priced item varies more than 15 percent above or below the estimated quantity, an equitable adjustment in the contract price shall be made upon demand of either party. The equitable adjustment shall be based upon any increase or decrease in costs due solely to the variation above 115 percent or below 85 percent of the estimated quantity. If the quantity variation is such as to cause an increase in the time necessary for completion, the Contractor may request, in writing, an extension of time, to be received by the Contracting Officer within 10 days from the beginning of the delay, or within such further period as may be granted by the Contracting Officer before the date of final settlement of the contract. Upon the receipt of a written request for an extension, the Contracting Officer shall ascertain the facts and make an adjustment for extending the completion date as, in the judgment of the Contracting Officer, is justified.
52.236-1 Performance of Work by the Contractor (Apr 1984) The Contractor shall perform on the site, and with its own organization, work equivalent to at least fifty (50) percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
SECTION G – CONTRACT ADMINSTRATION DATA
NRCSAR 41-52-232-70 Designated Payment Office Contact Point (NRCS, AMB, AUG 1989)
The contact point described below coordinates the issuance of payments under this contract. If payment is not received within 5 days after the due date specified in the contract, contact the payment office designated below for information on when payment will be made.
| Danny Mandell |
| USDA Natural Resources Conservation Service |
| 101 S Main Street |
| Temple, Texas 76501 |
(254) 742-9923
If questions arise on the amount paid, contact the Contracting Officer at the number or address shown in the contract.
SECTION H – SPECIAL CONTRACT REQUIREMENTS
452.215-73 Postaward Conference. (NOV 1996)
A post award conference with the successful offeror is required. It will be scheduled within 2 days after the date of contract award. The conference will be held at: TO BE ANNOUNCED AT A LATER DATE
452.236-73 Archaeological or Historic Sites. (FEB 1988)
If a previously unidentified archaeological or historic site(s) is encountered, the Contractor shall discontinue work in the general area of the site(s) and notify the Contracting Officer immediately.
452.236-74 Control of Erosion, Sedimentation, and Pollution. (NOV 1996)
| (a) Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting |
| and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.) |
| (b) Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be |
| discharged on the ground; into or nearby rivers, streams, or impoundments; or into natural or man-made |
| channels. Wash water or waste from concrete or aggregate operations shall not be allowed to enter live |
| streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to |
| not more than that of the stream into which it is discharged. |
| (c) Mechanized equipment shall not be operated in flowing streams without written approval by the |
| Contracting Officer. |
452.236-75 Maximum Workweek – Construction Schedule. (NOV 1996)
Within five (5) days after receipt of a Notice to Proceed, the Contractor must submit the following in writing for approval:
(a) A schedule as required by FAR Clause 52.236-15, “Schedules for Construction Contracts” and
| (b) The hours (including the daily starting and stopping time) and days of the week the Contractor proposes |
| to carry out the work. |
The maximum workweek that will be approved is MONDAY THROUGH FRIDAY, 10 HOURS A DAY.
| (c) The contractor shall not perform any work on the following holidays except in the case of an emergency |
| as permitted elsewhere in this contract: NEW YEAR’S DAY, MEMORIAL DAY,INDEPENDENCE DAY, |
| LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY. Contract performance time has been |
| established to allow for the non-working holidays stated above. |
| The contractor may be permitted to work on the following designated Federal holidays provided he/she |
| submits a letter of request to the Contracting Officer at least ten (10) calendar days in advance of the |
| holiday: COLUMBUS DAY, MARTIN LUTHER DAY, JR. DAY, VETERANS DAY, AND PRESIDENT’S DAY. |
452.236-76 Samples and Certificates (FEB 1988)
When required by the specifications or the Contracting Officer, samples, certificates, and test data shall be submitted after award of the contract, prepaid, in time for proper action by the Contracting Officer or his/her designated representative. Certificates and test data shall be submitted in triplicate to show compliance with materials and construction specified in the contract performance requirements.
Samples shall be submitted in duplicate by the Contractor, except, as otherwise specified, to show compliance with the contract requirements. Materials or equipment for which samples, certifications or test data are required shall not be used in the work until approved in writing by the Contracting Officer.
