Amend_3_-_Final.pdf

PDF 24 MB Posted

Attached to
BA-27c Barataria Landbridge CU#7 and #8
Solicitation number
AG-7217-S-15-0001
Issued by

View the file

Other files

File Type Posted
Bid_Abstract.pdf PDF
Amend_2.pdf PDF
Amend_1.pdf PDF
LA2.txt TXT text file
SF1442_Solicitation_Package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

AG-7217-S-15-0001

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

NRCS-LA-127217

ALEXANDRIA LA 71302

3737 GOVERNMENT ST.

USDA-NRCS-LOUISIANA STATE OFFICE

02/20/2015000003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

01/27/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

CWPPRA - BA27c Barataria Basin Landbridge Project CU #7 and 8, MIPR W42HEM11119946 and

W42HEM11119947, located in Lafourche Parish, Louisiana.

The purpose of this amendment is to provide additional questions and answers and provide revised plans and construction specifications.

Q1. Is geotextile fabric required under the dikes on the land based construction?

A1. Yes, see Q&A #10 in Amendment #1.

Q2. How does the project design engineer anticipate the stone dike being placed on the land based portion of the work? Please provide acceptable tools and method of placing that

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

DENISE A. BURRUSS

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-7217-S-15-0001/000003

will be acceptable to the NRCS.

A2. Per Special Provision #5, the contractor shall provide a "Work Installation Plan" to the

CO within 10 days after contract award which shall include "a detailed plan for the land based construction sites including the construction sequence and equipment to be used." It is up to the contractor to determine the means and methods to perform this work.

Q3. Can the contractor be allowed to work on

Sunday? As this is a remote site crews will not be able to travel home on a Sunday and will be idle in the area. Project overhead costs such as per diem and boats will be incurred 7 days a week.

A3. No, Per Section F, Page 5 of the solicitation, "Maximum Workweek - Construction

Schedule; The maximum workweek that will be approved is 12 hours per day, six days per week, Monday through Saturday for all portions of work, except the Excavation - Flotation Access

Dredging. The Excavation - Flotation Access

Dredging will be allowed to be performed 24 hours per day, 7 days per week."

Q4. Has the engineer investigated what is involved in converting marine construction equipment to bio-based fuels? There are no bio-based fuels for all the equipment involved in this project.

A4. Per Construction Specification 5 - Pollution

Control, Item #11 "The contractor shall make maximum use of biobased products that are United

States Department of Agriculture designated items. Information for this requirement and these products is available at http://www.biopreferred.gov." Further FAR

52.223-2 - Affirmative Procurement of Biobased

Products Under Service and Construction Contracts provides the following:

"a) In the performance of this contract, the contractor shall make maximum use of biobased products that are United States Department of

Agriculture (USDA)-designated items unless¿

(1) The product cannot be acquired¿

(i) Competitively within a time frame providing for compliance with the contract performance schedule;

(ii) Meeting contract performance requirements; or

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-7217-S-15-0001/000003

(iii) At a reasonable price."

Products that were designated were multi-purpose greases and hydraulic fluids.

Q5. Can the specifications be rewritten to eliminate one of the Notice to Proceeds? By definition, there should only be one NTP.

A5. No, this requirement will not be changed.

Q6. Builder's Risk Insurance is not attainable for this scope of work. The specifications need to be written such that Hurricane and Storm

Damage are not the contractor's fault. The NRCS in the only government agency that puts that sort of risk on the contractor.

A6. The specifications will not be changed in this regard.

Q7. Can the acceptance reaches be modified to every 2,500 lf of dike? This will allow the contractor to turn over significant completed portions of the project to the owner.

A7. Question previously answered as Question #2 under Amendment 1.

Q8. Can the land based dike construction be placed in one lift? This will reduce the impact of the land based equipment on the adjacent marsh.

A8. The contractors method shall be proposed in the Work Installation Plan as required in Special

Provision, Item #5.

Q9. Please provide measurement and payment specifications for the LWA bags.

A9. Per Construction Specification 95 -

Geotextile, Paragraph 7(b)(7); "No separate payment will be made for this item. Compensation for this item is to be included in Bid Item 5, Lightweight Aggregate, Encapsulated."

Q10. Questions are due by February 12. It was stated at the site visit that questions would be received thru February 19. Please clarify.

A10. Please see Amendment #2.

Q11. The specification calls for a woven but the

Permittivity (ASTM D4491), Elongation at Failure

(ASTM D4632) and AOS (ASTM 4751) minimums are numbers that cannot be met with a woven, those minimums are typical MARV requirements for a

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

4 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-7217-S-15-0001/000003

non-woven Geotextile (See Table 592-2).

A11. The Material Specification 592 has been amended. Construction Specification 95 -

Geoxtile has been amended to address permittivity and Apparent Opening Size (AOS). All other requirements will remain the same.

Q12. Can POA (USACE CWO-02215) be excluded from the requirement? Manufacturers do not have this test data for the type of woven made for this application?

