CALVIT BRIDGE REPLACEMENT DESIGN-D50

View the file

Other files

File Type Posted
Long Abstract.pdf PDF
Calvit WRP Amendment 0001.pdf PDF
FBO 1_SF1442.pdf PDF
FBO 19_FENCE_FINAL_11-20-08.pdf PDF
FBO 14_Structure removal calvit.doc DOC document
FBO 9_Calvit crossing docs0001.JPG JPG image
FBO 13_site prep calvit 420.doc DOC document
FBO 6_Calvit letter0002.JPG JPG image
FBO 16_earthfill calvit.doc DOC document
FBO 20_Copy of new may 09_Non-Electric Fence —
FBO 21_TX179_dvb.htm HTM file
FBO 4_calvitxingc s pg 2.pdf PDF
FBO 10_Calvit crossing docs0002.JPG JPG image
FBO 17_Rock for rip rap calvit 523.doc DOC document
FBO 3_calvitxingc s pg 1.pdf PDF
FBO 8_CALVIT BRIDGE Plan View.pdf PDF
FBO 12_Mob-Demob calvit 8.doc DOC document
FBO 11_CALVIT COVER.doc DOC document
FBO 5_Calvit letter0001.JPG JPG image
FBO 2_AG-7442-S-09-0055.rtf RTF text file
FBO 15_excavation calvit 21.doc DOC document
FBO 7_Calvit letter0003.JPG JPG image
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

County:

Date:

Date:

Q Peak (10-yr/24hr) = 1135 CFS Station Elevation

0 99.4 20 99.6 40 97.8 80 97.7 135 97.5 147 94.8

154.5 94 162 94.4 177 98 252 97.7 292 102.3 292 102.3 292 102.3 292 102.3 292 102.3 292 102.3 292 102.3 292 102.3 292 102.3

Station Elevation Station Elevation 135 97.5 112 98 135 97.5 112 98 135 97.5 112 98 135 97.5 112 98 147 94.8 144 94

CL ditch bottom = 154.5 94 164 94 162 94.4 196 98 177 98 196 98 177 98 196 98 177 98 196 98 177 98 196 98

94.20 Sq. Ft. 208.00 Sq. Ft.

42.78 Ft. 84.50 Ft.

Mannings "n" value = 0.035 Avg. Channel Slope = 0.0050 Ft./Ft.

Instructions for chart modification

Right bank = Right bank = Right bank =

Design Flow SectionExisting Bankfull (Bkf) Cross Section

Top left bank = Left bank =

Design Wetted Area =

Design Wetted Perimeter =

Bkf Wetted Area =

Bkf Wetted Perimeter =

WORKSHEET FOR GEOTEXTILE & STONE STREAM CROSSING

Landowner:

Designed By:

Checked By:

6/29/2009

7/22/2009

BowieCalvit bridge replacement

Larry Gibbs

Kevin LaStrapes

Top right bank =

Left bank = Left bank = Left ditch bottom =

Right ditch bottom =

X - SECTION OF STREAM

0 40 80 120 160 200 240 280

Distance

E le v a ti o n

5.10 Ft./Sec Min. D50 = 4.0 in.

Bankfull Flow (Q) = 480 CFS

USE 480 CFS

Q Peak (10-yr/24hr) = 1135 CFS

5.49 Ft./Sec 1142 CFS

Job Class = IV 8 8

Station Elevation 80 102 88 101 96 100 104 99 112 98 120 97 128 96 136 95 144 94 164 94 172 95 180 96 188 97 196 98 204 99 212 100 220 101 228 102

Stream Crossing Width = 13.5 Ft.

114 196

97.7 98

86.48 Ft. Left side = 32.23 Ft.

Right side= 34.25 Ft.

ESTIMATED QUANTITIES

Thickness of surfacing stone = 8 in.

51.7 Left side = 17.7

Right side= 18.8

Thickness of hoof contact zone = 0 in.

0.0 Left side = 0.0

Right side= 0.0

Design Flow (Q) = Design Velocity =

Bankfull Velocity =

Slope intersects ground left side sta. = Slope intersects ground left side EL. =

Slope intersects ground right side sta.= Slope intersects ground right side EL.=

Tons of Min. D50Total Surface Stone=

Tons Crusher Run

Tons of Min. D50

Tons of Min. D50

Hoof Contact Zone =

Entrance / Exit Slope left side = Entrance / Exit Slope right side =

Total Stream Crossing Length =

Tons Crusher Run

Tons Crusher Run

X - SECTION OF STREAM CROSSING

102 112 122 132 142 152 162 172 182 192 202

Distance

E le v a ti o n

176.0 Sq. Yds. Left side = 54.2 Sq. Yds.

Right side= 57.5 Sq. Yds.

GEOCELL MAY NOT BE USED SINCE VELOCITY > 5 FPS

114 196

112 144 164 198

97.7 98.0

8 8 109 201

8 in.

94 94

93.3 93.3

91.3 91.3

Min. 2 Ft.

CROSS - SECTION

Geotextile =

C

Finished Grade

Excavated Bottom

1 1

Toewall