52.236-13 Accident Prevention (NOV 1991)
(a) The Contractor shall provide and maintain work environments and procedures which will—
(1) Safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities;
(2) Avoid interruptions of Government operations and delays in project completion dates; and
(3) Control costs in the performance of this contract.
(b) For these purposes on contracts for construction or dismantling, demolition, or removal of improvements, the Contractor shall—
(1) Provide appropriate safety barricades, signs, and signal lights;
(2) Comply with the standards issued by the Secretary of Labor at 29 CFR Part 1926 and 29 CFR Part 1910; and
(3) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for the purposes are taken.
(c) If this contract is for construction or dismantling, demolition or removal of improvements with any Department of Defense agency or component, the Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.
(d) Whenever the Contracting Officer becomes aware of any noncompliance with these requirements or any condition which poses a serious or imminent danger to the health or safety of the public or Government personnel, the Contracting Officer shall notify the Contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the Contractor or the Contractor’s representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required. After receiving the notice, the Contractor shall immediately take corrective action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.
(e) The Contractor shall insert this clause, including this paragraph (e), with appropriate changes in the designation of the parties, in subcontracts.
52.252-4 Alterations in Contract (APR 1984)
Portions of this contract are altered as follows:
52.236-13 Accident Prevention is altered to include the following: NRCS Supplement to OSHA, parts 1910 and 1926, Construction Standards and Interpretations
NATURAL RESOURCES CONSERVATION SERVICE
SUPPLEMENT TO OSHA PARTS 1910 AND 1926
CONSTRUCTION INDUSTRY STANDARDS AND INTERPRETATIONS
| The contractor shall comply with OSHA (Occupational Safety and Health Administration) Parts 1910 and |
| 1926, Construction Industry Standards and Interpretations, and with this supplement. |
(1) Specific reference to the provision or standard in question;
(2) An explanation as to why the waiver is considered justified; and
| (3) The contractor’s proposed alternative, including technical drawings, materials, or equipment |
| specifications needed to enable the contracting officer to render a decision. |
| No waiver or variance will be approved if it endangers any person. The contractor shall not proceed under |
| any requested revision of provision until the contracting officer has given written approval. The contractor is |
| to hold and save harmless the Natural Resources Conservation Service free from any claims or causes of |
| action whatsoever resulting from the contractor or subcontractors proceeding under a waiver or approved |
| variance. |
Copies of OHSA Parts 1910 and 1926, Construction Industry Standards and Interpretations, may be obtained from:
Superintendent of Documents U.S. Government Printing Office Washington, D.C. 20402
NATURAL RESOURCES CONSERVATION SERVICE
SUPPLEMENT TO OSHA PARTS 1910 AND 1926
CONSTRUCTION INDUSTRY STANDARDS AND INTERPRETATIONS
GENERAL CONTRACTOR REQUIREMENTS
| 1.1 SAFETY PROGRAM | |
| Each contractor is to demonstrate that he or she has facilities for conducting a safety program | |
| commensurate with the work under contract. The contract is to submit in writing a proposed | |
| comprehensive safety program to the contracting officer for approval before the state of | |
| construction operations. The program is to specifically state what provisions the contractor | |
| proposes to take for the health and safety of all employees, including subcontractors and rental | |
| equipment operators. The program shall be site specific and provide details relevant to the work to | |
| be done, the hazards associated with the work, and the actions that will be necessary to minimize | |
| the identified hazards. |
| 1.2 | PRECONSTRUCTION SAFETY MEETING | |
| Representatives for the contractor are to meet with the contracting officer (CO) or the CO’s | ||
| representative before the start of construction to discuss the safety program and the | ||
| implementation of all health and safety standards pertinent to the work under this contract. |
| 1.3 | JOINT SAFETY POLICY COMMITTEE | |
| The Contractor or designated on-site representative is to participate in monthly meetings of a joint | ||
| Safety Policy Committee, composed of the Natural Resources Conservation Service (Contracting | ||
| Local Organization in locally awarded contracts) and contractor supervisory personnel. At these | ||
| meetings the contractor’s project manager and the contracting officer will review the effectiveness | ||
| of the contractor’s safety effort, resolve current health and safety programs, and coordinate safety | ||
| activities for upcoming work. |
| 1.4 | SAFETY PERSONNEL | |
| Each contractor is to designate a competent supervisory employee to the contracting officer to | ||
| administer the safety program. |
| 1.5 | SAFETY MEETINGS |
| A minimum of one “on-the-job” or “toolbox” safety meeting is to be conducted each week by all | |
| field supervisors or foreman and attended by mechanics and all construction personnel at the | |
| jobsite. The contractor is to also conduct regularly scheduled supervisory safety meetings at least | |
| monthly for all levels of job supervision. |
1.6 SAFETY INSPECTION
The contractor shall perform frequent and regular safety inspections of the jobsite, materials, and equipment, and shall correct deficiencies.