A12. Construction Specification 95 - Geotextile, Paragraph 7(a)(2) this requirement does not apply.

Q13. Will the engineer clarify for bid purposes the fill efficiency/tolerance that is required for compliance? Due to the shape of the filled bags to get 100% fill efficiency will require bags to be installed outside the lines and grades. The lack of a fill efficiency/tolerance leaves one to believe it may be acceptable to under build.

A13. The Lightweight Aggregate bags shall be placed to the neat lines and grades shown on the plans to achieve the final section shown on

Drawing Sheet 23 for the Composite Rock

Dike/Revetment detail. The contractor shall submit a lightweight aggregate plan (LWP) as required by Construction Specification 25 -

Rockfill, to address how they plan to accomplish this work.

Q14. Does the engineer expect the contractor to move spoils by barge in areas that will not or cannot accept due to pipelines, etc?

A14. The contractor shall prepare a flotation access plan, in accordance with Construction

Specification 21 - Excavation, Item 10(a)(6) which details the extent (depth and width), proposed sequence and duration of excavation activities....." to address how they propose to achieve the flotation excavation. In no event will spoil material be placed on top of the pipelines.

Q15. On drawing 8 of 35 the location of the 3" pipeline if straight lined appears to cross the proposed access channel. If that is the case we are not to dredge within 25 feet either side.

Will this be considered a change order or the

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

5 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-7217-S-15-0001/000003

contractors responsibility if we cannot achieve the -5.5' as per the plan drawings?

A15. Upon completion of the pre-construction survey and magnetometer survey, the alignment of the perpendicular channel may have to be adjusted in this area. The contractor would address this in the magnetometer anomaly plan submitted and adjustments made prior to the second NTP.

Q16. Construction Specification 13 - Piling requires "all timber piles shall be treated in accordance with AWPA Standard U1, Commodity

Specification G, to the requirements of Dual

Treatment (Marine Piles) for maximum protection in Use Classification UC5C, Southern Waters." In trying to meet this specification we have determined through our vendors that this appears to be a 50' Class B dual treatment pile 1.0

CCA/20# Creosote. Is this the correct interpretation of the specification? Does the

NRCS want creosote for this application of marine use in southern waters?

A16. Yes, the parameters that you indicate will meet the requirements of the specifications.

Q17. Is it possible to quote a partial bid on this request, just the rock supply and delivery portion?

A17. No, bids should be for all stated CLINs.

Q18. Request for substitution of OysterBreak versus rock.

A18. The NRCS has reviewed the information provided; however, the use of the product will not be utilized for this project; however, the information will be kept on file for consideration on other projects to be developed.

The following Construction Specifications are hereby amended:

1. Remove Special Provisions Pages SP-1 through

SP-5 and replace with Pages SP-1 through SP-5 dated February 2015 - Amendment #3.

2. Remove Construction Specification 3 -

Structure Removal, Page 3-3 and replace with Page

3-3 dated February 2015 - Amendment #3.

3. Remove Construction Specification 7 -

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

6 6

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

AG-7217-S-15-0001/000003

Construction Surveys, Pages 7-4 through 7-11 and replace with Pages 7-4 through 7-11 dated

February 2015 - Amendment #3.

4. Remove Construction Specification 95 -

Geotextile, Pages 95-4 through 95-5 and replace with Pages 95-4 through 95-5 dated February 2015

- Amendment #3.

The following Material Specifications are hereby amended:

1. Remove Material Specification 592 -

Geotextile, Pages 592-1 through 592-3 and replace with Material Specification 592 - Geotextile, pages 592-1 through 592-3 dated January 2014.

The following Drawing Sheets are hereby amended:

1. Remove Drawing Sheet 4 of 35 and replace with

Drawing Sheet 4A3 of 35 dated February 19, 2015.

2. Remove Drawing Sheet 8 of 35 and replace with

Drawing Sheet 8A3 of 35 dated February 19, 2015.

3. Remove Drawing Sheets 11-23 and replace with

Drawing Sheets 11A3-23A3 dated February 19, 2015.

4. Remove Drawing Sheets 26-29 and replace with

Drawing Sheets 26A3 through 29A3 dated February

19, 2015.

All other terms and conditions of the solicitation remain unchanged and in full force and effect.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

NRCS – February 2015 – Amendment # 3 LA – Barataria Basin Landbridge (BA-27c) CU#7&8 SP-1

SPECIAL PROVISIONS

1. Known pipelines and utilities are shown in the construction drawings. It is possible that some pipelines and/or utilities exist that have not been shown. The contractor shall be on the alert for such pipelines and utilities, and shall report them immediately to the Contracting Officer (CO).

The contractor shall notify Louisiana One Call (LA ONE CALL) at 1-800-272-3020 72 hours prior to digging, placing rock riprap or driving piling in order to locate utility lines.

2. The contractor shall notify the Eighth Coast Guard District so that a Notice to Mariners may be prepared, as required. Notification, with a copy of the permit approval and drawings, should be mailed to the following address within 48 hours of issuance of the Notice To Proceed, with a copy of such submitted to the NRCS:

CDR 8th Coast Guard District (dpw) Hale Boggs Federal Bldg.

500 Poydras St. Suite 1230 New Orleans, LA 70130-3396

Email notification must also be provided to the Eighth Coast Guard District, Aids to Navigation Branch, Marine Information Office 7 to 10 days prior to dredging or construction operations. The Marine Information Office may be reached by email at d8marineinfo@d8.uscg.mil. Telephone inquiries can be directed to 504-671-2327. The contractor shall provide documentation of the notification to the CO prior to the commencement of construction activities and shall provide documentation of all subsequent posting(s) of the Notice to Mariners to the CO.

3. All elevations stated in the plans and specifications refer to North American Vertical Datum (NAVD88), Geoid 99. Horizontal position in the plans and specifications refer to State Plane Louisiana South North American Datum (NAD) 83 feet.

4. The contractor shall review the plans and specifications for accuracy and completeness. The contractor shall also make their own determination of the quantities of work required to complete the construction and make their own assessment of the site and the work required prior to bidding.

Any discrepancies, errors, or omissions shall be brought to the attention of the CO prior to the bid due date.

5. Within 10 days after contract award, the contractor shall submit a Work Installation Plan to the CO for approval that includes, at a minimum:

Staging area for all features of the work Anticipated drafts of barges and all other vessels used for delivery Type of equipment to be used for installation Anticipated schedule of installation of all items of work Anticipated light loading of any barges Procedure for measurement of all barges and all barge tables A detailed plan for the land-based construction sites including the construction sequence and equipment to be used

6. The contractor's responsibilities include, but are not limited to, the following:

a) Become familiar with and abide by all requirements stated in the permits.

b) Repair or replace, in like manner any survey monuments, property line markers, fences, roads, bridges, launches, trails, waterways, and other facilities which may be damaged or destroyed during the construction of the structures and/or appurtenances installed as part of the project, and removal or disposal of all debris and temporary measures associated with construction of the project. Any survey monuments or property line markers damaged or destroyed shall be replaced promptly by a Professional Land Surveyor registered in the State

LA – Barataria Basin Landbridge (BA-27c) CU#7&8 SP-2 of Louisiana. The contractor shall stay off the marsh area vegetation except as allowed for by land based construction. Any marsh area vegetation outside the construction limits damaged by the contractor shall be repaired or mitigated by the contractor; such repair or mitigation shall be as set forth by the Contracting Officer and as required by the state/federal mitigation board and/or land owners.

c) All tools, equipment, materials and other property (excluding permanent project features) taken upon or placed upon the land or water bottoms by the contractor shall remain the property of the contractor. All such tools, equipment and other property shall be removed by the contractor prior to the final payment being made.

d) In the event of surface alterations resulting from activities of the contractor, beyond those alterations absolutely necessary for accessing the sites and conducting project activities, the contractor is responsible for restoring the site, to the greatest extent practical, to conditions existing at commencement of contractor activities, or the contractor or its insurance carrier will be responsible for the cost of such restoration. The contractor shall be responsible for removing all litter from the project sites upon completion of authorized work.

e) Airboats and small outboards shall be used whenever practical to reduce the usage of marshbuggies. Established trails and access channels shall be utilized whenever possible.

Marshbuggy use shall be limited to the construction limits of the project features. If the contractor chooses to use airboats, written permission from the respective land owner shall be obtained by the contractor and a copy shall be provided to the CO.

f) The contractor is made aware that occasional access by landowners, lessees and oilfield and utility company employees throughout the work area may be required. The contractor shall provide for such passage in a reasonably adequate and satisfactory manner, as determined by the CO, on such occasions.

g) The contractor shall include the State of Louisiana, Douglas A. Matherne, Ruth Matherne Hoffman, Robert A. Matherne, Jack R. Matherne, Carolyn Coulon Goodrow, William Mason Heirs Committee, Karen Majoria Gervais, Blake M. Gervais, Lauren A.

Gervais, Heather C. Gervais Hebert, Martin J. McAndrews, Jr., Louisiana Delta Farms, LLC, Delta Farms Oil Company, LLC, Goodrich Petroleum Company, LLC, Goyamo Oil Company, LLC, Monticeto Oil Company, LLC and IP Farms, Inc. as additional insureds on any and all pertinent liability insurance policies maintained by the contractor during the construction of the project. Such insurance policies shall provide that those parties will be protected from and defended and insured against, without costs or expense to those parties, any liability or loss (including loss of life), or damage to property of any kind, arising wholly or in part from or in connection with operations performed on their property.

h) The contractor’s movement in the project area shall be limited to the work limits and access routes stated in the specifications and as shown on the plans.

i) The contractor shall notify the contracting officer within seven (7) calendar days of occurrence of any written or oral notice of conflict between contractor and any subcontractor/supplier regarding non-payment for services or supplies. In the event that a lawsuit is filed and the prime contractor is notified of such lawsuit while the contract is active, the contractor shall notify the contracting officer within seven (7) calendar days of receipt of such notice.