1.7 FIRST AID TRAINING
Every contractor foreman's work crew must include an employee who has a current first aid certificate from the Mine Safety and Health Administration, American Red Cross, or other state-approved organization.
1.8 REPORTS.
Each contractor is to maintain an accurate record of all job-related deaths, diseases, or disabling injuries. The records shall be maintained in a manner approved by the contracting officer. A copy of all reports is to be provided to the contracting officer. All fatal or serious injuries are to be reported immediately to the contracting officer, and every assistance is to be given in the investigation of the incident, including submission of a comprehensive narrative report to the contracting officer. Other occurrences with serious accident potential, such as equipment failures, slides, and cave-ins, must also be reported immediately. The contractor is to assist and cooperate fully with the contracting officer in conducting accident investigations. The contracting officer is to be furnished all information and data pertinent to investigation of an accident.
1.9 CERTIFICATION OF INSURANCE
Contractors are to provide the contracting officer or his or her authorized representative with certificates of insurance before the start of operations indicating full compliance with State Worker's Compensation statutes. contracting officer or his or her authorized representative with certificates of insurance before the start of operations indicating full compliance with State Worker's Compensation statutes.
FIRST AID AND MEDICAL FACILITIES
2.1 FIRST AID KITS
A 16-unit first aid kit approved by the American Red Cross is to be provided at accessible, well-identified, locations at the ratio of at least 1 kit for each 25 employees. The first aid kits are to be moisture proof and dust tight, and the contents of the kits are to be replenished as used or as they become ineffective or outdated.
2.2 EMERGENCY FIRST AID
At least one employee certified to administer emergency first aid must be available on each shift and duly designated by the contractor to care for injured employees. The names of the certified employees shall be posted at the jobsite.
2.3 COMMUNICATION AND TRANSPORTATION
Prior to the start of work, the contractor is to make necessary arrangements for prompt and dependable communications, transportation, and medical care for injured employees. At least one stretcher and two blankets shall be readily available for transporting injured employees.
2.4 FIRST AID AND MEDICAL REPORTS
The contractor is to maintain a record system for first aid and medical treatment on the jobsite.
Such records are to be readily available to the contracting officer and are to include—
(a) A daily treatment log listing chronologically all persons treated for occupational injuries and illnesses;
(b) Cumulative record of injury for each individual;
(c) Monthly statistical records of occupational injuries, classified by type and nature of injury; and
(d) Required records for worker's compensation.
2.5 SIGNS AND DIRECTIONAL MARKINGS
Adequate identification and directional markers are to be provided to readily denote the location of all first aid stations.
2.6 EMERGENCY LISTING
A listing of telephone numbers and addresses of doctor, rescue squad, hospital, police, and fire departments is to be provided at all first aid locations.
PHYSICAL QUALIFICATION OF EMPLOYEES
3.1 GENERAL REQUIREMENTS
Persons employed throughout the contract are to be physically qualified to perform their assigned duties. Employees must not knowingly be permitted or required to work while their ability or alertness is impaired by fatigue, illness, or any other reason that may jeopardize themselves or others.
3.2 HOIST OPERATORS
Operators of cranes, cableways, and other hoisting equipment shall be examined annually by a physician and provided with a certification stating that they are physically qualified to safely operate hoisting equipment. The contractor is to submit a copy of each certification to the contracting officer.
3.3 HEAVY EQUIPMENT OPERATORS.
It is recommended that operators of trucks and heavy construction equipment be given physical examinations to determine if they are physically qualified to perform their assigned work without endangering themselves or others.