7. The contractor is advised that tidal fluctuations in this area will vary due to weather and daily tides. Historical tide data can be obtained from the U.S. Army Corps of Engineers or the U.S.

Geological Survey. The contractor is responsible for taking the appropriate measures to ensure that tidal fluctuations do not interfere with the prosecution of the contract.

LA – Barataria Basin Landbridge (BA-27c) CU#7&8 SP-3

8. The contractor is responsible for conducting a magnetometer survey as detailed in Construction Specification 7 – Construction Surveys to ensure the work site is clear of oil and gas infrastructure of other metallic objects and debris that may present a hazard to life, property, and equipment.

Magnetometer surveys were conducted within the project area in 2003 and in 2011. The magnetometer survey reports can be obtained for viewing purposes by contacting the Contracting Officer. All known pipelines within the project area are shown in the plans.

9. The contractor’s navigation requirements include, but are not limited to, the following:

a. All marine vessels shall follow the Inland Navigation Rules which are contained in the following Federal Laws or Regulation: International Navigational Rules Act of 1977 (Public Law 95-75, 91 Stat. 308, or 33 U.S.C. 1601-1608), and the Inland Navigation Rules Act of 1980 (Public Law 96-591, 94 Stat. 3415, 33 U.S.C. 2001-2038). These rules can be found on the Internet at http://www.navcen.uscg.gov/mwv/navrules/rotr_online.htm. All marine vessels shall display the lights and day shapes required by Part C – Lights and Shapes of the Inland Navigation Rules. The location, type, color, and size of the lights and day shape shall be in accordance with Annex I – Positioning and Technical Details of Lights and Shapes.

Any vessel engaged in dredging is considered a “Vessel restricted in her ability to maneuver” and shall display all the lights and shapes required in Rule 27: Vessel Not Under Control.

b. The contractor shall operate in compliance with pertinent U.S. Coast Guard regulations and shall conduct work in such a manner as to minimize any obstruction to navigation. If the Contractor’s dredge or any other floating equipment obstructs any navigation, making navigation difficult or endangering the passage of vessels, said dredge or equipment shall be promptly moved on the approach of any vessel to the extent necessary to afford a practical passage. Upon completion of work, the contractor shall promptly remove the dredge and other floating equipment, as well as ranges, buoys, piles and any other marks or objects that are not permanent project features placed in the navigable water or on shore.

c. All vessels that are regulated by the United States Coast Guard (USCG) shall have current inspection and certifications issued by the USCG before commencing construction. A copy of the certification shall be posted in a public area on board the vessel.

d. All dredge and quarter boats not subject to USCG inspection and certification or not having a current American Bureau of Shipping (ABS) Classification shall be inspected in working mode annually by a marine surveyor accredited by the National Association of Marine Surveyors (NAMS) or the Society of Accredited Marine Surveyors (SAMS). The surveyor must have at least five years experience in commercial marine vessels and equipment. All other vessels shall be inspected before being placed in use and at least annually by a qualified person. The inspection shall be documented. A copy of the most recent inspection report shall be posted in a public area on board the vessel. A copy of the inspection shall be furnished to the Contracting Officer Representative (COR) upon request. The inspection shall be appropriate for the intended use of the vessel. The inspection, as a minimum, shall evaluate the structural integrity of the vessel and compliance with the National Fire Protection Association code 302 – Pleasure and Commercial Motor Craft.

e. Officers and crew shall be in possession of a current valid USCG license or a correctly endorsed document as required by the USCG, which shall be posted in a public area on board the vessel.

f. The contractor shall notify the USCG prior to the mobilization of floating equipment to the job site.

10. ALL PIPELINES

LA – Barataria Basin Landbridge (BA-27c) CU#7&8 SP-4

a. The contractor shall notify the three designated pipeline companies listed below within the specified timeframe noted for each company:

Chevron Texaco Pipeline Company o Contact Ken Jones (504-247-3214) or Jacob Weaver (985-793-6080) at least 48 hours prior to performing work within 100 feet of the Chevron Texaco pipeline.

Hilcorp Energy Company o Contact Brad Baker (713-289-2858 or 713-549-1899) at least 48 hours prior to performing work within 100 ft of Hilcorp’s saltwater disposal line or nearby high pressure gas lines.

Tennessee Gas Company

(now Kinetica Partners, LLC / 224 Aviation Road / Houma, LA) o Contact Kurt Cheramie (985-209-2833) at least 48 hours prior to performing work within 100 feet of the Tennessee Gas / Kinetica Partners pipeline.

b. No excavation or spoil placement will be allowed within 25 feet of the Chevron Texaco pipeline or Tennessee Gas pipeline. No excavation will be allowed within 50 feet of the centerline of Hilcorp’s saltwater disposal line or nearby high pressure gas lines (pipelines P and Q on sheets 9 and 27 of the drawings). No excavation will be allowed within 25 feet of the existing pipelines shown on sheets 8 and 26 of the drawings. No activities that will result in the reduction of the existing cover over any pipeline will be permitted.

c. The contractor shall provide written documentation to the CO prior to work being in and/or around the pipeline in the event of pipeline crossing if a pipeline company chooses not to have a representative on site during construction activities in the vicinity of their pipeline.

d. Barges or other watercraft shall not anchor, spud, or dredge near each pipeline (see 10.b. for specific distances for each pipeline) without specific prior written approval from the pipeline company. All vessels shall be floating when crossing any pipeline. Spuds shall be welded or pinned up while traveling in and/or crossing any pipeline.

e. No heavy construction equipment will operate (place an operating load) near each pipeline

(see 10.b. for specific distances for each pipeline) without specific prior approval from the designated pipeline company. When necessary, timber mats shall be used when crossing a pipeline, as required and approved by the designated pipeline company. Written approval and requirements from the pipeline companies shall be provided to the CO at least 48 hours prior to operating equipment near each pipeline (see 10.b. for specific distances for each pipeline).

f. The contractor shall cross pipelines only at the locations and in the manner designated and approved by the pipeline company. The approved method shall not remove the soil cover over the pipeline. Pipeline companies may require the contractor to cross their pipelines at high tide and during daylight hours only. These requirements shall be determined by the agreement the contractor has with each specific pipeline company for crossing each pipeline.

g. The contractor shall schedule a pre-work meeting with the associated pipeline company to discuss all aspects of the planned activities, pipeline marking schedule, pipeline crossing locations, excavations within the distances specified in 10.b. for each pipeline and establish lines of communication.

LA – Barataria Basin Landbridge (BA-27c) CU#7&8 SP-5

h. Any pipeline markers damaged or removed by the contractor shall be replaced within 24 hours of such damage or removal.

i. All equipment crossings of the pipeline shall be marked or flagged.

j. The contractor shall be liable for any expense, loss or damage to any pipeline due to the presence of his/her equipment/operations in the vicinity of the pipeline, including but not limited to coating repair, pipe replacement, operational downtime or gas loss that the pipeline company may sustain resulting from the operations or activities of the contractor, its agents or employees during construction for any project feature.

k. If the contractor’s facilities or related equipment are damaged or destroyed or if said operations and equipment must be relocated or removed due to any emergency, operational or maintenance requirements arising out of the day to day business activities of any pipeline company, the pipeline company shall not be liable to the contractor or to any other person or entity for any damages whatsoever, including, but not limited to, damages of any type arising from the loss of product, loss of profit, interruption of business activity or business loss of any kind. Additionally, any subsequent repair and/or reinstallation of said facilities shall be at the sole (100%) cost of the contractor.

11. The project area and access to the project area lies within a dynamic coastal environment subject at any time to significant temporary or permanent changes in environmental conditions. The contractor is responsible for taking the appropriate measures to ensure that tidal fluctuations, rainfall events and soil conditions do not interfere with access to and from the job site and/or construction activities.

12. Work under this contract is permitted under Department of the Army Permit No. MVN-2004- 00467-CJ. A copy of Page 1 of this permit must be conspicuously displayed at the project site.

Also, a copy of the signed permit must be kept at the project site until the work is completed.

LA – Barataria Basin Landbridge (BA-27c) CU#7&8 3-3

7. Items of work and construction details

Items of work to be performed, in conformance with this specification and the construction details are:

a. Subsidiary Item, Structure Removal

(1) This item shall consist of the removal of wooden pilings at the locations shown on sheets 8, 11, and 29 of the construction drawings or within the footprint of the dike, revetment, or flotation access and as marked in the field by the COR.

(2) In Section 2, Marking, Method 2 shall apply.

(3) In Section 3, Removal, Method 2 shall apply. All structures marked for removal shall be removed in its entirety. If, during removal, the wooden pilings break below the ground surface, the piling remnants below the ground surface shall remain in place. If, during removal, the wooden pilings break leaving a fragment of piling above the ground surface that cannot be pulled out, the piling fragment shall be cut as close to the ground surface as possible.

(4) Existing miscellaneous materials attached to the existing wooden pilings shall also be removed.

(5) Disposal of the wooden pilings and miscellaneous materials shall be offsite and shall meet all the requirements of local, state and federal regulations and laws. Written documentation of disposal at an approved disposal site shall be given to the CO.

(6) In Section 6, Measurement and Payment, no separate payment will be made for this item. Compensation for this item will be included in payment for Bid Item 4, Excavation, Flotation Access Dredging.

NRCS – February 2015 – Amendment # 3 ` 7-4

LA – Barataria Basin Landbridge (BA-27c) CU#7&8

9. Items of work and construction details

Items of work to be performed in conformance with this specification and the construction details are:

a. Bid Item 3, Construction Surveys

(1) This item shall consist of all work necessary by the Contractor to check NRCS provided surveys, perform supplemental or interim staking for the Contractor’s own use, perform pre-construction surveys, magnetometer surveys, construction layout surveys, progress payment surveys, and computations for progress payments, and any other surveys the Contractor feels are required which are not specifically indicated to be provided by the NRCS.