3.4 MOTOR VEHICLE OPERATORS
Operators of motor vehicles engaged primarily in the transportation of personnel are to be 18 years of age or older and have a valid state operator's permit or license for the equipment being operated. The operators must have passed a physical examination administered by a licensed physician within the past year showing that they are physically qualified to operate vehicles safely.
PERSONAL PROTECTIVE EQUIPMENT
4.1 HARD-HAT AREAS
The entire jobsite, with the exception of offices, shall be considered a hard-hat area. All persons entering the area are, without exception, required to wear hard-hats. The contractor shall provide hard-hats for visitors entering hard-hat areas.
4.1.1 LABELS
Hard-hats shall bear a manufacturer's label indicating design compliance with the appropriate ANSI (American National Standards Institute) standard.
4.2 POSTING
Signs at least 3 by 4 feet worded as follows with red letters (minimum 6 inches high) and white background shall be erected at access points to designated hard-hat areas:
CONSTRUCTION AREA -- HARD-HAT REQUIRED BEYOND THIS POINT
These signs are to be furnished and installed by the contractor at entries to shops, construction yards, and job access points.
4.3 SAFETY GOGGLES (DRILLERS)
4.3.1 DRILLERS AND HELPERS.
Drillers and helpers operating pneumatic rock drills must wear protective safety goggles.
MACHINERY AND MECHANIZED EQUIPMENT
5.1 SAFE CONDITION
Before any machinery or mechanized equipment is initially used on the job, it must be inspected and tested by qualified personnel and determined to be in safe condition and appropriate for the intended use. Operators shall inspect their equipment prior to the beginning of each shift. Any deficiencies or defects shall be corrected prior to using the equipment. Safety equipment, such as seatbelts, installed on machinery is to be used by equipment operators.
5.2 TAGGING AND LOCKING
The controls of power-driven equipment under repair are to be locked. An effective lockout and tagging procedure is to be established, prescribing specific responsibilities and safety procedures to be followed by the person or persons performing repair work.
5.3 HAUL ROADS FOR EQUIPMENT
5.3.1 ROAD MAINTENANCE
The contractor shall maintain all roadways, including haul roads and access roads, in a safe condition so as to eliminate or control dust and ice hazards. Wherever dust is a hazard, adequate dust-laying equipment shall be available at the jobsite and utilized to control the dust.
5.3.2 SINGLE LANE HAUL ROADS
Single-lane haul roads with two-way traffic shall have adequate turnouts. Where turnouts are not practical, a traffic control system shall be provided to prevent accidents.
5.3.3 TWO-WAY HAUL ROADS
On two-way haul roads, arrangements are to be such that vehicles travel on the right side wherever possible. Signs and traffic control devices are to be employed to indicate clearly any variations from a right-hand traffic pattern. The road shall be wide enough to permit safe passage of opposing traffic, considering the type of hauling equipment used.
5.3.4 DESIGN AND CONSTRUCTION OF HAUL ROADS
Haul road design criteria and drawings, if requested by the contracting officer, are to be submitted for approval prior to road construction. Sustained grades shall not exceed 12 percent and all curves shall have open-sight line with as great a radius as practical. All roads shall be posted with curve signs and maximum speed limits that will permit the equipment to be stopped within one-half the minimum sight distance.
5.3.5 OPERATORS
Machinery and mechanized equipment shall be operated only by authorized qualified persons.
5.3.6 RIDING ON EQUIPMENT
Riding on equipment by unauthorized personnel is prohibited. Seating and safety belts shall be provided for the operator and all passengers.
5.3.7 GETTING ON OR OFF EQUIPMENT
Getting on or off equipment while the equipment is in motion is prohibited.
5.3.8 HOURS OF OPERATION
Except in emergencies, an equipment operator shall not operate any mobile or hoisting equipment for more than 12 hours without an 8-hour rest interval away from the job.
5.4 POWER CRANES AND HOISTS (truck cranes, crawler cranes, tower cranes, gantry cranes, hammerhead cranes, derricks, cableways, and hoists).
5.4.1 PERFORMANCE TEST
Before initial onsite operation, at 12-month intervals, and after major repairs or modification, power cranes, derricks, cableways, and hoists must satisfactorily complete a performance test to demonstrate the equipment's ability to safely handle and maneuver the rated loads. The tests shall be conducted in the presence of a representative of the contracting officer. Test data shall be recorded and a copy furnished the contracting officer.
5.4.2 PERFORMANCE TEST--Power Cranes (Crawler mounted, truck mounted, and wheel mounted).
The performance test is to be carried out with outriggers set and with a test load weighing 110 percent of the rated capacity when the boom angle is from 30 degrees to 60 degrees above the horizontal. The test is to consist of raising, lowering and braking the load and rotating the test load through 360 degrees at the specified boom angle or radius. Cranes equipped with jibs or boom tip extensions are to be tested using both the main boom and the jib, with an appropriate test load in each case.
5.4.3 PERFORMANCE TEST--Derricks, Gantry Cranes, Tower Cranes, Cableways, and Hoists, Including Overhead Cranes.
| This equipment is to be performance tested with a test load weighing 110 percent of the rated load. |
| In testing cableways, the test load is to be traveled to the upstream and downstream limits of travel |
| and thoroughly performance tested in at least three travel positions, including both limits of travel. |
5.4.4 BOOM ANGLE INDICATOR
Power cranes (includes draglines) with booms capable of moving in the vertical plane shall be provided with a boom angle indicator in good working order.
5.4.5 CRANE TEST CERTIFICATION
The performance test required by 5.4.2 and 5.4.3 is fulfilled if the contractor provides the contracting officer a copy of the certificate of inspection made within the past 12 months by a qualified person or by a government or private agency satisfactory to the contracting officer.
5.4.6 POSTING FOR HIGH VOLTAGE LINES
A notice of the 10-foot (or greater) clearance required by OSHA 1926.550, Subpart N, shall be posted in the operator's cab of cranes, shovels, boom-type concrete pumps, backhoes, and related equipment.
5.4.7 BOOM STOPS
Cranes or derricks with cable-supported booms, except draglines, shall have a device attached between the gantry of the A-frame and the boom chords to limit the elevation of the boom. The device shall control the vertical motions of the boom with increasing resistance from 83 degrees or less, until completely stopping the boom at not over 87 degrees above horizontal.
5.4.8 SAFETY HOOKS
Hooks used in hoisting personnel or hoisting loads over construction personnel or in the immediate vicinity of construction personnel shall be forged steel equipped with safety keepers. When shackles are used under these conditions, they shall be of the locking type or have the pin secured to prohibit turning.
5.5 ROLLOVER PROTECTIVE STRUCTURES (ROPS)
5.5.1 ROLLOVER PROTECTIVE STRUCTURES
OSHA 1926, Subpart W, Overhead Protection, Sections 1000 and 1002 are applicable regardless of the year in which the equipment was manufactured and regardless of the struck capacity of the equipment.
5.5.2 EQUIPMENT REQUIRING ROPS
The requirement for ROPS meeting 5.5.1 above applies to crawler and rubber-tired tractors such as dozers, push-and-pull tractors, winch tractors, tractors with backhoes, and mowers; off-highway, self-propelled, pneumatic-tired earthmovers, including scrapers, motor graders and loaders; and rollers, compactors, and water tankers (excluding trucks with cabs). These requirements shall also apply to agricultural and industrial tractors and similar equipment.
5.5.3 EQUIPMENT REQUIRING SEATBELTS
The requirements for seatbelts as specified in OSHA 1926, Subpart O, Motor Vehicles, Mechanized Equipment, and Marine Operations, Section 1926.602 shall also apply to self-propelled compactors and rollers, and rubber-tired skid-steer equipment.
LADDERS AND SCAFFOLDING
6.1 LADDERS. OSHA 1926, Subpart L - Section 450
Ladders shall be used as work platforms only when use of small hand tools or handling of light material is involved. No work requiring lifting of heavy materials or substantial exertion shall be done from ladders.
6.2 SCAFFOLDING. OSHA 1926, Subpart L - Section 451.
Scaffolds, platforms or temporary floors shall be provided for all work except that which can be done safely from the ground or similar footing.
6.3 SAFETY BELTS, LIFELINE, AND LANYARDS. OSHA 1926, Subpart E, Section 104. Lifelines, safety belts and lanyards independently attached or attended, shall be used when performing such work as the following when the requirements of 6.1 or 6.2 above cannot be met.