(2) All surveys completed by the contractor shall be taken in State Plane U.S. Survey Feet, Louisiana South Zone 1702, NAD 83 horizontal datum, and NAVD 88, GEOID99 vertical datum. The monument “BA27-SM-01R” GEOID99 with a benchmark elevation of 1.89ft NAVD 88 as shown on the plans shall be used for all surveys completed on the job site.

(3) The contractor shall provide to the COR the means and methods for establishing TBM’s for this project, the coordinates of the TBM’s established as well as the GEOID used and elevation established. Any discrepancies between NRCS and the contractor shall be resolved before using survey data utilizing the TBM’s.

(4) Water surface elevations shall not be used as an elevation check or as the primary control for any surveys.

(5) The contractor shall use the Louisiana DOTD feature code list for all surveys associated with this project.

(6) Persons considered qualified by the NRCS to perform contractor surveys shall be certified or licensed land surveyors, registered engineers, or construction personnel who are deemed qualified based on previous performance or who can demonstrate through performance that they are capable and qualified to perform any surveys required by the contractor. The contractor shall submit in writing to the CO for approval resumes, experience or qualification statements and references for the individuals to be assigned contractor survey responsibilities.

(7) Under this specification the NRCS will provide basic staking utilizing NAD 83 and NAVD 88, GEOID99 datum that includes the following:

Prior to the pre-construction survey:

o Centerline of the rock dike and revetments Construction layout survey (Within 15 days after the issuance of the second Notice to

Proceed):

o Revised centerline of the rock dike and revetments at 200 ft intervals & all PIs o Berm limits along the edge of the flotation access channel o End points of access channels including the perpendicular channels o Settlement plates o Centerline of fish dips o Centerline start and end points of pipeline gaps o Water level gauges

Permanent warning sign locations (Within 5 days of the written request of the contractor to the COR)

NRCS – February 2015 – Amendment # 3 ` 7-5

a. The above staking will be provided on a one time basis by NRCS. If such posts or marks are destroyed, the contractor will bear sole responsibility for replacement. The NRCS may replace them and deduct the expense of replacement from any amounts due or to become due to the contractor.

b. NRCS reserves the right to perform periodic quality assurance surveys on all project features. Quality assurance surveys will utilize similar equipment to that specified for the contractor.

(8) The contractor shall submit a survey plan to the CO ten (10) days after contract award. For each survey item to be completed, the plan shall address who will be conducting the surveys, when the surveys will be conducted, the equipment to be used, the methods to be employed, a plan view including imagery with the locations of the preconstruction survey transects, a plan view including imagery with the planned locations for all magnetometer surveys, the frequency of data collection, and any other information necessary to convey the details of the survey work to be completed. The survey plan shall include details of how each survey item requirement listed below will be performed. If multiple parties shall conduct surveys, the survey plan shall address how the surveys from the various parties shall be compiled into a uniform, consistent survey deliverable in accordance with Section 9a(8)f.

Two Notice to Proceeds shall be issued. The first Notice to Proceed shall include the Pre- Construction Survey and the Magnetometer Survey. The second Notice to Proceed shall include contractor staking and project construction and shall be issued within 75 days of the issuance of the first Notice to Proceed. The overall performance time shall begin upon issuance of the first Notice to Proceed.

Contractor construction surveys under this specification shall be in accordance with Method 2 with the following additional requirements:

a. Pre-Construction Survey and Magnetometer Survey

The locations of all planned pre-construction surveys shall be submitted and addressed in the contractor’s survey plan.

i. Pre-Construction Survey

After NRCS centerline stakeout, the contractor shall conduct a preconstruction survey. Profile surveys shall be conducted along the bankline, the planned centerline of the dike, and the planned centerline of the perpendicular access channels with shots taken every 50 feet. The bankline shall be coded as a breakline. The bankline profile shall exclude those reaches where the bankline is greater than 200 ft from the centerline of the dike.

The transects for the bankline and dike shall be taken approximately every 200 feet and at all PI’s, generally perpendicular to the centerline alignment so that a representative surface can be generated in MicroStation V8.11. Survey shots shall be taken every 25 feet along each transect and at each significant change in grade. The transects shall extend 100 feet inland beyond the marsh side toe of the rock structures to 100 feet beyond the access channel limits on the water side of the rock structures.

In addition, transects for the major curves/shifts in the profile alignment shall be

NRCS – February 2015 – Amendment # 3 ` 7-6 taken at the point of curvature and point of tangency along with at least two transects in the curve to adequately depict the surface around the curve.

The transects for the perpendicular access channels shall be taken every 200 feet and at each PI, generally perpendicular to the centerline alignment so that a representative surface can be generated in MicroStation V8.11. Survey shots shall be taken every 25 feet along each transect. The transects shall extend 200 feet on each side of the centerline of the perpendicular access channel.

These surveys shall be used as a pre-project condition for the access channel locations and to make modifications or adjustments to the project alignment and features as required by the CO.

Deliverables shall be in accordance with Section 9a(8)f. and supplied to the CO within 30 days after the first Notice to Proceed. NRCS will review the survey and make any necessary changes to the project features and provide the revised plans and specifications to the contractor within 45 days or less.

ii. Magnetometer Survey

The magnetometer survey shall be conducted concurrently with the pre-construction survey. At a minimum: Magnetometer lines shall be run along 1) the planned centerline of the composite rock dike/revetments, 2) the planned centerline of the access channels, 3) a line mid-way between the two centerlines and 4) the centerline and top of cut on both sides of the perpendicular access channels. Additional lines shall be surveyed perpendicular to the dike/revetment alignment at a maximum interval of 500 feet. On the marsh side, the perpendicular lines shall extend 100 ft beyond the anticipated footprint of the composite rock dike/revetments or to the existing bankline. On the water side, the perpendicular lines shall extend 100 ft beyond the anticipated spoil placement locations. Any other magnetometer survey locations that the contractor deems necessary to ensure that the work site is clear of oil and gas infrastructure or other metallic objects and debris that may present a hazard to life, property or equipment shall also be conducted.

A proton or cesium magnetometer shall be used to measure the earth’s ambient magnetic field. It shall have an accuracy of 0.1 nanotesla (gammas) and a sensitivity of 0.01 gammas. It shall be equipped with a digital altimeter accurate to 0.1 meters and a pressure sensor and have a sampling range of 0.1 to 4 hertz (Hz).

Magnetometer readings shall be correlated to a position with RTK GPS and take into account speed and position of the towfish relative to the vessel.

A Magnetometer Anomaly Plan (MAP) and the survey data shall be submitted to the CO 30 days after the first Notice to Proceed. The MAP shall describe how the magnetic anomalies found shall be addressed, through marking, avoidance, removal, etc. All magnetic anomalies shall be provided in the MAP with coordinates, signature intensity, signature width, and physical description of the anomaly, if possible. The information shall also be plotted in plan view. Known or detected pipelines (active or inactive) shall be identified with coordinates, bearing direction, top elevation, and depth of cover and clearly staked in the field. Any anomaly

NRCS – February 2015 – Amendment # 3 ` 7-7 suspected to be potentially dangerous to life or equipment shall be identified and addressed in the MAP.

Survey deliverables shall be in accordance with Section 9a(8)f. and supplied to the CO within 30 days after the first Notice to Proceed. NRCS will review the survey and the MAP and provide concurrence within 45 days or less.

Magnetometer surveys were conducted within the project area in 2003 and in 2011.

The magnetometer survey reports can be obtained for viewing purposes by contacting the Contracting Officer. All known pipelines within the project area are shown in the plans.

b. Construction Layout Surveys

Upon issuance of the second Notice to Proceed, the contractor shall perform supplemental or interim staking for the contractor’s own use and any other surveys the Contractor feels are required which are not specifically indicated to be provided by the NRCS.

c. Contractor’s Quality Control Surveys Quality control survey deliverables shall be submitted to the COR within 2 days of the survey. See Section 9a(8)f for format details of the deliverables.

d. Progress Surveys

For payment purposes, the deliverables shall be submitted to the CO concurrent with progress payment request. See Section 9a(8)f for format details of the deliverables.

i. Access Channel Surveys

Progress surveys (which shall consist of centerline profile and cross section surveys of the access channel) shall be taken. Centerline profile shots shall be taken at intervals not to exceed 50 ft.

Cross sections for parallel access channels shall be taken perpendicular to the rock dike/revetment centerline at all PI’s and at 200 ft intervals. Cross sections shall extend from the centerline of the dike to the extents of the spoil placement on the water side.

Cross sections for perpendicular access channels shall be taken perpendicular to the access channel centerline at all PI’s and at 200 ft intervals. Cross sections shall extend from 50 ft beyond the extents of the spoil placement to 50 ft beyond the opposite top of cut of the access channel.

Deliverables for the access channel survey shall be submitted to the CO concurrent with the progress payment request. Lines for the access channel shall be shown in a unique color or line style.

NRCS – February 2015 – Amendment # 3 ` 7-8

ii. Dike and Revetment Cross Sections and Centerline Profile Surveys Centerline and cross section surveys shall be taken concurrently. These surveys shall be taken after initial placement of lightweight aggregate, after initial placement of rock riprap, and after any subsequent placement of rock riprap.

Centerline profile shots shall be taken at intervals not to exceed 25 feet. Cross section surveys shall be taken perpendicular to the centerline alignment at all PI’s and at 200’ intervals and, when applicable, shall be at same locations as the cross sections for the access channel progress surveys. The cross section shall bisect the angle of the alignment at the location of the PI’s as close as is practicable. Cross sections shall extend 20 feet inland beyond the marsh side toe of the rock structures to 40 feet beyond the water side toe of the rock structures. Construction check surveys to be used for payment shall include, at a minimum, a survey shot at the toe, multiple shots along the slope, and a shot at the edge of the crown for both sides of the dike. A shot at the centerline shall also be taken.

The profile survey shall include a survey shot at the start of the fish dips, multiple shots along both slopes, a shot at both toes and a shot at the end of the fish dips. An additional cross section shall be taken at the centerline of each fish dip.

The profile survey shall also include a survey shot at the start of the pipeline gaps, multiple shots along both slopes, a shot at both toes and a shot at the end of the pipeline gaps.

Deliverables for the dike and revetment progress surveys shall be plotted over the access channel survey. Lines for each placement of rock and lightweight aggregate shall be shown in a unique color or line style to differentiate the phases of construction.

iii. Settlement Plate Surveys

The elevation of the top of the pipe on each settlement plate shall be established at the time of initial placement and at intervals not to exceed 30 days thereafter until construction completion. In addition, the top of pipe shall be surveyed following initial placement of lightweight aggregate and rock riprap and any subsequent lifts of riprap. Survey data for each settlement plate shall be submitted two days after each survey takes place.

iv. Temporary and Permanent Warning Sign and Temporary Buoy Surveys

The horizontal and vertical position of each sign support and the elevation of the top of each warning sign shall be established at the time of initial placement. The horizontal position of each buoy shall be established at the time of initial placement.

NRCS – February 2015 – Amendment # 3 ` 7-9

e. As-Built Surveys

Within 3 days of completion of all rock placement for the entire project, a final survey of all the rock structures shall be conducted. The final survey deliverables shall be submitted within 14 days of the completion of the survey. Final deliverables shall be approved by the CO before backfilling the access channel.

After receiving approval of the as-builts for the rock structures, backfilling of the access channels shall proceed. Following backfilling of the access channels, a final survey of the access channel, including spoil disposal areas, shall be conducted and incorporated into a comprehensive set of As-Built Survey drawings. The final deliverables shall be submitted prior to scheduling the final inspection.

The comprehensive As-Built Survey drawings shall include:

Pre-construction survey Progress surveys of access channels Lightweight aggregate First lift of riprap Subsequent lifts of riprap Final As-Builts of rock structure Final As-Builts of access channel including spoil disposal areas Permanent warning signs Settlement plates

All cross sections and profiles within the as-built survey drawings shall include the pre-construction survey, any progress surveys and the final as-built survey in each cross section and profile.

f. Deliverables

i. Raw Data The survey data submitted shall be in raw format and consist of electronically recorded data files, along with a hard copy of any field notes. The files shall be in *.rw5 and/or *.job and *.csv and/or *.asc file format and contain point numbers, northings, eastings, elevations, and feature codes. No duplicate point numbers shall be used for any and all surveys. The time and date the survey was taken shall also be included. Under no circumstances shall the information be edited for the purpose of eliminating incorrect soundings or snapping to the nearest transect. The contractor shall provide a separate file listing all incorrect soundings to be eliminated in the processed data.

ii. Processed Data The following data are required with all requests for payment:

Digital data sets of processed survey data with points and break lines in *.csv and/or *.asc file format containing point numbers, northings, eastings, elevations, and feature codes.

NRCS – February 2015 – Amendment # 3 ` 7-10

An electronic copy of the data sets on CD.

A hard copy and an electronic copy on CD, in both *.pdf and *.dgn format, of (11” x 17”) drawings shall be submitted to the CO and COR including:

o All surveyed features – including labels and legends o A plan view showing all survey lines and sheets showing all profile/cross sectional diagrams o Survey transects – by ID number or station number o Benchmarks (BMs) and temporary benchmarks (TBMs) used, including coordinates, reference elevations, and associated survey points that the BM’s and TBMs were used for

The drawing files shall be in *.dgn or *.dxf format compatible with MicroStation V8.11. The plan view(s) shall be overlaid onto 2013 (or later) geo-rectified Digital Orthophoto Quarter Quadrangle (DOQQ) aerial photographs. Also include a table with benchmark locations (in State Plane and Geographic coordinates), and datums and geoid on which the survey is based. The CWPPRA project name and number shall be shown on all drawings.

The survey profile/cross sections in the drawings shall be plotted at a one to one scale or with an exaggerated vertical scale as appropriate to adequately present the data. All cross sections and profiles shall include the pre-construction survey and any progress surveys in each cross section and profile. The final as-built survey shall also be included in each cross section and profile after the final as-built survey is complete.

(9) The contractor shall be responsible for executing the work to the limits, lines, locations and grades established by the NRCS. The Contractor shall also be responsible for maintaining and preserving all posts and other marks established by the NRCS.

(10) The contractor shall notify the CO in writing at least 48 hours in advance of any pending surveys to be performed by the Contractor.

(11) All survey notes shall conform to the…