(a) Work on stored material in hoppers, bins, silos, tanks, or other confined spaces.
(b) Work on hazardous slopes, structural steel, or poles; erection or dismantling of safety nets, tying reinforcing bars; and work from Boatswain's chairs, swinging scaffolds, or other unguarded locations at elevations greater than 6 feet.
opening to within 1 foot of the sides of the shaft, unless cages are provided.
41-52.249-70 Time Extensions for Unusually Severe Weather
(a) This clause specifies the procedure for determination of time extensions for unusually severe weather in accordance with the FAR clause 52.249-10, DEFAULT (Fixed-Price Construction). In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied.
(1) The weather experienced at the project site during the contract period must be found to be unusually sever; that is, more severe than the adverse weather anticipated for the project location during any given month.
(2) The unusually severe weather must actually cause a delay to the completion of the project.
The delay must be beyond the control and without the fault or negligence of the Contractor.
| (b) The following scheduled of monthly anticipated adverse weather delays is based on National Oceanic |
| and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the |
| baseline for monthly weather time evaluations. The Contractor’s progress schedule must reflect those |
| anticipated adverse weather delays in all weather dependent activities. |
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS BASED ON 6 DAY WORK WEEK
| JAN | FEB | MAR | APR | MAY | JUN | JUL | AUG | SEP | OCT | NOV | DEC |
| (9) | (7) | (6) | (4) | (4) | (3) | (2) | (2) | (3) | (3) | (5) | (8) |
| (c) Upon acknowledgement of the Notice to Proceed (NTP) and continuing throughout the contract, the |
| contractor will record the occurrence of adverse weather and resultant impact to normally scheduled work. |
| Actual adverse weather delay must prevent work on critical activities for fifty (50) percent or more of the |
| contractor’s scheduled work day. The number of actual adverse weather (even if adverse weather occurred |
| in the previous month), shall be calculated chronologically from the first to the last day of each month, and |
anticipated in paragraph (b) above, THE CONTRACTOR MAY SUBMIT A WRITTEN REQUEST FOR A
MODIFICATION FOR EXTENSION OF PERFORMANCE TIME DUE TO UNUSUALLY SEVERE
WEATHER. The Contracting Officer will convert any qualifying delays in to calendar days, giving full consideration for equivalent fair weather days, and issue a modification in accordance with FAR clause 52.249-10, DEFAULT (Fixed-Price Construction).
PART II – CONTRACT CLAUSES
SECTION I – CONTRACT CLAUSES
52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:
http://acquisition.gov/comp/far/index.html
Other files
| File | Type | Posted |
|---|---|---|
| Long Abstract.pdf | ||
| Calvit WRP Amendment 0001.pdf | ||
| FBO 1_SF1442.pdf | ||
| FBO 19_FENCE_FINAL_11-20-08.pdf | ||
| FBO 14_Structure removal calvit.doc | DOC document | |
| FBO 9_Calvit crossing docs0001.JPG | JPG image | |
| FBO 13_site prep calvit 420.doc | DOC document | |
| FBO 6_Calvit letter0002.JPG | JPG image | |
| FBO 16_earthfill calvit.doc | DOC document | |
| FBO 20_Copy of new may 09_Non-Electric Fence | — | |
| FBO 21_TX179_dvb.htm | HTM file | |
| FBO 4_calvitxingc s pg 2.pdf | ||
| FBO 10_Calvit crossing docs0002.JPG | JPG image | |
| FBO 17_Rock for rip rap calvit 523.doc | DOC document | |
| FBO 18_calvit bridge replacement-design-d50 .pdf | ||
| FBO 3_calvitxingc s pg 1.pdf | ||
| FBO 8_CALVIT BRIDGE Plan View.pdf | ||
| FBO 12_Mob-Demob calvit 8.doc | DOC document | |
| FBO 11_CALVIT COVER.doc | DOC document | |
| FBO 5_Calvit letter0001.JPG | JPG image | |
| FBO 15_excavation calvit 21.doc | DOC document | |
| FBO 7_Calvit letter0003.JPG | JPG image |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .